EPIC FOR POWER SUPPLY PROJECT THROUGH SUBMARINE CABLES FROM RAS
LAFFAN TO HALUL
SITE ACCEPTANCE TEST FOR 132kV GISClient Qatar Petroleum Document No. 3433-HW08-2-05-0003-F20
Contractor LSC / L&T Date / Rev. 05/03/2015 / Rev. - 1
Location Page No 1 of 2
Equipment Tag Test Date
MakeName / Type of EquipmentSerial Number
RatingPower VoltageCurrent
Secondary Injection Test
Panel Tag/location
CT Tag
Type of CT
Core-1 Core-2 Core-3
Ratio
Class
Purpose
L&T Vendor LSC QP
Signature
NameDesignatio
nDate
EPIC FOR POWER SUPPLY PROJECT THROUGH SUBMARINE CABLES FROM RAS
LAFFAN TO HALUL
SITE ACCEPTANCE TEST FOR 132kV GISClient Qatar Petroleum Document No. 3433-HW08-2-05-0003-F20
Contractor LSC / L&T Date / Rev. 05/03/2015 / Rev. - 1
Location Page No 2 of 2
Equipment Tag Test Date
1. Measurement:
Test PointsSecondary
Current Injected
Measured value at
LCC Panel……………………………
Relay panel……………………………
Relay Panel……………………………
2. Test Equipment’s used
Sr. No. Equipment / Instrument Make Equip. Sr. No.Calibration due
date
Remarks:…………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
L&T Vendor LSC QP
Signature
NameDesignatio
nDate