8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
1/36
VISAYAS SHIPPING CONFERENCE
Waterfront Cebu City Hotel & Casino28 April 2016
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
2/36
Corporate Overview
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
3/36
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
4/36
Hongkong
Singapore
Taiwan
Malaysia
Vietnam
Indonesia
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
5/36
5
To become a world-class port that is financially sound,economically profitable and self-sustaining with a passion todeliver safe, efficient and effective port services, responsible
environmental stewardship, exemplary public service, in
promoting regional commerce through the port.
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
6/36
6
To build, operate andmaintain ports under its
network and implement anintegrated management
systems aligned withinternationally accepted
standards and practices foroperations, planning and
development of ports withinits territorial jurisdiction
enhancing trade and
commerce.
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
7/367
It is the declared policy of theState to promote the
establishment and growth ofautonomous regional port
bodies to produce an efficient,
safe, economical andcoordinated system ofmovement of goods and
persons through the port,consistent with the
constitutional mandate to giveall regions of the countryoptimum opportunity to
develop.
Per Section 2 o f Repub lic Act 7621
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
8/368
The territorial jurisdictionof the Authority shallinclude all ports, seas,
lakes, rivers and all
other navigable inlandwaterways within the
province of Cebu,the City of Cebu, and
all other highly urbanizedcities which may be
created after the enactment
of R.A. 7621.
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
9/36
•
The Governing Body of the Cebu Port Authority is the Cebu PortCommission
• It is composed of the following:
• Chairman – DOTC Secretary or its designated Undersecretary
• 6 Commissioners representing the following sectors:
• Business (2 members)
• Cargo Handling Labor (2 members)
• Shipping (2 members)
• A Vice Chairman shall be elected from the 6 commissioners and at thesame time shall serve as the General Manager of the Authority
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
10/36
* Cebu Port Authority (CPA) is a Government Ownedand Controlled Corporation which operates the CebuBaseport for more than 20 years;
* CPA has a network of 16 ports strategically located
within Cebu;
* CPA is a member port to the International Network of Affiliated Ports (INAP);
* Cebu International Port is an ISPS-compliant facility;
* Cebu Baseport – Domestic Zone is compliant toNational Security Programme for Sea Transport andMaritime Infrastructure.
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
11/36
CEBU INTERNATIONAL PORT
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
12/36
Total Area : 14 Hectares
Back-up Area : 10 Hectares
Berthing Space : 512 Meters
Controlling Draft : 9.5 Meters at MLLWFeatures : 1,953 TEU Ground Slots
: 204 Reefer Container Plugs withback-up generator set
: Bulk Handling Terminal Facility
: One Stop Shop
ISPS (Int’
l.S
hip andP
ort FacilityS
ecurity) Compliant Facility
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
13/36
CEBU DOMESTIC PORT
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
14/36
CEBU DOMESTIC PORT
Facility is compliant to National Security Programme
for Sea Transport and Maritime Infrastructure
Total Area : 21 Hectares
Berthing Space : 3,838.47 Meters
Controlling Draft : 6.5 Meters at MLLW
Features : 3 Finger Piers
: Designed for conventional andRoll-on/Roll-off (Ro-Ro) vessels
: 2 Passenger Terminals for Inter-island Trips
: 2 Ferry Boat Terminals for Cebu City – Mactan ferry Boats
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
15/36
COMPLETE WITH
PASSENGER AMENITIES
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
16/36
WITH GENDER-SENSITIVE
FACILITIES
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
17/36
FACILITIES FOR PASSENGER
COMFORT & CONVENIENCE
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
18/36
FULLY AIR-CONDITIONED
WITH 1,000 SEATING CAPACITY
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
19/36
EQUIPPED WITH GENDER-
SENSITIVE AMENITIES
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
20/36
• Present Problems at the Cebu International Port:
Congestion due to increasing cargo volume;
Narrow apron area for loading and unloading of cargoes;
Water depth now too shallow; and
Road network has become more serious.
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
21/36
The New Cebu International Container Port is
geared to meet the demands of the dynamic and fast growing
economy. It is expected to provide a lasting solution to cope with
congestion at the existing Cebu International Port and the shallowwater de th of its container berths.
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
22/36
February 2015
List of Studies Conducted:
•The Study on the Cebu Integrated
Port Development Plan in the
Republic of the Philippines by JICA
(2002)
•The Study on the Master Plan for
the Strategic Development of the
National Port System in the Republic
of the Philippines by JICA (2004)
•Study on the New Cebu Container
Port and the Redevelopment of the
Existing Cebu Port in the Republic of
the Philippines by JICA thru Oriental
Consultants Co., Ltd. and Ides Co.,
Ltd. (February 2012)
•Korean Study on the New
International Container Port (2015)
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
23/36
February 2015
Feasibility Study of the
New Cebu International Port
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
24/36
NEW CIP PROJECT FEASIBILITY STUDY
FINAL REPORT
• Master Plan for the New CIP includes:
Selection of the Project Site;
Development Plan; and
Project Cost.
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
25/36
NEW CIP PROJECT FEASIBILITY STUDY
FINAL REPORT
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
26/36
NEW CIP PROJECT FEASIBILITY STUDY
FINAL REPORT
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
27/36
NEW CIP PROJECT FEASIBILITY STUDY
FINAL REPORT
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
28/36
NEW CIP PROJECT FEASIBILITY STUDY
FINAL REPORT
NEW CIP PROJECT FEASIBILITY STUDY
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
29/36
NEW CIP PROJECT FEASIBILITY STUDY
FINAL REPORT
NEW CIP PROJECT FEASIBILITY STUDY
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
30/36
NEW CIP PROJECT FEASIBILITY STUDY
FINAL REPORT
NEW CIP PROJECT FEASIBILITY STUDY
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
31/36
NEW CIP PROJECT FEASIBILITY STUDY
FINAL REPORT
NEW CIP PROJECT FEASIBILITY STUDY
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
32/36
NEW CIP PROJECT FEASIBILITY STUDY
FINAL REPORT
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
33/36
PROJECT OVERVIEW
The Feasibility Study of the New CIP Projectpointed a location in Tayud, Consolacion,
Cebu to be the project site.
The Feasibility Study of the New CIP Projecthas been completed last July 2015 and
submitted to DOTC.
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
34/36
The Project is included in the Comprehensive and IntegratedInfrastructure Program (CIIP) on 11 April 2016.
• Estimated Project Cost : ₱ 10 Billion• Implementation Period : 2017 – 2020
• Financing : Official Development Assistance (ODA)
Regional Development Council (RDC) – Central Visayas Regionthrough Resolution No. 55 (series of 2015) dated 11 December
2015 has endorsed the Project for funding through ODA.• The feasibility study for the project, funded by the Korean Export-Import Bank,
was completed in July 2015.
Status of the New Cebu International
Container Port Project:
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
35/36
NEDA is currently awaiting from DOTC thesubmission of requisite documents for the saidproject to facilitate NEDA Board-ICCprocessing/approval.
• Requisite Documents include F/S, Investment CoordinationCommittee (ICC) Project Evaluation Forms
The Project is scheduled for presentation to the DOTCSecretary for approval and subsequent endorsement tothe NEDA Board-ICC.
Status of the New Cebu International
Container Port Project:
8/17/2019 3_Cebu Port Authority Visayas Shipping Conference 2016
36/36
SUPPORT FROM LGU and OTHER
AGENCIES NEEDED
The new port will need an access road to
connect the port to/from the Cebu NorthCoastal Road
The new port will need the assistance of the
Local Government of Consolacion and
Department of Public Works and Highways
(DPWH)