Download - BOQ Substructure

Transcript
Page 1: BOQ Substructure

DESCRIPTION QTY UNIT

Bill No: 02SUBSTRUCTURE

EXCAVATION & EARTH WORKS

A SITE CLEARING128.00 m2 0.00

EXCAVATIONB 211.00 m3 0.00

C m3 Rate only

EARTH WORK SUPPORTSD 80.00 m2 0.00

0.00 DEWATERING 0.00

E 1.00 item 0.00

0.00 ANTI TERMITE TREATMENT 0.00

F 24.00 m2 0.00

0.00 FILLING & COMPACTION 0.00

G 140.00 m3 0.00

Carried to collection on page 04 0.00

A 71.00 m3 0.00

0.00 0.00

ITEM NO.

RATE(in USD)

AMOUNT (In USD)

Note: Please note that the works to the Water Well have been EXCLUDED due to lack of necessary details.

Clearing of site from rubbish and vegetable matters, stumps, roots. Demolition shall be included (if any)

Common excavation, depth not exceeding 2.00m for Raft Foundation,

Extra over breaking up rocks or any hard material as defined met with excavation of any depth.

Earth work support system to support the Excavated surface, height not exceeding 2.00m.

Keeping excavations free of all water including subterranean water within the site.

Chemical anti-termite surface treatment for Raft foundation.

Back filling to excavation for Raft foundations using naterials arising from excavations making level for the Ground floor slabs.

EXCAVATION & EARTH WORKS Cont'dDisposal of surplus materials arising from excavations.

Page 2: BOQ Substructure

CONCRETE WORKS 0.00 0.00

In-Situ Concrete 0.00 PLAIN IN-SITU CONCRETE 0.00

B 7.00 m3 0.00

0.00 REINFORCED IN-SITU CONCRETE 0.00

C 87.00 m3 0.00

0.00 Pre Cast Concrete 0.00

1.00 Nos 0.00

0.00 Form Work 0.00

D 196.00 m2 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Carried to collection on page 04 0.00

Reinforcement

Plain in-situ concrete, designed mix Grade C15 (15N/mm²) with Ordinary Portland Cement for 50mm thick blinding layer under Concrete Raft foundation.

Reinforced Concrete, designed mix Grade C25 (25N/mm²), vibrated, with Ordinary Portland Cement in Raft foundations, Foindation Beams, Columns, Lift Pit, Concrete Water Tank and the like.

700x700mm sized, 140mm thick Reinfroced Pre cast Concrete Cover slab for manhole including casted in steel handle

Plywood class 2 Formworks for sides of Concrete Raft foundations, Columns, Foindation beams, Water tank, Lift Pit and the like.

CONCRETE WORKS Cont'd

Page 3: BOQ Substructure

A 13,231.00 Kg 0.00

0.00 0.00

TANKING & DAMP PROOFING 0.00 B 152.00 m2 0.00

0.00 C 18.00 m2 0.00

0.00 D 8.00 m 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Carried to collection on page 04 0.00

A Total from page 01 0.00

Reinforcement bars of high yield steel grade 460 N / mm2 & mild steel grade 250 N / mm2 in Raft Foundation, Foundation beams, Columns, Lift Pit, Water Tank, including Staircase Starter bars, bends, tying wire, bends, hooks and spacers and the like.

Polythene damp proof membrane (500 gauge) laid on blinding layer for the soffit and edges of raft foindations.

Bituminous tanking membrane hot laid for the sides and sofft of Water Tank including all necessary accessories.

Water bars of approved quality applied for the lift Pit walls as per the requirement.

Page 4: BOQ Substructure

B Total from page 02 0.00

C Total from page 03 0.00

TOTAL OF BILL NO. 02 - SUBSTRUCTURE 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)

Bill No: 03

Page 5: BOQ Substructure

SUPERSTRUCTURE

CONCRETE WORKS

REINFORCED CONCRETEIn-Situ Concrete

A Ground Level 23.00 m3 0.00

B First Level 28.00 m3 0.00 0.00 C Second Level 29.00 m3 0.00 0.00 D Third Level 29.00 m3 0.00 0.00 E Fourth Level 29.00 m3 0.00 0.00 F Fifth Level 29.00 m3 0.00 0.00 G Sixth Level 29.00 m3 0.00 0.00 H Seventh Level 28.00 m3 0.00 0.00 J Eighth Level 28.00 m3 0.00 0.00 K Ninth Level 28.00 m3 0.00 0.00 L Tenth (Terrace) Level & Roof 37.00 m3 0.00 0.00 0.00

Pre Cast Concrete 0.00 M 1.00 Nos 0.00

0.00 Form Work 0.00

0.00

0.00 N Ground Level 108.00 m2 0.00 0.00 P First Level 285.00 m2 0.00 0.00 Q Second Level 298.00 m2 0.00 0.00 R Third Level 298.00 m2 0.00 0.00 S Fourth Level 298.00 m2 0.00 0.00 0.00 0.00

Carried to collection on page 04 0.00

Reinforced Concrete, designed mix Grade C25 (25N/mm²), vibrated, with Ordinary Portland Cement for Beams, Columns, Floor Slabs, Roof Slabs, Lift Core walls, Stair Cases, Lintols, Planters and the like in;

1400mm dia, 140mm thick Reinfroced Pre cast Concrete Cover slab for Water Well including casted in steel handle

