The Hashemite Kingdom of Jordan Ministry of Public Works and Housing
PROTECTION WORKS FOR BRIDGES ALONG DEAD SEA – GHOR HADITHA ROAD – PACKAGE 2
Tender Documents
J17142 November 2018
dar.com
Volume 3 Bill of Quantities
dar.com
The Hashemite Kingdom of Jordan Ministry of Public Works and Housing
PROTECTION WORKS FOR BRIDGES ALONG DEAD SEA – GHOR HADITHA ROAD – PACKAGE 2
Tender DocumentsJ17142 November 2018
Volume 3 Bill of Quantities
The Hashemite Kingdom of Jordan
Ministry of Public Works and Housing
PROTECTION WORKS FOR BRIDGES ALONG
DEAD SEA – GHOR HADITHA ROAD
PACKAGE 2
TENDER DOCUMENTS
Volume 3 : Bill of Quantities
November 2018
PROTECTION WORKS FOR BRIDGES ALONG DEAD SEA – GHOR
HADITHA ROAD
PACKAGE 2
PREAMBLES AND
BILL OF QUANTITIES
TABLE OF CONTENTS
Bridge Protection Works Dead Sea Ghor Haditha Road Package 2
TABLE OF CONTENTS
PR PREAMBLES
PM Confirmed
TABLE OF CONTENTS PR/TC - Page 1 of 1 J17142-0100D-MOM-PM-01 REV B
Initial Date
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
BILL OF QUANTITIES
01 GENERAL PROVISIONS AND PRELIMINARIES
GEOTECHNICAL WORKS
TRANSPORTATION WORKS
02 EARTHWORKS
03 SUB-BASEE & BASE COURSES
04 BITUMINOUS CONSTRUCTION
08 INCIDENTAL CONSTRUCTION
SUMMARY
STRUCTURAL WORKS
PROTECTION WORKS AT BRIDGE 1
PROTECTION WORKS AT BRIDGE 2
PROTECTION WORKS AT BRIDGE 3
PROTECTION WORKS AT BRIDGE 6
AL MUJIB BRIDGE REPAIR
PROTECTION WORKS AT BRIDGE 8
NEW BRIDGE 2
SUMMARY
GENERAL SUMMARY
PM Confirmed
TABLE OF CONTENTS BOQ/TC - Page 1 of 1 J17142-0100D-BOQ-PM-01 REV B
Initial Date
PREAMBLES
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
PREAMBLES J17142-0100D-MOM-PM-01 REV B
PR - Page 1 of
6
PREAMBLES
GENERAL RULES
1. INTRODUCTION
1.01 The rules contained in this Method of Measurement apply equally to both proposed
and executed works.
1.02 The Bills of Quantities are to be read and construed in association with the
Drawings, the Specification and this Method of Measurement. Information which is
given on the Drawings and/or in the Specification, is identified by cross-references
included in the descriptions of work in the Bills of Quantities.
1.03 Where work cannot be fully described or where the quantity of work required
cannot be accurately determined, it is given as an item or as a Provisional Sum.
1.04 Unless the term metre, used in this Method of Measurement, is preceded by the
words square or cubic it is deemed to be linear.
2. QUANTITIES
2.01 Quantities set out in the Bills of Quantities are the estimated quantities and they shall
not be taken as the actual and correct quantities for ordering or purchasing of
materials.
2.02 Works shall be measured net as fixed in position in accordance with the rules
contained in this Method of Measurement or except where otherwise stated in a
measurement rule applicable to the work.
2.03 Dimensions used in calculating quantities are taken to the nearest 10 mm (i.e. 5 mm
and over is regarded as 10 mm and less than 5 mm is disregarded).
2.04 Quantities measured in tonnes are given to two places of decimals. Other quantities
are given to the nearest whole unit except that any quantity less than one unit is
given as one unit.
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
PREAMBLES J17142-0100D-MOM-PM-01 REV B
PR - Page 2 of
6
2.05 Unless otherwise stated, where minimum deductions for voids are dealt with in this
Method of Measurement they refer only to openings which are within the
boundaries of measured areas. Openings which are at the boundaries of measured
areas are always deducted irrespective of size.
3. COMPOSITE ITEMS AND GENERAL ITEMS
3.01 One-off specific composite items (items which contain a number of elements) shall
be measured in the BOQ as an ‘Item’.
3.02 Where items are required to be measured where the use of other units of
measurement is not appropriate, these items shall be measured in the BOQ as an
‘Item’.
