MMA
October 2017
2017 Facilities Masterplan
West Shore Community College
Scottville, Michigan
AMM 2017 Campus Facilities Master Plan Contents
1. Introduction
2. Summary A. Background / Purpose of Master Plan Update B. Planning Goals C. Planning Guidelines D. Planning Process E. Recommendations
3. WSCC History, Mission & Goals
4. Facility Overview A. Site B. Administrative & Conference Center C. Arts & Sciences Center D. Public Safety / Recreation Center E. Technical Center F. Maintenance Building G. Auto Repair Maintenance Building H. Ice Arena I. Schoenherr Campus Center J. Other
5. Cost Summaries
6. Implementation Strategy
7. Facilities Assessment & Deferred Maintenance Capital Planning Report. 2016 Update
8. Deferred Maintenance Report
Contents
AMM 2017 Campus Facilities Master Plan Section 1 - 1
West Shore Community College commissioned Mathison | Mathison Architects to update the Facilities Master Plan first developed in 2000, with additional updates in 2003, 2004, 2006, 2007, 2008, 2010, 2011, 2012, 2013, 2014, 2015, and 2016. This plan is intended to guide the physical development of the College in ways that respect the environment, maxi-mize existing assets, and reflect its mission and vision for the future. It fur-ther reflects established priorities at WSCC as it strives toward excellence in educational opportunity for all.
We appreciate and acknowledge the assistance of WSCC Administration for their contributions to this update, including their time, interest, advice and constructive thoughts. In particular, the guidance and organization of Interim President Scott Ward were most appreciated during the entire process.
Mathison | Mathison Architects
Thomas R. Mathison, FAIA, REFP, NCARBPrincipal
1. Introduction
AMM 2017 Campus Facilities Master Plan Section 2 - 2
The Summary for this Facilities Master Plan Update report includes the following:
A. Background / Purpose of Master Plan Update
B. Planning Goals
C. Planning Guidelines
D. Planning Process
E. Recommendations
2. Summary
AMM 2017 Campus Facilities Master Plan Section 2 - 3
A. Background / Purpose of Master Plan Update
In 2000, West Shore Community College commissioned a Facilities Master Plan, completed that same year and updated annually to guide the future physical development of the College in ways that reflect its mission and vision for the future. Specific recommendations were developed with corresponding budgets to guide financial planning to achieve the recommended facility improvements.
Since that time, several major projects have been accomplished: a Science Wing Addition to the Arts & Sciences Center (2002); a new Ice Arena (2002); connection to the City of Ludington municipal sewer system (2004); a new Auto Repair Maintenance Building (2004); the Manistee County Center, which opened in 2007, the new Schoenherr Campus Center (2008), the renovation and expansion of the Arts & Sciences Center in September, 2010, improvements at the Administration Center in 2011, and reroofing and pool/locker room remodeling work at the Recreation Center in 2012, 2013, and 2014.
In 2014, glass was replaced at the Ice Arena, flooring was replaced at the Music rehearsal spaces in the Arts & Sciences Center, parking lot and walking lighting was replaced, and there is ongoing work toward total replacement of the existing dam. Construction for a new storage building at the Auto Maintenance Center is also being completed, in conjunction with several small out-buildings and nursery shed. Currently the College is in the midst of planning a major renovation and expansion of the Technical Center, funded in part via the State of Michigan Capital Outlay process. .
Today, the College is comprised of seven major buildings, and several small outbuildings. The seven buildings total approximately 302,000 SF, with a total current replacement value estimated at over $67.3 million.
2. Summary
AMM 2017 Campus Facilities Master Plan Section 2 - 4
2. Summary
In order to continue to look forward in the interest of meeting the needs of students for course offerings and facilities, and to include updated data on deferred maintenance issues, WSCC commissioned this update to its Master Plan in 2017. It should be mentioned that the Deferred Maintenance Report, updated in 2016, describes the current general condition of the facilities at WSCC as “good”, with buildings ranging in age from new to 40 years:
“Though the life expectancy of some building materials and systems has been reached, solid construction and good maintenance practices have helped to keep those materials (i.e., original windows, doors and HVAC systems) in as good condition as can be expected. Several original systems including roofs, windows, doors and HVAC system components are beginning to reach time for replacement and are being addressed by the College in a timely manner.”
The goal of this update is to provide West Shore Community College with a comprehensive roadmap for meeting facilities and deferred mainte-nance issues over the next 5 years. It should be stated that the recom-mendations documented in this section (Section 2) are presented without prioritization for each building / facility at WSCC. Selected prioritized projects and accompanying costs are presented in Sections 5 and 6 of this Update.
Just as change has created the need for this facilities master plan, future changes will continue to make the planning process dynamic. While this master plan report makes recommendations to retain an attractive, ser-viceable physical environment that is responsive to the changing needs of WSCC, it is not rigid or static. To be an effective consensus-building and decision-making tool, this facilities master plan should be seen as a flexible document, able to be periodically evaluated and revised as new ideas emerge.
AMM 2017 Campus Facilities Master Plan Section 2 - 5
B. Planning Goals
Like the 2000 Facilities Master Plan, as well as its updates in through 2016, this update includes the following specific goals:
1. Identify sites for new construction, or expansion on or off campus.
2. Identify and plan sites for possible additional parking facilities, including pedestrian and vehicular traffic patterns.
3. Recommend a plan to maximize the value of existing physical assets.
4. Recommend a plan for responding to emerging and changing physical needs as they relate to technology.
5. Maintain stewardship of the natural environment.
6. Assist in establishing priorities and cost estimates for a five-year Facilities Master Plan.
7. Consider design consistency, renovations, retrofits and maintenance.
8. Incorporate provisions within the Facilities Master Plan that will adhere to the necessary comprehensive 5-year planning documents for Capital Outlay, as required by the State of Michigan, State Budget Office.
2. Summary
AMM 2017 Campus Facilities Master Plan Section 2 - 6
C. Planning Guidelines
This update observes WSCC guidelines for shaping future facilities and environments:
• WSCC facilities, programs and services must be focused on the needs of students, creating the optimum environment for learning and growth.
• WSCC is committed to making educational services available to all, taking full advantage of emerging technologies, partnerships, and networks.
• Environmental quality and barrier-free issues must be considered in all facilities.
• Maintaining and enhancing the natural and built environment is important to the College.
• Facilities must be flexible and provide a variety of learning environments toward the enhancement of lifelong learning.
• WSCC is committed to being responsive to the changing needs of its component communities
2. Summary
AMM 2017 Campus Facilities Master Plan Section 2 - 7
D. Planning Process
Following input, this document was created to be submitted to the WSCC Board of Trustees for their consideration and approval, with the intent that it will become the College Facilities Master Plan.
Input included data gathered from a separate Space Needs Assessment Report, completed in 2015.
In addition to meetings, the planning effort also included a review of the 2016 “Facilities Inventory, Assessment and Deferred Maintenance Capital Planning Report”. The purpose of this updated study was to:
• Provide an inventory of the College’s facilities
• Determine the general condition of the buildings and grounds
• Determine a Facilities Condition Index (FCI) for each building and the College as a whole.
• Assist the College in meeting the goals of its Strategic Plan through timely maintenance of the campus buildings.
2. Summary
AMM 2017 Campus Facilities Master Plan Section 2 - 8
E. Recommendations
Based upon observations of site and building features, as well as an analysis of gathered information, several recommendations are presented in the following categories:
1. Site Recommendations2. Administrative Building Recommendations3. Public Safety / Recreation Center Recommendations4. Technical Center Recommendations 5. Arts & Science Center Recommendations 6. Schoenherr Campus Center Recommendations 7. Ice Arena Recommendations8. Technology Recommendations9. Environmental Recommendations
Renovation of the Technical Center is the top priority project.
2. Summary
AMM 2017 Campus Facilities Master Plan Section 2 - 9
1. Site Recommendations
A. Preserve unique WSCC sensitive outdoor environment.
Preservation of the unique and environmentally sensitive outdoor quality of West Shore Community College continues to be the first and guiding priority for all changes, improvements, expansion, and development within the College campus. It is a community asset for its beauty and environmental benefits to the College’s service area.
More specifically, WSCC should manage its natural resources for the sustained health of the environment, and for the benefit of WSCC course offerings, affiliated community programs, and collaborative efforts of local organizations and individuals by means of the following:
Planned landscaping and horticultural improvements, using native species and low maintenance plant materials;
• Monitoring existing campus flora to identify trees and shrubs to be removed and indigenous species to be enhanced;
• Identifying and enhancing wildlife habitats in the variety of environments found on campus;
• Developing and maintaining campus nature trails and interpretive programs, including the restoration of existing trails.
B. Upgrade the water system.
The college should pursue options to improve water quality and treatment for long-term best results and connection with a municipal water supply in the long term. As of 2017, solicitations have been prepared to design a water connector to the City of Ludington system, with construction anticipated in 2018.
2. Summary - Recommendations
AMM 2017 Campus Facilities Master Plan Section 2 - 10
C. Development of a Campus-Wide Emergency Generator
There is an opportunity to sustain continuous operations in times of power outages and to reduce annual electrical operating costs through the development of this emergency generator. Bids for this generator are being received with a current preliminary estimated cost of $720,000 for 1.5 MW generator capacity.
D. Future Student Housing
Due to student interest and changing demographic factors the College is considering a feasibility study to determine the viability of developing student housing. The scope of this study may include an assessment of student characteristics; enrollment trends; an analysis of the housing market; focus group sessions; student housing demand projections; and recommendations for the mix, size and charges for student housing rental units along with suggestions for unit features and common-area amenities. This study is planned to be completed in 2018. This master plan identifies a potential future site for housing for approximately 120 beds and associated parking.
E. Future Agricultural Sciences Program
In the fall of 2016 a new agricultural program through Michigan State University will begin. In the fall of 2015 the West Shore ESD started holding agricultural science programming on campus including the placement of a temporary chicken coop. With desired expansion by the ESD for their program and possible implementation of a WSCC/MSU program, additional space needs may be required for agricultural science including specialized classroom space and outdoor space(s) for hands-on learning. Currently, three out-buildings and a nursery building have been constructed near the Auto Maintenance Center.
2. Summary - Recommendations
AMM 2017 Campus Facilities Master Plan Section 2 - 11
F. New interior campus road and parking circulation system.
The new interior circulation road and parking system has been implemented as new facilities were added or expanded on campus. New parking and drives were completed in association with the new Schoenherr Campus Center, including a new entrance at Stiles Road. Also, parking and drive improvements were completed as part of the proposed expansion of the Arts & Sciences Center and at the Administrative & Conference Building.
Continued improvements should be made to clearly identify parking areas from driving lanes and walking paths. Supplemental wayfinding should be added to clarify directions for drivers to reach the Administrative and Conference Center. Consideration should be given to the designation of some parking areas for staff and faculty parking. Possible new student housing will also impact campus circulation for both vehicle and pedestrian.
G. Development of Athletic Fields and associated
improvements at the Recreation Center area of
campus.
To develop greater coordination of athletic and recreational programming, the College should relocate and develop open fields near the Recreation Center for soccer, softball and other general recreation and organized sports. A frisbee golf course has been installed. In addition, tennis courts and outdoor basketball capability should be considered, particularly in the context of potential on campus student housing.
The cross-country trail should be redeveloped and enhanced with fitness stations and compatible recreation functions, suitable for use by students and the community. The cross-country pavilion should be retained. Parking capacity should be provided to accommodate more intense use of the new field areas and the Recreation Center.
2. Summary - Recommendations
AMM 2017 Campus Facilities Master Plan Section 2 - 12
2. Summary - Recommendations
H. Consider a new entrance from Sugar Grove Road to
provide access to the Ice Arena / Recreation Center.
As programs and events grow at the Ice Arena and at the Recreation Center, and with the potential development of new athletic fields, greenhouse facility, and alternative energy sources, the vehicular traffic volume on campus will grow. A second, convenient access route to this part of campus should be considered to provide safe and uncongested travel.
I. Replace the boardwalk and stair from the Administration
Center plaza to the creek below. Create a footbridge to
span the creek and new stairs on the opposite bank.
