Download - AR L - University of Melbournearchive.abp.unimelb.edu.au/objects/pdfs/Post-construction...G SG UPDATE AS CLOUDED - 20.12.13 H SG REVISED SWITCHROOM DOOR LOCATION - 16.01.14 CP-04 J

Transcript
Page 1: AR L - University of Melbournearchive.abp.unimelb.edu.au/objects/pdfs/Post-construction...G SG UPDATE AS CLOUDED - 20.12.13 H SG REVISED SWITCHROOM DOOR LOCATION - 16.01.14 CP-04 J

- - -May 2011

1001 L

1:100 @ A0

1:200 @ A2

GENERAL ARRANGEMENT

01

4300

01

4305

01

4310

TAC-01

TAC-01

TAC-01

TAC-01

CP-05CP-05

TL-01

TL-05

TL-01

CF-02

TL-05

TL-01

CP-04

CF-02

CP-04

RE-09

CP-02

TL-05

TL-05

CP-01

FC-04

FC-02

TL-01

TL-01

FC-01

FC-01

FC-01

REFER TO AR1200 SERIES FOR WALL TYPE TAGSNOTE:

2010

TL-05

OVERVOID

TAC-01TAC-01

TAC-01 TAC-01

TAC-01TAC-01

TAC-01 TAC-01

WS-204

03

6500

06

4315

FW (TYP)

BELOWROOM GREEN

ENTRY BELOW

01

4315

01

5033

RE-04 RE-05

RE-04

TAC-01

WP-01

RE-12

FC-02

CF-02

CF-02

FC-01

RFB-01

CP-02

RE-09

VOID OVEREDGE OF

VOID OVEREDGE OF BEAMS OVER

CP-02

CP-02

CP-02

RE-09

RE-09

RE-09

RE-09

04

5032

01

5032

CF-01

CF-01

CF-01

CP-04

CP-04

CP-04CP-04

CF-01

CF-01

FC-01

RE-04

07.09.12-100% CD - TENDER ISSUESG10

RFB-01

RFB-01

RFB-01 RFB-01

RFB-01

RFB-01

RFB-01

RFB-01

RFB-01

RFB-01

RFB-01

RFB-01RFB-01

RFB-01

RFB-01RFB-01

RFB-01

RFB-01

RFB-01

BH-11

08

6500

CF-01

CP-05

CP-05

RE-13

HOISTWHEELCHAIR

VT-01

BASEMENT 01 FLOOR PLAN

11 - 08.10.12TENDER ADDENDUM 4YA

CF-01

FC-05

CF-01

FC-01

FC-01

12 - 26.03.13

FJ-04

FJ-04

FJ-04

FJ-04

FJ-04

FJ-04

FJ-04

FJ-12

FJ-12

FJ-04

FJ-04FJ-04

FJ-07

FJ-07

FJ-07

FJ-12

FJ-04

FJ-04

FJ-04

FJ-04

FJ-04

FJ-07FJ-04

FJ-04

CF-02

FC-04

CF-02

FC-04

CF-02

FC-04

JWI ISSUED FOR INFORMATION

SG - 28.03.13VALUE MANAGEMENT ISSUE13

14 SG -VALUE MANANGEMENT UPDATE 12.04.13

DIRECTORY BLADE

A SG VALUE MANANGEMENT UPDATE - 17.10.13

DIRECTORY BLADES ADDED

DIRECTORY BLADE

BLOCKWORK WALL MOVED

B SG 11.11.13-FLOOR FINISH REVISIONS AS CLOUDED

FC-01

CF-01

RE-18

C SG - XX.11.13UPDATES AS CLOUDED

25.11.13-SGE UPDATE AS CLOUDED

SGD 18.11.13-SERVICES DOOR SIZE AMENDED

16.12.13-UPDATE AS CLOUDEDSGF

G SG UPDATE AS CLOUDED - 20.12.13

H SG - 16.01.14REVISED SWITCHROOM DOOR LOCATION

CP-04

J SG -

1170

UPDATES AS CLOUDED 03.02.14

FB

FB

K SG -UPDATES AS CLOUDED 04.03.14

K

K

CP-02

CP-02

L SG - 11.04.14

ASHLAR DIRECTION

L

L

L

RL 40.423

L

L

UPDATES AS CLOUDED

Project No.

Drawing No.