3.03 Where one-off specific composite items, and general items, are required to be
measured, the term ‘Item’ shall be placed in the Unit Column and the Quantity
Column shall remain blank; the number 1 shall not be placed in the Quantity
Column.
3.04 Where a number of identical composite items are required to be measured, these
shall either be enumerated or measured as an Item where the number of identical
items is referred to in the description.
4. DESCRIPTIONS
4.01 Headings to groups of items in the Bill of Quantities are to be read as part of the
descriptions of the items to which the headings apply.
4.02 Dimensions are stated in descriptions generally in the sequence length, width, height.
Where ambiguity could arise, the dimensions are identified.
4.03 Dimensions given in descriptions are in millimetres unless otherwise indicated.
4.04 Unless otherwise specifically stated in the Bill of Quantities or herein, the costs of
the following are deemed to be included in the rates for measured work:
labour and all costs in connection therewith,
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
PREAMBLES J17142-0100D-MOM-PM-01 REV B
PR - Page 3 of
6
materials, products, goods and all costs in connection therewith,
Contractor’s equipment, including but not limited to construction plant,
scaffolding, tools, vehicles and the like, and all costs in connection therewith,
assembling, fitting and fixing materials, products and goods in position,
any method of fixing, fixing to any nature of base or background including
preparation and providing fixing materials,
breaking down for transport and installation and subsequent re-assembly of
composite items manufactured off site,
waste of materials,
square, raking and curved cutting,
work at any location or height,
work in small, isolated quantities,
protection of all work,
protection of all existing structures, utilities, site improvements, trees and
vegetation, features, pavements and other facilities on and adjacent to the
site, which are to remain upon completion of the work,
all other enabling tasks, associated and subsidiary components and items of
work, which are indicated or reasonably inferred from the Drawings and/or
Specification, and necessary to perform and complete the work described.
establishment and overhead charges and profit.
4.05 Except where items are included in the Bill of Quantities and are priced separately
by the Contractor therein, the costs of the following are deemed to be included in
the rates for measured work:
site administration and security,
insurances,
bonds and guarantees,
water for the works,
lighting and power for the works,
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
PREAMBLES J17142-0100D-MOM-PM-01 REV B
PR - Page 4 of
6
temporary accommodation for the use of the Contractor and the Engineer,
temporary telephones for the use of the Contractor and the Engineer, and the
cost of calls,
temporary roads, hardstandings, crossings and the like,
temporary fencing, hoardings, screens, fans, foot- ways, guardrails, gantries
and the like,
giving notices and making applications, including the payment of fees and
charges in connection therewith,
safety, health and welfare of workpeople,
compliance with traffic regulations,
maintenance of public and private roads, services and adjoining property,
control of noise and pollution, prevention of fire and compliance with all
other statutory and general obligations,
removing rubbish, protective casings and coverings and cleaning the works
on completion,
drying the works,
testing and commissioning of service installations including providing fuel,
samples of materials and testing of materials, including providing equipment
for testing,
design, co-ordination, installation and as-built record drawings and the like,
preparation and submittal of reports, records, certificates, notices, proposals,
designs, details, calculations and other information and data required by the
Specification,
allow in unit rates for all other requirements services, provisions, liabilities
and obligations contained in the General Requirements and Conditions of
Contract.
Maintaining, adapting, clearing away and making good are deemed to be included
with the items for temporary works.
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
PREAMBLES J17142-0100D-MOM-PM-01 REV B
PR - Page 5 of
6
5. SYMBOLS, ABBREVIATIONS AND DEFINITIONS
5.01 The following symbols and abbreviations are used in this Method of Measurement
and in the Bills of Quantities:
m = linear metre
m2 = square metre
m3 = cubic metre
cm = centimetre
mm = millimetre
Nr = number
kg = kilogramme
T = tonne
% = percentage.
dn = nominal diameter
Qty = quantity
Drg = drawing.
Mpa = Mega Pascal
5.02 The following definitions apply to all work:
'horizontal' means level or sloping work not exceeding 15 degrees from the
horizontal,
'sloping' means sloping work exceeding 15 degrees but not exceeding 80
degrees from the horizontal,
'vertical' means work exceeding 80 degrees from the horizontal,
'curved' means curved in any direction or in more than one direction and to
any radius or radii, and includes curved work to domes, vaults and the like.