Once an educational asset to the campus and specific curricula to study outdoor environments and ecosystems, this area is currently in very poor condition. At its lowest level, it is closed due to damage and disrepair. The footbridge is gone and the stairs on the opposite bank are in disrepair.
In 2017, plans were developed to renovate the existing stairs and landings, and to add a footbridge across the stream to join a new stair on the opposite bank to connect with the existing foothpath system. bids were received and the Colege is currenlty considering next steps for implementation.
J. Alumni Sculpture Park
In 2017, initial concepts for a potential alumni sculpture park were considered, in order to add outdoor sculpture settings to the campus and to recognize he contributions of College alumni. A site location in the center campus area, outside the Schoenherr Center is being considered for further design development.
AMM 2017 Campus Facilities Master Plan Section 2 - 13
2. Summary - Recommendations
2. Administrative & Conference Building
Formerly known as the Campus Center, this building is used for administration and office functions, classrooms, and kitchen/food service. It was built in 1969 as the first building on the WSCC campus. It currently includes 26,000 SF on one floor, with a partial basement for mechanical equipment.
The building has received several improvements:
• Kitchen fire suppression and vent hoods were replaced.
• The ceiling at the fire pit area has been replaced. The stepped area at the fire pit has been partially covered with a new flooring system to create barrier-free access from one interior pavilion directly to the other, and to expose the original fireplace.
• The outdoor patio and surrounding landscape, as well as the building boiler, was replaced in 2011.
• Exterior glass was replaced with a more energy-efficient glass system. Exterior doors have been replaced.
Recommendations
A. Remodel the Conference Spaces
The north section of the building houses classrooms and the former main dining room for the College. Renovation of these spaces would improve their utilization as innovation space, teaching spaces, conference break-out spaces and dining space by providing better acoustic separation from the kitchen and dishwashing areas.
AMM 2017 Campus Facilities Master Plan Section 2 - 14
2. Summary - Recommendations
B. Improve electrical distribution and technology
infrastructure.
Currently the electrical distribution system is functioning at maximum capacity. Redevelopment of existing spaces and functions will require corresponding enhancement of the electrical distribution system to serve those needs in the short and long-term future. This includes upgrading data wiring.
C. Expand the foyer for greater flexibility, pre-function
capability, and for improved traffic flow.
AMM 2017 Campus Facilities Master Plan Section 2 - 15
2. Summary - Recommendations
3. Public Safety / Recreation Center
The Public Safety / Recreation Center, is the location of the Law Enforcement Program at WSCC, as well as programs for athletics, fitness, and natatorium. It is used by students, staff, and is available for community use. It was built in 1975 and includes 47,710 SF on two floors.
The building has received several improvements recently:
• A portion of the roof was replaced in 2009.
• The gymnasium floor was replaced in 2009.
• The natatorium whirlpool was replaced in 2009.
• All exterior doors and doors from the natatorium to adjacent corridors were replaced in 2007.
• The boiler system was replaced in 2010, as were most HVAC controls.
• The gymnasium and natatorium lighting was replaced with fluorescent fixtures in 2010.
• A relocated athletic office was implemented in 2011, as well as limited improvements to the women’s locker room and gymnasium.
• Following significant storm damage, the entire roof and associated trim and metal fascia panels were installed in 2013.
• Exhaust fans for the pool area were replaced in 2013.
• Structural investigation of the bowed gym wall in 2013 indicates that the wall is stable. Water infiltration has stopped.
• Pool locker rooms and the pool ceiling renovation were completed in 2014.
• New roofing and mansard metal roofing was installed in 2014.
• The building elevator was recently refurbished.
• Recently, the MSU Extension Office has located in the office area
at the main building entrance at the upper level.
AMM 2017 Campus Facilities Master Plan Section 2 - 16
2. Summary - Recommendations
Recommendations:
A. Renovate the building for expanded programming.
As WSCC continues to adapt to the changing needs of the community, this area could be well used as classroom space, conference space, administration space or expanded CTE, continuing education, community education, and physical education programming. Currently the space is being used by the Law Enforcement program. The option also exists to capture the area below the roof at the entrance to increase the office area in the future.
B. New canopy at the north entrance.
This will enhance arrivals on the building’s north side with vestibule and canopy protection.
C. Replacement of pool infrastructure components.
The pump and piping infrastructure supporting the pool needs to be replaced or renovated. The pool requires re-tiling and the original piping connecting the mechanical room to locations under the pool needs to be replaced.
AMM 2017 Campus Facilities Master Plan Section 2 - 17
2. Summary - Recommendations
4. Technical Center
The original Technical Center was built in 1969 as vocational / technical classroom and lab space. It includes 32,600 SF on one floor, and it received renovation in 2004. A major addition of 39,200 SF was completed in 1993, including space for classrooms and labs.
Recent improvements include:
• New roofing at the Welding Lab in 2009.
• Boilers were replaced and temperature controls were updated in 2010.
• Rooftop units were replaced in 2009.
• Carpeting was replaced in 2009.
• Lighting in the atrium was replaced with fluorescent lighting.
• Entry vestibules at the north entrances were added in 2005.
• A new welding lab makeup air unit was installed.
• In 2013, the domestic water heater for the entire building was replaced, and associated circulation pumps were added.
Recommendations:
A. Major renovation and expansion of the building are
currently underway.
Includes upgraded toilet rooms, remodeled offices and classroom spaces, common spaces, and information center, as well as electrical improvements, and expansion of the welding lab.
AMM 2017 Campus Facilities Master Plan Section 2 - 18
2. Summary - Recommendations
5. Arts and Sciences Center
The original Arts and Sciences Center was built in 1970, with a science wing expansion in 2002 and an arts addition in 2010, bringing the total area to 35,000 SF. The building houses science and arts classrooms, studios, labs, gallery space, music classrooms and auditorium space.
In 2013, two chiller compressors were replaced at the science wing addition. Flooring was replaced in music studio in 2014-15. A boiler was replaced in 2015 and a snow melt system with heat exchange was installed in 2016 at walks on the West side of the Science wing extending to the South entrance of the Arts and Science Center.
Recommendations:
A. Add approximately 1,700 SF to the existing gallery, and to
provide for additional art storage capacity.
AMM 2017 Campus Facilities Master Plan Section 2 - 19
6. Schoenherr Campus Center
The Schoenherr Campus Center was constructed in 2008, and includes 38,000 SF of space over two floor levels for library, bookstore, café’, student activities, business office space, testing center, and counseling services.
Recommendations:
A. Improve acoustic quality of open, two-story space.
B. Reconfigure space at the upper level to accommodate
changing needs for student services, testing requirements,
counseling, and student gathering.
C. Reconfigure the existing Bookstore and the Cafeteria
Kitchen spaces to create an internet cafe experience in
the Bookstore.
2. Summary - Recommendations
AMM 2017 Campus Facilities Master Plan Section 2 - 20
7. Ice Arena
The Ice Arena was constructed in 2002 and includes 34,600 SF of athletic space. The facility is owned by Mason County and operated on a 50-year lease/purchase agreement. Recently the ice rink lighting was replaced with fluorescent light fixtures, and repairs to the roof deck were complete. Ceiling fans were installed to provide additional air circulation.
Recommendations:
A. Add officials’ locker room.
B. Remodel existing officials’ locker room for women’s locker
room.
C. Add multipurpose space.
2. Summary - Recommendations
AMM 2017 Campus Facilities Master Plan Section 2 - 21
2. Summary - Recommendations
8. Auto Repair Maintenance Building
The Auto Repair Maintenance Building was constructed in 2005 and includes 8,700 SF, including an Auto Lab, two classrooms and two Agriscience classrooms for use by CTE students.
Recommendations:
A. None
AMM 2017 Campus Facilities Master Plan Section 2 - 22
9. Technology Recommendations
A. Enhance technologies supporting distance learning.
B. Provide scheduled annual replacement of computers,
peripherals and network hardware.
C. Continue the WSCC initiative to enhance a wireless
campus.
AMM 2017 Campus Facilities Master Plan Section 2 - 23
10. Environmental Recommendations
A. Continue to evolve sustainable “green” building standards
and culture for WSCC.
The awareness of the benefits and application of sustainable design principles has lead to campus-wide green building standards, which will result in improved energy efficiency and consistency across the entire campus.
The encouragement for LEED-certified new construction and major remodeling to obtain capital funding from the State of Michigan adds to the College’s commitment to environmentally-conscious design, materials, and systems.
The Schoenherr Campus Center achieved a Silver LEED rating, and the Arts & Sciences Center achieved a Gold LEED rating. The current improvements planned at the Technical Center are aimed to achieve a LEED rating when completed.
2. Summary - Recommendations
AMM 2017 Campus Facilities Master Plan Section 3 -24
It is important to recognize the heritage and history of West Shore Community College as it looks to the future. Stated below are statements from the WSCC Board of Trustees Statements of Vision, Customer Orientation Philosophy, Mission, and Core Values for the College which was adopted by the Board of Trustees in May 2002. The College adopted a new Strategic Plan in late 2014: Transform 2017: A Blueprint for
Success.
History of the CollegeThe people of the area voted to establish West Shore Community College in 1967, and in 1968 the college began serving the needs of students. The college district includes all of Mason County, Manistee County, and parts of Lake, Newaygo, and Oceana counties. In the true spirit of a community college, West Shore’s instructional programs prepare students for immediate employment and/or provide a sound two-year base from which they can continue work towards a bachelor’s degree. A seven member board of trustees, elected at-large from the college district, provides leadership and direction for the college’s overall operation.
The campus lies on 360 acres of rolling timberland at the intersection of Stiles Road and Sugar Grove Road, near Scottville. The primary buildings that comprise the core of the College today are:
Schoenherr Campus Center Arts and Sciences Center Recreation Center Technical Center Administrative & Conference Building Ice Arena Auto Repair/Maintenance Center
The Manistee County Center at the Manistee West Shore Medical Center opened in August, 2007.
In 1996, the community passed a ten-year millage to maintain and enhance college facilities. The proceeds from this millage provide a cause for evaluating and prioritizing facility improvements and expansion. This millage was renewed for another ten-year period in 2006, and it was passed again in August 2015, for another ten years.
3. History, Mission & Goals
AMM 2017 Campus Facilities Master Plan Section 3 -25
Vision Statement of the College“Our vision is to be one of the premier community colleges in America, driven by a passion for:
• assuring student success; • serving our entire community, and • pursuing greatness.”
Mission Statement of the College“West Shore Community College’s Mission is to make our community a better place in which to learn, live, work and prosper.”
Core Values “West Shore Community College values people first. As we pursue greatness we are guided by these values:
• LEARNING: Creating opportunities for gaining core abilities, workplace skills, and lifelong personal growth.
• INTEGRITY: Honoring our commitments and promises with openness and mutual respect.
• EXCELLENCE: Striving for greatness through a positive attitude and continuous improvement.
• INCLUSIVENESS:
Building community through teamwork, collaboration and outreach.
• CREATIVITY:
Opening our minds and the minds of our students to infinite possibilities.
3. History, Mission & Goals
AMM 2017 Campus Facilities Master Plan Section 3 -26
3. History, Mission & Goals
Four Strategic Directions
• Foster Student Success
• Serve Our Communities
• Strengthen Our Organization
• Innovate and Collaborate
AMM 2017 Campus Facilities Master Plan Section 4- 27
A. Site
The College occupies 360 acres of rolling timberland between Scottville, Manistee and Ludington. The site includes a portion of the Lincoln River, as well as a pond created by a dam structure at a tributary to the river.
The site varies from heavy wooded areas, with steep slopes along the river, to rolling grasslands and a pine tree farm.
The wooded land north and northwest of the Administrative & Conference Building and the Technical Center are important to the image of the College. This is a mix of hardwoods and pines, which protects the lower, northern slopes and streambed below.
Since the summer of 2000, WSCC has had a “Green Team”, working in cooperation with the Administration and the Facilities Maintenance Department on environmental issues affecting the campus. Through it, a campus-wide conversation about sustainability has produced tangible results in WSCC policy, including an inventory of indigenous species at WSCC, and the development of a rain garden. The Green Team was also instrumental in guiding sustainable features of the addition to and renovation of the Arts & Sciences Center.
