ANADARKO PETROLEUM CORPORATION
Anadarko Facilities
Rapid technological advances in the context of
local land use change and permitting
Joe Aucoin, PM/Sr. Staff Facilities Engineer
ANADARKO PETROLEUM CORPORATION
Agenda - Rapid technological advances in the context of local land use change and permitting
Introduction – Oil and Water Facilities
Oil Hub
Oil Polishing Facility (OPF)History
Purpose
Emulsion/Expansion
Central Oil Stabilization Facility (COSF)Purpose
Produced Water
Salt Water Disposal FacilitiesExisting facility
New facility
2
ANADARKO PETROLEUM CORPORATION
Why did Anadarko need White Cliffs Pipeline and OPF?APC had 200-400 wells shut in daily due to high oil tanks. ~ 2005 to 2007
Dispatching mis-management by the local refinery.
10-15 MM daily gas, 2,000-3,000 BOPD delayed
Truck loads delayed taken to market reject tickets ($300 to $800 each treatment)
Hot Oil treatments (~$1MM in winter 2008)
A new oil take-away market was needed APC and Noble teamed together
SemCrude won the bid and White Cliffs Pipeline was born. January 2007
ANADARKO PETROLEUM CORPORATION
Oil Polishing Facility (OPF) – Executive Summary
Supports Truck loading diverted crude oilFrom trucks to interstate pipeline – White Cliffs 12” to Cushing, Oklahoma
Pipeline specification BS&W <1.0% of which <0.3% Water
~ 10-30% of all loads fail to meet the pipeline specification.
Site Construction began July 2008, In service April 2009
Retrofitted to include emulsionFrom flowback operations
4
ANADARKO PETROLEUM CORPORATION
Out of Spec Oil
Polished, In Spec Oil
Oil To Cushing,
Oklahoma
Noble
APC
Out of Spec Oil
Polished, In Spec Oil
OPF/White Cliffs - Flow Diagram
APC
APC
ONLY
APC
NEI
APC
NEI
OPF
OPF
100,000 Bbl
Tanks
Oil Gathering
10 ExistingTruck Bays
6 NewTruck Bays
White Cliffs Pipelines
ANADARKO PETROLEUM CORPORATION
Oil Polishing Facility (OPF)
6
ANADARKO PETROLEUM CORPORATION
Oil Polishing Facility (OPF) and “Oil Hub”
7
ANADARKO PETROLEUM CORPORATION
Oil Polishing Facility (OPF) Expansion
8
ANADARKO PETROLEUM CORPORATION
Central Oil Stabilization Facility (COSF) – Executive Summary
Anadarko GWA is implementing “Tankless” or “Pressurized Storage” design at the tank battery.
The new design reduces: Footprint, emissions, construction costs, OPEX
The new design adds: Social License to Operate
COSF will separate the flash gas and NGL from the oil. Products are:Gas Low Pressure (LP) gas gathering pipeline,
NGL NGL gathering pipeline feeds the Ft. Lupton NGL stabilizer complex.
Crude OIl Crude oil will be pumped and metered into the existing oil sales pipeline system► Rose Rock/White Cliffs to Cushing, Oklahoma
► Plains Tampa Rail site, to various refineries
► New Magellan Saddlehorn 20” Pipeline to Cushing, Oklahoma
9
ANADARKO PETROLEUM CORPORATION
Central Oil Stabilization Facility (COSF) 3D model
10
ANADARKO PETROLEUM CORPORATION
COSF
Major EquipmentQty (2) 250,000 bbl oil tanks, API 650 IFR Fire protection - foam
Lightning suppression
Heli-Piles and concrete caps poured
Qty (4) NGL vessels,
Qty (5) Inlet vessels,
Qty (6) Flash Gas compressors,
HP flare 65MMCFD Flare,
5.3 MW turbine generator, Instrument Air skid
5 Stabilization Trains
11
ANADARKO PETROLEUM CORPORATION
COSF
12
ANADARKO PETROLEUM CORPORATION
WATTENBERG OIL STATISTICS & RECORDS
Oil pipeline June 2012 to 4/14/2015 = 42,785,533 bbls Equivalent to 231,273 truckloads
Oil pipeline Year to date = 8,533,210 bbls Equivalent to 46,125 truckloads
OPF has treated 155,288 bbls year to date
One month records for Oil moved to Market March 2014 = 2,007,307 bbls March 2015 = 3,215,013 bbls
One day record for oil moved to market 4/1/2015 = 113,904 bbls
One day oil production record 3/17/2015 = 105,201 bbls
Currently Averaging ~103,500 bbls/day to market
13
ANADARKO PETROLEUM CORPORATION
KMG 19-3i SWD – Executive Summary
KMG 19-3i SWD is an Andarko GWA Salt Water Disposal facility
Injecting ~3,000 bowpd, permitted for 5,500 bowpd injection.
New technology implementedSelf cleaning mechanical filtration Turbo Clone™ from Clean Filtration Technologies
Bought out by DOW Chemical, TEQUATIC™ PLUS
14
ANADARKO PETROLEUM CORPORATION
GWA KMG 16-24i SWD Executive Summary
KMG 16-24i SWD is GWA’s 2nd Salt Water Disposal. Capable of injecting 17,000 bowpd, however, permitted for only 10,000 bowpd injection.
Added pipeline from Hudson CWSF, 4,000-6,000 bowpd Eliminate ~746 water truck trips per month => saves $223M-$335M per month to GWA gas plant OPEX
Added water recycling offloading rack
Added LACT unit to pump oil into the APC GWA oil gathering pipeline Eliminate ~46 oil truck trips/month
Cost/Schedule$18.0MM
Start up 2Q15
15
ANADARKO PETROLEUM CORPORATION
KMG 16-24i SWD
16
ANADARKO PETROLEUM CORPORATION
SWD Fire
17
Recent fire at 3rd Party Disposal site
https://www.youtube.com/watch?feature=player_embedded&v=VxX0F900vsQ
ANADARKO PETROLEUM CORPORATION
APC GWA Oil and Water Facilities –Summary
Allow and encourage O&G companies to innovate
Train your peopleTour O&G sites
In and outside your counties/districts
CSM Petroleum Super School
Interact with O&G companies to learn how it works
18
ANADARKO PETROLEUM CORPORATION
APC GWA Oil and Water Facilities
Questions and Discussion