Date Drwn Co-Ord Chck

Revision

Title

AND DRAWINGS COPYRIGHT OF THIS DRAWING IS VESTED IN WARDLE

DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS

BY THE CONSULTANT. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED. THIS

SHALL NOT COMMENCE PRIOR TO THE RETURN OF UNAMENDED SHOP DRAWINGS SIGNED

ALL SHOP DRAWINGS SHALL BE SUBMITTED TO THE SUPERINTENDENT AND MANUFACTURE

CONTRACTORS SHALL VERIFY JOB DIMENSIONS BEFORE ANY JOB COMMENCES.

Rev Amd DateRevision DescriptionIssue

Scale

THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE

+1 617 442 6232

Facsimile

+1 888 442 1417

Email

Telephone

1920 Washington

Street No.2

Boston

Massachusetts

02118 USA [email protected]

NADAAA

0913

AR

Project

Client

Parkville Campus

University of Melbourne

Building and Planning

Faculty of Architecture

Tel : +61 3 8662 0400 www.johnwardlearchitects.com

ABN 83 006 814 268© 2014 John Wardle Architects

25 Rokeby Street, Collingwood, Victoria 3066 Australia

FOR CONSTRUCTION

General Notes

01 02 03 04 05 06 07 08 09 10 11 12 13

600060006000600060006000600060006000350060006000

A

B

C

D

E

F

H

600060006000600060006000600060006000350060006000

01 02 03 04 05 06 07 08 09 10 11 12 13

G

9000

3000

8250

7250

3000

9000

7500

A

B

C

D

E

F

H

G

HE

RIT

AG

E B

OU

ND

AR

Y T

O E

LIS

ABET

H M

UR

DO

CH B

UIL

DIN

G

EEE

3504

FFF

3505

FFF

3505

EEE

3504

AAA

3500

BBB

3501

CCC

3502

CCC

3502

02

3003

BBB

3501

AAA

3500

01

3005

02

3006

3001

01

DDD

3503

DDD

3503

ELISABETH MURDOCH BUILDINGHERITAGE BOUNDARY TO

17

18

19

20

6 7 8 9 10

11

12

13

14

15

16

1 3 4 5

12 4 6 8 10

12

14

16

18 20

22

24

26

28

30

34

36

38

40

3 5 7 9 11

15

13

17

19 21

23

25

27

29

31

33

35

37

39

32

2

DB49

560

CP-01

5365

4060

HA

ND

RAIL E

XT.

290 N

OM.

BH-02

BH-24

LIFT 05

Com

ms

Gas

CHW

HHW

CW

HR

CW

FFL 37.200

Lift 01 Lift 02 Lift 03

Facade OverHeritage Listed Footprint of Existing

Building Line Over

HR

HR

2

3

4

5

6

7

8

1

9

10

11

12

CCWP-1

CCWP-2

CCWP-1

CCWP-2

CCWP-3

CH-1 CH-2

HEX-1

AHU-4AHU-2

AHU-3

DB19

DB40

DB36

DB37

DB37a

DB35

DB33

DB30

DB29

DB31

DB28

DB27

DB26

DB18

DB28a

DB26a

DB02

DB09

DB10

DB12

DB08

DB07

DB11

DB01

DB15

DB14

DB20

DB17

DB04

DB05

DB06

DB52

DB51

DB50

DB49

DB43

DB47

DB44

DB45DB

42

DB46

DB13

850 C

LE

AR A

CC

ESS

850 CLEAR ACCESS850 CLEAR ACCESS

1 2 3 4 5 6 7 8 9

Elec

Elec

Elec

HR

HR

ME

CH.