Utilities
The site is served by a private water well system. The quality of the water is consistently questioned and tested. Following a professional study to evaluate the current water system and to offer optional long-term solutions, the College upsized the existing well serving the main campus and added an additional well in order to meet the water usage needs expected with the completion of the new Campus Center. In addition, the College installed a second well to provide redundancy and back-up for the current well along with providing for the future expansion of campus facilities.
There have been discussions in the past of linking the campus to a municipal water system from the City of Ludington. Currently, a solicitation has been prepared for the design of a connector to the
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 28
City of Ludington water system. Ultimately, a public water system would enhance the quality of the water service to the campus, including potable water and fire suppression capability. The existing three wells on campus would then be used for irrigation.
Sanitary sewerage is handled by a direct connection to the municipal sewer system of Ludington.
Electrical capacity to the campus is adequate, and was improved with an electrical loop system throughout the campus. However, electrical distribution within each building remains a concern. The College is host to a major power substation at the entrance to the campus on Stiles Road. This is visually screened by maturing landscaping surrounding the station.
Consumers Energy Company has proposed to enter into an agreement with WSCC to construct a campus-wide emergency generator, transformer, and transfer switch that will allow the campus to go off the grids in times of emergency. Reduced electrical rates to the College as a result of this improvement would substantially reduce the annual operating cost of electrical energy for the College going forward.
Storm water runoff and management is not a major problem on campus, though there is erosion in some areas (i.e., near the Recreation Center). Also, the elimination of the few remaining storm water ditches along internal walks and drives via underground storm water piping leading to a retention basin would make a smoother and safer transition across lawns and paved surfaces for pedestrians. Eliminating the ditches would also reduce maintenance.
The College recently completed (2015) a dam repair project at the North end of the existing pond.
Telephone and cable service extends from Sugar Grove Road to the center of campus.Gas service is buried from Stiles Road and extends to the center of campus.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 29
Drives and Parking
Inadequate definition of driveway lanes and parking areas have consistently been mentioned by stakeholders as a drawback to the parking area west of the Technical Center. Wayfinding to the Administrative and Conference Building is also regularly cited.
The central location of the parking lot at the Schoenherr Campus Center makes it a parking lot of choice for staff and students – it fills quickly and remains full. Parking on grass areas is common. Identification of a separate area for staff parking has been discussed as a potential remedy to ease this pressure.
In terms of traffic flow through the campus, the primary concern is the dead-end road access to the Recreation Center and Ice Arena. The drive is defined, along the Arts and Sciences Center parking lot, by the planting of small trees. This separation has been effective; however, transition from that parking lot to the roadway is still a concern.
Traffic often moves too fast along the road near the Recreation Center where slopes are steep. Adjacent pedestrian walks to this road add to the safety problem. Also, the vehicle drop-off area at the Recreation Center entrance is too small for busses to be serviced adequately. The drive along the west side of the Recreation Center is narrow, too close to the building, and was repaved in 2002, as was the road to the Recreation Center and the Ice Arena. The parking area on the east side of the Recreation Center is in good condition.
Parking and general access to the Administrative & Conference Building is limited, though it was improved and expanded for better access by service vehicles and parking for the public.
Parking at the Arts and Sciences Center is adequate, and it serves as an overflow for events at the Recreation Center.
Parking at the Recreation Center and Ice Arena is adequate for most uses. The upper level handles most of the load, while the lower level allows for handicap parking and access to the Recreation Center.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 30
Handicap access from the upper parking lot to the front entrance is difficult. The lower lot can accommodate expansion.
The addition of the new Schoenherr Campus Center, as well as the adjacent parking and drive improvements has made a significant improvement from the campus entry at Stiles Road to the Arts & Science Center parking lot. With changing traffic patterns, the western-most section of paved parking surface could be removed and the site returned to a natural state.
With the installation of solar arrays at the Technical Center, a charging station for electric vehicles located here could augment alternative energy programming at WSCC and serve the needs of electric vehicle drivers.
Many of the walks around the Technical Center are asphalt. They are often difficult to distinguish from drive surfaces. There are no curb separations between drives and walks at any location.
Walks
The campus is generally pedestrian-friendly. However, there is significant pedestrian traffic on roadbeds between classes, particularly between the Arts and Sciences Center and the Recreation Center. Additional walks are needed here to provide adequate safety. The potential of a pedestrian bridge across the creek between the Administrative and Conference Center and the Recreation Center has been mentioned.
In general, there is a need for supplemental exterior building signage for pedestrians to identify individual buildings at the center of campus.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 31
Outdoor Recreation
At the center of campus, with increased density of buildings and foot traffic, the College should consider the addition of outdoor site amenities to enhance the full utilization of the site.
Outside the periphery of the area of main campus buildings, there are three main nature trail systems along the creek bed and extending into the upland grass and open spaces. These are often used by biology students. Portions of the trails are also used for cross-country running events. Requests have been made to create cross-country ski trails, as well as an outdoor fitness trail.
There are several bridges at various locations along the creek trail, which require maintenance. However, the trails are not handicap accessible and the walks and bridges are in need of repair or replacement.
A softball diamond exists near the Sugar Grove entrance. Touch football, soccer, and other recreational sports occur in the upland grass areas of the campus. The level area west of the Recreation Center could be developed into an open recreation area for field sports.
Softball, tennis facilities and outdoor basketball facilities could also be added near the Recreation Center for greater student, faculty, and community use.
The pavilion along the pond near the Recreation Center is used extensively by families in the community for picnics and other events. The pavilion in the upland area east of the Recreation Center is used for athletic and other events.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 32
4. Facility Overview
Future Land Use Considerations
Student Housing
Due to student interest and changing demographic factors the College is planning a feasibility study to determine the viability of developing student housing. The scope of this study may include an assessment of student characteristics; enrollment trends; an analysis of the housing market; focus group sessions; student housing demand projections; and recommendations for the mix, size and charges for student housing rental units along with suggestions for unit features and common-area amenities.
Agricultural Sciences
The College is currently in discussion with Michigan State University regarding the development of an agricultural sciences program. In the fall of 2015 the West Shore ESD started holding agricultural science programming on campus including the placement of a temporary chicken coop. With desired expansion by the ESD for their program and possible implementation of a WSCC/MSU program, additional space needs may be required for agricultural science including specialized classroom space and outdoor space(s) for hands-on learning.
Public Service Center
Recently, a 3.1-acre property on US-31, including a former 5,500 SF medical building, has been idientified as a potential site for the WSCC Law Enforcement Program, offering attributes not available on the main WSCC campus. The WSCC Board of Trustees has authorized a due diligence process to determine the suitability for this building and site to be used by the Law Enforcement Program, and ffor possible expanded use by related programs, such as EMS training, and fire training.
AMM 2017 Campus Facilities Master Plan Section 4- 33
AS
ITE
Octo
ber
2017
Replace Decks,
Bridge, Stairs
at Creek
Future Housing
- 120 Beds
Future Parking
11 Sub-Station
Planned
Expansion
Proposed
Expansion
Proposed
Expansion
AMM 2017 Campus Facilities Master Plan Section 4- 34
4. Facility Overview
B. Administrative & Conference Building
The Administrative & Conference Building was the first building on the campus of West Shore Community College, built in 1970. The building exists on two levels. The main level is approximately 26,000 SF. A small lower level includes a mechanical room and storage facilities.
The existing building is organized in three basic sections:
1. The center section is comprised of two large, hexagonal shaped gathering spaces for conference activities;
2. An eastern wing for administration, business office, IT, and Human Resources functions;
3. And a north wing for kitchen and dining space, as well as classrooms/conference rooms.
From a site perspective, the Administrative & Conference Building is the most remote building from major parking areas, though the College expanded parking area to roughly 50 spaces in 2008. It, nevertheless, is perceived as a remote building, requiring extra effort for students to reach and utilize.
The building exterior is comprised of brick and glass walls, with standing-seam metal, sloped roof areas over the lounges and mechanical equipment serving the kitchen, and mansard roof areas at the building perimeter. The brick appears to be in good condition, and the glass panels, replaced in 2011, allow clear views through the lounge spaces to the wooded environment along the creek. Roofing systems were replaced in 2002.
Upgrades have been made recently to the HVAC and electrical systems, and the data center was relocated. It should be noted that there is a natural water spring under the existing boiler room, which may be the cause of some drainage problems existing at the lower back side of the building.
AMM 2017 Campus Facilities Master Plan Section 4- 35
The electrical service equipment appears to be in good condition. However, additional receptacle panels are required, as the present panels are full. With increased use of computers and other technology, more panels are required. The existing fire alarm system appears to be in adequate condition.
Generally, the lighting is satisfactory. However, lighting should be upgraded in office areas to better serve computer use.
The patio area (hardscape and landscape) between the building and the creek was replaced in 2011. This is now an attractive and useful extension of the building functions. The wood stair and landings from the plaza area to the creek are in disrepair and closed to the public. Plans are in place to renovate the exxisting stairs and ecks, and to add a pedestrian bridge over the creek leading to a new stair on the opposite bank to connect with existing nature trails.
Center Section
On the interior, the entrance to the building opens to a semi-private foyer which directs visitors right or left. This is a key orientation point. However, this is a point of constriction, functionally. From here, one must pass through the gathering spaces to get to the east (administrative) wing or north (conference) wing. The large gathering spaces are among the best architectural spaces on campus and are attractive in their own right. However, because they are also circulation spaces, their use a conference space is limited.
The ceiling and upper walls and lighting are in good condition and are attractive, except in the area of the fireplace “pit”, which needs to be remodeled. Flooring in all areas has been replaced recently.
East Wing
The east wing houses Administrative Offices, Business Offices, Human Resources Offices, and IT staff.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 36
4. Facility Overview
The Business Office has been upgraded recently with new furnishings and finishes. There is significant space in this area that is unused or underutilized.
The College Administrative Offices, including the Board Room are organized along the north wall of the east wing. This area has been gradually upgraded over recent years. The IT department has added 50 wireless access points across campus.
North Wing
The existing north wing houses the kitchen, two classrooms, the MBT room and public toilet rooms. The conference/gathering space (formerly the College cafeteria) has excellent views from two sides to the natural environment toward the creek and is a popular location for small meetings.
The kitchen produces a significant amount of food for regular food service and special functions across the entire campus. With the modest new food service function at the Schoenherr Campus Center, the existing kitchen plays a dual role to produce food items, as well as serve as education/training space for Tech Prep programs. Remodeling in this area should include better traffic flow between the kitchen and banquet spaces, acoustic treatment to reduce noise transfer from the kitchen to adjacent spaces, better climate control, storage space for records and computer equipment, as well as office and storage space for Tech Prep programs.
The MBT Room serves as a large gathering/conference area to better serve banquet functions and conference needs. The finishes, furnishings and lighting were updated recently.The Tech Prep Room (formerly the MBT Room) is well-used and has been updated with new windows, finishes, furnishings, lighting, comfort control, and A/V capabilities. A new exterior vestibule was added to allow direct access from the outside adjacent parking area.
AMM 2017 Campus Facilities Master Plan Section 4- 37
BE
XIS
TIN
G P
LA
N -
AD
MIN
ISTR
ATIO
N &
CO
NF
ER
EN
CE
BU
ILD
ING
Octo
ber
2017
AMM 2017 Campus Facilities Master Plan Section 4- 38
BP
RO
PO
SE
D IM
PR
OV
EM
EN
TS
- A
DM
INIS
TR
ATIO
N &
CO
NF
ER
EN
CE
BU
ILD
ING
Octo
ber
2017
RENOVATION
AMM 2017 Campus Facilities Master Plan Section 4- 39
C. Arts and Sciences Center
The Arts and Sciences Center was the third building on the campus of WSCC, built in 1971. The building is on one level and contains approximately 35,000 SF. In 1997, Room 315 was remodeled, and in 1999, the Theater and Rooms 301 and 303 were remodeled. In 2002, a 17,700 SF Science Wing Addition was completed. In 2010, a major expansion and remodeling of existing space consolidated the arts programs to this location and provided new space for faculty offices, new general classrooms, new art studios, new music rehearsal spaces, and an expanded theatre and back-of-house spaces to support the theatre arts. This addition received a LEED-Gold rating.