Plywood class 2 Formworks for sides and soffits of Beams, Columns, Floor Slabs, Roof Slabs, Lift Core walls, Stair Cases, Lintols, Planters and the like in;

Page 6: BOQ Substructure

0.00 A Fifth Level 298.00 m2 0.00

0.00 B Sixth Level 298.00 m2 0.00 0.00 C Seventh Level 287.00 m2 0.00 0.00 D Eighth Level 287.00 m2 0.00 0.00 E Ninth Level 287.00 m2 0.00 0.00 F Tenth (Terrace) Level & Roof 376.00 m2 0.00 0.00

Reinforcement 0.00 0.00

0.00 G Ground Level 4,692.00 Kg 0.00 0.00 H First Level 3,732.00 Kg 0.00 0.00 J Second Level 3,735.00 Kg 0.00 0.00 K Third Level 3,735.00 Kg 0.00 0.00 L Fourth Level 3,735.00 Kg 0.00 0.00 M Fifth Level 3,694.00 Kg 0.00 0.00 N Sixth Level 3,754.00 Kg 0.00 0.00 P Seventh Level 3,659.00 Kg 0.00 0.00 Q Eighth Level 3,659.00 Kg 0.00 0.00 R Ninth Level 3,471.00 Kg 0.00 0.00 S Tenth (Terrace) Level & Roof 3,692.00 Kg 0.00 0.00 0.00

TANKING & DAMP PROOFING 0.00 0.00

T 36.00 m2 0.00

0.00 0.00 0.00 0.00 0.00

Carried to collection on page 04 0.00

CONCRETE WORKS Cont'dForm Work Cont'd

Reinforcement bars of high yield steel grade 460 N / mm2 & mild steel grade 250 N / mm2 in Beams, Columns, Floor Slabs, Roof Slabs, Lift Core walls, Stair Cases, Lintols, Planters including, bends, tying wire, bends, hooks and spacers and the like in,

Bituminous Damp Proofing membrane to the sides and surface of Concrete Roof Slabs including 50mm thick Protective Mortar Screed as per the requirement.

Page 7: BOQ Substructure

0.00 A 833.00 m2 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TANKING & DAMP PROOFING Cont'd

Bituminous Damp Proofing to the surface of Balconys, Toilets and Terrace areas including dressing arround and sealing to all penetrations as per the requirement.

Page 8: BOQ Substructure

Carried to collection on page 08 0.00

A Total from page 05 0.00

B Total from page 06 0.00

C Total from page 07 0.00

Page 9: BOQ Substructure

TOTAL OF BILL NO. 03 - SUPERSTRUCTURE 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)

Bill No: 04MASONRY

Solid Block Work0.00

0.00 A Ground Level 104.00 m2 0.00 0.00 B First Level 115.00 m2 0.00 0.00 C Second Level 120.00 m2 0.00 0.00 D Third Level 120.00 m2 0.00 0.00 E Fourth Level 120.00 m2 0.00 0.00 F Fifth Level 120.00 m2 0.00 0.00 G Sixth Level 120.00 m2 0.00 0.00 H Seventh Level 115.00 m2 0.00 0.00 J Eighth Level 115.00 m2 0.00 0.00 K Ninth Level 115.00 m2 0.00 0.00 L Tenth (Terrace) Level & Roof 161.00 m2 0.00 0.00 0.00

0.00 M Ground Level 18.00 m2 0.00 0.00 N First Level 15.00 m2 0.00 0.00 P Second Level 15.00 m2 0.00 0.00 Q Third Level 15.00 m2 0.00 0.00 R Fourth Level 15.00 m2 0.00 0.00 S Fifth Level 15.00 m2 0.00 0.00 T Sixth Level 15.00 m2 0.00 0.00 U Seventh Level 18.00 m2 0.00 0.00 V Eighth Level 18.00 m2 0.00 0.00 W Ninth Level 18.00 m2 0.00 0.00 X Tenth (Terrace) Level & Roof 24.00 m2 0.00 0.00 0.00 0.00

0.00

100mm thick solid concrete block walls in 1:3 C/S mortar to receive 12 thk mm double coat external and 15 mm thk internal plaster in;

50mm thick dry wall partitioning for independent duct walls in;

Page 10: BOQ Substructure

Carried to collection on page 11 0.00

Hollow Block Work0.00

0.00 A Ground Level 95.00 m2 0.00 0.00 B First Level 88.00 m2 0.00 0.00 C Second Level 88.00 m2 0.00 0.00 D Third Level 88.00 m2 0.00 0.00 E Fourth Level 88.00 m2 0.00 0.00 F Fifth Level 88.00 m2 0.00 0.00 G Sixth Level 88.00 m2 0.00 0.00 H Seventh Level 79.00 m2 0.00 0.00 J Eighth Level 79.00 m2 0.00 0.00 K Ninth Level 79.00 m2 0.00 0.00 L Tenth (Terrace) Level & Roof 185.00 m2 0.00 0.00 0.00 0.00 0.00

100mm thick Hollow concrete block walls in 1:3 C/S mortar to receive 15 mm thk plaster for both sides in;

Page 11: BOQ Substructure

Carried to collection on page 11 0.00

A Total from page 09 0.00

B Total from page 10 0.00

Page 12: BOQ Substructure

TOTAL OF BILL NO. 04 - MASONRY 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)

