Agenda Digitale Europea
Piano BUL per l’Italia
Settembre 2015
Piano
Banda Larga
Aiuti di Stato
SA 33807/2011 e n°646/2009
Piano
Banda Ultra-Larga
(Next Generation Access Network)
Aiuto di Stato
SA 34199/2012
Agenda Digitale Europea
2
3
For the purpose of this report, Next Generation Access includes VDSL, Cable Docsis 3.0 and FTTP. At the end of 2013, Cable Docsis 3.0 had the largest NGA coverage at 43%, followed by VDSL (38%) and FTTP (19%). Most of the upgrades in European cable networks already took place by 2011, while VDSL coverage doubled in the last three years. There was remarkable progress also in FTTP growing from 10% in 2011 to 19% in 2014, but FTTP coverage is still low.
NGA networks are still very much limited to urban areas: only 25% of rural homes are covered, mainly by VDSL.
Coverage of Next Generation Access technologies continued to increase and reached 68%. NGA
deployments still focus mainly in urban areas, while only 25% of rural homes are covered.
Digital Agenda Scoreboard 2015 – Connectivity
0%
20%
40%
60%
80%
100%
2010 2011 2012 2013 2014
Next Generation Access (NGA) broadband coverage in the EU,
2010-2014
Source: IHS,VVA and Point Topic
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
EL IT FR PL HR SK CZ EU RO BG IE ES FI SE NO SI HU CY DE EE AT UK PT LV IS DK LU LT NL BE MT
Total Rural
Next Generation Access (FTTP, VDSL and Docsis 3.0 cable) coverage, 2014
Source: IHS and VVA
Italia 30Mbps: 2Miliardi
Italia 100Mbps: 19Miliardi
Italia 1Gbps: 23Miliardi
Bit rate
Downstream : fino a 100Mbit/s
Upstream: fino a 100Mbit/s
Bit rate
Downstream : fino a 1Gbit/s
Upstream: fino a 1Gbit/s
Le Architetture NGAN
Bit rate
Downstream : fino a 50Mbit/s
Upstream: fino a 10Mbit/s
I modelli di aiuto
A) Modello diretto
B) Modello Partnership
C) Modello Contributo:
• Contributo alla realizzazione degli
investimenti;
• Fondo di garanzia;
• Credito d’imposta;
6
7
Gara Aggiudicata
Sirti S.p.A. per un importo di Euro 6.385.609,95
Gara TOLAPU Lotto 1:
Aggiudicato per Euro
16.843.347,96 all’ATI Sirti
S.p.A. (mandataria),
Valtellina S.p.A.
Gara TOLAPU Lotto 2:
Aggiudicato per Euro
6.465.812,64 all’ATI Sielte S.p.A.
(mandataria), Site S.p.A. Ceit s.r.l.
Gara TOLAPU Lotto 3: Aggiudicato
per Euro 13.861.988,28 all’ATI
Ericsson S.p.A. (mandataria), Alpitel
S.p.A. e Mazzoni Pietro S.p.A.
Gara Aggiudicata
RTI Sielte S.p.A., Site S.p.a., Ceit Impianti s.r.l..
Investimento pubblico: € 3.339.199,15
Gara Aggiudicata
Lotto 1: EDS Infrastrutture S.p.A. per euro 5.824.361,66.
Lotto 2: RTI Icot Tec S.p.A., Mazzoni S.p.A. e Delta s.r.l. per euro
6.507.964,01.
Investimento pubblico: € 12.332.325,67.
Gara Aggiudicata
Lotto 1: EDS Infrastrutture S.p.A. per euro
7.112.230,18.
Lotto 2: RTI Icot Tec S.p.A., Mazzoni S.p.A. e
Delta s.r.l. per euro 6.095.772,13.
Lotto 3: RTI Consorzio Stabile Energie Locali,
Eurotel s.r.l. per euro 5.799.094,65.
Investimento pubblico: € 19.007.096,96
Bando di gara pubblicato sulla GURI
n.91 del 5.08.2015 suddivisa in 3 Lotti.
Importo totale a base d’asta è di Euro
45.833.405,00
Gare Modello A- Banda Ultra Larga
Distribuzione geografica
• Progetto ad incentivato (Telecom
Italia - fondi FESR):
• Intervento diretto (Infratel Italia - Fondi
FEASR ):
Comuni Popolazione Investimento (m.ni di Euro)
149 2.682.311 95
Comuni Popolazione Investimento
(m.ni di Euro)
93 279.241 28
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Piani privati Piani pubblici
Copertura Ngan prevista al 2018 con contributi pubblici e privati