This building is organized in four basic sections:
1. The north end is the location for the theater, theater support spaces, and music rehearsal spaces.
2. The center section is the location for the fine arts and gallery spaces.
3. The south end is the location of classrooms and faculty offices.
4. West side is the science wing addition.
From a site perspective, the Arts and Sciences Center lies adjacent to a major parking lot and to the drive leading to the Recreation Center. A geo-thermal heating/cooling system was installed north of the new faculty offices as part of the recent remodeling / expansion project.
Also, the south entrance is closest to the parking lot, and as a result of the recent remodeling project, it is easily identified as a major entry to the building.
The building exterior is comprised of brick and glass walls, with metal mansard roof areas over the theater and distance learning rooms and metal mansard roof areas at the building perimeter. The roof was replaced in 2002 and as part of the 2010 remodeling project for the arts remodeling and expansion. The brick exterior appears to be in good condition.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 40
In 2015, a boiler was replaced, and a new snow-melt system with heat exchange was installed in 2016 at walks on the West side of the Science Wing extending to the South entrance of the Arts and Science Center.
Theater
On the interior, the north end of the building houses the theater and support spaces. The theater proper was remodeled with new seating and floor finish in 1999. The space is a comfortable, intimate venue for a variety of productions. Over the years, the theater has been creatively modified from a recital format to full stage production capability.
The remodeling in 2010 provided additional stage space, additional access to backstage areas, fly space for scenery, expanded scene shop and storage spaces, new dressings rooms and expanded storage space. There is direct access between the music rehearsal spaces and the backstage areas.
Fine Arts and Gallery
The center of the building includes the newly relocated art programs, including graphic design, two-dimensional art, and three-dimensional art instruction spaces. In addition, a new gallery space located on the main corridor provides greater visibility and access to the public for art shows and traveling exhibits.
As the gallery matures and grows, there is increasing need for secure, organized, and climate-controlled storage of art collections.
Classrooms and Faculty Offices
The south end of the building includes the distance-learning room, two expanded classrooms, two new classrooms and new faculty offices.
The corridor outside the former faculty offices was widened as part of the 2010 remodeling and expansion project, and this widened corridor now serves as the primary link to the south parking lot, so the entrance at the south end of the building is heavily used. An enhanced vestibule and entrance element provides better climate control and a more clear definition of a major entry point. There is an ongoing need for additional office space for adjunct faculty members.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 41
CE
XIS
TIN
G P
LA
N -
AR
TS
& S
CIE
NC
ES
CE
NTE
RO
cto
ber
2017
AMM 2017 Campus Facilities Master Plan Section 4- 42
C
PR
OP
OS
ED
IM
PR
OV
EM
EN
TS
- A
RTS
& S
CIE
NC
ES
CE
NTE
RO
cto
ber
2017
PROPOSED ADDITION
RENOVATION
AMM 2017 Campus Facilities Master Plan Section 4- 43
D. Public Safety / Recreation Center
The Public Safety / Recreation Center was built in 1976 and consists of two levels. The upper level includes about 12,200 SF, and the lower level includes about 35,510 SF.
The building is organized in two basic areas:
1. The upper level includes open spaces formerly used for the music and visual arts programs prior to the completion of the Arts & Sciences Center expansion and remodeling in 2010. Today, this level is used primarily by the Law Enforcement Program. The office area at the main entrance is occupied by the MSU Extension Office.
2. The lower level includes physical education space, such as the arena, wellness center, racquetball court, swimming pool, locker rooms, and storage facilities.
From a site perspective, the Public Safety / Recreation Center is located across the creek, up the hill from the Arts and Sciences Center and the Administrative & Conference Building. It lies at the end of a dead-end drive and parking area. The Ice Arena is located opposite the upper parking area.
Outside the lobby to the Public Safety / Recreation Center, outdoor seating area should be considered for student and patron waiting and gathering.
Two parking lots serve this building, including the primary parking lot to the east (upper lot) and a secondary lot to the north (lower lot). There is a need for a carport structure in the north lot for protection of WSCC vehicles and a canopy at the north entrance to the building. The north lot and building entrance are barrier-free. To the west is a large, open level area of grass that could be used for future fields, parking, tennis courts, etc. To the north is a large, grassy area where two former sewage lagoons were removed in 2005, as a result of connection to the municipal sewer system. The building exterior is comprised of brick and glass walls, with laminated wood beams at the building entrance, and a slightly
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 44
sloping roof with perimeter parapet. The brick appears to be in good condition, and the glass is effective in bringing in natural light to areas such as the Wellness Center.
In 2013, the entire roof and mansard sections were replaced with materials and finishes to match the other buildings on campus. Other items mentioned in the Deferred Maintenance Report include the need for possible replacement of the humidity control and piping valves for the pool, as well as replacement of the main HVAC system control boards. Rusting hollow metal doors and frames at entries were replaced with aluminum storefront systems in 2007.
In 2016, the existing elevator was refurbished.
Upper Level
On the interior, the main entrance includes a lobby space, stair and elevator to the lower level, and offices for the MSU Extension Program.
This upper level also includes open classroom space. Some interior walls were added to create separation of internal spaces for the Law Enforcement Program.
The former music rooms at the upper level are in good condition and had been used for community choir, community instrument ensemble, collegiate show choir, and the college music program. These rooms now house the Law Enforcement program and they are air-conditioned
Lower Level
At the lower level are the arena, the wellness center, weight room, racquetball court, pool, lockers rooms and storage. The interior arena walls have recently been painted, lighting has been improved, and the arena flooring has been replaced.
A portable stage and sections of portable bleachers are available for concerts and special events in the arena, though the existing sound system and acoustics are poor. For the types of athletic and cultural performance events held in the arena, acoustical treatments should be added, and a permanent sound system should be installed. The
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 45
existing arena is not air-conditioned and the existing HVAC equipment is controlled by a mix of pneumatic and digital controls.
The Wellness Center continues to increase in use and popularity with college students and the greater community, and it has been recently expanded as a result of converting one of the racquetball courts into a new weight room in 2005. The former weight room was remodeled for expanded wellness center equipment. Exercise equipment is replaced in accordance with the College’s planned equipment replacement cycle. The Wellness Center is air-conditioned.
In 2014, the pool area was renovated to include new acoustical ceiling treatment. Locker rooms and toilet rooms were renovated. The whirlpool was previously renovated as a separate project. In the pool area, all pool related piping and valves should be replaced. Existing air handler and controls should be upgraded, and the arena should be assessed for air conditioning or increased air-changes to improve ventilation and patron comfort.
The Recreation Office was relocated in 2011 near the intersection of the two corridors at the lower level for maximum control and exposure to corridor traffic. New windows were added between the corridor and area spaces, allowing observation of arena activities from the new Recreation Office.
In general, the following represent possible new programs or activities anticipated in a remodeled, upgraded, or expanded Recreation Center:
• Climbing wall• Day spa in conjunction with therapeutic massage program
and/or spa management program (steam room or sauna would need to be added)
• Activity pool, with water slide and play pool• Concessions area (for use during tournaments)• Student recreation opportunities, in the context of potential
future student housing on site.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 46
DE
XIS
TIN
G P
LA
NS
- R
EC
RE
ATIO
N C
EN
TE
RO
cto
ber
2017
AMM 2017 Campus Facilities Master Plan Section 4- 47
DP
RO
PO
SE
D IM
PR
OV
EM
EN
TS
- R
EC
RE
ATIO
N C
EN
TE
RO
cto
ber
2017
RENOVATION
RENOVATION
AMM 2017 Campus Facilities Master Plan Section 4- 48
E. Technical Center
The Technical Center was built in three phases, and it currently includes about 75,400 SF on one level. Originally built in 1970, it received additions in 1990 and 1992, with additional renovations to sections in 1999 and 2004. Vestibules on the north side of the building were added in 2005.
This building is organized in two basic sections:
1. The south half, which houses the original portion of the building, including tech prep classes, welding lab, and technology offices
2. The north half, built in 1990 and 1992, which houses computer labs, nursing classrooms, general classrooms, and secretarial studies, as well as administrative offices and conference space.
From a site perspective, this building is in view of the campus entrance on Stiles Road. It is also a primary destination of many WSCC students and is a heavily utilized building. It is the single largest building on campus, and it hosts the largest parking areas and a major bus pickup and drop-off area. The building contains a
main atrium space at its center to draw students from the parking lot, through the building, to the center of campus beyond.
The building exterior is consistent with the materials of other buildings on campus: brick and glass. The roof atrium material here is standing-seam metal, similar to the other buildings on campus, and is in good condition. Remaining roof areas should be replaced in the next five years.
A new welding lab makeup air unit was recently installed, and in 2013, the domestic water heater for the entire building was replaced, and associated circulation pumps were added.
HVAC improvements are needed in the area of DDC controls and the economizer system on one AHU.
Electrical distribution panels are at capacity.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 49
The College has a 15-year agreement, beginning July 1, 2006 and ending June 30, 2021, with the Mason-Lake Intermediate School District (ISD) for its Technical Preparation Partnership (Tech Prep). The majority of the classes are held in the Technical Center. Under this agreement, the ISD shares costs with the College for its presence on campus. Any future planned changes in College facilities should include consideration of the Tech Prep needs and programs, particularly in the Tech Center where the program administration resides.
To meet the ongoing need for larger lecture spaces to hold up to 85 students, remodeling of rooms such as #213/215 should be considered. Rooms #228 and #230 could also be modified to meet the joint needs of WSCC and the ISD electronics program.
In general, as other buildings on campus have been updated, there is a need for general updating of finishes in the Technical Center, particularly in the older south half of the building, as well as the creation of better spaces for student gathering, informal study, and formal group study space. Reorganizing existing faculty offices to create student study space and enclaves could help meet this demand.
Some improvements have been made recently by furnishing the central atrium with some seating and tables for students to meet and work together. Better lighting and acoustical treatment in this area would improve it further.
The Technical Center is currently in the design phase of a major capital improvement project, where many of the above recommendations will be implemented. This project will also include energy efficient features such as occupancy sensors, new ventilation
capacity at the welding area, and LED lighting.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 50
EE
XIS
TIN
G P
LA
N -
TE
CH
NIC
AL C
EN
TE
RO
cto
ber
2017
AMM 2017 Campus Facilities Master Plan Section 4- 51
EP
RO
PO
SE
D IM
PR
OV
EM
EN
TS
- T
EC
HN
ICA
L C
EN
TE
RO
cto
ber
2017
ADDITION
RENOVATION
AMM 2017 Campus Facilities Master Plan Section 4- 52
F. Maintenance Building
The existing maintenance building is a pre-engineered type structure of approximately 4,000 SF, first built in 1975. It has been expanded several times with similar construction. It houses a variety of heated and cold storage areas, from building supplies to vehicles and large equipment.
In general, the existing building is in questionable condition. The building is not insulated and is suitable only for storing items not requiring climate control.
Because of the lack of storage within each campus building, most of the supplies and deliveries for the campus are made to this building and stored, at least temporarily, until they can be delivered, in smaller parcels, to their destination buildings and departments. The lack of climate control is a concern for storing materials for any length of time.
Currently an addition of 1,200 SF is being planned to be added at the South end of the building. This addition will house offices and support space for maintenance personel.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 53
G. Auto Repair / Maintenance Center
The Auto Repair Maintenance Center was completed in 2005, and it currently includes 8,700 SF on one level. The building, a pre-engineered building, was built through a cooperative venture between the Mason-Lake Intermediate School District (ISD) and the College. Future planned changes in this facility will include consideration of the Tech Prep needs and programs.
This building is separated by a hallway and is organized in two basic sections:
1. The west portion, which houses the ISD Tech Prep auto repair program, faculty office, and one classroom along with one other ISD classroom;
2. The east portion houses space fo the Agriscience program.
To provide additional storage for the Auto Repair program, the Theatre program and general College use, a flexible storage building has been built across the parking lot. Currently concrete aprons are being completed.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 54
H. Ice Arena
The West Shore Community Ice Arena, completed in 2002, is a pre-engineered building containing four locker rooms, a pro-shop, concession area, a skate rental area, and a National Hockey League-size ice surface, with bleacher seating capacity for 320 spectators. Total area is 34,600 SF on one level.
