ITB No. 12/2009
BIDDING DOCUMENTS
EC/MOLISA/ILO LABOUR MARKETPROJECT
VIE 07/02M/EEC
June 2009
INTERNATIONAL LABOUR ORGANIZATIONEUROPEAN UNION
MINISTRY OF LABOUR, INVALIDSAND SOCIAL AFFAIRS
8/14/2019 Annex 3 (ITB Document)
2/118
2
ILO VIETNAM OFFICELABOUR MARKET PROJECT
INVITATION TO BID
Contents
PREFACE
GLOSSARY OF TERMS
SECTION I. INSTRUCTIONS TO BIDDERS
SECTION II. BID FORMS FOR PACKAGES 1 AND 2
SECTION III. SUPPLY REQUIREMENTS FOR PACKAGES 1 AND 2
SECTION IV. ILO GENERAL CONDITIONS FOR THE PURCHASE OF GOODS ANDRELATED SERVICES
SECTION V. SPECIAL CONDITIONS OF CONTRACTS
SECTION VI. PROPOSED MODEL OF PURCHASE ORDER/CONTRACT
SECTION VII. SAMPLE FORMS
8/14/2019 Annex 3 (ITB Document)
3/118
3
PREFACE
The Labour Market Information (LMI) component is a part of the EC/MoLISA/ILO LabourMarket Project: Better Information for Creating Jobs and Developing Skills in Vietnam. This project,
executed by the ILO, is funded by European Union under the agreement ASIE/2007/144-967.One of the LMI components objectives is to establish a Labour Market Information System(LMIS) for the Ministry of Labour, Invalids and Social Affairs of Viet Nam (MoLISA).
A LMIS is a network of users and producers of labour market information both quantitativedata and qualitative information used to shed light on employment issues such as skills mismatch.The key sources of labour market information are household-based surveys, establishment-basedsurveys and administrative records. Surveys at the national level including the Labour andEmployment Survey, the Viet Nam Household Living Standards Survey and the Inter-CensalPopulation Survey that collect labour statistics at the national level are the responsibility of theGeneral Statistical Office. The Ministry of Labour, Invalids and Social Affairs draws on these foranalysis and policy. In addition it collects labour market information from smaller surveys andadministrative records.
Key users of labour market information are Centres for Employment Services, vocationaltraining providers and government policy makers. Many others can be added to the list includingemployers, workers, researchers, planners and educators. The main producers of labour marketinformation are the General Statistical Office and the Ministry of Labour, Invalids and Social Affairs.However, useful information can be gathered from other sources such as the management informationsystem of Centres for Employment Services and the administrative records of educational institutionsand training providers. Other ministries and agencies also produce information related to labourmarkets. This includes records, plans, laws, regulations and decrees of the government. Think tanksand non-government organizations conduct research that gives a better picture of skill needs forparticular groups of jobs seekers defined by age, sex and ethnicity as well as location by region orprovince, urban or rural, highland or coastal, for example.
8/14/2019 Annex 3 (ITB Document)
4/118
8/14/2019 Annex 3 (ITB Document)
5/118
5
SECTION I. INSTRUCTIONS TO BIDDERS
International Labour Office ILO Office in Vietnam48-50 Nguyen Thai Hoc Street, Hanoi, Vietnam
Reference: ITB 12/2009- VIE 07/02M/EEC Date: 27 th July 2009
Dear Sirs,Supply and Installation of IT Equipment
for Data Centre of Labour Market Information Centre (MoLISA)(Bid Package 1)and
Hardware for Labour Market Information Units in 5 Employment ServicesCentres (ESCs) ( - Bid Package 2)
In the framework of Labour Market project VIE/07/02M/EEC Better information forcreating jobs and developing skills in Viet Nam funded by the European Commission, youare invited to submit a bid covering the items on the attached list, which must reach us on orbefore 11am 8 th September 2009 (Hanoi Time) at the address below:
Labour Market ProjectILO Office in Vietnam
48-50 Nguyen Thai Hoc Street, Hanoi, Vietnam
Submission of your offer:
For this request, offers by fax or E-mail are not admissible. Bidders must submit theiroffer in a sealed envelope or package at the above-mentioned address and marked as follows:
SUBMISSION Invitation to tender reference number ITB12/2009 VIE 07/02/EEC NOT TO BE OPENED BEFORE: 9am 9 th September 2009 (Hanoi
Time) .
Your offer should be duly stamped and signed by an authorized representative of yourcompany. Any offer received by the ILO after the deadline for submission will be rejected.We strongly recommend that proposals be sent by courier or hand-delivered to the above-mentioned address.
8/14/2019 Annex 3 (ITB Document)
6/118
6
Please submit one original, four copies and one soft copy in CDROM in MS-Office format of your offer (in a same envelope). When preparing your bid, please use the attached Bid Form(Section II) and observe the instructions in the attached ILO Supply Requirements (SectionIII), the ILO General Conditions for the purchase of Goods and related Services (SectionIV), the Special Conditions of Contract (Section V), the Proposed Model of Purchase
Order/Contract (Section VI) and the Sample Forms (Section VII). These and anysupplementary conditions that may be attached hereto will become part of the contract to beconcluded with the successful Bidder. A sample of proposed purchase order/contract that willbe signed with the successful Bidder is enclosed.
For this ITB, Bidders must submit quotation for all the equipment and services listed inSection III (Supply Requirements). Partial or incomplete offers will not be considered.
Qualification requirements for Bidders
1. Experience of Supplier- At least 5 years of proven experience in supplying and installing IT equipment.- The Bidder must have completed at least three contracts to provide server, storage
with the equivalent characteristic of this bidding package in terms of value andequipment types (Attached copy of contract and contract liquidation) from 2006 to2008.
- The resumes of key participating staff should be documented and provided to the ILOto Evaluate. The Bidder must have at least seven professionals with certificates issuedby Manufacturer of server and storage required in bidding document. Theprofessionals must have worked for the Bidder at least for 6 months.
- The Bidder must have service teams in Hanoi and Ho Chi Minh City. The mainservice Centre must have authorized service provider certificate issued by theManufacturer of Server, External Storage System, Desktop PC, Notebook PC, Printeris introduced in the bid (a notarized copy of this certificate must be provided).
2. Production and business capacity:- The Bidder must have a branch in Hanoi or Ho Chi Minh City and can prove the legal
status of the branch by providing evidence of the decision to establish the branch.- Supplier shall have branches or representative offices for technical support and
maintenance in Hanoi and Ho Chi Minh City.- Supplier shall meet delivery and implementation timing as well as the period of
warranty and technical support after contract signing as required in supplyrequirements.
3. Financial Capacity (from 2006 to present)- Finance Reports: The Bidder shall provide Audited Finance Reports three (3) years
recently in the Bidding Document.- Turnover (average): Not less than five (5) million USD
Requirements on experience and capacity will be evaluated "Pass" or "No Pass". TheSuppliers are considered qualified in terms of experience and capacity if they are evaluated"Pass" for the abovementioned 3 main requirements. A main requirement shall be consideredas Pass only if all sub-requirements are evaluated "Pass".
8/14/2019 Annex 3 (ITB Document)
7/118
7
Eligibility of Goods and Services
1. Manufacturers authorizationsSupplier shall supply the following documents, to the Purchasers satisfaction, that the
Goods and Services components of the Information System to be supplied, installed, and/orperformed by the Bidder are eligible Goods and Services:
Commitment Letter issued by Manufacturer (Server, External Storage System, SANSwitch, Rack, Tape Library, Backup software, Firewall, Switch, UPS, Desktop PC,Notebook PC, Printer) ensuring that the proposed products are original products frommanufacturer and granted legal license.
Technical support Commitment Letter issued by Manufacturer for the Main proposedproducts (Server, External Storage System, SAN Switch, Rack, Tape Library,Backup software, Firewall, Switches, UPS, Desktop PC, Printer).
The original copy of authorized reseller issued by the Manufacturer of the mainproducts in the bid (Server, Storage System, SAN Switch, Desktop PC, Notebook PC, Printer), in case the Bidder is not the Manufacturer.
Valid documents to certify the Bidder is the authorized warranty service of theManufacturer and the Bidder has at least 01 warranty service Centre in Vietnam formain product in the bid (Server, Storage System, Desktop PC, Printer).
2. Origin of GoodsAll goods to be supplied under the Contract shall have their country of origin. The term
country of origin means the country where the goods have been mined, grown, cultivated,produced, manufactured, or processed; or through manufacture, processing, or assembly,another commercially recognized article results that differs substantially in its basiccharacteristics from its imported components. Therefore, the nationality of the firm thatproduces, assembles, distributes, or sells the goods shall not determine their origin.Additionally, all hardware shall be produced not before 2008 and associated software must bethe newest version from the manufacture. If so required, the Bidder shall demonstrate theorigin and the production year of their goods.
Tender Bond
1. Bidders shall submit a Tender Bond (see Model in Section VII to this ITB) for a sumof twenty thousand US Dollars (US$ 20000) issued or confirmed in favor of the ILO by aninternationally recognized bank residing or carrying on business in Switzerland.
The Tender Bond shall reach the ILO Headquarters in Switzerland at the followingaddress:
International Labour OfficePROCUREMENT(Ref. ITB 12/2009 - - VIE 07/02M/EEC)4, route des MorillonsCH-1211 Geneva 22 (Switzerland)
not later than 11am 7 th September 2009 (Geneva Time) . Any Tender that has notbeen so secured will be rejected. The Bond shall be valid up to 8 thNovember 2009 but it willbe released to all unsuccessful Bidders on the date of signature of the contract between theILO and the successful Bidder. The successful Bidder's Tender Bond will be released onlyupon receipt by the ILO of the Performance Bond (see Model in Section VII to this ITB).
8/14/2019 Annex 3 (ITB Document)
8/118
8
2. The ILO may avail itself of this Tender Bond under following circumstances:
(a) if a Bidder withdraws or modifies its bid after the date of bid opening; and
(b) if a Bidder provides untruthful information with respect to the proposed equipment or
to any other requirement of this Invitation to Bid.
3. All costs associated with providing these bonds, including opening and confirmingbank's commissions, shall be borne by the Bidder.
Period of Validity of Bids
The bid validity period shall be two (2) months after the deadline for bid submission.Accordingly, a bid with a Tender Bond that expires before that time shall be rejected as non-responsive.
Documents Comprising the Bid
The Bid shall comprise two envelopes submitted simultaneously, one containing theTechnical Proposal and the other the Price Proposal, enclosed together in an outer singleenvelope.
