ACM CONSTRUCTION Co.
Our company was founded in 1990 by three civilengineers, with the policy to be market leader with aknowledgeable, dynamic and experienced team forthe various construction areas, acting in socially andenvironmentally responsible manner, committed tohigh standards of safe performance in the veryhighest quality . Our company has accomplishedvarious construction project for needs of public andprivate sector clients around Turkey.
In early 2000 our activities have been extended asbeing “DONREST”, in Russia, as being “UKREST”in Ukraine and as being “DONREST KZ” inKazakhstan. As contractor management andsubcontractor we have successfully andsubstantially completed various project in threecountries.
As a challenging company, behaving ethically,acting with integrity and respect, we would like toshare our knowledge with our clients to deliver ourprofessional excellence to complete works andcontribute to their success.
• Address : Hoşdere Caddesi 59/20
Y.Ayrancı/ANKARA/TURKEY
• Tel&Fax : +9(0312) 468 42 84 - 468 69 98
• Web : www.acm.com.tr – www.donrest.com
• Email: [email protected]
• Email: [email protected]
SOME INTERNATIONAL WORKS (TOO “DONREST KZ” -KAZAKHISTAN-) COMPLETED BY OUR COMPANY AS CONTRACTOR DURING THE LAST FIFTEEN YEARS
LINENO
CLIENT NAME PROJECT NAME EXPLAINATIONCONTRACT
DATECOMPLETION
DATE
1 TOO OLÝMPÝK
Construction of Olympic Residence Complex of 17.000 m2 (ongoing ) OSKEMENEGORSK/KAZAK HSTAN
Construction of Olympic Residence Complex of 3blocks,17.000 sqm
02.07.2006 31.12.2008
2 TOO MESA KURULUÞConstruction of Park Mamır Residence Complex of 125.000 m2 ALMAATI/KAZAK HSTAN
Construction of Park Mamır Residence Complex of 12blocks,125.000 sqm
02.02.2007 03.03.2009
3 TOO ARUANA
Construction of Hantengri Residence Complex of 18.500 m2 ASTANA/KAZAK HSTAN
Construction of Hantengri Residence Complex of 5blocks,18.500 sqm
01.06.2006 31.12.2006
SOME INTERNATIONAL WORKS (OOO “DONREST” -RUSSIA-) COMPLETED BY OUR COMPANY AS CONTRACTOR DURING THE LAST FIFTEEN YEARS
LINENO
CLIENT NAME PROJECT NAME EXPLAINATIONCONTRACT
DATECOMPLETION
DATE
1 OOO”CENK”Construction of “RTM” Shopping CenterLIPESK/ RUSSIA
ConstructionShoppingcenter23.000sqm. 15.08.2007 31.05.2008
2 OOO”LIPESK YARMARKA”Construction of “RADUGA” Shopping CenterLIPESK/ RUSSIA
Shopping centre framework reinforced concrete structure47.000sqm 01.04.2007 30.10.2007
3 ENKA Co.CompConstruction of REAL HIPERMARKETLIPESK/RUSSIA
Real Hypermarket, framework reinforcedconcretestructure18.000sqm. 19.06.2007 19.10.2006