The facility, which is owned by Mason County and operated by West Shore Community College on a 50-year lease, was funded by donations from the West Shore Community College foundation, along with funds from West Shore Community College, Mason County, Manistee County, and a grant from the State of Michigan. The regional facility provides figure skating, hockey, and open skating opportunities for all the citizens of the area. The College maintains the building and recently completed some humidity control and interior ceiling improvements, as well as an upgraded fire-suppression system.
There is a need to add a multi-use space adjacent to the office area for use as classroom space and community space.
With the growth of women’s hockey, there is a need for a women’s locker room. Proposed plans show the creation of a neew referee’s locker roomm, and the conversion of te former referee locker room for use as the women’s locker rroom.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 55
RENOVATION
EXPANSION
EXPANSION
HP
RO
PO
SE
D IM
PR
OV
EM
EN
TS
- W
ES
T S
HO
RE
IC
E A
RE
NA
Octo
ber
2017
AMM 2017 Campus Facilities Master Plan Section 4- 56
I. Schoenherr Campus Center
The Schoenherr Campus Center was completed and occupied in 2008 as the philosophical and literal center of campus and campus life. It contains approximately 38,000 SF of space over two floors. The east end of the building includes a new campus library. The west end of the building is a two-story area including a new bookstore, food service capability, and student service offices and functions. The open atrium area is used for multiple functions, including dining, informal gathering, and studying. In the center of the atrium is a two-story element with recreation area on the ground level, and study space on the upper level. The remainder of the upper level includes classrooms, offices, counseling services and professional development space.
The Schoenherr Campus Center received a LEED-Gold rating.
By its nature, the Schoenherr Campus Center is an active place, with attendant noise levels that are high during peak periods. Modifications should be made at the cashier windows during peak periods to attenuate the noise infiltration from the common area to the Student Services office area.
There is a need to expand the capacity and reconfigure the layout of the Testing and Learning Center on the upper level. The Faculty Innovation Center was recently reconfigured and repurposed.
Also, on the lower level, there is a desire to reconfigure the Bookstore and the cafeteria kitchen to create an internet cafe-type experience in the Bookstore.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 4- 57
IE
XIS
TIN
G L
EV
EL 0
1 P
LA
N -
SC
HO
EN
HE
RR
CA
MP
US
CE
NTE
RO
cto
ber
2017
AMM 2017 Campus Facilities Master Plan Section 4- 58
IE
XIS
TIN
G L
EV
EL 0
2 P
LA
N -
SC
HO
EN
HE
RR
CA
MP
US
CE
NTE
RO
cto
ber
2017
AMM 2017 Campus Facilities Master Plan Section 4- 59
IP
RO
PO
SE
D IM
PR
OV
EM
EN
TS
LE
VE
L 0
1 P
LA
N -
SC
HO
EN
HE
RR
CA
MP
US
CE
NTE
RO
cto
ber
2017
RENOVATION
AMM 2017 Campus Facilities Master Plan Section 4- 60
IP
RO
PO
SE
D IM
PR
OV
EM
EN
TS
LE
VE
L 0
2 -
SC
HO
EN
HE
RR
CA
MP
US
CE
NTE
RO
cto
ber
2017
RENOVATION
AMM 2017 Campus Facilities Master Plan Section 4- 61
J. Other Buildings
There are several other buildings on campus:
Diesel Building
The Diesel Building is at the far east end of the campus property and is used primarily for storage of miscellaneous maintenance equipment. It gets its name from its original use as a location for teaching diesel technology.
An adjacent former portable classroom structure houses theatre-related scenery, props, and costumes. It is scheduled to be demolished following the removal and relocation of its contents.
Barn
The barn is an original fixture to the site before the property was a college campus. It is a traditional wood timber frame structure with vertical wood siding, and it is used for storage of miscellaneous items.
Two Security Houses
The campus includes two houses, original to the campus, which are being used as housing for security personnel. Both are two- story wood-framed dwellings, in good condition, and maintained annually. Both houses have been remodeled recently including new roofs and full kitchen remodeling.
Maintenance Building
The Maintenance Building was recently expanded to provide space for the relocation of Maintenance Staff offices.
4. Facility Overview
AMM 2017 Campus Facilities Master Plan Section 5 - 62
For each WSCC building, the following pages contain cost information related to the specific recommendations identified in Section 2. The first spreadsheet summarizes the construction costs and project costs for each building, as well as the overall campus site. They are listed in the order of priority. Connection to the municipal water source is listed as a separate cost based on previous studies obtained by the College.
The Construction Cost is the cost one would expect to receive when soliciting competitive bids for construction from general contractors or construction managers. It includes the cost of materials and labor to install the materials, as well as a reasonable factor for contractor overhead and profit.
The Project Cost includes the Construction Cost and other costs required to complete the project for use by the College. These include budgets for professional design fees and reimbursable expenses, plan review fees, material and construction testing services, movable furniture, moveable equipment, technology systems and a contingency. For fiscal planning by WSCC, the Project Costs should be used.
It should be stated that the costs for on-campus technology systems are presented as a component of each building / facility budget.
In addition, the Project costs include a figure for completing deferred maintenance projects, derived from the 2016 update of the Facilities Assement and Deferred Maintenance Capital Planning Report. See Section 7.
5. Cost Summaries
AMM 2017 Campus Facilities Master Plan Section 5 - 63
Co
st
Su
mm
ary
- A
ll P
roje
cts
West
Sh
ore
Co
mm
un
ity C
olleg
e
Octo
ber,
2017
Pro
jec
tP
rio
rity
Co
ns
tru
cti
on
Co
st
Pro
jec
t C
os
t
Tech
nic
al C
en
ter
14,7
80,0
00
$
5,3
78,8
00
$
Pu
blic S
afe
ty / R
ecre
ati
on
Cen
ter
23,1
31,0
10
$
4,6
96,5
17
$
Sch
oen
herr
Cam
pu
s C
en
ter
3456,0
00
$
725,0
42
$
Wate
r C
on
necti
on
43,4
00,0
00
$
3,4
00,0
00
$
Cam
pu
s-W
ide E
merg
en
cy G
en
era
tor
5720,0
00
$
720,0
00
$
Ice A
ren
a
6342,4
79
$
$ 600,0
00
Ad
min
istr
ati
ve &
Co
nfe
ren
ce B
uild
ing
72,0
97,0
30
$
2,9
87,0
25
$
Art
s &
Scie
nces C
en
ter
8339,1
27
$
479,0
16
$
Sit
e Im
pro
vem
en
ts -
Fie
lds/C
ou
rts, R
oad
Ext.
91,6
53,0
00
$
1,9
84,4
01
$
TO
TA
L16,9
18,6
46
$
20,9
70,8
01
$
AMM 2017 Campus Facilities Master Plan Section 5 - 64
Pu
blic S
afe
ty / R
ecre
ati
on
Cen
ter
We
st
Sh
ore
Co
mm
un
ity C
oll
eg
e
Octo
be
r, 2
01
7
De
scri
pti
on
Are
a
$/S
F
Bu
dg
et
($)
To
tal fo
r It
em
($
)
C
on
str
uc
tio
n C
os
ts$2,7
46,5
00
Bu
ild
ing
Ad
dit
ion
s:
Ca
nop
y a
t n
ort
h e
ntr
ance
500
100
$
$50,0
00
Bu
ild
ing
Re
no
va
tio
ns
:
U
ppe
r L
eve
l 11,6
00
145
$
$1,6
82,0
00
P
ool L
eve
l7,3
00
115
$
$839,5
00
P
ool I
nfr
astr
uctu
reLS
$175,0
00
Co
ntr
acto
r G
.C.'s
and
O.H
.&P
. (
14
%):
$384,5
10
Co
ns
tru
cti
on
To
tal fo
r th
e P
ub
lic S
afe
ty C
en
ter:
$3,1
31,0
10
A/E
Fe
es (
8%
)$316,6
19
Re
imbu
rsa
ble
Exp
en
se
s (
8%
of A
E f
ee)
$25,3
29
Loca
l A
gen
cy P
lan R
evie
w$1,5
00
Te
stin
g a
nd
In
sp
ectio
n S
erv
ice
s (
by O
wn
er)
$7,5
00
Fu
rnitu
re,
Fix
ture
s,
an
d E
quip
me
nt
(by O
wn
er)
*$100,0
00
Te
ch
no
logy E
quip
me
nt
(by O
wn
er
@ 8
%)
$287,8
35
De
ferr
ed M
ain
ten
an
ce
Ba
cklo
g (
1-5
Ye
ars
)$466,9
30
Co
ntin
ge
ncy (
10%
)$359,7
94
Pro
ject
To
tal fo
r P
ub
lic S
afe
ty / R
ecre
ati
on
Ce
nte
r$4,6
96,5
17
AMM 2017 Campus Facilities Master Plan Section 5 - 65
Sc
ho
en
he
rr C
am
pu
s C
en
ter
We
st
Sh
ore
Co
mm
un
ity
Co
lle
ge
Octo
be
r, 2
01
7
Descri
pti
on
Are
a
$/S
F
Bu
dg
et
($)
To
tal fo
r It
em
($)
C
on
str
ucti
on
Co
sts
$400,0
00
Bu
ild
ing
Ren
ovati
on
s:
U
pper
Level R
em
odelin
g8,0
00
26
$
$208,0
00
L
ow
er
Level R
em
odelin
g2,4
00
80
$
$192,0
00
Contr
acto
r G
.C.'s
and O
.H.&
P. (
14%
):$56,0
00
Co
nstr
ucti
on
To
tal fo
r th
e S
tud
en
t C
en
ter:
$456,0
00
A/E
Fees (
8%
)$48,8
99
Reim
burs
able
Exp
enses (
8%
of A
E fee)
$3,9
12
Local A
gency P
lan R
evie
w$1,5
00
Testing a
nd Insp
ection S
erv
ices (
by O
wner)
$7,5
00
Furn
iture
, F
ixtu
res, and E
quip
ment (b
y O
wner)
*$40,0
00
Technolo
gy E
quip
ment
$12,0
00
Defe
rred M
ain
tenance B
acklo
g (
1-5
Years
)$99,6
65
Contingency (
10%
)$55,5
67
Pro
ject
To
tal fo
r S
tud
en
t C
en
ter
$725,0
42
AMM 2017 Campus Facilities Master Plan Section 5 - 66
Art
s &
Sc
ien
ce
s C
en
ter
We
st
Sh
ore
Co
mm
un
ity C
oll
eg
e
Octo
be
r, 2
01
7
De
scri
pti
on
Are
a
$/S
F
Bu
dg
et
($)
To
tal fo
r It
em
($
)
C
on
str
uc
tio
n C
os
ts$297,4
80
Bu
ild
ing
Ad
dit
ion
s:
G
alle
ry
808
255
$
$206,0
40
A
rt S
tora
ge
472
145
$
$68,4
40
Bu
ild
ing
Re
no
va
tio
ns
:
E
xis
ting A
dja
ce
nt
Sp
ace
s
200
115
$
$23,0
00
Co
ntr
acto
r G
.C.'s
and
O.H
.&P
. (
14
%):
$41,6
47
Co
ns
tru
cti
on
To
tal fo
r th
e A
rts
& S
cie
nc
es
Cen
ter:
$339,1
27
A/E
Fe
es (
8%
)$32,7
71
Re
imbu
rsa
ble
Exp
en
se
s (
6%
of A
E f
ee)
$1,9
66
Loca
l A
gen
cy P
lan R
evie
w$750
Te
stin
g a
nd
In
sp
ectio
n S
erv
ice
s (
by O
wn
er)
$4,0
00
Fu
rnitu
re,
Fix
ture
s,
an
d E
quip
me
nt
(by O
wn
er)
*$15,0
00
Te
ch
no
logy E
quip
me
nt
(by O
wn
er
@ 4
%)
$14,8
96
De
ferr
ed M
ain
ten
an
ce
Ba
cklo
g (
1-5
Ye
ars
)$33,2
67
Co
ntin
ge
ncy (
10%
)$37,2
39
Pro
ject
To
tal fo
r A
rts
& S
cie
nc
es
Cen
ter
$479,0
16
AMM 2017 Campus Facilities Master Plan Section 5 - 67
Ad
min
istr
ati
ve
& C
on
fere
nc
e B
uil
din
gW
es
t S
ho
re C
om
mu
nit
y C
oll
eg
e
Octo
be
r, 2
01
7
De
scri
pti
on
Are
a (
SF
)
$/S
F
Bu
dg
et
($)
To
tal fo
r It
em
($
)
C
on
str
uc
tio
n C
os
ts$1,8
39,5
00
Bu
ild
ing
Re
no
va
tio
ns
:
N
ew
Fo
yer
3,2
50
182
$
$591,5
00
P
ort
ions o
f E
xis
ting B
uild
ing
12,0
00
104
$
$1,2
48,0
00
Co
ntr
acto
r G
.C.'s
and
O.H
.&P
. (
14
%):
$257,5
30
Co
ns
tru
cti
on
To
tal fo
r th
e A
dm
in &
Co
nf.