Bill No: 05FINISHES

0.00

0.00 FINISHES TO WALLS 0.00 Plastering 0.00

0.00

0.00 A Ground Level 138.00 m2 0.00 0.00 B First Level 168.00 m2 0.00 0.00 C Second Level 173.00 m2 0.00 0.00 D Third Level 173.00 m2 0.00 0.00 E Fourth Level 173.00 m2 0.00 0.00 F Fifth Level 173.00 m2 0.00 0.00 G Sixth Level 173.00 m2 0.00 0.00 H Seventh Level 168.00 m2 0.00 0.00 J Eighth Level 168.00 m2 0.00 0.00 K Ninth Level 168.00 m2 0.00 0.00 L Tenth (Terrace) Level & Roof 312.00 m2 0.00 0.00 0.00

0.00 M Ground Level 386.00 m2 0.00 0.00 N First Level 369.00 m2 0.00 0.00 P Second Level 374.00 m2 0.00 0.00 Q Third Level 374.00 m2 0.00 0.00 R Fourth Level 374.00 m2 0.00 0.00 S Fifth Level 374.00 m2 0.00 0.00 T Sixth Level 374.00 m2 0.00 0.00 U Seventh Level 356.00 m2 0.00 0.00 V Eighth Level 356.00 m2 0.00 0.00 W Ninth Level 356.00 m2 0.00 0.00

Note: The cost of Bedding (Screed) has NOT been included in TILING WORK of any kind.

12mm thick double coat cement and sand (1:3) External plastering to 100mm solid block walls in,

15mm thick cement and sand (1:3) Internal plastering to 100mm & 50mm solid block walls in,

Page 13: BOQ Substructure

X Tenth (Terrace) Level & Roof 564.00 m2 0.00 0.00 0.00

Carried to collection on page 21 0.00

Painting0.00

0.00 A Ground Level 524.00 m2 0.00 0.00 B First Level 537.00 m2 0.00 0.00 C Second Level 547.00 m2 0.00 0.00 D Third Level 547.00 m2 0.00 0.00 E Fourth Level 547.00 m2 0.00 0.00 F Fifth Level 547.00 m2 0.00 0.00 G Sixth Level 547.00 m2 0.00 0.00 H Seventh Level 524.00 m2 0.00 0.00 J Eighth Level 524.00 m2 0.00 0.00 K Ninth Level 524.00 m2 0.00 0.00 L Tenth (Terrace) Level & Roof 876.00 m2 0.00 0.00

Wall Tiling 0.00 0.00

0.00 M Ground Level 55.00 m2 0.00 0.00 N First Level 75.00 m2 0.00 0.00 P Second Level 75.00 m2 0.00 0.00 Q Third Level 75.00 m2 0.00 0.00 R Fourth Level 75.00 m2 0.00 0.00 S Fifth Level 75.00 m2 0.00 0.00 T Sixth Level 75.00 m2 0.00 0.00 U Seventh Level 62.00 m2 0.00 0.00 V Eighth Level 62.00 m2 0.00 0.00 W Ninth Level 62.00 m2 0.00 0.00 X Tenth (Terrace) Level & Roof 60.00 m2 0.00 0.00 0.00 0.00

FINISHES TO WALLS Cont'd

Prepare and apply one sealer coat and two full coats of PVA emulsion paint on external and internal surfaces of concrete block walls in

200 x 250mm Ceramic wall tiles on 15mm thick Cement/ Sand (1:3) bedding in Toilet walls up to ceiling height.

Page 14: BOQ Substructure

0.00 0.00 0.00

Carried to collection on page 21 0.00

0.00

0.00 A Ground Level 5.00 m2 0.00

0.00 B First Level 5.00 m2 0.00 0.00 C Second Level 5.00 m2 0.00 0.00 D Third Level 5.00 m2 0.00 0.00 E Fourth Level 5.00 m2 0.00 0.00 F Fifth Level 5.00 m2 0.00 0.00 G Sixth Level 5.00 m2 0.00 0.00 H Seventh Level 5.00 m2 0.00 0.00 J Eighth Level 5.00 m2 0.00 0.00 K Ninth Level 5.00 m2 0.00 0.00 L Tenth (Terrace) Level & Roof 5.00 m2 0.00 0.00 0.00

FINISHES TO FLOORS 0.00 Screed 0.00

0.00

0.00 M Ground Level 11.00 m2 0.00 0.00 N First Level 20.00 m2 0.00 0.00 P Second Level 23.00 m2 0.00 0.00 Q Third Level 23.00 m2 0.00 0.00 R Fourth Level 23.00 m2 0.00 0.00 S Fifth Level 23.00 m2 0.00 0.00 T Sixth Level 23.00 m2 0.00 0.00 U Seventh Level 23.00 m2 0.00 0.00 V Eighth Level 23.00 m2 0.00 0.00 W Ninth Level 23.00 m2 0.00 0.00 X Tenth (Terrace) Level & Roof 34.00 m2 0.00

FINISHES TO WALLS Cont'dWall Tiling Cont'd

300 x 600mm Polished Ceramic wall tiles on 15mm thick Cement/ Sand (1:3) bedding in Kitchens.