The Technical Proposal shall contain the following:
1) Copy of the Bid Form with prices undisclosed; (See Section II. BID FORM)2) Copy of Tender Bond; (See Section VII. SAMPLE 3) Original Tender Bond shall be
sent to ILO/PROCUREMENT (see page 7 under Tender Bond for details ) 3) Written confirmation authorizing the signatory of the Bid to commit the Bidder;
The original and all copies of the bid, each consisting of the documents listed inthis ITB, shall be typed or written in indelible ink and shall be signed by a personor persons duly authorized to sign on behalf of the Bidder.
The authorization must be in writing and included in the bid. The name andposition held by each person signing the authorization must be typed or printedbelow the signature. All pages of the bid, except for unamended printed literature,shall be initialed by the person or persons signing the bid.
4) Attachmentsa. Attachment 1: Bidders Qualifications (See Section I. Qualification
requirements for Bidders ) b. Attachment 2: Eligibility of Goods and Services (See Section I. Eligibility of
Goods and Services ) c. Attachment 3: Conformity of the Information System to the Bidding
Documents. The Bidders technical solution conforming in all material aspects with thetechnical requirements of bid packages 1 and 2 and other parts of thisbidding document. Explicit cross reference to bidding document pages isexpected.
A Preliminary Project Plan describing proposed management processesand including human and other resources to be used. The plan shouldinclude a detailed Implementation Schedule in bar chart form showingduration, sequence and interrelationship of all key activities. The plan
8/14/2019 Annex 3 (ITB Document)
9/118
9
should also state what is expected from the purchaser and other partiesand how the bidder proposes to co-ordinate these activities.
d. Attachment 4: Proposed Subcontractors (see Model in Section VII ) e. Attachment 5: Intellectual Property
The Price Proposal shall contain the following:
1) A bid form duly completed and signed by a person or persons duly authorized to bindthe Bidder to the Contract; (See Section II. BID FORM)
Site visit Questions & Replies
For the package 1, a unique site visit organised to the attention of all bidders, whointend to bid, will take place on 9am 18 th August 2009 (Hanoi Time) at Bureau of
Employment (of MOLISA) - No2 Dinh Le Street, Hoan Kiem District, Hanoi, Vietnam. You are requested to confirm in writing the presence of a representative of your companyindicating his name and title to the Project Office .
For the package 2, The Bidder may wish to visit and examine some or all theemployment services Centres of the labour market Information System and obtain for itself,at its own responsibility and risk, all information that may be necessary for preparing the bidand entering into the Contract. The Bidder shall give the ILO an adequate notice of aproposed visit before at least seven (7) days. Then The ILO will make a site visit appointmentbetween the bidder and the proposed provincial ESC (DOLISA).
The costs of visiting the site or sites shall be at the Bidders own expenses. No sitevisits shall be arranged or scheduled after the deadline for the submission of the Bids.
If you have any questions, please submit your inquiry in writing on or before 24 th August 2009 to Labour Market Project - ILO Office in Vietnam, 48-50 Nguyen Thai HocStreet, Hanoi, Vietnam Fax: (84-4)37478816 ext: 209 Email: [email protected], quoting theReference: ITB 12/2009- VIE 07/02M/EEC.
Replies will be transmitted in writing to all Bidders having attended the visit on 28 th August 2009.
Bid Currencies
The Bidder shall quote its prices for all Goods and Related Services to be offered inthe currency of United State Dollar (USD).
Bid Prices
The prices and discounts quoted by the Bidder in the Bid Submission shall conform tothe requirements specified below.
The price to be quoted in the Bid Form shall be the total price of the Bid, excludingany discounts offered.
The price of items that the Bidder has left blank in the cost table provided in section IIshall be assumed to be included in the price of other items. Items omitted altogether from the
8/14/2019 Annex 3 (ITB Document)
10/118
10
cost tables shall be assumed to be omitted from the bid and, provided that the bid issubstantially responsive, an adjustment to the bid price will be made during bid evaluation.
Prices proposed in the Bid Form for Goods and any Related Services are to beexpressed and shall be defined and governed in accordance with the rules prescribed in thelatest edition of Incoterms, issued by the International Chamber of Commerce, Paris.
(a) for Goods offered from outside the Vietnam:The prices shall be quoted on a DDU (named place of destination) basis, exclusive of all taxes, stamps, duties, levies, and fees imposed in Vietnam. The named place of destination is the Project Site.
(b) for Locally supplied Goods:Unit prices of Goods offered from within Vietnam, shall be quoted on an EXW (exfactory, ex works, ex warehouse or off-the-shelf, as applicable) basis, including feesof Load/Unload to/from truck, Transport to destination and Insurance.
(c) for Related Services:The price of the Related Services shall be quoted in total for each service (whereappropriate, broken down into unit prices) The Prices must exclusive of all customsduties, sales tax, and other taxes paid or payable in Vietnam.
The prices must also include all costs incidental to the performance of the supply, asincurred by the Supplier, such as travel, subsistence, office support, communications,translation, printing of materials, etc.
Bid Opening
The ILO shall conduct the opening of Technical Proposals and Price Proposals in thepresence of LMP Project Management Board.
First, all envelopes holding the Technical Proposals shall be opened one at a time, andthe following read out and recorded :
(a) the name of the Bidder; and
(b) any other details as the Purchaser may consider appropriate.
The Price Proposals remain sealed and are held in custody by the Purchaser. Aftertechnical evaluation, Price Proposals of technically compliant Bids are only opened for thosewho pass the technical assessment, one at a time and the following read out and recorded:
(c) the name of the Bidder;
(d) Prices, including any discounts and alternative offers; and
(e) any other details the Purchaser may consider appropriate.
The contract will then be awarded to the Bidder submitting the lowest Price.
Evaluation of BidsTo evaluate a bid, the ILO shall use all the criteria and methodologies defined in this
document. No other criteria or methodology shall be permitted. The Bidder proposing goodsand related services compliant with all ILO requirements and offering the lowest price will beawarded a contract.
8/14/2019 Annex 3 (ITB Document)
11/118
11
If your offer is accepted, you will receive a formal Purchase Order/Contract includingpayment schedule and agreed work plan.
Attachments:- Section II: Bid Form for Package 1 and 2;- Section III: Supply Requirements for Package 1 and 2;- Section IV: ILO General Conditions for the purchase of Goods and related Services;- Section V: Special Conditions of Contracts;- Section VI: Proposed Model of Purchase Order/Contract- Section VII: Sample Forms.
-
8/14/2019 Annex 3 (ITB Document)
12/118
12
SECTION II. BID FORM BID PACKAGE 1 LABOUR MARKET INFORATION DATA CENTRE
EQUIPMENT (LMIC)
International Labour Office ILO Office in Vietnam 48-50 Nguyen Thai Hoc Street, Hanoi, Vietnam
Ref. : ITB 12/2009- VIE 07/02M/EEC
Date : (INSERT DATE OF ITB)
Closing Date: (INSERT DATE & TIME) Reply Via: Sealed enveloped only
The following should be completed by the Supplier
Supply and Installation of IT Equipment for the Labour Market Information Centre (MoLISA)
Your Bid Reference Date Currency Bid Validity Date
Total Amount * DDU (MoLISA)
Hanoi
Delivery schedule of Equipment
Installation schedule Total Weight Kg & Total Volume/M3
filled bysuppler
*This amount includes the price of equipment delivered, installed and tested as wellas related training.
This Quotation has been prepared in accordance withSupply Requirements, ILO General Conditions for the Purchase of Goods and related
Services and Special Conditions of Conditions of Contract
(suppliers detailed address)
8/14/2019 Annex 3 (ITB Document)
13/118
13
BID FORM - BID PACKAGE 1 LABOUR MARKET INFORATION DATA CENTRE EQUIPMENT (LMIC)No.< ITB 12/2009
Requested Specifications Proposed Specifications
Blank --
2 DD-MM-YY
Requested Specifications Proposed Specifications
Blank --
No Item UOM QTY Requested Delivery Date
Proposed DeliveryTime (days)
Weight kg/ Volume m3
1 DD-MM-YY
8/14/2019 Annex 3 (ITB Document)
14/118
14
SECTION II. BID FORM BID PACKAGE 2 HARDWARE FOR LABOUR MARKET INFORATION UNITS
IN 5 EMPLOYMENT SERVICES CENTRERS (ESCs)
International Labour Office ILO Office in Vietnam 48-50 Nguyen Thai Hoc Street, Hanoi, Vietnam
Ref. : ITB 12/2009- VIE 07/02M/EEC Date : (INSERT DATE OF ITB)
Closing Date: (INSERT DATE & TIME) Reply Via: Sealed enveloped only
The following should be completed by the Supplier
Hardware for Labour Market Information Units in 5 Employment Services Centres ( (ESCs)
Your Bid Reference Date Currency Bid Validity Date
Total Amount * DDU (MoLISA)
Hanoi
Delivery schedule of Equipment
Installation schedule Total Weight Kg & Total Volume/M3
filled bysuppler
*This amount includes the price of equipment delivered, installed and tested as wellas related training.
This Quotation has been prepared in accordance withSupply Requirements, ILO General Conditions for the Purchase of Goods and relatedServices and Special Conditions of Conditions of Contract
(suppliers detailed address)
8/14/2019 Annex 3 (ITB Document)
15/118
15
BID FORM - BID PACKAGE 2 HARDWARE FOR LABOUR MARKET INFORATION UNITS IN 5 EMPLOYMENTSERVICES CENTRERS (ESCs)
No.< ITB
Requested Specifications Proposed Specifications
Blank --
2 DD-MM-YY
Requested Specifications Proposed Specifications
Blank --
No Item UOM QTY Requested Delivery Date
Proposed DeliveryTime (days)
Weight kg/ Volume m3
1 DD-MM-YY
8/14/2019 Annex 3 (ITB Document)
16/118
16
SECTION III. SUPPLY REQUIREMENTS
1. INTRODUCTION TO LABOUR MARKET INFORMATION SYSTEM
From point of view that information management is an important part for operation of Ministry.
Information is also property of the nation, the basic for policy determining and decision making,one information system on labour market is being established as part of the Labour MarketProject: Better Information for creating jobs and developing skills in Vietnam.
Labor market information system will keep as archives all information systems computerizedduring 2008-2010 in a general database. Beside the general database, each unit can be installedone on-site database to manage information of that unit, updated and synchronized with labormarket database at Ministry in a certain period.
The selected Bidder shall perform the following tasks:
1. Supply IT software, hardware and other equipment to be used in the LMIC at Ministryand other provincial Employment Services Centres.
2. Set up and install infrastructure configuration and IT equipment system.3. Transfer technology to and train the Ministry staff responsible for management of
equipment delivered and installed by Bidder.4. Supply warranty, maintenance for hardware and software supplied by Bidder.
