OONUMA
Introductory Webinar10.31.11
Co-Sponsors: Platinum +
Co-Sponsors: Gold
Co-Sponsors: Silver
Co-Sponsors: Bronze
Sponsored by:
FOUNDATION for CALIFORNIACOMMUNITY COLLEGES
OONUMA
BIMSTORM
®
EDUTM
BIM 2
2
HEALTHSTORM
TM
BIMSTORM
®
3000 PARTICIPANTS
REAL-TIME COLLABORATION
Penn State iCON LAB
OONUMA
S Y S T E M
ONUMA SYSTEMOONUMA
CLOUD BIM SERVER
DESIGN
FINAL DESIGN
CONSTRUCTION
ENGINEERING BIM
COMMISSIONING
OPERATIONS
MAINTENANCE
FACILITY MANAGEMENT
EARLY PLANNING
ONUMA SYSTEMONUMA SYSTEM
CLOUD COMPUTING
OONUMA
© 2011 Gehry Technologies, Inc. All Rights Reserved10/30/11
GTX enables seamless data management, mash-up and analytics on any platform
9
• Data management– Permissions and version-control– Activity logging– Secure backup and sync
• 3D and metadata mash-up– Comprehensive interoperability– Real-time collaboration– Navigation and search• Analytics and data mining– Visualization and rendering–Measurement, conflict avoidance– Compliance and code-checking– Reporting (e.g. QTO, cost, energy)• Free Beta for all BIMStorm
participantsFree until February 28, 2011
www.trelligence.com © 2011 – Trelligence, Inc.
About Trelligence
• AEC industry leader in architectural programming, early design, and analysis & design valida;on so<ware (Trelligence Affinity™)
• Autodesk Preferred Industry Partner for the AEC Industry
• Provides technology to enhance project workflows and to automate the management and transfer of data throughout the lifecycle of building projects
• Delivers integra;on with BIM and Design tools to bridge the gap between programming, conceptual & schema;c design, and the detailed design in tools such as Revit® Architecture
• In partnership with Integrated Environmental Solu;ons (IES), delivers unprecedented early-‐stage sustainability analysis star;ng with program data
• Provides one-‐of-‐a-‐kind analysis tools for design valida;on throughout the project lifecycle
DESIGN
FINAL DESIGN
CONSTRUCTION
1- Kaiser Permanente Gwinnett
COMMISSIONING
OPERATIONS
MAINTENANCE
3,4,5,6,7 - California Community College
EARLY PLANNING
3 -Miracosta Master Plan
4,5,6 -Miracosta Projects
2 - Kaiser Glenlake
7 - LACCD Mission College - COBie
3 -Miracosta Master
FOUNDATION for CALIFORNIACOMMUNITY COLLEGES
OONUMA
Stephen A. CoxManager, Facilities Design & Construction
Alexander M. HerrSenior Project Manager
Xiajun A. Lin, AIA, LEED APNational Facilities Services Facilities Planning
BIM 2
2
HEALTHSTORM
TM
BIMSTORM
®
GLENLAKE COMPREHENSIVE MEDICAL CENTER & AMBULATORY
Pre-‐Design10/4/2011
Final 10/24/11
Program
Campus Summary• Building #1 -‐-‐ 122,404 s/f (exisHng)
• CUP Add -‐-‐ 6,000s/f• Building #2 -‐-‐ 114,438 s/f• Shell Space -‐-‐ (5,600 s/f inc above) Total -‐-‐ 245,842 s/f
Parking Garage #1 & Surface parking -‐-‐ 340 spacesGarage #2 -‐-‐ 767 SpacesTotal -‐-‐ 1,107 Spaces
Stacking Diagram Building #1
Stacking Diagram Building #2
FOUNDATION for CALIFORNIACOMMUNITY COLLEGES
OONUMA
Introduction to the California Community Colleges John Roach
Executive Director, Technology ServicesFoundation for California Community Colleges
BIMSTORM
®
EDUTM
• 72 Districts• 112 Colleges
• Nearly 300 sites
• 24,000 acres
• 5,500 building• 71 million square feet• 2.75 million students
About the California Community Colleges
All use FUSION to manage facili;es planning & repor;ng
• Chaffey • Peralta
• Citrus • Riverside
• Contra Costa • San Francisco
• Foothill-‐De Anza • San Joaquin Delta
• Los Angeles • San Jose-‐Evergreen
• Los Rios • San Mateo County• Marin • Santa Clarita• Mt. San Antonio • Sonoma County
Sixteen Community College Districts Funded The Original Development Of FUSION
Ongoing Annual O&M Funded by all 72 Districts
FUSION Workflow withInterlinked Modules on the Web
Space Inventory
Facility
Enrollment ConstrucGon Planning
Project Fiscal Integrated
FUSIONData
Space Inventory
Facility
Enrollment
Project Fiscal Integrated
FUSIONData
Campus Facili;es Life Cycle
Master Planning Maintenance
A&E Services Energy & Sustainability
Planning, Tracking, Repor;ng
The Facility Asset Management Life Cycle
FUSION’s Original Capability
FUSION Today
Master Planning Maintenance
A&E Services Energy & Sustainability
Planning, Tracking, Repor;ng•Space Inventory • Facility Assessments• Enrollment Forecasts• Capital Plans• Project Tracking• ReporHng
Campus Facili;es Life Cycle
Instead of Big New FUSION FeaturesBuild data links connecHng to other sobware
FUSION
Campus Facili;es Life CycleMaster Planning Maintenance
A&E Services Energy &
SustainabilityPlanning, Tracking, Repor;ng•Space Inventory • Facility Assessments• Enrollment Forecasts• Capital Plans• Project Tracking• ReporHng
32
Data links, import, export
San Joaquin Delta College
33
ONUMA
FUSION GIS
BIM
DATA
ENERGY
FACILITY
CAD
API
Energy Sensors
DOCS
Future System
COBie
IFC
APPS
REVIT
SKETCHUPArchCAD
COLLABORATE
OONUMA
FUSION
GIS
BIM
DATA
ENERGY
FACILITY
CAD
APPS
DOCS
CLOUD
71 million square feet2.75 million students
112 California locations
the largest system of public higher education in the world.
The Entire State of California Community College System in a Cloud Computing Environment
+FUSION GIS+ CLOUD COMPUTINGMASH-UP
OONUMA
38
39
John RoachExecutive Director, Technology Services
Foundation for California Community Colleges Kimon Onuma, FAIA
Onuma, Inc.
BIMSTORM
®
EDUTM
Tina MacicaMPM Consultancy
BuildLACCD program
BIMSTORM
®
EDUTM
Co-Sponsors: Platinum +
Co-Sponsors: Gold
Co-Sponsors: Silver
Co-Sponsors: Bronze
Sponsored by:
Top Related