AquaFence V1200
Stepwise Installation of the AquaFence System
Revision Number: AQFCEMC-GB-1008-02
27th
October 2008
8/9/2019 Aquafence Stepweise Installation
2/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 2
This document has to be seen in conjunction with the main document: AquaFence V1200 IOM InstallationManual English. It repeats the major steps of assembling the system but leaves out the installation of side-connectors and the protection shield which is throughout handled in above mentioned documents and thedocument: Installation Debris Shield
The use of this document is to have large self-explaining pictures available that explain the stepwise assemblingof AquaFence outside even under adverse weather conditions.
The referred items are listed in the A3 overall drawing handed out with this document.
Table of content:
Phase 1: putting down the wall element to the envisaged place ...........................................................................3Phase 2: Unfold the element.................................................................................................................................5Phase 3: Stabelize, lift up the 4 stabelizer rods and place them into the respective Maze Bracket (12)................ 5Phase 4: connceting the wall-elements with each other, with a side-adopter or a corner-element ........................6Phase 5 + Phase 6 sealing the horizontal and vertical clamp ...............................................................................6
Phase 7: fastening the wall elements together......................................................................................................9Phase 8 Fixation of the elements to the ground..................................................................................................11
8/9/2019 Aquafence Stepweise Installation
3/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 3
Phase 1: putting down the wall element to the envisaged place
Tools (hand-forks) for lifting 4 persons shall lift one element with the fork-handles
8/9/2019 Aquafence Stepweise Installation
4/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 4
The elements must have their horizontal portion facing the floodwater. Once the water reaches this horizontal plate the structure isfully stabilized. It is the force of the water pushing down on the plate that stabilizes the construction.
8/9/2019 Aquafence Stepweise Installation
5/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 5
Maze Bracket
Stabelizer Rod
Maze Bracket
Stabelizer Rod
Phase 2: Unfold the element
Phase 3: Stabelize, lift up the 4 stabelizer rods and place them into the respective Maze Bracket (12)
8/9/2019 Aquafence Stepweise Installation
6/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 6
Phase 4: connceting the wall-elements with each other,with a side-adopter or a corner-element
Phase 5 + Phase 6 sealing the horizontal and vertical clamp
Place next element between the first one and repeat phase 2 +3
Slide the canvas (22) under the clamps (6 + 9).Push the horizontal clamp (9) against the corner, fasten the eccentriclock (28) on the horizontal clamp (9) and tighten the clamp with thetightening wheels (32).Push the vertical clamp (6) against the horizontal clamp (9), and tightenthe clamp with the tightening wheels (32).
8/9/2019 Aquafence Stepweise Installation
7/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 7
fasten the eccentric lock (28) on the horizontal clamp (9) and tighten the clamp with the tightening wheels (32).
8/9/2019 Aquafence Stepweise Installation
8/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 8
Phase 5 sealing the horizontal clamp Phase 6 sealing the vertical clamp
8/9/2019 Aquafence Stepweise Installation
9/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 9
Phase 7: fastening the wall elements togetherbeaks (24) are end-to-end, no folds inthe canvas (22)
The full length of the canvas (22) must properly be secured under the clamp.Fasten the wheels tight (by hand is good enough), but make sure the canvas is completelystraight under the horizontal and vertical clamps. Fold / Wrinkles would cause leakages.
8/9/2019 Aquafence Stepweise Installation
10/13
8/9/2019 Aquafence Stepweise Installation
11/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 11
Phase 8 Fixation of the elements to the groundDepending on the nature of ground, mean of fixation screws: use e.g. cast in channel and T-head bolts (Halfen), asphalt screws,concrete screws, straps or earth-screws
8/9/2019 Aquafence Stepweise Installation
12/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 12
Phase 8 Fixation of the elements to the groundAquaFence wall-element fixed with T-head bolts and Halfen cast in channel on concrete base
8/9/2019 Aquafence Stepweise Installation
13/13
AquaFenceAS | Tlf: + 47 69 207170 | Fax. + 47 69 223520 | Industriveien 17 | N- 1890 Rakkestad | [email protected] Org.nr NO 981 342 399 MVA
Page 13