This ITB consists of two packages:- Package 1: equipment for a integrated Data Centre (LMIC) located at
o Ministry of Labour, Invalids, and Social AffairsNo2 Dinh Le Street, Hoan Kiem District, Hanoi, Vietnam
- Package 2: equipment for 5 Provincial Employment Services Centres (5 ESCs)
located ato Ha Noi ESC: 285 Trung Kinh Street, Yen Hoa, Cau Giay district, Ha Noio Hai Duong - ESC: 106 Hong Quang Street, Hai Duong Cityo Da Nang - ESC: No.21 Phan Chu Trinh Street- a Nang Cityo Dong Nai - ESC: 62/8, Cach mang T8 Street, Quang Vinh, Bien Hoa Cityo HCMC - ESC: 153 Xo Viet Nghe Tinh Street, Binh Thanh district, HCM City
- As both packages are part of the same system, Bidders are required to bid for bothpackages. (See Page 16 for the overall design plan.)
- Bid evaluation and contract award shall therefore be to the Bidder who has the bestoverall bid.
- The total price of two bids shall include expenses for equipment, installation,configuration, connection and warranty service.
For reference, here-in after is the overall design of Labour Market Information System that willbe deployed at MOLISA and other provincial Employment Services Centres via this bid.
In submission documents, the Bidder will propose the design of Labour Market InformationSystem that may be more detailed and slightly different depend on their particular devices andtechnologies.
8/14/2019 Annex 3 (ITB Document)
17/118
17
Overall design of LMIS
8/14/2019 Annex 3 (ITB Document)
18/118
18
BID PACKAGE 1
Labour Market Information Data
Centre (LMIC)
List of goods and related services
8/14/2019 Annex 3 (ITB Document)
19/118
19
PACKAGE 1 BID Labour Market Information Data Centre (LMIC)
LIST OF GOODS AND RELATED SERVICES
No Description of Goods Quantity Unit Warranty1 Server Farm Firewall 01 Unit 1 Year 2 Internet Firewall 01 Unit 3 Years 3 Core Switch 02 Unit 1 Year 4 Server Farm Switch 02 Unit 1 Year 5 User Access Switch 02 Unit 1 Year 6 Internet Router 01 Unit 3 Years 7 Cluster Host For Database Server 02 Unit 3 Years 8 Web Server 03 Unit 3 Years 9 Backup Server 02 Unit 3 Years 10 DNS Server 02 Unit 3 Years
11 Anti-Virus Server 01 Unit 3 Years 12 Rack Cabinet + KVM Switch 01 Unit 1 Year 13 Rack Cabinet 01 Unit 1 Year 14 External Storage System 01 Unit 3 Years 15 SAN Switch 02 Unit 3 Years 16 Tape Library 01 Unit 3 Years 17 Backup Software 01 License 1 Year support 18 Microsoft Windows Server 2008
Enterprise 02 License 1 Year support
19 Microsoft Windows Server 2008Standard
10 License 1 Year support
20 Microsoft SQL Server 2008 Enterprise 02 License 1 Year support 21 Raised Floor 01 Floor 1 Year 22 Electric Generator 01 Unit 1 Year 23 SMART-UPS 40KVA 3 PHASE 01 Unit 2 Years 24 Air Conditioner 02 Unit 1 Year 25 Automatic Fire Warning & Fire
Extinguishing System 01 System 1 Year
26 Surge Protection Unit for Power Line 01 Unit 1 Year 27 Surge Protection Unit for LAN 01 Unit 1 Year 28 Surge Protection Unit for TELEPHONE 01 Unit 1 Year 29 Earth Grounding Point 01 System 1 Year 30 Electric cabinet, main cable & spares 01 Server
Room 1 Year
31 Installation, configuration, training andTechnical supporting
01 Project
8/14/2019 Annex 3 (ITB Document)
20/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
20
DETAIL TECHNICAL SPECIFICATIONS AND REQUIREMENTS
The Bidder must provide the original technical document from the Manufacturer to the bid equipment. In the reques
the Bidder must prove the response level for request with explanation and relevant technical parameter. The Bidder alsoitem of the attached technical document the Bidder bases on. If the Bidder doesnt have full explanation or cannot showlevel for request or cannot refer to technical document of the bidding document, the Bidder doesnt pass at the requirement
No Requirement Satisfied level
Satisfy Acceptable
(1) (2) (3) (4)
A Provision scale
Comparison withtypes and quantitymentioned in
technicalrequirement bellow
Fully Compliance insufficietype
B Feature, technical parameter of products
Quality All goods and accessories are new100%.
All goodsnew or ha
1 SERVER FARM FIREWALL
Form Factor 19" standard rack mount Not availa
Users/Nodes Unlimited >= 10,000 < 10,000
Firewall Throughput 650 Mbps < 650 Mb
IPS Throughput 650 Mbps < 650 Mb
3DES/AES VPNThroughput 325 Mbps < 325 Mb
Concurrentconnection 400,000 >= 380,000 < 380,000
8/14/2019 Annex 3 (ITB Document)
21/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
21
New connection persecond 25,000 >= 24,000 < 24,000
Virtual Interfaces (VLANs) 200 VLAN >=180 VLAN < 180 VL
VPN Expansion VPN clustering & load balancing Not compbalancing
High Availability Active/Active & Active/Standby Not compActive/St
LAN Port 4 ports Gigabit Ethernet 1 port Fast Ethernet Up to 8 ports Gigabit Ethernet
Not have Ethernet a1 port FasOr not supEthernet
Memory 1 GB < 1 GB
System Flash 64 MB < 64 MBIPS ModuleMemory 4 GB < 4 GB
IPS Flash 2 GB < 2 GB
IPS Features
- Layers 2 through 7 inspection - Accurate inline prevention technology - Uses multivector threat identificationto protect the network from policyviolations, vulnerability exploitations,and anomalous activity
Not comp- Layers 2- Accurat- Uses muto protectviolationsand anom
Warranty 1 Year < 1 Year 2 INTERNET FIREWALL
Form Factor 19" standard rack mount Not availa
8/14/2019 Annex 3 (ITB Document)
22/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
22
Users license Unlimited >= 10,000 < 10,000
Firewall throughput 1.8 Gbps >= 1.75 Gbps < 1.75 Gb
VPN throughput 250 Mbps < 250 Mb
Concurrent sessions 1,100,000 >= 1,000,000 < 1,000,0
Interfaces 06 x 10/100/1000 Mbps Not have
Storage 160 GB >= 120 GB < 120 GB
DHCP server andrelay Support Not supp
Layer-2 (bridge) Support Not suppo
Firewall Features
- VoIP - IM: MSN, Yahoo, ICQ, Skype... - Peer-to-peer: Kazaa, Gnutella,
BitTorrent,..
Not comp- VoIP - IM: MS- Peer-to-BitTorren
VPN Features
- AES 128-256 bit - 3DES 56-168 bit - Star and mesh - Integrated certificate authority
Not comp- AES 12- 3DES 5- Star and- Integrate
IPS Features
- Blocks attacks such as DoS - Port scanning - IP/ICMP/TCP-related - DNS cache poisoning - FTP bounce - Signature-based and protocol anomaly
Not comp- Blocks a- Port sca- IP/ICMP- DNS cac
- FTP bou- Signatur
URL Filtering - 20 million URLs covering 3 billionWeb pages Not comp- 20 millio
8/14/2019 Annex 3 (ITB Document)
23/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
23
- 70 languages spanning 200 countries - Centralized, daily updates
Web page- 70 langu- Centrali
Anti-Virus/Anti-Spyware
- Protects HTTP, FTP, POP3, andSMTP protocols - Pattern-based spyware - Centralized, daily updates
Not comp- ProtectsSMTP pro- Pattern-b- Centrali
Messaging Security
- Email IPS - Pattern-based anti-spam - IP reputation checking - Signature-based antivirus - Zero-hour outbreak protection - Block/allow lists
Not comp- Email IP- Pattern-b- IP reput- Signatur- Zero-ho- Block/al
Protocol/applicationsupport 200 >= 175 < 175
Gateway HighAvailability Active/passive and active/active failover
Not compActive/pa
ISP redundancy Support Not suppo
Services support services including Troubleshooting HW, Upgrade software &firmware within 3 years
Not incluTrouble ssoftware &
Security Software
Security (Firewall, IPSec & SSL VPN,Anti-Virus, Anti-Spyware,) withnetwork access control (NAC), programcontrol and VPN (IPSec & SSL) Included: 155 User Licenses
150 User Licenses
Not have IPSec & SSpyware,control (NVPN (IPS< 150 Use
Security functions 3 Years 3 Years < 3 Years
8/14/2019 Annex 3 (ITB Document)
24/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
24
update services
Software update andsupport services 3 Years
3 Years < 3 Years
Warranty 3 Years < 3 Years3 CORE SWITCH
Form Factor 1U 19" standard rack mount Not availaor not 1U
Port Configuration - 24 port 10/100/1000 Base-T - 4 port SFP
Not comp- 24 port - 4 por SF
High Availabality StackWise technology Not suppo
Switching Capacity 32 Gbps < 32 Gbp
Forwarding Rate 38.7 Mpps >= 38.0 Mpps < 38.0 Mp
MAC addresssupport 12,000 < 12,000
VLAN support - 1,005 VLAN - 4,000 VLAN ID
Not suppo4,000 VL
Spanning-treesupport 128 >= 120 < 120
IGMP Group &multicast routesupport
1,000 >= 800 < 800
Unicast routesupport 20,000 >= 18,000 < 18,000
Operating System - Latest OS version - Support basic RIP and static routing - Upgradable to full dynamic routing
Not comp- Latest O- Support- Upgrada
8/14/2019 Annex 3 (ITB Document)
25/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
25
DRAM Memory 128 MB >= 120 MB < 120 MB
Flash Memory 32 MB >= 30 MB < 30 MB
QoS Features
- 802.1p CoS - 4 egress queues/port - Shaped Round Robin (SRR) - Weighted Tail Drop (WTD) - Strict priority queuing - Committed information rate (CIR)function - Asynchronous data flows upstreamand downstream - Up to 64 aggregate or individualpolicers
Not comp