40mm thick Cement/ Sand (1:3) Screed to receive the Tiling in Toilet & Balcony areas in;

Page 15: BOQ Substructure

0.00 0.00

Carried to collection on page 21 0.00

0.00

0.00 A Ground Level 104.00 m2 0.00 0.00 B First Level 98.00 m2 0.00 0.00 C Second Level 100.00 m2 0.00 0.00 D Third Level 100.00 m2 0.00 0.00 E Fourth Level 100.00 m2 0.00 0.00 F Fifth Level 100.00 m2 0.00 0.00 G Sixth Level 100.00 m2 0.00 0.00 H Seventh Level 103.00 m2 0.00 0.00 J Eighth Level 103.00 m2 0.00 0.00 K Ninth Level 103.00 m2 0.00 0.00 L Tenth (Terrace) Level & Roof 97.00 m2 0.00 0.00

Floor Tiling 0.00 0.00

0.00 M 17.00 m2 0.00

0.00 N 5.00 m2 0.00

0.00 0.00

0.00 P Ground Level 3.00 m2 0.00 0.00 Q First Level 8.00 m2 0.00 0.00 R Second Level 8.00 m2 0.00 0.00 S Third Level 8.00 m2 0.00 0.00

FINISHES TO FLOORS Cont'dScreed Cont'd

60mm thick Cement/ Sand (1:3) Screed to receive the Tiling in areas other than Toilet & Balcony areas in;

Non-Skid Ceramic floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout in

Garage area in Ground Floor ( 200 x 450mm sized)

Pump room & Garbage collecting room in Ground floor (300 x 300mm sized)

300 x 300mm Non-Skid Ceramic floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Balcony and Terrace areas in;

Page 16: BOQ Substructure

T Fourth Level 8.00 m2 0.00 0.00 0.00 0.00

Carried to collection on page 21 0.00

0.00 0.00 A Fifth Level 8.00 m2 0.00 0.00 B Sixth Level 8.00 m2 0.00 0.00 C Seventh Level 12.00 m2 0.00 0.00 D Eighth Level 12.00 m2 0.00 0.00 E Ninth Level 12.00 m2 0.00 0.00 F Tenth (Terrace) Level & Roof 25.00 m2 0.00 0.00 0.00

0.00 G Ground Level 8.00 m2 0.00 0.00 H First Level 12.00 m2 0.00 0.00 C Second Level 15.00 m2 0.00 0.00 D Third Level 15.00 m2 0.00 0.00 E Fourth Level 15.00 m2 0.00 0.00 F Fifth Level 15.00 m2 0.00 0.00 G Sixth Level 15.00 m2 0.00 0.00 H Seventh Level 11.00 m2 0.00 0.00 J Eighth Level 11.00 m2 0.00 0.00 K Ninth Level 11.00 m2 0.00 0.00 L Tenth (Terrace) Level & Roof 9.00 m2 0.00 0.00 0.00

0.00 M Ground Level 45.00 m2 0.00 0.00 N First Level 45.00 m2 0.00

FINISHES TO FLOORS Cont'dFloor Tiling Cont'd

200 x 200mm sized Non-Skid Ceramic floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Toilet areas in

600 x 600mm sized polished Porcilain floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Areas other than Toilets, Balconys, Terraces, Bed rooms, Garage, Garbage collecting room and Pump room in;

Page 17: BOQ Substructure

0.00 0.00 0.00 0.00 0.00

Carried to collection on page 21 0.00

0.00 A Second Level 47.00 m2 0.00

0.00 B Third Level 47.00 m2 0.00 0.00 C Fourth Level 47.00 m2 0.00 0.00 D Fifth Level 47.00 m2 0.00 0.00 E Sixth Level 47.00 m2 0.00 0.00 F Seventh Level 56.00 m2 0.00 0.00 G Eighth Level 56.00 m2 0.00 0.00 H Ninth Level 56.00 m2 0.00 0.00 J Tenth (Terrace) Level & Roof 56.00 m2 0.00 0.00 0.00

0.00 K Ground Level 7.00 m2 0.00 0.00 L First Level 7.00 m2 0.00 0.00 M Second Level 7.00 m2 0.00 0.00 N Third Level 7.00 m2 0.00 0.00 P Fourth Level 7.00 m2 0.00 0.00 Q Fifth Level 7.00 m2 0.00 0.00 R Sixth Level 7.00 m2 0.00 0.00 S Seventh Level 7.00 m2 0.00 0.00 T Eighth Level 7.00 m2 0.00 0.00 U Ninth Level 7.00 m2 0.00 0.00 0.00

0.00 V Ground Level 1.00 m2 0.00 0.00

FINISHES TO FLOORS Cont'dFloor Tiling Cont'd

250 x 250mm sized Non-Skid Ceramic floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Stair cases in;

50 x 250mm sized "Nosing" Ceramic tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Stair cases in;

Page 18: BOQ Substructure

W First Level 1.00 m2 0.00 0.00 X Second Level 1.00 m2 0.00 0.00 Y Third Level 1.00 m2 0.00 0.00 0.00 0.00

Carried to collection on page 21 0.00

0.00 A Fourth Level 1.00 m2 0.00

0.00 B Fifth Level 1.00 m2 0.00 0.00 C Sixth Level 1.00 m2 0.00 0.00 D Seventh Level 1.00 m2 0.00 0.00 E Eighth Level 1.00 m2 0.00 0.00 F Ninth Level 1.00 m2 0.00 0.00 0.00