Bu
ild
ing
:$2,0
97,0
30
A/E
Fe
es (
8%
)$201,9
08
Re
imbu
rsa
ble
Exp
en
se
s (
8%
of A
E f
ee)
$16,1
53
Loca
l A
gen
cy P
lan R
evie
w$1,5
00
Te
stin
g a
nd
In
sp
ectio
n S
erv
ice
s (
by O
wn
er)
$2,5
00
Fu
rnitu
re,
Fix
ture
s,
an
d C
om
pute
rs (
by O
wn
er)
*$55,0
00
Te
ch
no
logy E
quip
me
nt
(by O
wn
er
@ 8
%)
$186,1
18
De
ferr
ed M
ain
ten
an
ce
Ba
cklo
g (
1-5
Ye
ars
)$197,3
76
Co
ntin
ge
ncy (
10%
of
Co
nstr
.To
tal +
De
f. M
ain
.)$229,4
41
Pro
ject
To
tal fo
r A
dm
inis
trati
ve &
Co
nfe
ren
ce
Bld
g.:
$2,9
87,0
25
AMM 2017 Campus Facilities Master Plan Section 5 - 68
Ice A
ren
aW
es
t S
ho
re C
om
mu
nit
y C
oll
eg
e
Octo
be
r, 2
01
7
De
scri
pti
on
Are
a (
SF
)
$/S
F
Bu
dg
et
($)
To
tal fo
r It
em
($
)
C
on
str
uc
tio
n C
os
ts$300,4
20
Ice A
ren
a R
en
ov
ati
on
an
d E
xp
an
sio
n
R
eno
vate
Off
icia
ls' R
oo
m f
or
Wo
me
n's
Locke
r R
oo
m300
121
$36,3
00.0
0
N
ew
mu
ltip
urp
ose
ro
om
1,2
00
164
$196,8
00.0
0
N
ew
off
icia
ls' l
ocke
r ro
om
340
198
$67,3
20.0
0
Co
ntr
acto
r G
.C.'s
and
O.H
.&P
. (
14
%):
$42,0
59
Co
ns
tru
cti
on
To
tal fo
r Ic
e A
ren
a$342,4
79
A/E
Fe
es (
8%
)$30,1
38
Re
imbu
rsa
ble
Exp
en
se
s (
8%
of A
E f
ee)
$2,4
11
Loca
l A
gen
cy P
lan R
evie
w$1,5
00
Fu
rnitu
re,
Fix
ture
s,
an
d E
quip
me
nt
(by O
wn
er)
*$105,0
00
Te
ch
no
logy E
quip
me
nt
(by O
wn
er
@ 8
%)
$27,3
98
Te
stin
g a
nd
In
sp
ectio
n S
erv
ice
s (
by O
wn
er)
$7,5
00
De
ferr
ed M
ain
ten
an
ce
Ba
cklo
g (
1-5
Ye
ars
)$49,3
26
Co
ntin
ge
ncy (
10%
)$34,2
48
Su
b T
ota
l fo
r Ic
e A
ren
a$600,0
00
TO
TA
L f
or
Ice
Are
na
$600,0
00
AMM 2017 Campus Facilities Master Plan Section 5 - 69
Sit
e I
mp
rove
me
nts
- R
ec
rea
tio
n F
ield
s/C
ou
rts
, R
oa
d E
xte
ns
ion
We
st
Sh
ore
Co
mm
un
ity C
oll
eg
e
Octo
be
r, 2
01
7
Descri
pti
on
Are
a (
SF
)
$/S
F
Bu
dg
et
($)
To
tal fo
r It
em
($)
C
on
str
ucti
on
Co
sts
$1,4
50,0
00
Sit
e Im
pro
vem
en
ts
N
ew
road a
ccess to Ice A
rena
LS
$630,0
00.0
0
A
thle
tic f
ield
s a
t R
ecre
atio
n C
ente
rLS
$360,0
00.0
0
T
ennis
court
s (
4)
LS
$190,0
00.0
0
S
ola
r gre
enhouse
LS
$170,0
00.0
0
D
ecks, S
tairs, B
ridge a
t A
dm
inis
trativ
e C
ente
rLS
$100,0
00.0
0
Contr
acto
r G
.C.'s
and O
.H.&
P. (
14%
):$203,0
00
Co
nstr
ucti
on
To
tal fo
r S
ite Im
pro
vem
en
ts$1,6
53,0
00
A/E
Fees (
8%
)$145,4
64
Reim
burs
able
Exp
enses (
8%
of A
E fee)
$11,6
37
Local A
gency P
lan R
evie
w$1,5
00
Testing a
nd Insp
ection S
erv
ices (
by O
wner)
$7,5
00
Contingency (
10%
)$165,3
00
Su
b T
ota
l fo
r S
ite Im
pro
vem
en
ts$1,9
84,4
01
TO
TA
L f
or
Sit
e Im
pro
vem
en
ts$1,9
84,4
01
AMM 2017 Campus Facilities Master Plan Section 6 - 70
Since the completion of the 2000 Plan, the College has completed a new Science Wing Addition to the Arts & Sciences Center, new campus signage, connection to the local municipal sanitary sewer system, remodeling of a portion of the Tech Center, a new Ice Arena, an education center in partnership with West Shore Medical Center in Manistee, a new Auto Repair Maintenance Building, the new Schoenherr Campus Center, an expanded and remodeling Arts & Sciences Center, replacement and enhancement of the outdoor patio area at the Administrative and Conference Center, renovation of the Recreation Center, and multiple small additions and remodeling projects across campus.
Moving forward, based upon the recommendations and the information gathered during this update of the College master plan, we believe the following represents an appropriate implementation strategy for West Shore Community College. It should be stated that, though these are listed in prioritized order, the actual implementation of a specific priority may occur in a different order, depending on funding opportunities and programs not yet known.
Priority 1:
Renovation and Expansion of the Technical
Center
Currently in the design phase through the Capital Outlay funding process. Construction to begin in 2018.
Cost: $ 5,378,750
Priority 2:
Remodel the Public Safety / Recreation
CenterRemodel to include roofing, HVAC, toilet rooms, and classrooms. Provide general upgrades of finishes throughout the building.
Cost: $ 4,696,517
6. Implementation Strategy
AMM 2017 Campus Facilities Master Plan Section 6 - 71
Priority 3:
Remodel upper level and bookstore area of
Schoenherr Campus Center
Remodel the upper level to expand and reconfigure the testing center and create new student study space. Reconfigure the Bookstore and cafeteria kitchen space on the loweer level to create an internet cafe-type experieince in the Bookstore.
Cost: $ 725,042
Priority 4:
Connect to the City of Ludington municipal water
system.
Cost: $3,400,000
Priority 5:
Campus-Wide Emergency Generator
Add equipment and capacity to the existing electrical system to allow WSCC to act as an emergency shelter and to operate successfully in the event of a power outage. Improved energy rates will reduce annual energy operating costs for the College.
Cost: $ 720,000
Priority 6:
Expansion and Renovation of Ice Arena
Development of a multipurpose space, and new officials’ locker room, as well as renovation of the existing official’s room for a women’s locker rooom.
Cost: $ 600,000
6. Implementation Strategy
AMM 2017 Campus Facilities Master Plan Section 6 - 72
6. Implementation Strategy
Priority 7:
Remodel the Administrative & Conference Building
Remodel north wing spaces for Tech Prep classroom, as well as conference and community use. Remodel all toilet rooms. Add new foyer. Replace existing exterior decks and stairs at the creek, including new bridge.
Cost: $2,987,025
Priority 8:
Addition to Arts & Sciences CenterAdd new gallery and art storage space adjacent to the existing gallery.
Cost: $ 479,016
Priority 9:
Site improvements
Development of outdoor learning space, athletic fields, recreation-al fields, tennis courts, outdoor basketball courts, cross-country trail, and fitness trail at the Recreation Center, with complementary features for College and public use. Provide parking area.
Road extension from Ice Arena to Sugar Grove Road
Deck and bridge replacement at the Administration Building
Cost: $ 1,984,401
AMM 2016 Campus Facilities Master Plan
AMM 2016 Campus Facilities Master Plan Section 8 - 2
Bui
ldin
g / C
ampu
s / A
ll A
sses
sed
Faci
litie
s C
ompa
rison
Rep
ort
Wes
t Sho
re C
omm
unity
Col
lege
July
, 201
6Pr
iorit
y Is
sues
Dat
a0-
5 Ye
ar C
umul
ativ
e D
ata
Year
B
uild
ing
Pct.
Of
Pct.
ofPc
t. of
Pct.
ofFa
cilit
yB
uilt
Are
a (S
F)To
tal S
FC
RV
Tota
l CR
VD
MB
/16
Tota
l DM
BFC
I/16
Rat
ing/
16D
MB
/16
Tota
l DM
BFC
I/16
Rat
ing/
16D
MB
/13
FCI/1
3R
atin
g/13
DM
B/1
3FC
I/13
Rat
ing/
13A
ll as
sess
ed fa
cilit
ies
66,3
09,2
00$
Bld
g.M
ain
Cam
pus
279,
510
100.
0%66
,309
,200
$
100.
0%30
7,09
0$
10
0%2,
513,
551
$28
4,41
6$
1,
812,
359
$
01A
dmin
. & C
onf.
Bld
g.
1969
26,0
009.
3%6,
168,
000
$
8.
7%24
,672
$
8.0%
0.4%
GO
OD
222,
048
$
8.
8%3.
6%G
OO
D(fo
rmer
Cam
pus
Cen
ter)
10,5
30$
0.
2%G
OO
D99
,509
$
1.
9%G
OO
D
02Te
chni
cal C
ente
r (or
igin
al)
1969
32,6
0011
.7%
6,85
0,42
2$
10.1
%59
,599
$
19.4
%0.
9%G
OO
D64
1,88
5$
25.5
%9.
4%FA
IR45
,722
$
0.8%
GO
OD
146,
918
$
2.
4%G
OO
D
02.1
Tech
nica
l Cen
ter (
add
ition
)19
9239
,200
14.0
%9,
249,
278
$
13
.6%
-$
0.
0%0.
0%G
OO
D44
6,74
0$
17.8
%4.
8%G
OO
D-
$
0.0%
GO
OD
178,
634
$
2.
2%G
OO
D
03A
rts
& S
cien
ces
Cen
ter
1970
35,0
0012
.5%
11,0
89,0
84$
14
.4%
-$
0.
0%0.
0%G
OO
D33
,267
$
1.
3%0.
3%G
OO
D(o
rigin
al a
nd 2
01 a
dditi
on)
-$
0.
0%G
OO
D-
$
0%
GO
OD
03.1
Art
s &
Sci
ence
s C
ente
r 20
0217
,700
6.3%
6,08
7,31
6$
7.9%
21,9
14$
7.
1%0.
4%G
OO
D11
7,48
5$
4.7%
1.9%
GO
OD
(200
2 A
dditi
on)
-$
0.
0%G
OO
D41
,099
$
0.
9%G
OO
D
04R
ecre
atio
n C
ente
r19
7547
,710
17.1
%10
,960
,800
$
17.4
%17
5,37
3$
57
.1%
1.8%
GO
OD
532,
695
$
21
.2%
5.4%
FAIR
123,
855
$
1.2%
GO
OD
690,
650
$
6.