Zone

Ref'g

Zone

Ref'g

DB55

DB56

850 CLEAR ACCESS850 CLEAR ACCESS

DB57

DB58

DB59

FFL 36.000

DB16

000E

000C

000A

000D

000B

FFL 36.700

FFL 37.200FFL 37.200

FFL 37.200

FFL 37.200

FFL 37.200

FFL 37.200

FFL 37.200

FFL 37.200

FFL 36.000

FFL 36.000

FFL 38.000

39.900

FFL 38.000

FFL 34.680

FFL 39.300

FFL 37.200

VOID OVER

Rm. B104

Rm. B103

Rm. B102

Rm. B101

Rm. B113

Rm. B105

Rm. B106

Rm. B108

Rm. B112

Rm. B111

Rm. B110

Rm. B109

Rm. B107

Rm. B114

Rm. B115

Rm. B201

Rm. B116

Rm. B117

Rm. B133

Rm. B203

Rm. B134

Rm. B135

Rm. B136

Rm. B137

Rm. B131

Rm. B128

Rm. B130

Rm. B132

Rm. B138

Rm. B127

Rm. B126

Rm. B123

Rm. B125

Rm. B124

Rm. B129

Rm. B121

Rm. B118

Rm. B122

Rm. B120

850 C

LE

AR A

CC

ESS

FH

R

850 C

LE

AR A

CC

ESS

850 C

LE

AR A

CC

ESS

DB34

04LIFT

FFL

39.300

FFL 37.200

FFL 34.680

DB23

ZoneRef'g

Hatch Over Gatic

850 C

LE

AR A

CCESS

850 C

LE

AR A

CCESS

850 C

LE

AR A

CCESS

Intake/Exhaust Plenum

DB61

DB62

DB63

STAIRUNDER VOID

ZoneRef'g

FFL 38.000 FFL 38.000

DB03

DB24

DB25

FFL 37.500

Rm. B140

Rm. B139

FFL 37.500

DB21

HR

DB22

Exhaust PlenumIntake Plenum

AHU-5

AHU-6

000L

Rm. B141

Rm. B142

000M

BelowRoomPump

Water Storage Tank

OverLineBuilding

above

Plenum

Intake

Above

Plenum

Mech.

Above

Plenum

Mech.