Skirtings 0.00 25.00 m 0.00

0.00 0.00

0.00 G Ground Level 9.00 m 0.00 0.00 H First Level 29.00 m 0.00 0.00 I Second Level 29.00 m 0.00 0.00 J Third Level 29.00 m 0.00 0.00 K Fourth Level 29.00 m 0.00 0.00 L Fifth Level 29.00 m 0.00 0.00 M Sixth Level 29.00 m 0.00 0.00 N Seventh Level 37.00 m 0.00 0.00 O Eighth Level 37.00 m 0.00 0.00 P Ninth Level 37.00 m 0.00 0.00 Q Tenth (Terrace) Level & Roof 50.00 m 0.00 0.00 0.00

0.00

FINISHES TO FLOORS Cont'dFloor Tiling Cont'd

100mm High Skirting to Garage, Pump room and Garbage collecting Room in Non-skid Ceramic Tiles;

100mm High Skirting for Terrace & Balcony areas in Non-skid Ceramic Tiles in;

100mm High Skirting with 600 x 600mm sized polished Porcilain floor tile for Areas other than Toilets, Balconys, Terraces, Bed rooms, Garage, Garbage collecting room and Pump room in;

Page 19: BOQ Substructure

R Ground Level 88.00 m 0.00 0.00 S First Level 62.00 m 0.00 0.00 T Second Level 68.00 m 0.00 0.00 0.00

Carried to collection on page 21 0.00

0.00 A Third Level 68.00 m 0.00

0.00 B Fourth Level 68.00 m 0.00 0.00 C Fifth Level 68.00 m 0.00 0.00 D Sixth Level 68.00 m 0.00 0.00 E Seventh Level 73.00 m 0.00 0.00 F Eighth Level 73.00 m 0.00 0.00 G Ninth Level 73.00 m 0.00 0.00 H Tenth (Terrace) Level & Roof 83.00 m 0.00 0.00 0.00

0.00 J Ground Level 10.00 m 0.00 0.00 K First Level 10.00 m 0.00 0.00 L Second Level 10.00 m 0.00 0.00 M Third Level 10.00 m 0.00 0.00 N Fourth Level 10.00 m 0.00 0.00 O Fifth Level 10.00 m 0.00 0.00 P Sixth Level 10.00 m 0.00 0.00 Q Seventh Level 10.00 m 0.00 0.00 R Eighth Level 10.00 m 0.00 0.00 S Ninth Level 10.00 m 0.00 0.00 0.00

FINISHES TO CEILING 0.00 Plastering with Putty finish 0.00

0.00

0.00 T Ground Level 101.00 m2 0.00 0.00

FINISHES TO FLOORS Cont'dSkirting Cont'd

100mm High Skirting with 250x250mm sized Ceramic tiles for Stair cases in;

12 mm thick Cement/ Sand (1:3) Puttyed Plastering to Soffit of Slabs including under sides of Stair cases finished with one sealer coat and two full coats of PVA emulsion paint in;

Page 20: BOQ Substructure

U First Level 95.00 m2 0.00 0.00 V Second Level 97.00 m2 0.00 0.00 W Third Level 97.00 m2 0.00 0.00 X Fourth Level 97.00 m2 0.00 0.00 Y Fifth Level 97.00 m2 0.00 0.00 Z Sixth Level 97.00 m2 0.00 0.00

Carried to collection on page 21 0.00

0.00 A Seventh Level 100.00 m2 0.00

0.00 B Eighth Level 100.00 m2 0.00 0.00 C Ninth Level 100.00 m2 0.00 0.00 D Tenth (Terrace) Level & Roof 12.00 m2 0.00 0.00

Gypsum Board Ceiling 0.00 0.00

0.00 E Ground Level 8.00 m2 0.00 0.00 F First Level 12.00 m2 0.00 0.00 G Second Level 15.00 m2 0.00 0.00 H Third Level 15.00 m2 0.00 0.00 J Fourth Level 15.00 m2 0.00 0.00 K Fifth Level 15.00 m2 0.00 0.00 L Sixth Level 15.00 m2 0.00 0.00 M Seventh Level 11.00 m2 0.00 0.00 N Eighth Level 11.00 m2 0.00 0.00 P Ninth Level 11.00 m2 0.00 0.00 Q Tenth (Terrace) Level 97.00 m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

FINISHES TO CEILING Cont'dPlastering with Putty finish Cont'd

Concealed ceiling finished with one sealer coat and two full coats of PVA emulsion paint for Toilet areas with 600 X 600mm metal frame grid and 9 mm gypsum board, beading, nails and screws etc in;

Page 21: BOQ Substructure

Carried to collection on page 21 0.00

A Total from page 12 0.00

B Total from page 13 0.00

C Total from page 14 0.00

D Total from page 15 0.00

E Total from page 16 0.00

F Total from page 17 0.00

G Total from page 18 0.00

H Total from page 19 0.00

J Total from page 20 0.00

Page 22: BOQ Substructure

TOTAL OF BILL NO. 05 - FINISHES 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)

Bill No: 06ROOF WORKS

Roof Structure 0.00 A 101.00 m2 0.00

0.00 Roof Covering 0.00

B 101.00 m2 0.00

0.00 C 7.00 m 0.00

0.00 Insulation 0.00

D 101.00 m2 0.00

0.00 Facia Boards 0.00

E 50.00 m 0.00

0.00 Roof Plumbing 0.00

0.00

0.00

Timber roof structure in "Balau" timber inclusive of fabrication and erection together with all fixing accessories as per the drawings to comprise Ridge boards, Rafters, Wall plates, Bracings etc.

Supplying and fixing of LYSAGHT roofing sheets fixed onto Timber Roof Structure together with all fixing accessories.