6%FA
IR
05Ic
e A
rena
2002
34,6
0012
.4%
5,06
8,60
0$
12.3
%-
$
0.0%
0.0%
GO
OD
289,
417
$
11
.5%
5.7%
FAIR
74,3
90$
1.
0%G
OO
D51
7,01
1$
7.0%
FAIR
06A
uto
Rep
air a
nd
2005
8,70
03.
1%1,
343,
800
$
2.
6%25
,532
$
8.3%
1.9%
GO
OD
130,
349
$
5.
2%9.
7%FA
IRM
aint
enan
ce C
ente
r29
,919
$
1.9%
GO
OD
130,
700
$
8.
3%FA
IR
07Sc
hoen
herr
2007
38,0
0013
.6%
9,49
1,90
0$
13.0
%-
$
0.0%
0.0%
GO
OD
99,6
65$
4.0%
1.1%
GO
OD
Cam
pus
Cen
ter
$0.
0%G
OO
D7,
838
$
0.1%
GO
OD
AMM 2016 Campus Facilities Master Plan Section 8 - 3
Summaryof
AllSystems/
Compo
nents
Build
ingNo.
01:A
dministrative&Co
nferen
ceBu
ilding
CRV:
6,16
8,00
0$
Immed
.Va
lue
15Yrs.
Value
610
Yrs.
Value
11+Yrs.
Value
System
%%
$%
$%
$%
$
Structure
0.18
1,11
0,24
0$
0.00
$0.00
$0.08
88,819
$0.92
1,02
1,42
1$
Roof
0.05
308,40
0$
0.00
$0.04
12,336
$0.08
24,672
$0.88
271,39
2$
Glazing
0.07
431,76
0$
0.00
$0.00
$0.05
21,588
$0.95
410,17
2$
Clad
ding
0.06
370,08
0$
0.00
$0.00
$0.05
18,504
$0.95
351,57
6$
HVAC
0.16
986,88
0$
0.10
98,688
$0.02
19,738
$0.10
98,688
$0.78
769,76
6$
Plum
bing
0.09
555,12
0$
0.00
$0.00
$0.10
55,512
$0.90
499,60
8$
Prim
ary/Second
ary
0.05
308,40
0$
0.00
$0.00
$0.10
30,840
$0.90
277,56
0$
Distrib
ution
0.04
246,72
0$
0.10
24,672
$0.12
29,606
$0.18
44,410
$0.60
148,03
2$
Lightin
g0.04
246,72
0$
0.00
$0.07
17,270
$0.12
29,606
$0.81
199,84
3$
Voice/Da
ta0.02
123,36
0$
0.00
$0.03
3,70
1$
0.12
14,803
$0.85
104,85
6$
Ceilings
0.03
185,04
0$
0.00
$0.03
5,55
1$
0.05
9,25
2$
0.92
170,23
7$
Walls
0.05
308,40
0$
0.00
$0.05
15,420
$0.10
30,840
$0.85
262,14
0$
Doors
0.03
185,04
0$
0.00
$0.00
$0.05
9,25
2$
0.95
175,78
8$
Floo
rs0.04
246,72
0$
0.00
$0.02
4,93
4$
0.10
24,672
$0.88
217,11
4$
Code
(fire,A
DA,etc.)
0.04
246,72
0$
0.00
$0.02
4,93
4$
0.13
32,074
$0.85
209,71
2$
Immed
.Site
0.05
308,40
0$
0.00
$0.20
61,680
$0.10
30,840
$0.70
215,88
0$
6,16
8,00
0$
DMB
123,36
0$
175,17
1$
564,37
2$
5,30
5,09
7$
FCI
2.0%
DMB05Yrs.
298,53
1$
FCI
4.8%
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 18%
1,11
0,24
0$
2005
:
2008
:
2010
:
2013
:
2016
No
chan
ges
repo
rted.
P
ast w
ater
leak
s fro
m u
nder
grou
nd s
prin
g re
paire
d, o
ther
wis
e no
rep
orte
d pr
oble
ms.
Str
uctu
re s
uppo
rtin
g pa
tio a
rea
(par
tial b
asem
ent)
sho
ws
wat
er in
filtr
atio
n bu
tno
str
uctu
ral d
amag
e (s
ee im
med
iate
site
not
es).
Sto
rm w
ater
dra
inag
e pr
oble
ms
due
to u
nder
size
d ro
of d
rain
and
dam
aged
out
lets
to c
reek
.B
roke
n, c
ompr
omis
ed d
rain
tile
cau
sing
bac
kups
in b
asem
ent (
mec
hani
cala
reas
). F
loor
set
tling
due
to w
ater
.C
oncr
ete
heav
ing
at D
oor
121
- cau
sing
doo
r to
bin
d.
Sto
rm d
rain
pro
blem
s an
d ba
sem
ent d
rain
bac
kup
reso
lved
by
rout
ine
root
cut
ting
to c
ontro
l pro
blem
.Fl
oor s
ettle
men
t nea
r kitc
hen
repa
ired
(200
5)C
oncr
ete
heav
ing
at D
oor 1
21 -
caus
ing
door
to b
ind.
No
chan
ges
repo
rted.
Issu
e fro
m 2
008
rem
ain.
Doo
r 121
stic
king
pro
blem
reso
lved
. Sto
rm d
rain
pro
blem
s re
solv
ed.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
% o
f sy
stem
to
bud
get
fo
r re
pai
r/re
pla
cem
ent
$Im
med
iate
1-5
yrs
6-10
yrs
11+
yrs
Str
uctu
re0
08
92
CR
V o
f S
yste
m
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Yea
r B
uilt:
196
9
Par
tial b
asem
ent.
Lim
ited
reno
vatio
n pe
rform
ed (
2007
/200
8). B
ooks
tore
, st
uden
t ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew C
ampu
s C
ente
r B
uild
ing.
New
cla
ssro
om v
estib
ule
adde
d to
allo
w d
irect
acc
ess
to
clas
sroo
m (
2009
, $50
,000
)15
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
Mai
n C
ampu
s
AMM 2016 Campus Facilities Master Plan Section 8 - 4
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 5%30
8,40
0$
2005
:
2008
:
2010
Roo
f ins
pect
ed a
nnua
lly. N
o re
porte
d pr
oble
ms,
no
activ
e le
akin
g.
2013
:
No
chan
ges
2016
:
No
chan
ges
repo
rted.
S
ingl
e pl
y E
PD
M r
oof (
1986
) an
d or
igin
al c
emen
t sha
kes
dete
riora
ted
and
fund
ed fo
r re
plac
emen
t in
2002
.S
hake
s to
be
repl
aced
with
pre
finis
hed
met
al r
oof.
(per
form
ed in
200
2)
New
EP
DM
roo
f (20
02).
Sha
kes
repl
aced
with
pre
finis
hed
met
al.
Gut
ter
at m
ain
entr
y in
adeq
uate
ly s
lope
d, w
ater
doe
sn't
drai
n pr
oper
ly, c
ausi
ng ic
e da
ms.
Gut
ter
deep
er th
an it
is w
ide
- may
cau
se fu
ture
pro
blem
s. M
inim
al in
sula
tion
betw
een
met
al r
oof a
nd g
utte
r ov
er 1
11 &
112
, cau
ses
icin
g pr
oble
ms
Num
erou
s sm
all r
oof l
eaks
repa
ired
(200
8)
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
% o
f sy
stem
to
bud
get
fo
r re
pai
r/re
pla
cem
ent
$Im
med
iate
1-5
yrs
6-10
yrs
11+
yrs
Roo
f0
48
88
CR
V o
f S
yste
m
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. Boo
ksto
re,
stud
ent s
ervi
ces
offic
es, c
afet
eria
rel
ocat
ed to
new
Cam
pus
Cen
ter
Bui
ldin
g.
New
cla
ssro
om v
estib
ule
adde
d to
allo
w d
irect
acc
ess
to c
lass
room
(20
09,
$50,
000)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 5
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 7%43
1,76
0$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Orig
inal
dou
ble
pane
uni
ts, i
n fa
ir co
nditi
on.
Som
e br
oken
sea
ls c
ausi
n g c
loud
ing
in v
ario
us a
reas
of b
uild
ing,
esp
ecia
lly in
loun
ge a
reas
.
Hol
low
met
al fr
ames
adj
acen
t to
door
s sh
owin
g ex
cess
ive
rust
ing.
Som
e cl
eane
d an
d re
pain
ted.
Woo
d lin
tels
- m
oist
ure
bein
g fo
rced
out
of w
ood
affe
cts
abili
ty o
f pai
nt to
adh
ere
- ong
oing
mai
nten
ance
issu
e al
l aro
und
build
ing.
No
chan
ges
repo
rted
Win
dow
fram
es a
nd s
eals
are
det
erio
rate
d, a
llow
ing
wat
er in
to b
uild
ing.
Sys
tem
at e
nd o
f life
and
due
for r
epla
cem
ent.
App
roxi
mat
ely
40%
of w
indo
w s
yste
m is
fund
ed fo
r rep
lace
men
t.
All
win
dow
s re
plac
ed w
ith n
ew a
lum
inum
fram
e in
sula
ted
units
.
Gla
zing
00
595
Sys
tem
/ C
om
po
nent
No
tes
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
AMM 2016 Campus Facilities Master Plan Section 8 - 6
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 16%
986,
880
$
2005
:
2008
:
2010
:
2013
:
2016
:R
epla
ced
one
com
pres
sor f
or th
e S
outh
Lou
nge
Exi
stin
g ro
ofto
p un
it is
cur
rent
ly d
own
- in
the
proc
ess
of b
eing
repl
aced
in 2
016.
AC
rep
lace
d fo
r lo
unge
are
a. D
ata
cent
er (
room
131
) re
loca
ted,
coo
ling
prob
lem
res
olve
d. B
ooks
tore
are
a to
o w
arm
- so
me
adju
stm
ents
mad
e to
bal
ance
/add
res
ista
nce.
Roo
m
131
too
hot.
Con
trol
s - m
ostly
pne
umat
ics,
ther
mos
tats
req
uire
onl
y no
rmal
per
iodi
c ca
libra
tion.
Thr
ee a
ir ha
ndlin
g un
its -
one
requ
ires
bala
ncin
g, tw
o m
ake
exce
ssiv
e no
ise.
B
oile
r ex
haus
t bei
ng p
ulle
d in
to b
uild
ing
thro
ugh
firep
lace
flue
.Man
ual d
ampe
rs a
t fire
plac
e. F
irepl
ace
upgr
aded
to g
as.
11+
yrs
6-10
yrs
1-5
yrs
Imm
edia
te%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t
Mos
t of H
VA
C s
yste
m o
rigin
al, i
n go
od c
ondi
tion
for
age.
New
a/c
con
dens
er fo
r ca
fete
ria in
stal
led,
200
1. N
ew a
/c fo
r lo
unge
are
as in
stal
led
2002
. Sou
thea
st e
nd o
f bui
ldin
g ha
s ba
lanc
ing
prob
lem
s fro
m s
ubdi
visi
on o
f spa
ce. C
oolin
g in
adeq
uate
in d
ata
cent
er a
nd te
leco
m c
lose
ts d
ue to
equ
ipm
ent h
eat l
oad.
Sys
tem
/ C
om
po
nent
No
tes
Boi
lers
che
cked
dai
ly a
nd in
spec
ted
twic
e an
nual
ly. B
oile
r end
rew
elde
d to
reso
lve
leak
ing
prob
lem
. Boi
ler o
rigin
al, a
t end
of l
ife, b
ut fu
nctio
ning
and
wel
l mai
ntai
ned.
Boo
ksto
re
relo
cate
d to
new
Cam
pus
Cen
ter.
HVA
C in
old
spa
ce re
wor
ked
durin
g re
nova
tion,
ove
rhea
ting
prob
lem
s re
solv
ed. B
oile
r exh
aust
bac
kdra
ft th
roug
h fir
epla
ce fl
ue re
solv
ed a
s m
uch
as
poss
ible
thro
ugh
dam
per a
djus
tmen
t. O
rigin
al k
itche
n H
VAC
func
tioni
ng, n
o re
porte
d pr
oble
ms.