1110

R

1110

R

1110

R

13

10

BELOWRm. B202

DB64

850 CLEAR ACCESS

850 CLEAR ACCESS

W01B01

W02B01

W03B01

W04B01

W05B01

W06B01

W07B01

W08B01

W10B01

W11B01

W13B01

W14B01

W15B01

W12B01

W17B01

W16B01

W18B01

W19B01

W20B01

W21B01

DB65

W28B01

W23B01

STAIR 000F

STAIR 000G

W22B01

W26B01

W27B01

850 C

LE

AR A

CC

ESS

850 C

LE

AR A

CC

ESS

850 C

LE

AR A

CC

ESS

above

Plenum

Discharge

PENO

1800 x 1200

PENO

1800 x 1200

PENO

1800 x 1200

PENO

1800 x 1200

PENO

650 X 550

ROOM NAME LEGEND

MALE WC

MEDIUM LECTURE THEATRE

MEDIUM LECTURE THEATRE

LIBRARY - STAFF MEETING

B133

B134

B135

B136

B137

B201

B202

B203

B101

B102

B103

B104

B105

B106

B107

B108

B109

B110

B111

B112

B113

B114

B115

B116

B117

B118

B119

B120

B121

B122

B123

B124

B125

B126

B127

B128

B129

B130

B131

B132

B138

BASEMENT FOYER LOWER

GREEN ROOM

EXHIBITION STORE

STAFF BIKE STORE

CLEANER STORE

BIN STORE

FEMALE CHANGE ROOM

MALE CHANGE ROOM

BASEMENT FOYER 01

RE-HEAT KITCHEN

DISABLED WC

BABY CHANGE ROOM

FEMALE WC

PLANT

COMMS ROOM

BASEMENT FOYER 02

AIRLOCK

LARGE LECTURE THEATRE

BIOBOX

BIOBOX AV RACK ROOM

LIBRARY - TEA ROOM

LIBRARY - DISCIPLINE LIBRARIAN

LIBRARY - CLIENT SERVICES

LIBRARY - STAFF WORKSPACE

LIBRARY - SECURE COMPACTUS

LIBRARY - STAFF WC

LIBRARY - QUICK ACCESS

LIBRARY - OPEN COMPACTUS

LIBRARY - PRINT / COPY

LIBRARY - MEETING ROOM

LIBRARY - PROJECT ROOM

LIBRARY - PROJECT ROOM

LIBRARY - PROJECT ROOM

LIBRARY - PROJECT ROOM

LIBRARY - COLLECTION

LIBRARY - BOOK REPAIR

000E

000F

000D

000C

000B

000A

000G

STAIR

STAIR

STAIR

STAIR

STAIR

STAIR

STAIR

PUMP ROOM

BASEMENT FOYER LOWERB201

GREEN ROOMB202

B203 PLANT - PUMP ROOM

B204 PLANT - SW SUMP ROOM

PLANTB140

B139 MAIN SWITCHROOM

B141

B142

FOYER/VESTIBULE

FOYER/VESTIBULE

000L STAIR

000M STAIR

WGXX

SK-02

PA-01

XXX

WBXX

WSXX

AF-XX

XA-XX

ACCESS FLOOR TYPE

WXXXA

WXXXS

WXXXF

INDICATES A SETOUT POINT

FB

AP INDICATES AN ACCESS PANEL

INDICATES A RECESSED FLOOR BOX

INSITU CONCRETE

PRECAST CONCRETE

BLOCKWORK / MASONRY

INSULATION

D101b

DOOR NO.

SUB-DOOR NO./DOOR WITHIN ROOM

DOOR

ACTUAL LEVEL (G,B,1,2 . . .)

DOOR NUMBER

DETAIL CALLOUT

DETAIL NUMBER

SHEET REFERENCE NUMBER

REVISION TAG

INSULATION TYPE

FLOOR WASTE DRAIN

INDICATES STUD WALL PARTITION TYPE. REFER TO WALL SYSTEMS SCHEDULE

SCHEDULE

INDICATES BLOCKWORK WALL PARTITION TYPE. REFER TO WALL SYSTEMS

INDICATES GLAZED PARTITION WALL TYPE. REFER TO WALL SYSTEMS SCHEDULE

REPORT

INDICATES AN ACOUSTIC RATED PARTITION. REFER TO ACOUSTIC CONSULTANT

INDICATES A SMOKE SEAL PARTITION. REFER TO WALL SYSTEMS SCHEDULE

INDICATES A FIRE RATED PARTITION. REFER TO WALL SYSTEMS SCHEDULE

PAINT FINISH TO WALLS TYPICALLY UNLESS SPECIFIED OTHERWISE

TYPICALLY

PARTITION SETOUTS DIMENSIONED FROM FINISHED FACE TO FINISHED FACE

EXPOSED CONCRETE COLUMNS & INSITU CONCRETE WALLS.

REQUIRED WHERE JOINERY COVERS DRY WALL PARTITIONS. NO SKIRTING TO

MATERIALS SCHEDULE FOR DESCRIPTION OF SKIRTING TYPES. NO SKIRTING

SKIRTING TYPE TYPICALLY UNLESS SPECIFIED OTHERWISE. REFER TO

FOR ALL DOOR FINISHES REFER TO DOOR SCHEDULE

STRUCTURAL ADEQUACY - PARTITION CONTRACTOR TO PROVIDE & CO-ORDINATE ADDITIONAL NOGGINGS / STRUCTURAL SHEET /STEEL SUPPORTS WITHIN PARTITIONS & WALLS TO ENSURE ADEQUATE SUPPORT & FIXINGS FOR ALL WALL MOUNTED EQUIPMENT EG. LCD SCREENS & JOINERY.

REFER TO 8000, 8100 & 7100 SERIES

REFER TO 1500 PLAN SERIES FOR FACADE SETOUT AND REFERENCES

REFER TO 8000 PLAN SERIES FOR JOINERY CODES & 8100s FOR JOINERY DETAILS.

REFER TO 7100 SERIES FOR INTERNAL ELEVATIONS

REFER TO 7500 SERIES FOR WALL TYPE DETAILS

REFER 7550 SERIES FOR WALL LINING DETAILS

FOR FINISHES INFORMATION RELATING TO THE HANGING STUDIO (ROOM 226, 314 & 408) REFER TO DRAWINGS AR5120 - AR5149

FOR FINISHES INFORMATION RELATING TO THE JOSEPH REED FACADE & STUDY SPACE (ROOM 247) REFER TO AR5160 - AR5169

FOR WORKSPACES LISTED BELOW, REFER TO DETAIL 03 & 04 DWG 7173 FOR TYPICAL PARTITION ELEVATIONS & FINISHES:

DIMENSIONS GENERALLY SETOUT TO FACE OF LINING OF WALL TYPE

REFER TO MATERIALS SCHEDULE FOR PB-01 DETAILS

304, 305, 316, 317, 323, 332, 337-340, 345-351

REFER 5030 SERIES FOR STAIR LAYOUTS & DETAILS

ALLOW ONE EMERGENCY BUTTON UNLESS NOTED OTHERWISE.

X

AAA

0000