Supplying and fixing of LYSAGHT Roofing Flasing along the Ridge board as per the drawings.

Supplying and fixing of 50mm Glass wool insution with one sided Aluminium foil fixed on timber structure together with all fixing accessories.

25 x 225mm sized timber facia boards fixed to Timber Roof structure including Painting with Two full coats of Enamul paint as per the drawings.

Supplying, fabrication and erection of Rain water Disposal System together with all Fittings & fixing accessories as per the drawings to comprise,

Page 23: BOQ Substructure

F Half round Zincalum Rain Water Gutters 17.00 m 0.00 0.00 G Zincalum Rain Water down pipes 170.00 m 0.00 0.00

H LYSAGHT Flashing at Gable ends 32.00 m 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OF BILL NO. 06 - ROOF WORKS 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)

Bill No: 07TIMBER WORKS

Timber Flooring0.00

0.00 A Ground Level 25.00 m2 0.00 0.00 B First Level 36.00 m2 0.00 0.00 C Second Level 36.00 m2 0.00 0.00 D Third Level 36.00 m2 0.00 0.00 E Fourth Level 36.00 m2 0.00 0.00 F Fifth Level 36.00 m2 0.00 0.00 G Sixth Level 36.00 m2 0.00 0.00 H Seventh Level 26.00 m2 0.00 0.00 J Eighth Level 26.00 m2 0.00 0.00 K Ninth Level 26.00 m2 0.00 0.00 L Tenth (Terrace) Level 16.00 m2 0.00 0.00

Timber Skirting 0.00 0.00

0.00 M Ground Level 30.00 m 0.00 0.00 N First Level 41.00 m 0.00 0.00 P Second Level 41.00 m 0.00 0.00 Q Third Level 41.00 m 0.00 0.00 R Fourth Level 41.00 m 0.00 0.00 S Fifth Level 41.00 m 0.00 0.00

Treated Laminated Timber Flooring fixed on Cement/ Sand (1:3) screed for Bed Room areas in;

100mm High, Treated Laminated Hardwood Skirting fixed to Concrete Block walls for Bed Room areas in;

Page 24: BOQ Substructure

T Sixth Level 41.00 m 0.00 0.00 U Seventh Level 27.00 m 0.00 0.00 A Eighth Level 27.00 m 0.00 0.00 B Ninth Level 27.00 m 0.00 0.00 C 15.00 m 0.00 0.00 0.00 0.00 0.00 0.00

Carried to collection on page 25 0.00

Timber Wall Cladding0.00

0.00 A Ground Level 3.00 m2 0.00 0.00 B First Level 5.00 m2 0.00 0.00 C Second Level 5.00 m2 0.00 0.00 D Third Level 5.00 m2 0.00 0.00 E Fourth Level 5.00 m2 0.00 0.00 F Fifth Level 5.00 m2 0.00 0.00 G Sixth Level 5.00 m2 0.00 0.00 H Seventh Level 12.00 m2 0.00 0.00 J Eighth Level 12.00 m2 0.00 0.00 K Ninth Level 12.00 m2 0.00 0.00 L Tenth (Terrace) Level 14.00 m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tenth (Terrace) Level (Total Ceiling)

Supplying & Fixing of Timber T&G Wall Panel Strip System for external walls as per the drawings in;

Page 25: BOQ Substructure

Carried to collection on page 25 0.00

A Total from page 23 0.00

B Total from page 24 0.00

Page 26: BOQ Substructure

TOTAL OF BILL NO. 07 - TIMBER WORKS 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)

Bill No: 08METAL WORKS & OTHER FIXTURES

0.00

0.00 A First Level 5.00 m 0.00 0.00 B Second Level 5.00 m 0.00 0.00 C Third Level 5.00 m 0.00 0.00 D Fourth Level 5.00 m 0.00 0.00 E Fifth Level 5.00 m 0.00 0.00 F Sixth Level 5.00 m 0.00 0.00 G Seventh Level 8.00 m 0.00 0.00 H Eighth Level 8.00 m 0.00 0.00 J Ninth Level 8.00 m 0.00 0.00 K Tenth (Terrace) Level 10.00 m 0.00 0.00 0.00

0.00 L Ground Level 0.00 0.00 M First Level 4.00 m 0.00 0.00 N Second Level 4.00 m 0.00 0.00 P Third Level 4.00 m 0.00 0.00 Q Fourth Level 4.00 m 0.00

Supplying & Fixing of 12 mm thick Clear Tempered Glass and Stainless steel handrail system for Balconys & Terrace areas as per the drawings in;

Supplying & Fixing of Stainless Steel Handrail comprising 50mm dia Top chord, 25mm dia vertical posts, 25mm dia Intermediate rails for Stair cases as per the drawings in;

Page 27: BOQ Substructure

0.00 R Fifth Level 4.00 m 0.00 0.00 S Sixth Level 4.00 m 0.00 0.00 A Seventh Level 4.00 m 0.00 0.00 B Eighth Level 4.00 m 0.00 0.00 C Ninth Level 4.00 m 0.00 0.00 0.00 0.00

Carried to collection on page 28 0.00

METAL WORKS & OTHER FIXTURESCont'd

0.00

0.00 D First Level 1.00 Nos 0.00 0.00 E Second Level 1.00 Nos 0.00 0.00 F Third Level 1.00 Nos 0.00 0.00 G Fourth Level 1.00 Nos 0.00 0.00 H Fifth Level 1.00 Nos 0.00 0.00 J Sixth Level 1.00 Nos 0.00 0.00 K Seventh Level 1.00 Nos 0.00 0.00 L Eighth Level 1.00 Nos 0.00 0.00 M Ninth Level 1.00 Nos 0.00 0.00 0.00 0.00 0.00 0.00

