Auth: [email protected] Slide 1
GVA - customer name
Gas Vehicle Alliance - Copyright 2011
Gas Alliance Group
Gas Vehicle Alliance - Generic presentation
Combined Gas Vehicle experience of 71 Years
First UK Dedicated Company for Gas vehicles
Auth: [email protected] Slide 2Gas Vehicle Alliance - Copyright 2011
Gas Stations
Gas Supply Contracts
Gas Engine Engineering
Feasibility Studies
H&S, Risk Ass. and COSHH
Fuel Delivery Systems
Training Programmes
Research & Development
Gas Vehicles Sales & Marketing
Bio-Gas procurement
Demonstration supply Government Lobbying
GVA - Who we are
Gas Alliance Group
Auth: [email protected] Slide 2Gas Vehicle Alliance - Copyright 2011
GVA - Partners
Future growth
Gas Alliance Group
Gas Broker
HMRC (duty submission)
GVA
GBA
Car Operators
Van Operators
Truck Operators
Bus Operators
VW
Merc
MAN
AD Plant, clean up & compression
SGNInjection
Farm 2 Farm 3 Farm 4+
Crouchlands Farm
RHI
Fuel usage & duty
collection
Fuel usage & duty collection
(if any?)
Biomethane
24,000 kg/day
8,760,000 kg/yr
monitoring
Vir
tual
pip
eli
ne
Station build
& Fuel supply
Station build
& Fuel supply
Stat
ion
build
& F
uel s
uppl
y
Gas Alliance Biomethane-to-customer model
BSOG
Station build & Project Management
Fuel
mon
itor
ing
Fuel m
onitoring
Scania
Auth: [email protected] Slide 2Gas Vehicle Alliance - Copyright 2011
GVA - Trial station equipment
GVA - CO2 (WTW) – zero (or negative) CO2 target
Auth: [email protected] Slide 15
Source: German Energy Agency (DENA) Study 2010
CNG meets E 6 goals today
Gas Vehicle Alliance - Copyright 2011
GVA - Hybrid / Diesel v’s Gas
Auth: [email protected] Slide 14Gas Vehicle Alliance - Copyright 2011
Hybrid (E6) Diesel (E5) Bio-Gas (E6)
Imported fuel Diesel, Lithium, Adblue Diesel Nil
WTW GHG emissions ~ 900 gCO2 eq./km ~ 400 gCO2 eq./km ~ 110 gCO2 eq./km
TTW (vehicle) emissions 170 gCO2 eq./km 200 gCO2 eq./km Nil
Fuel security Many countries worldwide Oil rich countries UK only
Added running costs Adblue, Li Battery change Diesel pricing Extra filter change
Capital cost (premium) ? nil > £2000
Performance ? same same
50 diesel Sprinters averaging 20,000 km/yr = 200 tons CO2 / yr50 NGT gas Sprinters using Bio-Methane = zero tons (could demonstrate a negative CO2)
TTW emissions savings
GVA - ”Adblue in the making”
Auth: [email protected] Slide 11Gas Vehicle Alliance - Copyright 2011
urea production and distribution pathway
GVA - Where in the World ?
Bolivia
World’s largest Lithium discovery
Auth: [email protected] Slide 13Gas Vehicle Alliance - Copyright 2011
GVA - Lithium mining extraction
CO2 Emissions
Plant constructionUtility supplyTransportationPower
5.3 million tons
1.3 million tons
800,000
600,000
Total apprx. CO2 for new site = 8 million tons
Auth: [email protected] Slide 14
Source: BuildCarbonNeutral.org
Gas Vehicle Alliance - Copyright 2011
Auth: [email protected] Slide 16
Combined Heat & Power
(CHP)
GVA - UK BioGas production and vehicle use
Gas Vehicle Alliance - Copyright 2011
GVA - Fuel price forecasting
Auth: [email protected] Slide 12
?
Non-linked price index
Gas Vehicle Alliance - Copyright 2011
Auth: [email protected] Slide 18
Custom built stations Slow fill or Fast fill optionEasy transition to Bio-GasR & M and 24 Hr helplineAttractive fuel contracts
No Capital outlay
sample
CNG / BioGas Fuelling
GVA - Fuel station/s
Gas Vehicle Alliance - Copyright 2011
Auth: [email protected] Slide 20
GVA - CNG / BioGas fast fill unit
Gas Vehicle Alliance - Copyright 2011
Site specific design (gas quality, space, access etc.)
Fuel management
Station HSSE & training
Low inventory of stored gas.
Project lead time: 6-9 months
YEARS
COST
321
Gas Contracts
Tracker contract
Typical 5 year fuel contract
Discounts with additional loads
Fixed term contracts
3rd party sales revenue/royalties
Auth: [email protected] Slide 21
GVA - Fuelling contracts
Diesel
Gas
20-30%
Gas Vehicle Alliance - Copyright 2011
Auth: [email protected] Slide 21
GVA - Next steps?
Gas Vehicle Alliance - Copyright 2011
• Agree Heads of Agreement
•Site surveys of all potential depots:• Gas availability• Electrical availability• Space and access• Logistics requirements (filling patterns)• Fleet growth potential• 3rd party opportunities
• Agree site requirements
• Agree Contract Terms & Conditions
• Implement Gas Supply Contract
• Instigate agreed Project Plan
Contact: Nick HarbordOperations Director<e> [email protected]<t> 0784 6617662