- 802.1p C- 4 egress- Shaped - Weighte- Strict pr- Commitfunction - Asynchrand down- Up to 64policers
Security Features
- IEEE 802.1x - VLAN ACLs - Port-based ACLs for Layer 2interfaces - Private VLAN - DHCP Snooping - Dynamic ARP Inspection - IP source guard - TACACS+ and RADIUSauthentication - Bridge protocol data unit (BPDU)guard - Spanning Tree Root Guard (STRG) - IGMP filtering Dynamic VLANassignment - 1000 access control entries (ACEs) aresupported
Not comp- IEEE 80- VLAN A- Port-basinterfaces- Private V- DHCP S- Dynami- IP sourc- TACACauthentica- Bridge pguard - Spannin- IGMP fiassignmen- 1000 accsupported
8/14/2019 Annex 3 (ITB Document)
26/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
26
Warranty 1 Year < 1 Year
4 SERVER FARM SWITCH
Form Factor 1U 19" standard rack mount Not availa
or not 1U
Port Configuration - 24 port 10/100/1000 Base-T - 4 port SFP
Not comp- 24 port - 4 por SF
Switching Capacity 32 Gbps < 32 Gbp
Forwarding Rate 38.7 Mpps >= 38.0 Mpps < 38.0 Mp
MAC addresssupport 12,000 < 12,000
VLAN support - 1,024 VLAN - 4,000 VLAN ID Not suppo4,000 VL
Spanning-treesupport 128 >= 120 < 120
IGMP Group &multicast routesupport
1,000 >=900 < 900
Unicast routesupport 11,000 >= 10,000 < 10,000
Operating System - Latest OS version - Support basic RIP and static routing - Upgradable to full dynamic routing
Not comp- Latest O- Support- Upgrada
DRAM Memory 128 MB >= 120 MB < 120 MBFlash Memory 32 MB >= 30 MB < 32 MB
QoS Features - 802.1p CoS - 4 egress queues/port
Not comp- 802.1p C
8/14/2019 Annex 3 (ITB Document)
27/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
27
- Shaped Round Robin (SRR) - Weighted Tail Drop (WTD) - Strict priority queuing - Committed information rate (CIR)
function - Asynchronous data flows upstreamand downstream - Up to 64 aggregate or individualpolicers
- 4 egress- Shaped - Weighte- Strict pr
- Commitfunction - Asynchrand down- Up to 64policers
Security Features
- IEEE 802.1x - VLAN ACLs - Port-based ACLs for Layer 2interfaces - Private VLAN
- DHCP Snooping - Dynamic ARP Inspection - IP source guard - TACACS+ and RADIUSauthentication - Bridge protocol data unit (BPDU)guard - Spanning Tree Root Guard (STRG) - IGMP filtering Dynamic VLANassignment - 2000 access control entries (ACEs) aresupported
Not comp- IEEE 80- VLAN A- Port-basinterfaces- Private V- DHCP S- Dynami- IP sourc- TACACauthentica- Bridge pguard - Spannin- IGMP fiassignmen- 2000 accsupported
Warranty 1 Year < 1 Year
5 USER ACCESS SWITCH
Form Factor 1U 19" standard rack mount Not availaor not 1U
8/14/2019 Annex 3 (ITB Document)
28/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
28
Port Configuration - 24 port 10/100Base-T - 2 port 10/100/1000BT or SFP uplinks
Not comp- 24 port - 2 port 10
Switching Capacity 8.8 Gbps >= 8.5 Gbps < 8.5 Gbp
Forwarding Rate 6.6 Mpps >= 6.5 Mpps < 6.5 Mpp
MAC addresssupport 8,000 < 8,000
VLAN support 32 VLAN < 32 VLA
DRAM Memory 32 MB < 32 MB
Flash Memory 16 MB < 16 MB
Warranty 1 Year < 1 Year
6 INTERNET ROUTER
Form Factor 1U 19" standard rack mount Not availaor not 1U
Architecture
- 4 slots support HWIC, WIC, VIC, orVWIC type modules - 1 slot supports NM and NME typemodules - 2 PVDM (DSP) Slots on Motherboard
Not comp- 4 slots sVWIC typmodules - 1 slot sumodules - 2 PVDM
VPN Acceleration - Hardware integrated on motherboard - Support DES, 3DES, AES 128, AES192, and AES 256
Not comp- Hardwar- Support
192, and AFast Switching 60 Mbps >= 56 Mbps < 56 Mbp
Forwarding Rate 120 Mpps >= 116 Mpps < 116 Mp
8/14/2019 Annex 3 (ITB Document)
29/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
29
LAN Interface 02 port 10/100 RJ-45 Not have
WAN Interface - 2 port Serial - Support bandwidth up to 2 Mbps
Not comp- 2 port S- Support
Cable - 1 Power Cable - 2 V35 Smart Serial cable
Not have - 1 Power- 2 V35 S
DRAM Memory 256 MB, up to 768 MB 256 MB, up to 512 MB 256 MB,
Flash Memory 64 MB, up to 256 MB 64 MB, up to 128 MB 64 MB, n
Warranty 1 Year < 1 Year
7 CLUSTER HOST FOR DATABASE SERVER
Form Factor 4U, 19" standard rack mount > 4U or n
Processor 04 x 6-Core Intel Xeon Processor 2.66GHz
Not enouProcessor
Chipset Intel 7300 Chipset Not Intel
Memory 32GB PC2-5300 RAM < 32GB P
Maximum memory Support up to 256GB PC2-5300 RAM(32 DIMM sockets)
< 256GB sockets
Memory Protection - Advanced ECC - Mirrored Memory - Online Spare Memory
Lack of o- Advance- Mirrored- Online S
Hard disk 04 x 146GB 10k 2.5 SAS HDD Not enouHDD
Internal Disk bays 16 Internal Disk Bays SFF SAS orSATA
< 16 InterSATA
Storage controller SAS/SATA Controller with 512 MB SAS/SATA
8/14/2019 Annex 3 (ITB Document)
30/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
30
BBWC Controller BBWC C
RAID Support RAID 0; 1; 1 + 0; 5; 6 Only have RAID 0, 1, 5, 6 Lack of osupports:
Optical Drive Slimline DVD-ROM Drive (8X/24X) Not have (8X/24X)
Expansion slots Up to 11 (PCI-X and PCI-Express) - (4) full length PCI-E x8 - (1) full length PCI-E x4 and
- (3) half length PCI-E x4 slots; - Optional card adds (3) PCI-X or (3)PCI-E x8
Only have 10 following slots: (4) full length PCI-E x8, (1) full lengthPCI-E x4 and (3) half length PCI-E x4slots; Optional card adds (2) PCI-X or (2)PCI-E x8
Not have (4) full lePCI-E x4slots; Optional PCI-E x8
Network Controller Two embedded Multifunction GigabitNetwork Adapters with ToE, includingsupport for Accelerated iSCSI throughan optional Licensing Kit
Not enouMultifuncAdapters for Acceleoptional L
Graphics Integrated 32MB Graphic RAM < 32MB oGraphic R
Interfaces - 02 x VGA ports- 05 x USB 2.0 ports - 01 x Remote Management port
Lack of o- 02 x VG- 05 x US- 01 x Rem
FC controller 02 x Fibre Channel Host Bus Adapters 4Gb for connect to SAN
02 x FC HBA > 3Gb < 02 x FibAdapters
Operating system
and Virtualizationsoftware supports
- Microsoft Windows Server
- Microsoft Windows Server Hyper-V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- SuSE Linux Enterprise Server- Novell NetWare
Only have these OS supports:
- Microsoft Windows Server- Microsoft Windows Server Hyper-V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- Novell NetWare
Lack of o
supports:- Microso- Microso- Oracle E- Red Hat
8/14/2019 Annex 3 (ITB Document)
31/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
31
- Sun Solaris for x64/x86-basedSystems- VMware Virtualization Software- Citrix XenServer
- Sun Solaris for x64/x86-basedSystems- VMware Virtualization Software- Citrix XenServer
- Novell N- Sun SolSystems- VMware
- Citrix XOnboardAdministrator
- Rom-based Setup Utility and OptionRom Configuration for Arrays- Automatic Server Recovery - Virtual Unit ID control - Dynamic Sector Repairing (with SmartArray controller) - Drive Parameter Tracking (with SmartArray controller) - Hot Spare Boot
Not have - Rom-baRom Con- Automa- Virtual U- DynamiArray con- Drive PaArray con- Hot Spa
Power supply 02 x Hot-plug 1200W 12V AC PowerSupply Supports DC power supply
Less thannot suppo
Warranty 3 years < 3 years
8 WEB SERVER
Form Factor 4U, 19" standard rack mount > 4U or n
Processor 02 x 6-Core Intel Xeon Processor2.66GHz
Not enouProcessor
Chipset Intel 7300 Chipset Not Intel
Memory 16 GB PC2-5300 RAM < 16GB P
Maximum memory Support up to 256GB PC2-5300 RAM(32 DIMM sockets) < 256GB sockets
Memory Protection - Advanced ECC - Mirrored Memory
Lack of ofunctions
8/14/2019 Annex 3 (ITB Document)
32/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
32
- Online Spare Memory - Advance- Mirrored- Online S
Hard disk 04 x 146GB 10k 2.5 SAS SP HDD Not enouSP HDD
Internal Disk bays 16 Internal Disk Bays SFF SAS orSATA
Not have SAS or SA
Storage controller SAS/SATA Controller with 512 MBBBWC Controller SAS/SATBBWC C
RAID Support RAID 0; 1; 1 + 0; 5; 6 Only have RAID 0, 1, 5, 6 Lack of osupports:
Optical Drive Slimline DVD-ROM Drive (8X/24X) Not have (8X/24X)
Expansion slots Up to 11 (PCI-X and PCI-Express) - (4) full length PCI-E x8 - (1) full length PCI-E x4 and
- (3) half length PCI-E x4 slots; - Optional card adds (3) PCI-X or (3)PCI-E x8
Only have 10 following slots: (4) full length PCI-E x8, (1) full lengthPCI-E x4 and (3) half length PCI-E x4slots; Optional card adds (2) PCI-X or (2)PCI-E x8
Not have
(4) full lePCI-E x4slots; Optional PCI-E x8
Network Controller Two embedded Multifunction GigabitNetwork Adapters with ToE, includingsupport for Accelerated iSCSI throughan optional Licensing Kit
Not enouMultifuncAdapters for Acceleoptional L
Graphics Integrated 32MB Graphic RAM < 32MB oRAM
Interfaces - 02 x VGA ports- 05 x USB 2.0 ports - 01 x Remote Management port
Lack of o- 02 x VG- 05 x US- 01 x Rem
8/14/2019 Annex 3 (ITB Document)
33/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
33
FC controller 2 x Fibre Channel Host Bus Adapters 4Gb for connect to SAN
02 x FC HBA > 3Gb < 02 x FiAdapters
Operating systemand Virtualizationsoftware supports