Supplying & Fixing of 50mm dia, 900mm length Stainless Steel Horizontal Hollow Rods as per the drawings in;

Page 28: BOQ Substructure

Carried to collection on page 28 0.00

A Total from page 26 0.00

B Total from page 27 0.00

Page 29: BOQ Substructure

TOTAL OF BILL NO. 08 - METAL WORKS & OTHER FIXTURES 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)

Bill No: 09DOORS & WINDOWS

0.00 Ground Floor 0.00

A W1 2.00 Nos 0.00 B W1A 1.00 Nos 0.00 C W2 1.00 Nos 0.00 D W4 1.00 Nos 0.00 E W5 2.00 Nos 0.00 F W6 1.00 Nos 0.00 G V1 3.00 Nos 0.00 H RS 1.00 Nos 0.00 J D1 2.00 Nos 0.00 K GD 1.00 Nos 0.00 L FW 1.00 Nos 0.00 M D3 3.00 Nos 0.00 N TD 3.00 Nos 0.00 O PD 1.00 Nos 0.00 P SD2 1.00 Nos 0.00 Q SD4 1.00 Nos 0.00 R SD ( Kitchen ) 1.00 Nos 0.00

0.00 First Floor 0.00

S W1 2.00 Nos 0.00 T W1A 1.00 Nos 0.00 U W2 2.00 Nos 0.00

Supplying and fixing of Doors &Windows as per the drawings & schedule including all necessary ironmongery and other fixing accessories in,

Page 30: BOQ Substructure

V W3 1.00 Nos 0.00 W W4 2.00 Nos 0.00 X W5 2.00 Nos 0.00 Y W6 1.00 Nos 0.00 Z W8 1.00 Nos 0.00

AA V1 4.00 Nos 0.00 AB SD1 1.00 Nos 0.00 AC FW 1.00 Nos 0.00 AD D2 1.00 Nos 0.00 AE D3 4.00 Nos 0.00 AF TD 4.00 Nos 0.00 AG SD1 1.00 Nos 0.00 AH SD ( Kitchen ) 1.00 Nos 0.00

0.00 0.00 0.00 0.00

Carried to collection on page 34 0.00

Second Floor 0.00 A W1 2.00 Nos 0.00 B W1A 1.00 Nos 0.00 C W2 2.00 Nos 0.00 D W3 1.00 Nos 0.00 E W4 3.00 Nos 0.00 F W5 2.00 Nos 0.00 G W6 1.00 Nos 0.00 H V1 4.00 Nos 0.00 J SD1 1.00 Nos 0.00 K FW 1.00 Nos 0.00 L D2 1.00 Nos 0.00 M D3 4.00 Nos 0.00 N TD 4.00 Nos 0.00 O SD1 1.00 Nos 0.00 P SD ( Kitchen ) 1.00 Nos 0.00

0.00 Third Floor 0.00

Q W1 2.00 Nos 0.00 R W1A 1.00 Nos 0.00 S W2 2.00 Nos 0.00 T W3 1.00 Nos 0.00 U W4 3.00 Nos 0.00 V W5 2.00 Nos 0.00 W W6 1.00 Nos 0.00 X V1 4.00 Nos 0.00 Y SD1 1.00 Nos 0.00 Z FW 1.00 Nos 0.00

AA D2 1.00 Nos 0.00 AB D3 4.00 Nos 0.00

Page 31: BOQ Substructure

AC TD 4.00 Nos 0.00 AD SD1 1.00 Nos 0.00 AE SD ( Kitchen ) 1.00 Nos 0.00

0.00 Fourth Floor 0.00

AF W1 2.00 Nos 0.00 AG W1A 1.00 Nos 0.00 AH W2 2.00 Nos 0.00 AJ W3 1.00 Nos 0.00 AK W4 3.00 Nos 0.00 AL W5 2.00 Nos 0.00 AM W6 1.00 Nos 0.00 AN V1 4.00 Nos 0.00 AP SD1 1.00 Nos 0.00 AQ FW 1.00 Nos 0.00 AR D2 1.00 Nos 0.00

0.00 0.00

Carried to collection on page 34 0.00

A D3 4.00 Nos 0.00 B TD 4.00 Nos 0.00 C SD1 1.00 Nos 0.00 D SD ( Kitchen ) 1.00 Nos 0.00

0.00 Fifth Floor 0.00

E W1 2.00 Nos 0.00 F W1A 1.00 Nos 0.00 G W2 2.00 Nos 0.00 H W3 1.00 Nos 0.00 J W4 3.00 Nos 0.00 K W5 2.00 Nos 0.00 L W6 1.00 Nos 0.00 M V1 4.00 Nos 0.00 N SD1 1.00 Nos 0.00 P FW 1.00 Nos 0.00 Q D2 1.00 Nos 0.00 R D3 4.00 Nos 0.00 S TD 4.00 Nos 0.00 T SD1 1.00 Nos 0.00 U SD ( Kitchen ) 1.00 Nos 0.00

