ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Project Data
Wetland Park Visitor Centre (Phase I)
Project Cost (Phase I) $16M
Site Area (Phase I) 5000
m2
Total GFA (Phase I)
228 m2
Project Inception (Phase
I) Feb 2000
Commencement (Phase I)
Jul 2000
Completion (Phase I)
Dec 2000
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
The Site
Wetland Park Visitor Centre (Phase I)
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
The Goals
Westland Park Visitor Centre (Phase I)
• Millennium project for HK’s Eco-tourism
• Architecture
harmonize with adjacent wetland
environmental friendly
convey message :
Respect Ecosystem
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Master Layout
Wetland Park Visitor Centre (Phase I)
Visitor Centre (Phase I)
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Visual Impact
Wetland Park Visitor Centre (Phase I)
• Building echoes adjacent wetland
• Low rise, simple massing, use of natural
finish materials, sculptures of wetland
animals
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Building Envelop
Wetland Park Visitor Centre (Phase I)
Double Wall
Roof Insulation
Deep overhang
Timber Screen
Minimum opening
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
OTTV
Wetland Park Visitor Centre (Phase I)
• OTTV = 4.32W/m2
• Statutory requirement =
70W/m2(podium),
30W/m2 (tower block)
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Use of Natural Ventilation &
Daylight
Wetland Park Visitor Centre (Phase I)
• Photo cell to switch on
lighting when
illumination level is
low
• Wind sensor to switch on
extraction fan when
natural air movement is
insufficient
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Material Re-use
Wetland Park Visitor Centre (Phase I)
• Old bricks from China
• Granite rock paving from boundary wall of Wanchai
Police Headquarters
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Material Re-use
Wetland Park Visitor Centre (Phase I)
• Gabion wall infill made from oyster shell from Lau
Fau Shan
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Material Re-use
Wetland Park Visitor Centre (Phase I)
• Boundary fence wall using dismantled timber
formwork from concreting
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Material with recycled content
Wetland Park Visitor Centre (Phase I)
• Pulverized fuel ash (PFA) as cement
replacement for all structural concrete
Use of non-depletable substances• Use of environmentally friendly refrigerant
(zero ozone depletion potential) R407c for
the direct expansion type A/C system
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Minimize Construction Waste
Wetland Park Visitor Centre (Phase I)
• Steel metal decking as permanent formwork for
roof slab
• Prefabricated
Air ducts
• Use of second hand formwork from other building sites
ArchSD
ARCHITECTURAL SERVICES DEPARTMENT
Case
Stu
dy
Landscape Design
Wetland Park Visitor Centre (Phase I)
• Use of native wetland
plant species where
suitable