5.03 The term 'extra over' means that the work so described involves extra cost over the
basic work in which it occurs. No deduction of the quantity of basic work is made
for the extra over work.
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
PREAMBLES J17142-0100D-MOM-PM-01 REV B
PR - Page 6 of
6
SUBSURFACE INVESTIGATION
1.01 The Bill of Quantities is to be read and construed in conjunction with the
Drawing(s), the Specification, the Method of Measurement and these Preambles.
1.02 Headings to groups of items in the Bill of Quantities are to be read as part of the
descriptions of the items to which the headings apply.
1.03 The general and detailed requirements of the Specification are not repeated in the
descriptions of the items in the Bill of Quantities, except for the purposes of
identification.
1.04 The Works have been measured in accordance with the rules contained in the
Method of Measurement, as applicable to the work, and these Preambles.
1.05 The quantities stated in the Bill of Quantities are estimated quantities only and are
not intended to limit the amount of work to be performed under the Contract. The
quantities in the Bill of Quantities, however, shall not be exceeded without the
written consent of the Engineer. On completion, all work will be remeasured in
accordance with the rules contained in the Method of Measurement and these
Preambles, as the actual quantities executed.
1.06 Where work cannot be fully ascertained or accurately described, or where the
quantity of work required cannot be determined it is denoted as ‘PROVISIONAL’.
Such work is to be carried out only in accordance with the instructions of the
Engineer and may, if the Engineer so decides, be omitted entirely.
1.07 The rates and prices inserted by the Contractor in the Bill of Quantities, are to
include for the full cost of the work as described in, or reasonably inferred from the
Specification and other Contract Documents.
1.08 If the Contractor does not price any item in the Bill of Quantities, the cost thereof
shall be deemed to be included in the rates and prices inserted against other items in
the Bill.
BILL OF QUANTITIES
BILL Nr. 1 – GENERAL PROVISIONS AND
PRELIMINARIES
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
GENERAL PROVISIONS AND PRELIMINARIES J17142-0100D-BOQ-PM-01 REV B BOQ/1 - Page 1 of
3
BILL Nr. 1
GENERAL PROVISIONS AND PRELIMINARIES
To Collection
Amount
J.D.
18,000.00
1,800.00
Item Description Qty Unit Rate
1.03 SCOPE AND CONTROL OF
WORKS
1.03(1) Surveying equipment
PS
Add for overhead charges and profit in
accordance with sub-clause 13.5(b) of
the Conditions of Contract 10%
1.03(2) Maintenance of the surveying
equipment 18 Month
1.06 EMPLOYER'S PERSONNEL
STAFF OFFICES AND FACILITIES
1.06(1)
Construction of site facilities including
roads, fencing, drainage, external
lighting and the like Item
1.06(2) Construction of Employer's Personnel
staff offices Item
1.06(3a) Provide 1 office boy for cleaning
catering and general assistance
12 Man-Month
1.06(3b)
Provide 1 office boy for cleaning
toilets including all expenses, wages
allowances, insurance … (etc)
12
Man-Month
1.06(3c) Provision of two (2) drivers including all
expenses, wages allowances,
insurances … (etc.) 24 Man-Month
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
GENERAL PROVISIONS AND PRELIMINARIES J17142-0100D-BOQ-PM-01 REV B BOQ/1 - Page 2 of
3
Item Description Qty Unit Rate
Amount
J.D.
1.06(4a) Computers, software, printer,
photocopier and accessories Item
1.06(4b)
Office Furniture (3 Offices,
1 Secretary's Offices, 1 Conference
room, Kitchen, 2 Toilets, Store)
Item
1.11 1.11 MANDATORY EMPLOYMENT
OF LOCAL PERSONNEL PER BYLAW
No. 131 FOR THE YEAR 2016
1.11(1) Fresh Graduate Engineers 48 Man.Month 500
1.11(2) Lab Technicians 72 Man.Month 800
1.11(3) Laborers 180 Man.Month 300
To Collection
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
GENERAL PROVISIONS AND PRELIMINARIES J17142-0100D-BOQ-PM-01 REV B BOQ/1 - Page 3 of
3
Amount J.D.
COLLECTION
BOQ/1 - Page 1
BOQ/1 - Page 2
BILL Nr. 1 - GENERAL PROVISIONS AND PRELIMINARIES
To General Summary J.D.