4 BAYTUR Co.CompConstruction of Multi-Functional Living Project of “AGALAROV ESTATE” MOSCOW/RUSSIA.
ConstructionMulti-Functionalliving complex, 96.000sqm. 15.05.2006 15.06.2007
5 BAYTUR Co.CompConstruction of 75 private villas “MONOLIT REZIDANS”MOSCOW/RUSSIA
Construction0f 75privatevillas 48.000sqm. 15.08.2004 01.02.2006
SOME INTERNATIONAL WORKS (OOO “DONREST” -RUSSIA-) COMPLETED BY OUR COMPANY AS CONTRACTOR DURING THE LAST FIFTEEN YEARS
LINENO
CLIENT NAME PROJECT NAME EXPLAINATIONCONTRACT
DATECOMPLETION
DATE
6 OOO”CENK”Construction of office “MAKS” A CLASS
MOSCOW/RUSSIAConstructionA classoffice Moscowwcity centre, 5.800sqm 20.04.2003 30.10.2005
7 OOO”CENK”Construction of KYPCK Hoteland Office Complex
MOSCOW/RUSSIA
ConstructionHotel andoffice complex, Moscow city centre,20.000sqm
01.05.2002 15.07.2003
8 OOO ”DELTA”Construction of KONI AILEND Shopping Center
MOSCOW/RUSSIAConstructionShoppingcentreMoscowcity centre, 8.900sqm 05.05.2002 10.09.2002
RUSSIA & KAZAKHSTAN LISANCE
CONSTRUCTION OF KYPCK HOTEL AND OFFICE COMPLEX MOSCOW / RUSSIA (2002-2003)
CONSTRUCTION OF OFFICE MAKC A CLASS MOSCOW/RUSSIA (2003-2005)
COMPLETED WORKS FOR PUBLIC SECTOR CLIENTS WITHIN LAST 15 YEARS
LINENO
CLIENT NAME PROJECT NAME EXPLAINATIONCONTRACT
DATECOMPLETION
DATE
1Kemerköy Elektrik
Üretim ve Ticaret A.Þ.
General Maintenance, Repair and System Control of Refining Systems of Coal Ash and Chimney Gas –MÝLAS/MUÐLA
General Maintenance, Repair and Operation Works ofall the Equipments and Installations at the outside ofthe Thermal Power Plant including the refining
systems of chimney gas, supplying, preparing andtransferring systems of coal, and ash and cinder
disposal systems
18.01.2005 25.01.2006
2Gaziantep Municipality
GASKÝ General Directorate
Drinkable Water Construction in Kozluyazý, Övündük andGüngürgeVillages of Town of Þehit Kamil /GAZÝANTEP
Construction of Drinking Water Network for threevillages in Gaziantep Municipality region
28.02.2005 22.03.2005
3 Kemerköy Elektrik Üretim ve Ticaret A.Þ.
General Maintenance, Repair and System Control of Refining Systems of Coal Ash and Chimney Gas –MÝLAS/MUÐLA
General Maintenance, Repair and Operation Works ofall the Equipments and Installations at the outside ofthe Thermal Power Plant including the refiningsystems of chimney gas, supplying, preparing andtransferring systems of coal, and ash and cinder
disposal systems.
07.05.2004 19.01.2005
4Kemerköy Elektrik
Üretim ve Ticaret A.Þ.
General Maintenance and Repair of the Systems of Coal
Delivery, Preparation and Transportation –MÝLAS/MUÐLA
General Maintenance and Repair Works of all the
external Equipments and Installations for coal supply,prepare and transfer systems of the thermal Power
Plant.
26.01.2004 07.05.2004
5PTT General Directorate
Kayseri Central Directorate
Heating System Transformation of the central
directorate building of Avanos-Hacıbektaş- Kaymaklı-Acıgöl Postal Services - NEVŞEHİR
Transformation of the Heating Systems from charcoalto fuel oil in 4 Regional Directorate Buildings .
16.09.1998 30.10.1998
6PTT General Directorate
Kayseri Central Directorate
Heating System Transformation of the central
directorate building of Derinkuyu-Ürgüp Postal Services - NEVŞEHİR
Transformation of the Heating Systems from charcoalto fuel oil in 2 Regional Directorate Buildings . 02.10.1997 22.10.1997
LINENO
CLIENT NAME PROJECT NAME EXPLAINATIONCONTRACT
DATE
COMPLETION DATE
7Türk Telekominikasyon
A.Ş. Nevşehir Central Directorate
Maintenance and Repair of İdiş R/L Energy Transfer
Line - NEVŞEHİR
Maintenance and Repair Works of 42 km. long PowerLine.
28.05.1997 15.07.1997
8Ministry of Education
Directorate of Antalya
Restoration of Center Selin Kindergarten School -
ANTALYA
General Construction and Renovation Works of SelinNursery School .
10.07.1996 16.09.1996
9PTT General Directorate
Nevşehir Central Directorate
Maintenance and Restoration of Service and Power
Plant Buildings of Ürgüp-Avanos-Derinkuyu-Kalaba -NEVŞEHİR
General Construction and Renovation Works of 4 PTTRegional Service and Directorate Buildings .
