8/13/2019 Block 10 Module 2
1/18
8/13/2019 Block 10 Module 2
2/18
8/13/2019 Block 10 Module 2
3/18
=
8/13/2019 Block 10 Module 2
4/18
( ) ( )
( )
=
=
8/13/2019 Block 10 Module 2
5/18
150 m (original pipe length)+ 10 % (allowance for pipe fittings)
= 165 m (revised pipe length)
Unit heater
at 6.6 bar g
270 kg/h
Revised loadto supply the heater battery is
270 kg/h + 5.8% = 286 kg/h
Boilerat
7.0 bar g
286 kg/ h
L = 150 mP1 =7 bar g P2 =6.6 bar g
8/13/2019 Block 10 Module 2
6/18
( )( )
( ) ( )( )
( )
8/13/2019 Block 10 Module 2
7/18
8/13/2019 Block 10 Module 2
8/18
8/13/2019 Block 10 Module 2
9/18
( )( )
( )
( )
=
=
8/13/2019 Block 10 Module 2
10/18
8/13/2019 Block 10 Module 2
11/18
8/13/2019 Block 10 Module 2
12/18
( ) ( )
8/13/2019 Block 10 Module 2
13/18
8/13/2019 Block 10 Module 2
14/18
8/13/2019 Block 10 Module 2
15/18
8/13/2019 Block 10 Module 2
16/18
8/13/2019 Block 10 Module 2
17/18
8/13/2019 Block 10 Module 2
18/18
Top Related