GEOTECHNICAL WORKS
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
GEOTECHNICAL WORKS
J17142-0100D-BOQ-PM-01 REV B GE/BOQ - Page 1 of
3
GEOTECHNICAL WORKS
Item Description Qty Unit Rate Amount
J.D.
SUBSURFACE INVESTIGATION
2.13 Geotechnical site investigation
P.S
100,000
To Collection
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
GEOTECHNICAL WORKS
J17142-0100D-BOQ-PM-01 REV B GE/BOQ - Page 2 of
3
Amount J.D.
COLLECTION
GE/BOQ - Page 1
GEOTECHNICAL WORKS
To General Summary J.D.
TRANSPORTATION WORKS
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
EARTHWORKS J17142-0100D-BOQ-PM-01 REV B TR/BOQ/2 - Page 1 of
3
BILL Nr. 2
EARTHWORKS
Item Description Qty Unit Rate Amount
J.D.
2.02.2 Construction
2.03 HIGHWAY EXCAVATION
2.03.1 Unclassified Highway Excavation 13245 m3
2.03.1 Unclassified Wadi Bed Excavation:
2.03.1.01 Bridge 2 18000 m3
2.03.1.02 Bridge 3 21000 m3
2.03.1.05 Bridge 8 45000 m3
2.06 EMBANKMENT CONSTRUCTION
2.06.1 Embankment Construction for Roads 24145 m3
2.06.1 Embankment Construction for Wadi Bed
2.06.01 Rockfill
2.06.01.01 Bridge 2 25000 m3
To Collection
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
EARTHWORKS J17142-0100D-BOQ-PM-01 REV B TR/BOQ/2 - Page 2 of
3
Unit Rate Amount
J.D.
m3
m3
m3
m3
m3
m3
To Collection
Item Description Qty
2.06.01.02 Bridge 3 4000
2.06.01.05 Bridge 8 12000
2.06.02 Engineered Fill
2.06.02.01 Bridge 2 10000
2.06.02.02 Bridge 3 2700
2.06.02.05 Bridge 8 5000
2.07 SUBGRADE CONSTRUCTION AND
TOPPING
2.07.1 Subgrade layer 20 cm (topping) 3995
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
EARTHWORKS J17142-0100D-BOQ-PM-01 REV B TR/BOQ/2 - Page 3 of
3
Amount
COLLECTION J.D.
TR/BOQ/2 - Page 1
TR/BOQ/2 - Page 2
BILL Nr. 2 - EARTHWORKS
To Summary J.D.
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
TR/BOQ/3 - Page 1 of 1 J17142-0100D-BOQ-PM-01 REV B
BILL Nr. 3
SUB-BASE AND BASE COURSES
Item Description Qty Unit Rate Amount
J.D.
3.02 GRANULAR SUB-BASE COURSE
3.02.1 Sub-base Course, CBR ≥ 40%,
compacted to 100% M.D.D 1525 m3
3.03 AGGREGATE BASE COURSE
3.03.1 Aggregate base course, CBR ≥ 80%,
compacted to 100% M.D.D 2030 m3
BILL Nr. 3 - SUB-BASE AND BASE COURSES
To Summary J.D.
SUB-BASE AND BASE COURSES
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
TR/BOQ/4 - Page 1 of 1 J17142-0100D-BOQ-PM-01 REV B
BILL Nr. 4
BITUMINOUS CONSTRUCTION
Unit Rate Amount
J.D.
T
T
m
2
m
2
m2
m2
BILL Nr. 4 - BITUMINOUS CONSTRUCTION
To Summary J.D.
BITUMINOUS CONSTRUCTION
Item Description Qty
4.02
BITUMINOUS PRIME AND TACK
COATS
4.02.1 Bituminous prime coat 15
4.02.2 Bituminous tack coat 6
4.05 BITUMINOUS BINDER AND WEARING
COURSE
4.05.1
Bituminous binder course, 6 cm thick
10145
4.05.2
Bituminous binder course, 5 cm thick
10145
4.05.3 Bituminous wearing course, 5 cm thick 10145
4.05.4 Bituminous wearing course, 7.5 cm thick
(Bridges 2 & 5)
550
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
INCIDENTAL CONSTRUCTION J17142-0100D-BOQ-PM-01 REV B TR/BOQ/8 - Page 1 of
3
BILL Nr. 8
INCIDENTAL CONSTRUCTION
Item Description Qty Unit Rate Amount J.D.
