1 | Program Name or Ancillary Text eere.energy.gov
Water Power Peer Review
Ocean Thermal Energy Extraction Visualization
Matthew Ascari
Lockheed Martin Corporation
11/02/2011
2 | Wind and Water Power Program eere.energy.gov
Feb 05
Purpose, Objectives, & Integration
Interest in OTEC has a long history, and assessments of its potential have improved over the years. Still, they are based on ∆T1000 and resolution is poor. A thorough understanding of the available ocean thermal resource is necessary to establish effective OTEC and SWAC commercialization approaches and determine the potential impact (in terms of Giga Watts) on the energy market.
The Ocean Thermal Extractable Energy Visualization (OTEEV) project focuses on assessing the Maximum Practicably Extractable Energy (MPEE) from the Ocean Thermal resource. MPEE is defined as being sustainable and technically feasible, given today’s state-of-the-art ocean energy technology and foreseeable future improvements. Results of the assessment are integrated into an interactive GIS tool available to the public for global resource visualization and location specific queries.
3 | Wind and Water Power Program eere.energy.gov
Technical Approach
[Describe the technical approach or methods used to achieve the project objective(s).] The Ocean Thermal Energy Evaluation and Visualization (OTEEV) project, rather than simply repeating previous assessments with up-to-date datasets, is using results from HYCOM, a global, high-resolution numerical ocean model run in assimilation mode. By inputting this data into our energy extraction model, we are able to produce a new dataset providing estimated net power per location across the world’s oceans.
[Identify key issues currently being addressed and their significance.]
A practical resource assessment is highly dependent on the cold water availability within the oceans and determining a sustainable rate of replenishment to establish maximum plant density.
[Emphasize unique aspects of approach.] • Uses power extraction model to define average annual output per location• HYCOM datasets supply more information in a sharper geographical resolution, 1/12O
• Multi year datasets include both strong El Niño and La Niña events• Depth selection of cold water source is optimized• Cold water replenishment rate equation is applied for global assessment
4 | Wind and Water Power Program eere.energy.gov
Plan, Schedule, & Budget
Schedule• Initiation date: January 2010• Planned completion date: December 2011• [Milestones for FY10 and FY11] Dataset generation and Power Extraction Model• [Go/no-go decision points for FY12 and FY13] Successful GIS tool
incorporation, extraction model and data validation.
Budget: • [Describe any variances from planned budget and identify if/how the project plan
was modified.] Project is on track and proceeding according to its original budget.
• [Identify what portion of the project budget has been expended to date.] As of 9/25/2011, approximately 77% or $289K of the project’s allocated budget ($375K) has been expended.
Budget History
FY2009 FY2010 FY2011
DOE Cost-share DOE Cost-share DOE Cost-share
$0 $0 $16K $0 $273K $0
5 | Wind and Water Power Program eere.energy.gov
OTEEV Power Equation
* Power (P) in MW, Temperature (T) in ºC, Depth (d) in meters, and Density (ρ) in kg/m³
• 100MW Nominal Net Power (PNET) Conditions
Gross Power
Intake Head LossPipe Friction
Head Loss
Static Head Loss (Due to Depth and Density
Change) Condensers and Distribution Pumping
Warm Water Pumping
Ammonia Pumping
• D, dT and T0 defined by FAU provided data sets• Net Power calculated for each grid point
• Output file generated for GIS integration
Variable Losses:• Pipe Friction Head Loss• Static Head Loss
Fixed Losses:• Intake Head Loss
• Condensers and Distribution Pumping• Warm Water Pumping• Ammonia Pumping
6 | Wind and Water Power Program eere.energy.gov
Accomplishments and Results
[Describe the most important technical accomplishments achieved to date and their significance.]
OTEC Power Extraction Model was completed based on nominal 100MW plant conditions and has been used to calculate location specific power output based on temperature and depth profiles from HYCOM datasets.
[Relate the accomplishments to project milestones, barriers, and objectives.]
The completion of the energy extraction model and subsequent validation efforts have enabled the project to move into its final phase of incorporating model output into the GIS tool.
7 | Wind and Water Power Program eere.energy.gov
Web Visualization and Query
OTEEV
OTEEV
Sea Surface Temperature
Temperature Delta
Sea Water Air Conditioning
This tool will allow visual exploration of the resource datasets, queries to bring up detailed attribute values, and the ability to download subset areas of interest.
InternetAccessible
Multiple Layer Selections
Interactive Global Information
Mock-up of visualization tool using January 2011 data
(Megawatts)
8 | Wind and Water Power Program eere.energy.gov
Challenges to Date
[Identify the most important challenges faced during this reporting period and their impacts on technical accomplishments and progress.]
Establishing the replenishment rate for the cold water source in order to determine practical (sustainable) resource assessment of extractable energy.
[Describe the approaches to resolving any issues or challenges faced during this reporting period.]
The project team developed an algorithm to define OTEC Plant density based on current velocity and estimated cold water source replenishment.
9 | Wind and Water Power Program eere.energy.gov
Next Steps
[Explain project plans for the rest of FY12 and/or to project completion; discuss remaining barriers that the project plans to address, and list upcoming milestones and deliverables.]
• Load full model output into GIS tool and verify operation• Supply additional set of Sea Water Air Conditioning (SWAC) data to
be included as a separate layer in the visualization tool• Validate tool operation • Deliver final technical report
[Discuss possible next steps and their impacts; describe tasks that could be added or expanded; describe potential opportunities for future research and development suggested by project results.]
The resource assessment completed under this project assumes a design that is most likely not optimized for specific locations and/or metocean conditions. Future research and development efforts could be focused on enhanced visual models of OTEC systems and assessing their impact on global circulation of the oceans.
10 | Wind and Water Power Program eere.energy.gov
Additional SlidesBack-Up
11 | Wind and Water Power Program eere.energy.gov
Define a replenishment ratioR = ∆x∆z Vin / Fc
as the rate at which the deep current brings in new, cold water relative to the withdrawal rate.
Because the area fromwhich the cold water isdrawn is proportional to (Δx)2, a given R implies a draw-down area of
(Δx)2 ~ (R Fc / Δz Vin)2
Inverting this allows definition of a plant density
Đp = (Δx)-2 ~ ( Δz Vin / R Fc )2
For a 100 MWe OTEC plant, Fc ~ 300 m3/s.
With a cold-water layer Δz=300 m and an inflow Vin of 1 cm/s, choosing R = 1000
yields Δx ~ 100 km, meaning Đp ~ 10-4 km-2
(one plant per 10,000 km2), or about one plant per 1° lat-long square.
Replenishment Rate of Cold Water
Top Related