- Microsoft Windows Server- Microsoft Windows Server Hyper-V - Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- SuSE Linux Enterprise Server- Novell NetWare- Sun Solaris for x64/x86-basedSystems- VMware Virtualization Software- Citrix XenServer
Only have these OS supports: - Microsoft Windows Server- Microsoft Windows Server Hyper-V - Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- Novell NetWare- Sun Solaris for x64/x86-basedSystems- VMware Virtualization Software- Citrix XenServer
Lack of osupports:- Microso- Microso- Oracle E- Red Hat- Novell N- Sun SolSystems- VMware- Citrix X
OnboardAdministrator
- Rom-based Setup Utility and OptionRom Configuration for Arrays- Automatic Server Recovery - Virtual Unit ID control - Dynamic Sector Repairing (with SmartArray controller) - Drive Parameter Tracking (with SmartArray controller) - Hot Spare Boot
Not have
- Rom-baRom Con- Automa- Virtual U- DynamiArray con- Drive PaArray con- Hot Spa
Power supply 02 Hot-plug 1200W 12V AC PowerSupply Supports DC power supply
Less thannot suppo
Warranty 3 years < 3 years9 BACKUP SERVER
Server type 4U, 19 Rackmount > 4U or n
8/14/2019 Annex 3 (ITB Document)
34/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
34
Processor Quad-Core Intel Xeon Processor X5550(2.66 GHz) Quad-CorGHz
Chipset Intel 5520 Chipset Not Intel
Memory 6 GB PC3-10600R DDR3-1333 < 6 GB P
MemoryUpgradeable
18 DIMM sockets Support up to 144GB DDR3 Registered(RDIMM) memory
< 18 DIMRegistere
Memory type - DDR3 Registered (RDIMM) memory - DDR3 Unbuffered (UDIMM) memory
Not comptypes: - DDR3 R- DDR3 U
Memory Protection - Advanced ECC - Mirroring mode
- Lockstep mode
Lack of ofunctions- Advance
- Mirrorin- Lockste
Hard disk 04 x 146GB 15K SAS HDD < 04 x 14
Internal Storage
- Up to 24 Hot Plug SFF - Up to 14 Hot Plug LFF - Two open half-height media baysavailable for tape drives, optical media,optional SAS HDD cage
< 24 Hot Plug LFF- Not havheight medrives, opHDD cag
Storage controller SAS/SATA Controller with 512 MBBBWC Controller SAS/SATBBWC C
RAID Support RAID 0/1/1+0/5/5+0/6 Only have these RAID supports: RAID0/1/5/5+0/6 Not have 0/1/1+0/5
Optical Drive SATA DVD ROM Not Not h
8/14/2019 Annex 3 (ITB Document)
35/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
35
Expansion slots Nine (9) available PCI-Express Gen2slots < 09 PCI-
Graphics Integrated 64 MB video standard Less than
Network Controller Integrated Quad Port MultifunctionGigabit Server Adapter Not have Multifunc
Interfaces
- 05 total USB ports - 01 Dedicated USB 2.0 Port (availablefor DAT USB tape connectivity) - 01 internal Secure Digital (SD) slot - 01 Remote management port - 02 x VGA port
Not have - 05 total - 01 Dedifor DAT U- 01 intern- 01 Remo
FC controller 02 x Fibre Channel Host Bus Adapters 4Gb 02 x FC HBA > 3Gb < 02 02 x
Adapters
Power supply 02 x Hot-plug AC 460W Power supplyUnit 480W < 02 pow
power sup
Operating systemSupports
- Microsoft Windows Server- Microsoft Windows Server Hyper V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- SuSE Linux Enterprise Server- Novell NetWare- Sun Solaris for x64/x86-basedSystems - VMware - Citrix Essentials for XenServer
Only have these OS supports: - Microsoft Windows Server- Microsoft Windows Server Hyper V - Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- Novell NetWare- Sun Solaris for x64/x86-basedSystem - VMware - Citrix Essentials for XenServer
Lack of osupports:- Microso- Microso- Oracle E- Red Hat- Novell N- Sun SolSystems - VMware- Citrix E
Warranty 3 years < 3 years 10 DNS SERVER
Server type 2U, 19 Rackmount >2U or no
8/14/2019 Annex 3 (ITB Document)
36/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
36
Processor Quad-Core Intel Xeon Processor X5550(2.66 GHz) Quad-CorGHz
Chipset Intel 5520 Chipset Not Intel
Memory 4GB PC3-10600R DDR3-1333 < 4GB PC
Memory Upgradable 18 DIMM sockets Support up to 144GB DDR3 Registered(RDIMM) memory
< 18 DIMRegistere
Memory type - DDR3 Registered (RDIMM) memory - DDR3 Unbuffered (UDIMM) memory
Not comptypes: - DDR3 R- DDR3 U
Memory Protection
- Advanced ECC (multi-bit errorprotection) - Mirroring mode - Lockstep mode
Lack of o- Advanceprotection
- Mirrorin- Lockste
Harddisk 02 x 146GB 15K SAS HDD < 03 x 14
Internal Disk bays Up to 16 Hot Plug SFF Up to 6 Hot Plug LFF < 16 Hot LFF
RAID Support RAID 0/1/1+0 Only have these RAID supports: RAID0/1
Not have 0/1/1+0
Expansion slots Six (6) available - optional PCI-X/PCI-Express or x16 PCI riser < 6 expasPCI-X/PC
Graphics Integrated 32MB Graphic RAM < 32MB oGraphic R
Network Controller 02 x Dual Port Multifunction GigabitServer Adapters with ToE, includingsupport for Accelerated iSCSI through
< 02 x DuServer Adsupport fo
8/14/2019 Annex 3 (ITB Document)
37/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
37
an optional Licensing Kit an option
Interfaces - 05 total USB ports - 01 internal Secure Digital (SD) slot
- 01 Remote management port
Not have - 05 total - 01 intern- 01 Remo
Optical drive SATA DVD-ROM Not have
Power supply 02 x Hot-plug AC 460W Power supply 02 x Hot-plug AC 480W Powersupply
< 02 powpower sup
Operating systemSupports
- Microsoft Windows Server- Microsoft Windows Server Hyper-V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- SuSE Linux Enterprise Server- Novell NetWare- Sun Solaris for x64/x86-based
Systems
Only have these OS supports: - Microsoft Windows Server- Microsoft Windows Server Hyper-V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- Novell NetWare- Sun Solaris for x64/x86-basedSystems
Lack of osupports:- Microso- Microso- Oracle E- Red Hat- Novell N- Sun SolSystems
IntegratedHypervisors(Optional)
- VMware 3i virtualization technology - Citrix XenServer virtualizationtechnology
Not have features:- VMware- Citrix Xtechnolog
Warranty 3 years < 3 years
11 ANTI-VIRUS SERVER
Server type 2U, 19 Rackmount >2U or no
Processor Quad-Core Intel Xeon Processor X5550(2.66 GHz) Quad-CorGHz
Chipset Intel 5520 Chipset Not Intel
Memory 4GB PC3-10600R DDR3-1333 < 4GB PC
8/14/2019 Annex 3 (ITB Document)
38/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
38
Memory Upgradable 18 DIMM sockets Support up to 144GB DDR3 Registered(RDIMM) memory
< 18 DIMRegistere
Memory type - DDR3 Registered (RDIMM) memory - DDR3 Unbuffered (UDIMM) memory
Not comptypes: - DDR3 R- DDR3 U
Memory Protection
- Advanced ECC (multi-bit errorprotection) - Mirroring mode - Lockstep mode
Lack of o- Advanceprotection- Mirrorin- Lockste
Harddisk 02 x 146GB 15K SAS HDD < 02 x 14
Internal Disk bays Up to 16 Hot Plug SFF Up to 6 Hot Plug LFF
< 16 Hot LFF
RAID Support RAID 0/1/1+0 Only have these RAID supports: RAID0/1
Not have 0/1/1+0
Expansion slots Six (6) available - optional PCI-X/PCI-Express or x16 PCI riser < 6 expasPCI-X/PC
Graphics Integrated 32MB Graphic RAM < 32MB oGraphic R
Network Controller
02 x Dual Port Multifunction GigabitServer Adapters with ToE, includingsupport for Accelerated iSCSI throughan optional Licensing Kit
< 02 x DuServer Adsupport foan option
Interfaces - 05 total USB ports - 01 internal Secure Digital (SD) slot - 01 Remote management port
Not have - 05 total - 01 intern- 01 Remo
8/14/2019 Annex 3 (ITB Document)
39/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
39
Optical drive SATA DVD-ROM Not have
Power supply 02 x Hot-plug AC 460W Power supply 02 x Hot-plug AC 480W Powersupply
< 02 powpower sup
Operating systemSupports
- Microsoft Windows Server - Microsoft Windows Server Hyper-V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- SuSE Linux Enterprise Server- Novell NetWare- Sun Solaris for x64/x86-basedSystems- VMware Virtualization Software- Citrix XenServer
Only have these OS supports: - Microsoft Windows Server- Microsoft Windows Server Hyper-V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- Novell NetWare- Sun Solaris for x64/x86-basedSystems- VMware Virtualization Software- Citrix XenServer
Lack of osupports:- Microso- Microso- Oracle E- Red Hat- Novell N- Sun SolSystems- VMware- Citrix X
IntegratedHypervisors(Optional)
- VMware 3i virtualization technology
- Citrix XenServer virtualizationtechnology
Not have features:- VMware- Citrix Xtechnolog
Warranty 3 years < 3 years
12 RACK CABINET
Rack type Universal Rack 42U Shock Rack < 42U Un
Cooling Rack Airflow Optimization Kit Not have Kit
Grounding Rack Grounding Kit Not have
Stabilizer 600W Stabilizer Kit Not have
Sidepanel Sidepanel Kit Not have
PDU High Voltage Modular PDU Not have
8/14/2019 Annex 3 (ITB Document)
40/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
40
Power Cord 16A C19 DK Power Cord Not have
Management
CAT 5 / 0*1*8 Port KVM Switch + 8Console Cables Rackmount pointing device & 17 LCDMonitor
Not IncluKVM SwRackmouMonitor
Other Rack and servers are from the sameManufacturer Racks andManufact
Warranty 1 year < 1 year
13 RACK CABINET
Rack type Universal Rack 42U Shock Rack < 42U Un