08.06.1995 30.11.1995
10PTT General Directorate
Nevşehir Central Directorate
Transformation of Heating System and Boiler to central heating System of Gülşehir-Ortahisar-Uçhisar -NEVŞEHİR
Transformation of the Heating Systems from charcoal tofuel oil in 4 Regional Directorate Buildings .
19.10.1994 25.11.1994
11PTT General Directorate
Nevşehir Central Directorate
Iron Railing of Postal Services and Power Plant
Buildings of Gülşehir-Tuzköy-Karac.-Topak.-Hacıbek.-Avuç-Acıgöl-Uçhisar - NEVŞEHİR
General Construction and Renovation Works of 4 PTTRegional Service and Directorate Buildings
06.06.1994 02.09.1994
12PTT General Directorate
Nevşehir Central Directorate
Iron Railing of Postal Services and Power Plant
Buildings of Derinkuyu-Kaymaklı-Suvermez-Kalaba-Sarilar - NEVŞEHİR
General Construction and Renovation Works of 4 PTTRegional Service and Directorate Buildings . 23.03.1994 09.05.1994
13Treasury of Ankara
Directorate of National Real Estate
Restoration of Guesthouse located in Dip Sok. No 6/1
– ANKARA
General Renovation of the Guesthouse.10.08.1993 28.09.1993
COMPLETED WORKS FOR PRIVATE SECTOR CLIENTS WITHIN LAST 15 YEARS
LINENO
CLIENT NAME PROJECT NAME EXPLAINATIONCONTRACT
DATECOMPLETION
DATE
1Aslý Gazetecilik ve Matbaacýlýk
A.Þ.
Maintenance and Repair of Printing Facilities of Akşam Newspaper -ANKARA
General Maintenance and Renovation Works forPrinting Complex of the Akşam Newspaper .
26.06.2000 26.09.2000
2 KoltukoðluGýda Sanayi Ltd.Þti.Construction of Molasses and Olive Oil Facilities - OSB/KİLİS
Construction of Prefabricated Industrial Plant includingElectrical, and Mechanical Systems, (1200 sqm. closedarea)
12.05.1998 01.09.1998
3 BediroðluTekstil Sanayi A.Þ.Construction of Textile Industrial Facilities and Administrative Building - OSB/KİLİS
Construction of Prefabricated Industrial Plant (2300sqm. closed area), and Administration Building (750sqm. closed area) including Electrical, and Mechanical
Systems and landscaping .
07.05.1997 01.05.1998
4S.S. Armaðan Konut Yapý
Kooperatifi
Construction of 90 Residence Buildings -Elvankent/ANKARA
Turnkey Construction of 90 Residence ApartmentBuildings (12600 sqm.closed area)
15.08.1993 31.12.1995
COMPLETED WORKS AS CONTRACTORS WITHIN LAST 15 YEARS
LINENO
CLIENT NAME PROJECT NAME EXPLAINATIONCONTRACT
DATECOMPLETION
DATE
1Doruk İnşaat ve Ticaret
Ltd.Şti.
Construction, General Infrastructure and
Surroundings Preparation of TOKİ İzmir Seferihisar 180 Residence Buildings – İZMİR
For 180 housessubstracturelworks and landscapingin thearea.
26.01.2004 30.03.2004
2MLG İnşaat ve Ticaret
Ltd.Şti.
Construction of Çayyolu Hukukçu Dostlar Park for
Ankara Municipality Department of Environment Protection - ANKARA
110.000m2 Parkarealandscapingworks. 13.08.2002 30.11.2002
3 AGE İnşaat ve Ticaret A.Ş.
Construction and infrastructure of 125 workplace
for T.R. Prime Ministry PUB TERRA-1 Kocaeli Re-construction of Small Workplaces SBK-2 -İZMİT
3 Blocks, 12500m2 indoor areaof 125 small businesshopfacilitiesconstraction.
27.05.2002 31.12.2002
4Koçoğlu İnşaat Sanayi ve
Ticaret A.Ş.