8.05 SLOPE PROTECTION AND
STABILIZATION
8.05.4.1 Loose Stone Riprap
8.05.4.1.1 Bridge 1 12000 m3
8.05.4.1.2 Bridge 2 2200 m3
8.05.4.1.3 Bridge 3 1100 m3
8.05.4.1.6 Bridge 6 4400 m3
8.05.4.1.7 Bridge 7 (Mujib) 4400 m3
8.05.4.1.8 Bridge 8 1800 m3
8.11 HIGHWAY SIGNING
8.11.1 Triangular Shape, circular Signs, and
Small Rectangular Signs (equal and not
exceeding 1 Sq.M area)
8 Nr
8.11.4 Single Post Sign Supports 8 Nr
To Collection
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
INCIDENTAL CONSTRUCTION J17142-0100D-BOQ-PM-01 REV B TR/BOQ/8 - Page 2 of
3
Item Description Qty Unit Rate Amount
J.D.
8.12 PAVEMENT MARKINGS FOR
TRAFFIC
8.12.1
Thermoplastic Reflectorized Paint
(TRP) as pavement Lines, white and
yellow (gaps not measured)
375 m
2
8.12.8 Catseye pavement studs (3 cluster type) 330 Nr
8.16 STEEL GUARDRAIL AND
CONCRETE SAFETY BARRIER
8.16.1 Steel GuardRail with reflectors at every
other post
1575 m
To Collection
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
INCIDENTAL CONSTRUCTION J17142-0100D-BOQ-PM-01 REV B TR/BOQ/8 - Page 3 of
3
Amount
COLLECTION J.D.
TR/BOQ/8 - Page 1
TR/BOQ/8 - Page 2
BILL Nr. 8 - INCIDENTAL CONSTRUCTION
To Summary J.D.
Bridge Protection Works Dead Sea Ghor Haditha Road
SUMMARY Amount J.D.
02 EARTHWORKS
03 SUB-BASE AND BASE COURSES
04 BITUMINOUS CONSTRUCTION
08 INCIDENTAL CONSTRUCTION
TOTAL TRANSPORTATION WORKS
To General Summary J.D.
SUMMARY J17142-0100D-BOQ-PM-01 REV B TR/BOQ/S - Page 1 of 1
STRUCTURAL WORKS
Bridge Protection Works Dead Sea Ghor Haditha Road
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 1 of 1
BILL Nr. 5
CONCRETE, STEEL AND STRUCTURES
Item Description Qty Unit Rate Amount
J.D.
5.18
ADDITIONAL WORKS
Works that may need to be applied on
bridges during construction like
replacement of guardrails, treatment of
exposed steel, curbstones, parapets,
sidewalks, asphalt, as directed and advised
by the Engineer
P.S.
350,000
PROTECTION WORKS AT BRIDGE 1
5.18 BRIDGE EXPANSION JOINTS
5.18.5 (2) Replace/ repair movement joints as directed
by the Engineer (movement range ± 25 mm) 68 m
BILL Nr. 5 - CONCRETE, STEEL AND STRUCTURES
To Summary J.D.
Bridge Protection Works Dead Sea Ghor Haditha Road
BILL Nr. 5 - CONCRETE, STEEL AND STRUCTURES
To Summary J.D.
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 1 of 1
BILL Nr. 5
CONCRETE, STEEL AND STRUCTURES
Item Description Qty Unit Rate Amount
J.D.
PROTECTION WORKS AT BRIDGE 2
5.01 CONCRETE AND CONCRETE MIXES
AND TESTING
Concrete Class 110/25; ordinary
Portland Cement, plain
5.01.8 (1a) Blinding beds for foundations 600 m3
5.01.8 (1b) Cyclopean concrete below existing culvert 1300 m3
Concrete Class 270/20; Ordinary Portland
Cement, Reinforced (finish as shown on
drawings)
5.01.8 (1c)
5.01.8 (1d)
5.01.8 (1d)
Channels/Basins foundations 2920 m3
Channels/Basins walls 650 m3
Cementitious grout below existing culvert 20 m
3
5.03 STEEL REINFORCEMENT AND FIXING
5.03.4 (2) High tensile steel bar reinforcement 450 T
5.15 WATERPROOFING FOR STRUCTURES
Bituminous Paint (Two coats)
5.15.6 (1) To concrete surfaces below ground 2125 m2
Bridge Protection Works Dead Sea Ghor Haditha Road
BILL Nr. 5 - CONCRETE, STEEL AND STRUCTURES
To Summary J.D.