Cooling Rack Airflow Optimization Kit Not have Kit
Grounding Rack Grounding Kit Not have
Stabilizer 600W Stabilizer Kit Not have
Sidepanel Sidepanel Kit Not have
PDU High Voltage Modular PDU Not have
Power Cord 16A C19 DK Power Cord Not have
Other Rack and servers are from the sameManufacturer Racks andManufact
Warranty 1 year < 1 year
14 EXTERNAL STORAGE SYSTEM
Form factor Rackmount Not rackm
Hard drive 16 x 300GB 15K rpm FC HDD < 16 x 30
Drive Support - FC- FATA
Lack of o- FC
8/14/2019 Annex 3 (ITB Document)
41/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
41
- FC Solid State Disk - FATA - FC Solid
Maximum DrivesPer Enclosures 12
11 < 11
Maximum Enclosure 8 < 8
Number of Drives Minimum: 6 SSD, 8 FC and FATA Maximum: 8 SSD, 96 FC and FATA
MaximumFATA
Maximum Capacity 96TB < 96TB
RAID Support Vraid0, Vraid1, Vraid 0+1, Vraid5,Vraid 0+5, Vraid 6 & Cross VraidSnaps
Lack of osupports: Vraid5, VVraid Sna
LUN size Up to 32TB < 32TB
Number of controllers 2
< 2
Cache Size (perController Pair) 4GB
< 4GB
Battery Backup forCache Up to 96 hours
95 hours < 95 hour
Host Connectivity Fibre Channel, iSCSI and DirectConnect Not have Direct Co
Number of HostSupported (Single Path/DualPath)
512/256
< 512/256
Host Ports (percontroller pair)
4 or 2 embedded FC switches with ten8Gb/s FC SAN ports per controller
Not have with ten 8controller
Device Connectivity Redundant FC-AL pairs from each Not have
8/14/2019 Annex 3 (ITB Document)
42/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
42
controller to switched JBOD forredundant paths to dual drive ports
each contredundan
Device Ports (percontroller pair) 4
< 4
Device Port Speed 4 Gb < 4Gb
Maximumthroughput (MB/s) 1550
>1500 140,000 IO/sec
8/14/2019 Annex 3 (ITB Document)
43/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
43
- Apple Mac OSX - Citrix Xen
- Apple Mac OSX - Citrix Xen
- Apple M- Citrix X
Supported Softwares
- Continuous Access
- StorageWorks Cluster Extenstion- Business Copy- Dynamic Capacity Management - Secure Path - Data Protector - System Insight Manager - Storage Mirroring
Only have these supported softwares: - Continuous Access- StorageWorks Cluster Extenstion- Business Copy- Dynamic Capacity Management - Secure Path - Data Protector - System Insight Manager
Lack of osoftwares- Continu- StorageW- Busines- Dynami- Secure P- Data Pro- System
Other External Storage system and servers arefrom the same Manufacturer External Snot from t
Warranty 3 years < 3 years
15 SAN SWITCH Switch core 1U Rackmount > 1U rack
Fabric latency 8 Gbps < 8 Gbps
Maximum Ports 24 < 24
Minimum Ports 16 > 12 < 12
Aggregate SwitchBandwidth
384 Gbps > 380 Gbps < 380 Gb
Protocol Support Fibre Channel Not FC
High Availability
Features
No single point of failure. Hot code
load. Ports on demand with nodowntime
Not have
of failure,demand w
Models Available Full Fabric Not Full F
Maximum frame 2112-byte payload < 2112 by
8/14/2019 Annex 3 (ITB Document)
44/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
44
size
Classes of service Class 2, Class 3, Class F (inter-switchframes)
Lack of o2, Class 3
Port types FL_Port, F_Port, and E_Port; self-discovery based on switch type(U_Port)
Lack of oFL_Port, discovery(U_Port)
USB One USB port for system log filedownloads or firmware upgrades
Not have download
Media types B-Series Branded Small Form-FactorPluggable (SFP)
Not have
Laser Short-wave up to 1,640 ft (500 m);long-wave up to 6.2 mi (10 km) whenavailable
Not have up to 1,646.2 mi (10
Supported softwares Telnet, RADIUS,SNMP, Web Tools,Enhanced Group Management,Advanced Zoning, Fabric Watch,Extended Fabric, Adaptive Networking,Advanced Performance Monitoring, ISLTrunking, Fabric Manager,, Data CentreFabric Manager
Only have these supported softwares:SNMP, Web Tools, Enhanced GroupManagement, Advanced Zoning,Fabric Watch, Extended Fabric,Adaptive Networking, AdvancedPerformance Monitoring, ISLTrunking, Fabric Manager,, DataCentre Fabric Manager
Lack of osoftwaresEnhancedAdvancedExtendedAdvancedTrunkingFabric Ma
Management access 10/100 Ethernet (RJ-45), serial port Not have managem
Diagnostics POST and embedded online/offlinediagnostics
Not have online/off
Other SAN Switch and servers are from thesame Manufacturer SAN Swithe same M
Warranty 3 years < 3 years
16 TAPE LIBRARY
8/14/2019 Annex 3 (ITB Document)
45/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
45
Form Factor 4U Rackmount > 4U Rac
Tape DrivesSupported
LTO-4 Ultrium 1840LTO-4 Ultrium 1760LTO-3 Ultrium 960LTO-3 Ultrium 920
Lack of odrives:- LTO-4 U- LTO-4 U- LTO-3 U- LTO-3 U
Number of TapeDrives 2
< 2
Maximum TapeDrives 4
< 4
Number of TapeCartridge 40
< 40
Maximum CartridgeSlots 48
47 < 47
Maximum capacity Native: 38.4 TB Compressed (2:1): 76.8 TB Capacity (native) a
Maximum TransferRate
Native: 576 GB/hr (two drives), 1.1TB/hr (four drives) Compressed (2:1): 1.1 TB/hr (twodrives), 2.3 TB/hr (four drives)
Not have - Native: TB/hr (fo- Compredrives), 2
Interface 3Gb/sec SASUltra320 LVD SCSI
Not have - 3Gb/sec- Ultra320
MSBF 2 Million robot load/unload cycles < 2 Millio
MTBF 100,000 hours (based on 1M MSBF) < 100,000
Average CartridgeSwap Time 45 seconds (drive to slot, slot to drive)
> 45s
8/14/2019 Annex 3 (ITB Document)
46/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
46
Initialization Time 80 to 120 seconds > 120s
Inventory Time 2:15 minutes (using bar code labeledcartridges) < 2:30 minutes > 2:30
Connectors
Mini-SAS (located on back of MSL4048 SAS model only)(1) RJ-45 (located on back of MS4048)(1) USB port (located on back of MSL4048)
Lack of oMini-SASMSL4048(1) RJ-45(1) USB pMSL4048
Inventory Time 4 minutes > 4 minut
ManagementInterface
10/100 Mbytes/second, auto-configuring interface. RJ-45 connection.Https configurable.
Not have
Power 312 Watts (max) > 312W
Other Tape Library and servers are from thesame Manufacturer Tape Librthe same M
Warranty 3 years < 3 years
17 BACKUP SOFTWARE
Reduced recoverytime
Ability to restore data instantly whenbackup to disk, unlike a tape drive thathas to be mounted, loaded and searched
Not have
Improved backupperformance
Backing up to disk allows data to becopied at the optimum level of performance - performing a full backupor smaller incremental backups
Not have
Storage capacityreduction
Data reduction technology (Virtual andSynthetic Full) helps eliminate the needto backup the same data multiple timestherefore reducing the disk and tapecapacity
Not have
8/14/2019 Annex 3 (ITB Document)
47/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
47
Branch officebackupconsolidation
Backup to disk allows copy the data atdistributed branch offices to a centralsite for consolidated backup
Not have
Backup to VirtualTape withDeduplication
Take full advantage of the capabilitiesin virtual tape libraries (VTL) offeringde-duplication capabilities and can storeup to 50 times as much data in a givenamount of disk space.
Not have
Advancedintegration withVirtual LibrarySystem (VLS)
Achieves unique integration withVirtual Library System (VLS) toprovide automated and transparentmovement of data between the VLS andphysical tape libraries. By offloadingthe copy operations to the VLS, trafficon the SAN is reduced, and space canbe freed up on the VLS for additional
disk backups.
Not have
Zero DowntimeBackup/InstantRecovery
Zero Downtime Backup (ZDB)addresses the needs of data Centres withzero tolerance for performance impactand the need to eliminate backupwindows.
Not have
Manager of Manage For multi-site operations, the softwareallows distribution of control to localadministrators while maintaining theability to set overall policies andmonitoring the entire enterprise backupenvironment from a central point
Not have
Protection forVirtualized Servers
Manages both the physical and virtualenvironments. This software supportsall leading virtualized environments,such as VMware, Microsoft Hyper-V,Citrix XenServer, Microsoft Virtual
Not have support oenvironmHyper-V, Virtual Se
8/14/2019 Annex 3 (ITB Document)
48/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
48
Server, Sun Solaris Zones, and HPIntegrity VM
HP Integr
Ensuring SecurityCompliance
Keeping your data secure is easy withthe centralized and having the choice of client-based encryption for end-to-endsecurity of their data. Taking advantageof the encryption functionality in LTO4tape drives for encryption with noperformance impact on backup speeds
Not have
Synthetic FullBackup/Virtual FullBackup
Synthetic backup puts a stop to the buildup of incremental backups, andeliminates the need to run lengthy fullbackups. It works by merging allincremental backups into a fullsynthetic backup. If all the backups,full and incremental, are written to the
same file library which uses adistributed file media format, an evenmore efficient type of synthetic backupis possible.