Construction of 48 Permanent Residence buildings
for the Ministry of Wealth and Construction Sakarya Karaman 4
thRegion-ADAPAZARI
7 Blocks 7200 m2 indoor area of 48 housesconstraction,inbetweenareassubstractuelworks andlandscaping.
19.06.2001 12.12.2001
5Kulak İnşaat Ticaret ve
Sanayi
Construction of 426 Residence Buildings and
Tunnel Format and Pre-casting for T.R. Prime Ministry PUB MEER Project - İZMİT
426Housesconcrateworkswith tunnelframework. 01.10.2000 15.03.2001
6Çolakoğlu İnşaat Turizm Sanayi
ve Ticaret A.Ş.
Construction and Wet Plastering of 522 Permanent Earthquake Residence Buildings for Yalova Subaşı 1
stRegion - YALOVA
522Housesplaste, gipsiyumandpaintingworks. 15.10.2000 25.12.2000
7Özyapı İnşaat Sanayi Ticaret
A.Ş.
Tunnel Format and Roof Construction of Bolu ve
Kandıra F Type Prison - BOLU-İZMİT84.000m2 concrateworkswith tunnelframework. 11.01.2000 02.05.2000
LINENO
CLIENT NAME PROJECT NAME EXPLAINATIONCONTRACT
DATECOMPLETION
DATE
8 Tepe Ýnþaat ve Ticaret A.Þ.
Construction and Wet Plaster of T.S.K.
Rehabilitation and Maintenance Center –ANKARA
TSK Rehabilitationcenterconstraction250.000 m2 gibsiyumworks
29.01.1999 30.03.2000
9ER-YA Ýnþaat Turizm Ticaret
A.Þ.
Construction of Primary School of Kafkas
University Foundation - KARSTheElementaryschoolconstractionofKarsKafkasUniversityFoundation.
01.07.1999 15.09.1999
10ER-YA Ýnþaat Turizm Ticaret
A.Þ.
Construction of Primary School of Package No
98E2M4P27 Kars Merkez Şehitler Mahallesi for Ministry of Education- KARS
TheElementaryschoolof MEB Kars for 960 studientsandsportscenterconstructionwith 8.500m2 indoorarea 02.01.1999 30.10.1999
11 Tepe Ýnþaat ve Ticaret A.Þ.Construction of Gas Concrete Wall of Adana
Shopping Mall - ADANA
At Adana Shopping center 19.000 m2 wall works withGasbetonbrics
06.11.1998 06.04.1999
12 Baytur Ýnþaat Taahhüt A.Þ.Tunnel Formatting of Nergis İnş.San.A.Ş.
Yeşilşehir Residences 1st
Section of 1470 residence buildings - Demirtaş/ BURSA
With tunnel frame work of 1470 houses constractionsconcrateworksof 220.000m2
15.01.1997 30.12.1997
13 Baytur Ýnþaat Taahhüt A.Þ.Construction of 800 Residence Buildings for T.Emlakbank Ataşehir 3rd Section 2nd -Ataşehir/İSTANBUL
With tunnel framework of 800 housesconstractionsconcrateworksof 120.000m2
02.01.1997 31.12.1997
TUNNEL FORMAT AND ROOF CONSTRUCTION OF BOLU AND KANDIRA F TYPE PRISION İZMİT-BOLU/TURKEY (2000)
CONSTRUCTION OF PRIMARY SCHOOL KARS/TURKEY (1999)
COMPLETED WORKS AS CONSTRUCTION MANAGEMENT AND CONSULTANCY WITHIN LAST 15 YEARS
LINENO
CLIENT NAME PROJECT NAME HİZMET TANIMICONTRACT
DATECOMPLETION
DATE
1S.S. Kalem Konut Yapý
Kooperatifi
Consulting and Engineering Services for the Construction of 60 Residence Buildings - Etlik/ANKARA
Construction of 60 pcs. Residence Buildings 15.08.1990 31.12.1994
2 R.GÜRKAN Construction of R.Gürkan PrivateResidence Building - Ümitköy/ANKARA Construction of R.Gürkan Private Residence Building
05.05.1993 30.12.1993
3S.S. Kalem Konut Yapý
Kooperatifi
Infrastructure and Environment Construction of 60 Residence Buildings of 31406 Blocks ve 31410 Interiors of Blocks -Etlik/ANKARA
Infrastructure and Environment Construction of 60 pcs.Residence Buildings 11.08.1994 31.12.1994
Top Related