0.00 Sixth Floor 0.00

V W1 2.00 Nos 0.00 W W1A 1.00 Nos 0.00 X W2 2.00 Nos 0.00 Y W3 1.00 Nos 0.00

DOORS & WINDOWS Cont'dFourth Floor Cont'd

Page 32: BOQ Substructure

Z W4 3.00 Nos 0.00 AA W5 2.00 Nos 0.00 AB W6 1.00 Nos 0.00 AC V1 4.00 Nos 0.00 AD SD1 1.00 Nos 0.00 AE FW 1.00 Nos 0.00 AF D2 1.00 Nos 0.00 AG D3 4.00 Nos 0.00 AH TD 4.00 Nos 0.00 AJ SD1 1.00 Nos 0.00 AK SD ( Kitchen ) 1.00 Nos 0.00

0.00 Seventh Floor 0.00

AL W1 2.00 Nos 0.00 AM W1A 1.00 Nos 0.00 AN W2 1.00 Nos 0.00 AP W3 1.00 Nos 0.00

0.00

Carried to collection on page 34 0.00

0.00 A W4 2.00 Nos 0.00 B W5 3.00 Nos 0.00 C W6 1.00 Nos 0.00 D W7 1.00 Nos 0.00 E V1 3.00 Nos 0.00 F SD3 1.00 Nos 0.00 G FW 1.00 Nos 0.00 H D2 1.00 Nos 0.00 J D3 3.00 Nos 0.00 K TD 3.00 Nos 0.00 L SD1 1.00 Nos 0.00 M SD ( Kitchen ) 1.00 Nos 0.00

0.00 Eighth Floor 0.00

N W1 2.00 Nos 0.00 O W1A 1.00 Nos 0.00 P W2 1.00 Nos 0.00 Q W3 1.00 Nos 0.00 R W4 2.00 Nos 0.00 S W5 3.00 Nos 0.00 T W6 1.00 Nos 0.00 U W7 1.00 Nos 0.00 V V1 3.00 Nos 0.00 W SD3 1.00 Nos 0.00 X FW 1.00 Nos 0.00

DOORS & WINDOWS Cont'dSeventh Floor Cont'd

Page 33: BOQ Substructure

Y D2 1.00 Nos 0.00 Z D3 3.00 Nos 0.00

AA TD 3.00 Nos 0.00 AB SD1 1.00 Nos 0.00 AC SD ( Kitchen ) 1.00 Nos 0.00

0.00 Ninth Floor 0.00

AD W1 2.00 Nos 0.00 AE W1A 1.00 Nos 0.00 AF W2 1.00 Nos 0.00 AG W3 1.00 Nos 0.00 AH W4 2.00 Nos 0.00 AJ W5 3.00 Nos 0.00 AK W6 1.00 Nos 0.00 AL W7 1.00 Nos 0.00 AM V1 3.00 Nos 0.00 AN SD3 1.00 Nos 0.00

0.00 0.00 0.00

Carried to collection on page 34 0.00

0.00 A FW 1.00 Nos 0.00 B D2 1.00 Nos 0.00 C D3 3.00 Nos 0.00 D TD 3.00 Nos 0.00 E SD1 1.00 Nos 0.00 F SD ( Kitchen ) 1.00 Nos 0.00

0.00 0.00

Tenth Floor 0.00 G W1 4.00 Nos 0.00 H W1A 1.00 Nos 0.00 J W2 1.00 Nos 0.00 K W3 1.00 Nos 0.00 L W4 2.00 Nos 0.00 M W5 1.00 Nos 0.00 N W6 1.00 Nos 0.00 O W7 1.00 Nos 0.00 P V1 2.00 Nos 0.00 Q SD4 2.00 Nos 0.00 R FW 1.00 Nos 0.00 S D2 1.00 Nos 0.00 T D3 2.00 Nos 0.00 U TD 2.00 Nos 0.00 V SD1 1.00 Nos 0.00

DOORS & WINDOWS Cont'dNinth Floor Cont'd

Page 34: BOQ Substructure

W SD ( Kitchen ) 1.00 Nos 0.00 0.00 0.00 0.00 0.00

Carried to collection on page 34 0.00

A Total from page 29 0.00

B Total from page 30 0.00

C Total from page 31 0.00

D Total from page 32 0.00

E Total from page 33 0.00

Page 35: BOQ Substructure

TOTAL OF BILL NO. 09 - DOORS & WINDOWS 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)

Bill No: 13VERTICAL TRANSPORTATION SYSTEM

A 1.00 Nos 0.00 Supplying and installation of Mitshibshi, 6 person capacity lift as per the requirements.

Page 36: BOQ Substructure

TOTAL OF BILL NO. 10 - VERTICAL TRANSPORTATION SYSTEM 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)

Bill No: 14MISCELLANIOUS WORKS

Paving BlocksA 5.00 m2 0.00

Kitchen Tops & CabinetsB EXCLUDED

C 1.00 item 0.00

Laying 200x100 non skid Paving Blocks at the entrance area.

Completion of Kitchen top with all cabinets in All floors

Allow for carrying out all the Civil works such as construction of ,grease trap, Pump base, RCC manholes, catch pits, interceptors, manholes, Valve pits, RCC cover slab, rain water collection tank, water tank structures, all RCC concrete structures, RSJ supporting system for water tank, concrete beddings and thrust blocks, water proofing work, etc.

Page 37: BOQ Substructure

TOTAL OF BILL NO. 14 - MISCELLANIOUS WORKS 0.00 (CARRIED OVER TO THE GENERAL SUMMARY)