Not have
OS Support Windows 2000/XP/2003/2008/Vista;Novell NetWare/OES; HP-UX, HPMPE/iX; Sun Solaris; Linux RedHat/SUSE/Debian, United Linux; IBMAIX; SGI IRIX; SNI SINIX; SCOOpenServer, SCO Unixware; HP Tru64UNIX; OpenVMS
Not suppoWindowsNovell NeMPE/iX; Hat/SUSEAIX; SGIOpenServUNIX; Op
Other Backup Software and servers are fromthe same Manufacturer Backup Sfrom the s
18 Microsoft Windows Server 2008 Sngl OLP NL
Version Enterprise Not Enter
8/14/2019 Annex 3 (ITB Document)
49/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
49
Media Windows Svr Std 2008 32-bit/x64English Disk Kit MVL DVD Not Inclu32-bit/x64
CAL 5 User CAL < 5 User C
19 Windows Svr 2008 Sngl OLP NL Version Standard Not Stand
Media Windows Svr Ent 2008 32-bit/x64English Disk Kit MVL DVD Not Inclu32-bit/x64
CAL 5 User CAL < 5 User C
20 Microsoft SQL Server 2008 Win32 Sngl OLP NL + 10 Device CAL
Version Enterprise Not Enter
Media SQL Svr Enterprise Edtn 2008 EnglishDisk Kit MVL DVD Not Inclu2008 Eng
CAL 10 Device CAL < 10 Devi
21 Raised floor Quantity & Size 40 pieces * 600x600x32mm plate < 40 piecMaterial Steel flatform with cement core
600x600x32mm - Surface HPL anti-electrostatic
Steel flatf600x600xelectrosta
Grade Medium Lower thaDisposing load(kN/m2) 12kN/m2
11kN/m2 < 11kN/m
Cap of bearing plate 85mm x 4mm < 85mm x
Pipe 24mm 2mm thick < 24m
Warranty 1 Year < 1 Year 22 Electric Generator
Prime Power 55KVA < 55KVAStandby Power 50KVA < 50KVA
8/14/2019 Annex 3 (ITB Document)
50/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
50
Engine Type Diesel GAS or DIESEL Modality 4 Cylinders < 4 Cylin
Frequency 50Hz 50-60Hz < 50Hz, >
Anti noise cover Included Anti-Noise cover Not incluWarranty 1 Year < 1 Year
23 SMART-UPS 40KVA 3 PHASE
Output PowerCapacity
32 kW / 40 kVA < 32 kW
Nominal OutputVoltage
Within 230V,400V. 3Phase 220V,400V 3PH Out of 22
Output Voltage Note Configurable for 380 : 400 or 415 V 3Phase nominaloutput voltage
Not ConfV 3 Phaseoutput vo
Efficiency at FullLoad
96% 95% < 95%
Output VoltageDistortion
Less than 5% at full load 5% at full load > 5% at fu
Output Frequency (sync to mains)
Within 47 - 53 Hz for 50 Hz nominalrange
Out of 47range
Crest Factor Unlimited Not Unlim
Waveform Type Sine wave Sine wave Not Sine wa
Bypass Built-in Maintenance Bypass,Built-inStatic Bypass
Built-in Maintenance Bypass Not have Bypass,B
Nominal Input
Voltage
400V 3PH 390V 3PH < 390V 3
Input Frequency 47 - 70 Hz (auto sensing) Not have
Input voltage rangefor main operations
Within 304 - 477V range 310 - 480V Out of 31
8/14/2019 Annex 3 (ITB Document)
51/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
51
Maximum InputCurrent
55A 54A < 54A
Input BreakerCapacity
80A 78A < 78A
Input TotalHarmonic Distortion
Less than 5% for full load 5% for full load More than
Battery Type Maintenance-free sealed Lead-Acidbattery withsuspended electrolyte: leakproof
Not have Lead-Acielectrolyt
Included BatteryModules
4 < 4
Replacement Battery SYBT4; hotswap replacement SYBT4 Not SYBT
Backup Time 12 minutes < 12 minu
Interface Port(s) DB-9 RS-232,Smart-Slot Pre-Installed SmartSlot Cards
Lacking oRS-232,SPre-Instal
Warranty 2 Years < 2 Years
24 AIR CONDITIONER
Type Floor Standing Not Floor Capacity 48000BTU < 48000BWarranty 1 Year < 1 Year
25 AUTOMATIC FIRE WARNING & FIRE EXTINGUISHING SYSTEM
Mechanics System 4 * Cylinder Assembly, 80.0L Argoniteand Cylinder valve 1 * Completer Kit, Primary Consisting 3 * Completer Kit, Slave Consisting4 * Valve, Manifold Connection Check 1 * Valve, Non-Return Pilot Line Check 1 * Restrictor, 1-1/2" NPT Threaded
Unsuffici
8/14/2019 Annex 3 (ITB Document)
52/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
52
2 * Drain cock 360o Fire WarningSystem
1 * Fire Suppression Control Panel3 * Photoelectric Smoke Detector Withbase 3 * Heat Detector With base1 * Manual Pull amd Abort Station 1 * Alarm Bell 6''1 * Multi-tone electronic strobe/horn
Unsuffici
Installation &Accessories
Included all accessories, man power tofinish installing the system.
Warranty 1 Year < 1 Year
26 Surge Protection Unit for Power Line Connection Type Parallel Not ParalSurge CurrentCapacity
160kA < 160kA
Fault Current Rating(AIC)
65kAIC 63kAIC 8.1 volt
Insertion Loss 1 dB Connectors RJ-45 Type Not RJ-4Transmission speed 10baseT, 100baseT, 1000baseT Can run a
100baseTResponse Time
8/14/2019 Annex 3 (ITB Document)
53/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
53
Warranty 1 Year < 1 Year
28 Surge Protection Unit for TELEPHONE
Peak CurrentNormal Mode
0.20 kAmps < 0.20 kA
Peak CurrentNormal Mode
0.15 kAmps < 0.15 kA
NM Surge ResponseTime (ns)
1ns > 1ns
Warranty 1 Year < 1 Year
29 Earth Grounding Point
Standardrequirement
3 > 3
Material Included all require materials & Man-power to install, testing Earth
Grounding Point Warranty 1 Year < 1 Year
30 ELECTRIC CABINET, MAIN CABLE & SPARES
Patch Panel 24 port CAT6 Patch Panel < 24 port Requirements Including all material, goods and
accessories to completing install LAN,Power cables for Data CentreInfratructure
31 SERVICES
Installation, configuration, training andtechnical supporting
C Methodology of goods provision
Plan Make plan to provide goods in thebidding document which meets therequirement of the bidding invitation
Dont mabidding dmeets the
8/14/2019 Annex 3 (ITB Document)
54/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
54
document. invitation
Arrangement Point out solution and projectmanagement model in the biddingdocument which meets the requirementof the bidding invitation document.
Dont poimanagemdocumentrequiremedocument
D Equipment installation and technical staff capability
Equipmentinstallationcapability
Experienced in implementing the samesystem ( Based on the contractsprovided by the Bidder)
No experisame syst
Technical staff capability
Yes
E Declaration of conformity level in terms of warranty and technical support.
Warranty service Warranty service delivered by theprovider or authorizeddistributor/reseller with the warrantyperiod as required
No warraprovider odistributoperiod as
Technical support Commitment on suitable technicalsupport as required
No commthe suppo
G Implementation time
Delivery time Meet any requirement on deliveryprogress
Dont meprogress a
Installation time Make implementation plan in thebidding document which meet timingrequirement as in bid invitationdocument.
Dont mabidding dtiming reqdocument
H Training and Technology Transfer
Training Detail training in bidding documentwhich meets requirement of bidinvitation document.
No detail or it doesninvitation
8/14/2019 Annex 3 (ITB Document)
55/118
BID PACKAGE 1 Labour Market Information Data Centre (LMIC)
55
Technology transfer List of document which will beprovided the investor in bidingdocument which meet requirement of bid invitation document.
List of doprovided documentrequireme
documentEvaluation Conformity Pass of all the content are acceptable
Unconformity Dont merequireme
8/14/2019 Annex 3 (ITB Document)
56/118
56
BID PACKAGE 2
Hardware for Labour MarketInformation Units
In 5 Employment Services Centres (ESCs)
List of goods and related services
8/14/2019 Annex 3 (ITB Document)
57/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
57
LIST OF GOODS AND RELATED SERVICES FOR EACH OF 5 ESCs
No Description of Goods Quantity Unit Warranty1 Database , Application , Domain Controller
Servers 03 Unit 3 Years
2 File Server 01 Unit 3 Years 3 Rack Cabinet 01 Unit 1 Year 4 Microsoft Windows Server OPL 2008 Standard 02 License 1 Year support 5 Windows Svr 2008 OPL Enterprise 02 License 1 Year support 6 Microsoft SQL Server 2008 OPL Enterprise 01 License 1 Year support 7 Anti-virus Software 30 License 1 Year support 8 UPS 8KVA 02 Unit 2 Years 9 UPS 3KVA 01 Unit 2 Years
10 Larger size electronic Board 01 Unit 1 Year 11 Wall mounted Projector Screen 02 Unit 1 Year 12 Projector 02 Unit 1 Year 13 Notebook PC 03 Unit 1 Year 14 Desktop PC 20 Unit 3 Years 15 Digital flatbed Scanner 01 Unit 1 Year 16 Digital Camera 01 Unit 1 Year 17 Digital Camcorder 01 Unit 1 Year 18 Network Laser Printer 02 Unit 3 Years 19 Air Conditioner 01 Unit 1 Year 20 Photocopy Machine 01 Unit 1 Year
21 Office Chairs + Tables 20 Unit 1 Year 22 Firewall 01 Unit 3 Years 23 Server Farm Switch 01 Unit 1 Year 24 User Access Switch 03 Unit 1 Year 25 Wifi Access Point 03 Unit 1 Year 26 ADSL Modem 02 Unit 1 Year 27 Telephone System 01 System 1 Year 28 Electric cabinet, main cable & spares 01 Project 1 Year 29 Installation, configuration, training and supporting 01 Project 1 Year 30 All equipments & products above are for 1
(one) Employment Service Centre (ESC)
- Total 5 ESCs
8/14/2019 Annex 3 (ITB Document)
58/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
58
1. DETAIL TECHNICAL SPECIFICATIONS AND REQUIREMENTS
The Bidder must provide the original technical document from the Manufacturer to the bid equipment. In the requesthe Bidder must prove the response level for request with explanation and relevant technical parameter. The Bidder alsoitem of the attached technical document the Bidder bases on. If the Bidder doesnt have full explanation or cannot showlevel for request or cannot refer to technical document of the bidding document, the Bidder doesnt pass at the requirement
No Requirement Satisfied level
Satisfy Acceptable
(1) (2) (3) (4)
A Provision scale
Comparison with typesand quantity mentionedin technicalrequirement bellow
Fully Compliance instyp
B Feature, technical parameter of products
Quality All goods and accessories are new 100%. All100
01 Database , Application , Domain Controller Servers