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 1 of 1
BILL Nr. 5
CONCRETE, STEEL AND STRUCTURES
Item Description Qty Unit Rate Amount
J.D.
PROTECTION WORKS AT BRIDGE 3
5.01 CONCRETE AND CONCRETE MIXES
AND TESTING
Concrete Class 110/25; Ordinary
Portland Cement, plain
5.01.8 (1a) Blinding beds for foundations 295 m3
Concrete Class 270/20; Ordinary Portland
Cement, Reinforced (finish as shown on
drawings)
5.01.8 (1c) Channels/Basins foundations 1800 m3
5.01.8 (1d) Channels/Basins walls 455 m
3
5.03 STEEL REINFORCEMENT AND FIXING
5.03.4 (2) High tensile steel bar reinforcement 288 T
5.15 WATERPROOFING FOR STRUCTURES
Bituminous Paint (Two coats)
5.15.6 (1) To concrete surfaces below ground 1430 m2
5.18 BRIDGE EXPANSION JOINTS
5.18.5 (2) Replace/ repair movements joints as directed
by the Engineer (movement range ± 25 mm) 54 m
Bridge Protection Works Dead Sea Ghor Haditha Road
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 9 of
3
Amount
COLLECTION J.D.
ST/BOQ/5 - Page 1
ST/BOQ/5 - Page 2
BILL Nr. 5 - CONCRETE, STEEL AND STRUCTURES
To Summary J.D.
Bridge Protection Works Dead Sea Ghor Haditha Road
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 1 of 1
BILL Nr. 5
CONCRETE, STEEL AND STRUCTURES
Item Description Qty Unit Rate Amount
J.D.
PROTECTION WORKS AT BRIDGE 6
5.18 BRIDGE EXPANSION JOINTS
5.18.5 (2) Replace/ repair movement joints as directed
by the Engineer (movement range ± 25 mm) 54 m
BILL Nr. 5 - CONCRETE, STEEL AND STRUCTURES
To Summary J.D.
Bridge Protection Works Dead Sea Ghor Haditha Road
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 1 of 1
BILL Nr. 5
CONCRETE, STEEL AND STRUCTURES
Item Description Qty Unit Rate Amount
J.D.
AL MUJIB BRIDGE REPAIR
Note: Prices shall be full compensation for
furnishing all materials, scaffoldings,
formwok, labour, equipment, tools, supplies
and all other items necessary for proper
completion of the Work
5.01 CONCRETE AND CONCRETE MIXES
AND TESTING
5.01.9 Repair of corroded Reinforcement in transfer
beams at expansion joints (Task B) P.S. 50,000
5.18 BRIDGE EXPANSION JOINTS
5.18.5 (2) Movement joints to be replaced (Task A)
(movement range ± 25mm) 54 m
5.19 BRIDGE BEARINGS
5.19.8 Repair damaged bearings and ties down
devices (Task C&D) P.S 50,000
BILL Nr. 5 - CONCRETE, STEEL AND STRUCTURES
To Summary J.D.
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 1 of 1
Bridge Protection Works Dead Sea Ghor Haditha Road
BILL Nr. 5
CONCRETE, STEEL AND STRUCTURES
Unit Rate Amount
J.D.
m3
m3
m3
m3
m3
T
m2
by the Engineer (movement range ± 25 mm) 80 m
BILL Nr. 5 - CONCRETE, STEEL AND STRUCTURES
To Summary J.D.
Item Description Qty
PROTECTION WORKS AT BRIDGE 8
5.01 CONCRETE AND CONCRETE MIXES
AND TESTING
Concrete Class 110/25; ordinary
Portland Cement, plain
5.01.8 (1a) Blinding beds for foundations, 620
5.01.8 (1b) Cyclopean concrete below existing bridge
foundation
935
Concrete Class 270/20; Ordinary Portland
Cement, Reinforced (finish as shown on
drawings)
5.01.8 (1c) Channels/Basins foundations
2770
5.01.8 (1d) Channels/Basins walls 400
5.01.8 (1e) Cementitious grout below existing bridge
foundation
20
5.03 STEEL REINFORCEMENT AND FIXING
5.03.4 (2) High tensile steel bar reinforcement 255
5.15 WATERPROOFING FOR STRUCTURES
Bituminous Paint (Two coats)
5.15.6 (1) To concrete surfaces below ground 1940
5.18 BRIDGE EXPANSION JOINTS
5.18.5 (2) Replace/ repair movement joints as directed
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 1 of 4
BILL Nr. 5
CONCRETE, STEEL AND STRUCTURES
Item Description Qty Unit Rate Amount
J.D.
