Download - 8.Annexure-Vi-price Bid (Bidders Confirmation Sheet)

Transcript
  • UP14C15018

    Page 159ANNEXURE - VI-PRICE BID (BIDDER'S CONFIRMATION SHEET)-1

    PRICE SCHEDULE (LUMP SUM)

    BIDDER'S NAME :DESCRIPTION TOTAL LUMP SUM PRICE (Rs.)

    ITEM

    EXCISE DUTY

    Value Added Tax

    TENDER No: UP14C15018NAME OF WORK:"HIRING THE SERVICES FOR REPAIR OF REGENERATION COLUMNS C-1202 & C-1302 in GSU-12 & 13 AT ONGC URAN PLANT"

    Lump sum price for job of "HIRING THE SERVICES FOR REPAIR OF REGNERATION COLUMNS C-1202 & C-1302 in GSU-12 & 13 AT ONGC URAN PLANT" as per enclosed scope of work and Technical Specifications. The lump sum price is inclusive of all taxes, duties, levies, insurance, Octroi, Cess, transportation charges etc. including but not limited to applicable customs duty, excise duty, Value Added Tax, Corporate Tax, Works Contract Tax, Service Tax as applicable to complete job. RATES OF TAXES & DUTIES CONSIDERED AND INCLUDED IN THE ABOVE LUMP SUM PRICE ARE TO BE INDICATED FOR THE PURPOSE OF CLAIM IN ACCORDANCE WITH

    CHANGE IN LAWLaws, Acts, Rules, Regulations etc. and the tariffs thereof considered by the bidder while estimating the incidence of taxes, duties, fees, levies etc. considered and included in the bidders Lump sum price quoted above, as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment to the contract price in the event of change in law in terms of relevant clause of General Conditions of Contract are as under:

    TENDER DOCUMENT

    CLAUSE REFERENCE

    LAW/ ACTS/ RULES/

    REGULATIONS, ETC.

    REFERENCE

    TARIFF INDICATING

    RATE OF TAX/ DUTY/ FEE/ LEVY ETC.

    SERVICE TAX & CESS

    WORK CONTRACT TAX

  • UP14C15018

    Note : 1. Bidder may suitably add other heads in terms of Change in Law clause of General Conditions of Contract. 2. The bidders not indicating the rates as desired above shall not be entitled for any claim due to change in law. 3. The successful bidder has to give an undertaking that they will submit invoices in a way that ONGC will be able to get CENVAT benefit on EXCISE duty as well as Service Tax based on tax invoice as per respective rules under the act.

  • UP14C15018

    ANNEXURE - VI-PRICE BID (BIDDER'S CONFIRMATION SHEET)-1PRICE SCHEDULE (LUMP SUM)

    TOTAL LUMP SUM PRICE (Rs.)

    "HIRING THE SERVICES FOR REPAIR OF REGENERATION COLUMNS C-1202 & C-1302 in GSU-12 & 13 AT ONGC URAN PLANT"

    RATES OF TAXES & DUTIES CONSIDERED AND INCLUDED IN THE ABOVE LUMP SUM PRICE ARE TO BE INDICATED FOR THE PURPOSE OF CLAIM IN ACCORDANCE WITH

    Laws, Acts, Rules, Regulations etc. and the tariffs thereof considered by the bidder while estimating the incidence of taxes, duties, fees, levies etc. considered and included in the bidders Lump sum price quoted above, as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment to the contract price in the event of change in law in terms of relevant clause of General Conditions of Contract are as under:

    AMOUNT INCLUDED IN THE LUMP SUM

    PRICE

  • UP14C15018

    Note : 1. Bidder may suitably add other heads in terms of Change in Law clause of General Conditions of Contract. 2. The bidders not indicating the rates as desired above shall not be entitled for any claim due to change in law. 3. The successful bidder has to give an undertaking that they will submit invoices in a way that ONGC will be able to get CENVAT benefit on EXCISE duty as well as Service Tax based on tax invoice as per respective rules under the act.

  • UP14C15018

    Page 160ANNEXURE - VI-PRICE BID (BIDDER'S CONFIRMATION SHEET)-2

    BREAK-UP OF LUMP SUM PRICE

    BIDDER'S NAME :

    Description Quantity

    1 1

    2 4

    3 1

    1

    A' Total Rs.

    TENDER No.-.-UP14C15018 NAME OF WORK: "HIRING THE SERVICES FOR THE JOB OF REPAIR OF REGENERATION COLUMNS C-1202 & C-1302 in GSU-12 & 13 AT ONGC URAN PLANT"

    Note : 1. Rates shall be inclusive of all taxes, duties, levies, insurance , octroi, cess, handling & Transportation charges etc. 2. No discount shall be seperately given, discount if any shall be included in the offer itself. A. SCHEDULE OF RATE for C-1202 of GSU-12:Sl No.

    Unit rate for repair

    Unit rate of taxes

    Fillet weld patches area (MXM) (Including material+ Service like welding etc.)Weld overlay area (MXM) (Including material+ Service like welding etc.)Lump sum charges for Erection/dismantling & rent of material for scaffolding (Nos)

    4

    Lump sum charges for painting of railings, platform, grating & column as per the procedure with supply of all painting material

  • UP14C15018

    Page 161

    B. SCHEDULE OF RATE for C-1302 of GSU-13

    Sl.No Description Quantity

    1 38.7

    2 3

    3 Weld overlay area (M x M) 3

    4 6.75

    5 1

    6 1

    B' Total Rs.Total 'A' + 'B'

    Unit rate for repair

    Unit rate of taxes

    Area of Lap bands (MXM) OD of shell-2.74 m (including material +service like welding etc.)

    Fillet weld patches area ( M x M) (including material +service like welding etc.)

    Replacement of SS cladding (3.0mm thick) inside the column( M x M)Lump-sum charges for Erection/dismantling/transportation to & fro & rent of material for scaffolding(nos.)Lump-sum charges for painting of railing, platform, grating & column as per procedure with supply of all painting materials(no.)

  • UP14C15018

    ANNEXURE - VI-PRICE BID (BIDDER'S CONFIRMATION SHEET)-2

    BREAK-UP OF LUMP SUM PRICE

    A' Total Rs.

    NAME OF WORK: "HIRING THE SERVICES FOR THE JOB OF REPAIR OF REGENERATION COLUMNS C-1202 & C-1302 in GSU-12 & 13 AT ONGC URAN PLANT"

    Note : 1. Rates shall be inclusive of all taxes, duties, levies, insurance , octroi, cess,

    2. No discount shall be seperately given, discount if any shall be included in the offer

    A. SCHEDULE OF RATE for C-1202 of GSU-12:Total unit rate with taxes

    Total amount Rs.

  • UP14C15018

    B. SCHEDULE OF RATE for C-1302 of GSU-13

    B' Total Rs.Total 'A' + 'B'

    Total unit rate with

    taxesTotal

    amount Rs.

    Lump-SumBreak-up