Server type 2U, 19 Rackmount >2U
Processor 02 x Quad-Core Intel Xeon Processor
X5560 2.8GHz
Les
ProChipset Intel 5520 Chipset No
Memory 6GB PC3-10600R DDR3-1333 < 6
Memory Upgradable 18 DIMM sockets Support up to 144GB DDR3 Registered
< 1Re
8/14/2019 Annex 3 (ITB Document)
59/118
8/14/2019 Annex 3 (ITB Document)
60/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
60
Interfaces
- 05 total USB ports
- 01 internal Secure Digital (SD) slot - 01 Remote management port
No- 05- 0- 0
Optical drive SATA DVD No
Power supply 02 x Hot-plug AC 460W Power supply 02 x Hot-plug AC 480W Powersupply
< 0pow
Operating systemSupports
- Microsoft Windows Server- Microsoft Windows Server Hyper-V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- SuSE Linux Enterprise Server- Novell NetWare- Sun Solaris for x64/x86-based Systems
Only have these OS supports: - Microsoft Windows Server- Microsoft Windows Server Hyper-V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- Novell NetWare- Sun Solaris for x64/x86-basedSystems
Lacsup- M- M- O- R- N- SuSys
Integrated Hypervisors(Optional)
- VMware 3i virtualization technology - Citrix XenServer virtualizationtechnology
Nofea- Vtec- Ctec
Warranty 3 years < 3
02 FILE SERVER
Server type 4U, 19 Rackmount > 4
Processor 02 x Quad-Core Intel Xeon ProcessorX5560 2.8GHz < 0Pro
Chipset Intel 5520 Chipset No
Memory 4GB PC3-10600R DDR3-1333 < 4
8/14/2019 Annex 3 (ITB Document)
61/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
61
Memory Upgradeable 18 DIMM sockets Support up to 144GB DDR3 Registered(RDIMM) memory
< 1Re
Memory type - DDR3 Registered (RDIMM) memory - DDR3 Unbuffered (UDIMM) memory
Notyp- Dme- Dme
Memory Protection - Advanced ECC - Mirroring mode - Lockstep mode
Lacfea- A- M
- LHard disk 04 x 300GB SAS HDD < 0
Internal Storage
- Up to 24 Hot Plug SFF - Up to 14 Hot Plug LFF - Two open half-height media baysavailable for tape drives, optical media,optional SAS HDD cage
< 2Plu- NheidrivHD
Storage Controller SAS/SATA Controller with 512 MBBBWC Controller SAMB
RAID Support RAID 0/1/1+0/5/5+0/6
Only have these RAID supports: RAID
0/1/5/5+0/6
No
0/1
Optical Drive SATA DVD ROM No
Expansion slots Nine (9) available PCI-Express Gen2 slots < 0
Graphics Integrated 64 MB video standard Les
8/14/2019 Annex 3 (ITB Document)
62/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
62
vid
Network Controller Integrated Quad Port MultifunctionGigabit Server Adapter NoMu
Interfaces
- 05 total USB ports - 01 Dedicated USB 2.0 Port (available forDAT USB tape connectivity) - 01 internal Secure Digital (SD) slot - 01 Remote management port - 02 x VGA port
No- 05- 0(avcon- 0- 0
Power supply 02 x Hot-plug AC 460W Power supplyUnit 480W < 0
pow
Operating systems andVirtualization softwaresupports
- Microsoft Windows Server- Microsoft Windows Server Hyper V- Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- SuSE Linux Enterprise Server- Novell NetWare- Sun Solaris for x64/x86-based Systems - VMware - Citrix Essentials for XenServer
Only have these OS supports: - Microsoft Windows Server- Microsoft Windows Server Hyper V - Oracle Enterprise Linux (OEL)- Red Hat Enterprise Linux- Novell NetWare- Sun Solaris for x64/x86-basedSystem - VMware - Citrix Essentials for XenServer
Lacsup- M- M- O- R- N- SuSys- V- C
Warranty 3 years < 3
03 RACK CABINET
Rack type Universal Rack 42U Shock Rack < 4
Cooling Rack Airflow Optimization Kit NoKit
8/14/2019 Annex 3 (ITB Document)
63/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
63
Grounding Rack Grounding Kit No
Stabilizer 600W Stabilizer Kit 500W Stabilizer Kit < 5Sidepanel Sidepanel Kit No
Management
CAT 5 / 0*1*8 Port KVM Switch + 4Console Cables Rackmount pointing device & 17 LCDMonitor
NoKVRacLC
PDU High Voltage Modular PDU No
Power Cord 16A C19 DK Power Cord No
Management Rackmount pointing device & 17 LCDMonitor Noor
Other Racks and servers are from the sameManufacturer Racsam
Warranty 3 years < 3
04 Microsoft Windows Server 2008 Sngl OLP NL
Version Enterprise No
Media Windows Svr Std 2008 32-bit/x64 EnglishDisk Kit MVL DVD
No32-DV
CAL 5 User CAL < 5
05 Windows Svr 2008 Sngl OLP NL
Version Standard No
Media Windows Svr Ent 2008 32-bit/x64 EnglishDisk Kit MVL DVD
No32-DV
CAL 5 User CAL < 5
8/14/2019 Annex 3 (ITB Document)
64/118
8/14/2019 Annex 3 (ITB Document)
65/118
8/14/2019 Annex 3 (ITB Document)
66/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
66
Acid battery with suspended electrolyte :leakproof
Leaele
Typical Backup Timeat Half Load
11.3 minutes (1350 Watts) 11 minutes (1350 Watts) < 1
Typical Backup Timeat Full Load
3.0 minutes (2700 Watts) 2.8 minutes (2700 Watts) < 2
Hot-swappablebatteries
Ensures clean, uninterrupted power toprotected equipment while batteries arebeing replaced
Do
Interface Port(s) DB-9 RS- 32, SmartSlot ,USB 1 Available SmartSlot InterfaceQuantity
LacRSPre
Warranty 2 Years < 2
10 LARGER SIZE ELECTRONIC DISPLAY BOARD
Dimensions 1500mm x 5000 mm (~7,5 m2) < 1
Pitch size 7,62mm 7,5mm < 7
Colours Red, Yellow, Green # R
Module size 244mm*122mm < 2
Panne pixel(dots) 32dots*16dots < 3
Pixel density 17220/m2 1600/m2 < 1
View Gngle (H/V) Horizontal 120, Vertical 120 Horizontal =120, Vertical = 120 Ho
Brightness 800cd/ m2 = 800cd/ m2 8
View distance 580m < 5
Power consumption 50300W/m2 > 5
Life time 100000 Hour < 1
Exchange frame speed >150frames/Second < 1
8/14/2019 Annex 3 (ITB Document)
67/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
67
Refresh framefrequency
600Hz < 6
Control distance 120m (without relay) < 1
Display mode VGA 640 x 480 VGA 1600 x 1024
VGVG
Accepting signal RS232 No
Warranty 12 Months < 1
11 Wall mounted Projector Screen Type Electric Remote Control No
Nominal Diagonal
100" 100 10
Material Matt White NoWarranty 12 Months < 1
12 Projector
Display Technology TI DLP technology / 0.55 XGA DDR12 DMD Chip
NoXG
Resolution Native XGA (1024x768) < N
Brightness(ANSI Lumens)
2800 2700 < 2
Contrast Ratio 2200:1 2100:1 < 2
Displayable Colors 134.2 million colors 130 million colors < 1
Projection Image Size 27.47 ~ 302.85 inches < 2
Projection Distance 1.2 ~ 12 meters < 1
VideoCompatibility
HDTV (480i/p, 576i/p, 720i/p, 1080i),Full NTSC, NTSC 4.43, PAL M/N,SECAM
NoHDFul
8/14/2019 Annex 3 (ITB Document)
68/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
68
SESpeaker 2W speaker < 2
Warranty 2 Years < 2
13 Notebook PC
CPU Intel Core 2 Duo 2.8 GHz < In
Chipset Support Mobile Intel PM45 , GM45,GL40 Express Chipset
NoGM
Memory 2048MB DDR2 SDRAM, 800 MHz < 2
Maximum memory 4096 MB Two slots supporting dual channelmemory
< 4< Tme
Hardisk 160GB SATA HDD; 3D DriveGuardfeature
120GB SATA HDD < 1fea
Removable Storage
DVD+/-RW SuperMulti DL No
Graphic Mobile Intel GMA X4500 HD Mobile Intel GMA X4500 HD No
Display 14.0-inch diagonal LED HD > 1tec
Wireless support
Intel 802.11 a/b/g/n draft 2.0, a/b/g;Bluetooth 2.0
Intel 802.11 a/b/g/, a/b/g; Bluetooth2.0
No802
Network Controller Marvell Ethernet (10/100/1000 NIC) optional 56K v.92 modem
No(10opt
Ports and connectors
4 USB 2.0 ports, VGA, HDMI, stereomicrophone in, stereo headphone/line out,power connector,RJ-11/modem, RJ-45/ethernet
4 USB 2.0 ports, VGA, stereomicrophone in, stereo headphone/lineout, power connector, RJ-11/modem, RJ-45/ethernet
Do
8/14/2019 Annex 3 (ITB Document)
69/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
69
Operating System Windows Vista Business32 license Windows XP professional Not
Weigth 2.27 kg > 2
Other Notebook PC and servers are from thesame Manufacturer Nothe
Warranty 1 Year < 1
14 DESKTOP PC
Form Factor Small form factor Not
CPU Intel Pentium Dual-Core E5200 processor2.50 GHz
Intel Pentium Dual-Core Processor 2.40Ghz
SpNo
RAM 1GB DDR2 SDRAM DDR2 Bus 800Non-ECC
1GB DDR2 < 1800
Maximum Memory 16GB of DDR2 SYNCH DRAM < 1Chipset Intel Q33 Express No
Internal Hard Disk 160-GB SATA 3.0-Gb/s Hard Drive(8MB Cache, 7200 RPM, NCQ, Smart IV)
120-GB SATA < 1DriSm
USB ports 8 USB 2.0 ports and 2 internal USB header
< 8and
Securities Integrated 1.2 TPM (standard)Optional: Security cable with Kensingtonlock ProtectTools software
NoSecPro
Device DVD ROM Drive NoCard reader 16-In-1 3.5 Media Card Reader
Optional: 22-in-1 (with 1394) Media Card Reader
NoReaNoMe
8/14/2019 Annex 3 (ITB Document)
70/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
70
Network 10/100/1000 Mbps < 1
Graphics Intel Graphics Media Accelerator 3100 No310
Audio Integrated HD audio with ADI1884 codec NoAD
Power Supply 240-watt BTX power supply Active PFC115v/230v line switch
250-watt BTX power supply Active PFC115v/230v line switch
> 2Ac115
Monitor 17" inch LCD Color Monitor From same manufacture with Case.
NoNoCa
Keyboard/Mouse USB Standard Keyboard USB 2-Button Optical Scroll Mouse
USB Standard Keyboard USB Optical Scroll Mouse
No
Operating System Windows Vista Business32 license Windows XP professional Not
Other Desktop PCs and servers are from thesame Manufacturer Dethe
Warranty 3 Years < 3
15 DIGITAL FLATBED SCANNER Scanner type Flatbed, ADF (optional) No
Scan resolution, optical Up to 2400 dpi Up to 2200 dpi < 2
Bit depth 48-bit < 4
Levels of grayscale 256 < 2
Automatic documentfeeder capacity
Optional, 50 sheets 45 sheets < 4
Automatic documentfeeder speed
Up to 8 ppm/4 ipm Up to 7ppm/4 ipm Les
Scan size, maximum 8.5 x 11 in < 8
8/14/2019 Annex 3 (ITB Document)
71/118
Bid Package 2: Hardware for Labour Market Information UnitsIn 5 Employment Services Centres (ESCs)
71
(flatbed) Warranty 1 Year < 1
16 DIGITAL CAMERA
Camera EffectivePixels
Approx 8.0 Million pixels, 1/2.5-inch type < 8