NEW BRIDGE 2
5.01 CONCRETE AND CONCRETE MIXES
AND TESTING
Concrete Class 270/20; Ordinary Portland
Cement, Reinforced (finish as shown on
drawings)
5.01.8 (1a) Bridge deck slab (on precast beams)
88 m3
5.01.8 (1b) Precast slab panel 23 m3
5.01.8 (1c) Wing walls 9 m3
5.01.8 (1d) Diaphragms 9 m3
5.01.8 (1e) Apron slab 28 m3
Concrete Class 400/20; Ordinary Portland
Cement, Prestressed (finish as shown on
drawings)
5.01.8 (1f) Bridge deck (Precast beams) 161 m3
Concrete Class 350/20; Ordinary Portland
Cement, Reinforced ((finish as shown on
drawings)
5.01.8 (1g) Cross-heads (including backwalls) 53 m3
To Collection
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 2 of
4
Item Description Qty Unit Rate Amount J.D.
5.03 STEEL REINFORCEMENT AND FIXING
5.03.4 (2) High tensile steel bar reinforcement 56 T
5.07 PRESTRESSED CONCRETE
CONSTRUCTION
Super low relaxation prestressing strands to
BS 5896
5.07.8 (2) 15.7 mm diameter 12 T
5.15 WATERPROOFING FOR STRUCTURES
APP modified water proofing membrane
5.15.6 (1) to concrete surfaces below ground 242 m2
Waterproofing membrane (5mm thick)
5.15.6 (2) to bridge deck 440 m2
5.18 BRIDGE EXPANSION JOINTS
5.18.5 (2) Expansion joint (movement range ± 20 mm ) 25 m
5.19 BRIDGE BEARINGS
5.19.8 (2a) Elastomeric bearings size 250mm x 400mm x
41mm (Capacity 1250 kN) at abutments
16 Nr
5.20 BRIDGE PARAPETS AND RAILINGS
5.20.4 (1a) Concrete precast parapet 83 m
5.20.4 (2) Aluminium single rail parapet 83 m
To Collection
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 3 of
4
Item Description Qty Unit Rate Amount J.D.
5.22 DRAINAGE OF STRUCTURES
5.22.4 (1) Gully grate and frames 1 Nr
5.22.4 (5b) 200 mm UPVC pipe for
drainage of bridge deck 2 m
5.23 CONCRETE PILING
5.23.1 Concrete cast in place piles including, boring,
concrete, reinforcement and all other
accessories 800 mm diameter, of 2000 KN
Vertical capacity
152
m
5.23.3 Non destructive integrity testing of
800 mm diameter piles 8 Nr
To Collection
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
CONCRETE, STEEL AND STRUCTURES J17142-0100D-BOQ-PM-01 REV B ST/BOQ/5 - Page 4 of
4
Amount
COLLECTION J.D.
ST/BOQ/5 - Page 1
ST/BOQ/5 - Page 2
ST/BOQ/5 - Page 3
BILL Nr. 5 - CONCRETE, STEEL AND STRUCTURES
To Summary J.D.
Bridge Protection Works Dead Sea Ghor Haditha Road
Package 2
SUMMARY
Amount J.D.
PROTECTION WORKS AT BRIDGE 1
PROTECTION WORKS AT BRIDGE 2
PROTECTION WORKS AT BRIDGE 3
PROTECTION WORKS AT BRIDGE 6
AL MUJIB BRIDGE REPAIR
PROTECTION WORKS AT BRIDGE 8
NEW BRIDGE 2
TOTAL STRUCTURAL WORKS
To General Summary J.D.
SUMMARY
J17142-0100D-BOQ-PM-01 REV B ST/BOQ/S - Page 1 of 1
GENERAL SUMMARY
Bridge Protection Works Dead Sea Ghor Haditha Road
GENERAL SUMMARY
Amount J.D.
GENERAL PROVISIONS AND PRELIMINARIES
GEOTECHNICAL WORKS
TRANSPORTATION WORKS
STRUCTURAL WORKS
TOTAL
To Form of Tender J.D.
GENERAL SUMMARY
J17142-0100D-BOQ-PM-01 REV B BOQ/GS - Page 1 of 1
dar.com Volume 3 J17142 November 2018