AH
U in
bas
emen
t nee
ds n
ew d
rive
shaf
t and
reba
lanc
ing
of fa
ns to
pre
vent
con
tinue
d be
arin
g fa
ilure
. AH
U in
offi
ce a
rea
need
s ne
w d
rive
shaf
t (w
orn)
. Eva
pora
tor f
an p
ulle
ys a
nd b
earin
gs a
re a
t end
of l
ife a
nd d
ue fo
r rep
lace
men
t. A
ll A
HU
s du
e fo
r com
plet
e in
spec
tion
and
over
haul
.
Sys
tem
CR
V o
f S
yste
m
HV
AC
Kitc
hen
vent
hoo
d re
plac
ed, f
ire s
uppr
essi
on s
yste
m in
stal
led.
(201
0) B
asem
ent A
HU
driv
e sh
aft r
epla
ced.
Offi
ce a
rea
AH
U d
rive
shaf
t rep
lace
d. B
alan
ce o
f HVA
C s
yste
m is
orig
inal
and
fu
nctio
ning
, but
maj
ority
of p
robl
ems
from
200
8 re
mai
n. T
he s
yste
m is
at e
nd o
f life
and
due
for r
epla
cem
ent (
cont
rols
, roo
f top
uni
ts, b
oile
rs, e
tc.).
Maj
or H
VAC
wor
k pe
rform
ed. N
ew D
DC
con
trols
inst
alle
d. B
oile
rs re
plac
ed w
ith (2
) new
Loc
hinv
ar K
nigh
t con
dens
ing
boile
rs. (
2) n
ew ro
ofto
p A
C c
onde
nser
uni
ts in
stal
led.
(1) n
ew A
ir ha
ndlin
g un
it in
stal
led.
$
7810
210
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. Boo
ksto
re,
stud
ent s
ervi
ces
offic
es, c
afet
eria
rel
ocat
ed to
new
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to a
llow
dire
ct a
cces
s to
cl
assr
oom
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 7
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 6%37
0,08
0$
2005
:
2008
:
2010
:
2013
:
2016
No
chan
ges
repo
rted.
No
chan
ges
repo
rted
No
chan
ges
repo
rted,
no
repo
rted
prob
lem
s.
No
chan
ges
repo
rted.
Bric
k in
goo
d co
nditi
on.
No
repo
rted
pro
blem
s
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cla
ddin
g0
05
95
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 8
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 9%55
5,12
0$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Wat
er p
ress
ure
fluct
uatio
ns (
60 p
si-3
0 ps
i) ty
pica
l thr
ough
out c
ampu
s.Fl
ush
sens
ors
chan
ged
back
to m
anua
l typ
e as
they
fail.
Hot
wat
er ta
nk r
epla
ced.
Tan
k ga
uges
rep
lace
d (2
005)
, lim
it co
ntro
ls m
ay n
otbe
acc
urat
e.
New
DD
C c
ontr
ols
inst
alle
dB
oile
rs r
epla
ced
with
(2)
new
Loc
hinv
ar K
nigh
t con
dens
ing
boile
rs(2
) ne
w r
oofto
p A
C c
onde
nser
uni
ts in
stal
led
(1)
new
Air
hand
ling
unit
inst
alle
d
New
bal
last
tank
and
wel
l add
ed to
incr
ease
wat
er v
olum
e an
d re
duce
ove
rall
pres
sure
and
pre
ssur
e flu
ctua
tions
.M
ain
kitc
hen
drai
n re
quire
s ro
ot c
uttin
g ev
ery
2-3
year
s. P
lan
is to
repl
ace
with
new
larg
er d
rain
line
dur
ing
futu
re p
arki
ng lo
t wor
k.D
ishw
ashe
r roo
m d
rain
nee
ds 1
" air
gap,
but
dra
in d
esig
n/lo
catio
n no
t pro
vidi
ng a
dequ
ate
spac
e fo
r rep
air.
New
Loc
hinv
ar w
ater
hea
ter i
nsta
lled.
No
othe
r pro
blem
s re
porte
d.
Orig
inal
hot
wat
er ta
nk –
ope
rate
s, b
ut a
t end
of l
ife.
Wat
er s
ofte
ner
– no
rep
orte
d pr
oble
ms.
Fixt
ures
– m
ostly
orig
inal
, no
repo
rted
pro
blem
s.Fl
ush
valv
es u
pgra
ded
to s
enso
r ty
pe, n
o re
port
ed p
robl
ems.
Mai
n ki
tche
n dr
ain
repl
aced
(200
9) to
reso
lve
bloc
kage
issu
es. N
o re
porte
d pr
oble
ms.
Dis
hwas
her r
oom
dra
in re
paire
d (2
009)
.N
o re
porte
d pr
oble
ms.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Plu
mbi
ng0
010
90
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce60
% A
dmin
istr
atio
n
AMM 2016 Campus Facilities Master Plan Section 8 - 9
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 5%30
8,40
0$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d. S
yste
m s
till f
unct
ioni
ng a
t cap
acity
.
Prim
ary
from
on-
site
sub
stat
ion.
Pow
er to
bui
ldin
gs th
roug
h ne
w c
ampu
s-w
ide
loop
sys
tem
, ste
pped
dow
n at
bui
ldin
g. N
o re
port
ed p
robl
ems.
No
repo
rted
pro
blem
s.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges,
no
repo
rted
prob
lem
s.
Tran
sfor
mer
s te
sted
in 2
012,
upd
ated
and
repa
ired
as re
quire
d. N
o re
porte
dbl
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Prim
ary
/ Sec
onda
ry0
010
90
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 10
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 4%24
6,72
0$
2005
:
2008
:
2010
:
2013
:
2016
:
At m
axim
um c
apac
ity, a
dditi
onal
circ
uits
nee
ded.
Stil
l fun
ctio
ning
at c
apac
ity.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges,
sys
tem
stil
l fun
ctio
ning
at c
apac
ity.
No
repo
rted
chan
ges,
sys
tem
stil
l fun
ctio
ning
at c
apac
ity.
No
repo
rted
chan
ges,
sys
tem
stil
l fun
ctio
ning
at c
apac
ity.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Dis
trib
utio
n10
1812
60
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 11
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 4%24
6,72
0$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
No
chan
ges
repo
rted.
Fixt
ures
con
tinue
to b
e up
grad
ed a
s ne
cess
ary
and
as p
art o
f oth
er p
roje
cts.
Roo
ms
103,
106
, 111
, 112
upg
rade
d, b
alan
ce o
f bui
ldin
g is
old
er fl
uore
scen
t fix
ture
s.P
enda
nt fi
xtur
es o
bsol
ete,
lens
es u
nava
ilabl
e, b
ut r
equi
re n
o m
ore
than
typi
cal m
aint
enan
ce.
Fixt
ures
bei
ng u
pgra
ded
with
ele
ctro
nic
balla
sts
and
T8 la
mps
as
nece
ssar
y.
New
ligh
ts in
stal
led
in n
ew s
uspe
nded
cei
lings
at M
BT
and
Caf
é'
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Ligh
ting
07
1281
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 12
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 2%12
3,36
0$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted
Wi-F
i add
ed to
all
build
ings
.
No
repo
rted
prob
lem
s.
Cam
pus
phon
e sy
stem
bei
ng s
witc
hed
to V
OIP
sys
tem
.
Fibe
r to
eac
h bu
ildin
g (1
998)
Net
wor
k sw
itche
s on
4-y
ear
upgr
ade
cycl
eW
irele
ss in
stal
led.
No
repo
rted
pro
blem
s
Upg
rade
d 19
96+
/-, a
t cap
acity
for
build
ing.
Mas
ter
cloc
k sy
stem
dis
able
d.
Voi
ce/D
ata
03
1285
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 13
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 3%18
5,04
0$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
2x2
susp
ende
d til
es in
goo
d co
nditi
on; e
xpos
ed w
ood
deck
in g
ood
cond
ition
.G
lue-
on 1
2x12
tile
s at
low
er c
eilin
g in
loun
ge s
pace
s
No
repo
rted
pro
blem
s.
12x1
2 til
es in
fire
pit
area
det
achi
ng d
ue to
pas
t roo
f lea
ks. D
ryw
all c
eilin
g ab
ove
will
like
ly re
quire
repl
acem
ent a
t sam
e tim
e (a
ppro
x. 6
00 S
F)
Dam
aged
are
as o
f cei
ling
repa
ired,
no
repo
rted
prob
lem
s.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cei
lings
03
592
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 14
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 5%30
8,40
0$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Mos
tly g
ypsu
m b
oard
, som
e pa
inte
d co
ncre
te b
lock
, in
good
con
ditio
n. W
alls
rep
aint
ed o
n re
gula
r sc
hedu
le.
Som
e gy
psum
boa
rd c
rack
ing
and
poor
ly c
once
aled
join
ts in
ren
ovat
ions
-Roo
m 1
01, R
oom
128
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Wal
ls0
510
85
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 15
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 3%18
5,04
0$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Ext
erio
r –
orig
inal
hol
low
met
al d
oors
, in
fair
cond
ition
, som
e re
pairs
mad
e.H
ardw
are
near
end
of l
ife, b
ut fu
nctio
ning
. Doo
r re
plac
emen
t pla
nned
for
futu
re, n
ot fu
nded
. Thr
esho
lds
and
som
e cl
oser
s re
plac
ed d
urin
g A
DA
wor
k.In
terio
r –
woo
d, in
goo
d co
nditi
on. M
ost h
ardw
are
knob
sty
le.
Rem
ovab
le m
ain
front
doo
r m
ullio
n -w
orn
and
rust
ed, d
ue fo
r re
plac
emen
t.In
terio
r w
ood
door
s be
ing
refin
ishe
d at
toile
t roo
ms
No
chan
ges
repo
rted.
Mai
n en
try d
oors
repl
aced
with
new
alu
min
um fr
ame
full-
lite
door
s.O
ther
ext
erio
r doo
rs re
plac
ed in
bui
ldin
g co
re a
nd in
nor
th w
ing.
Sou
th w
ingd
oors
stil
l req
uire
repl
acem
ent.
All
exte
rior d
oors
now
repl
aced
with
new
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Doo
rs0
05
95
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 16
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 4%24
6,72
0$
2005
:
2008
:
2010
:
2013
:
2016
No
chan
ges
repo
rted.
Som
e ca
rpet
orig
inal
, in
poor
con
ditio
n in
loun
ge. C
arpe
t rep
lace
d in
offi
cear
eas,
food
cou
rt; b
alan
ce o
f car
pet f
unde
d fo
r re
plac
emen
t. Q
uarr
y til
e da
mag
ed fr
om
wat
er le
ak -
repl
aced
, no
repo
rted
pro
blem
s.
Car
pet r
epla
ced
in r
emai
ning
spa
ces
(200
2-03
).Is
olat
ed c
rack
ing
of q
uarr
y til
e th
roug
hout
bui
ldin
g. R
epai
rs p
lann
ed.
Qua
rry
tile
dam
age
repa
ired
(200
5).
No
repo
rted
chan
ges,
no
repo
rted
prob
lem
s.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Floo
rs0
210
88
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 17
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 4%24
6,72
0$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Not
spr
inkl
ed, e
xcep
t for
fire
sup
pres
sion
in k
itche
n an
d gr
ill a
rea.
Fire
ala
rms
upgr
aded
with
str
obes
and
hor
ns.
Exi
t lig
hts
upgr
aded
, but
no
batte
ry b
acku
p. E
mer
genc
y lig
hts
on b
atte
ry b
acku
p, n
o re
port
ed p
robl
ems.
No
fire
stop
ping
aro
und
pipe
s go
ing
thro
ugh
rate
d w
all b
etw
een
boile
r ro
om a
nd e
lect
ric e
quip
men
t roo
m. D
oor
betw
een
spac
es r
ated
, but
pro
pped
ope
n.K
itche
n eq
uipm
ent u
p to
dat
e.A
DA
com
plia
nt to
ilet r
oom
add
ed. T
hres
hold
s an
d cl
oser
s up
grad
ed fo
r A
DA
.K
nob
hard
war
e th
roug
hout
on
inte
rior
door
s.
Kitc
hen
fire
supp
ress
ion
outd
ated
, may
be
gran
dfat
here
d in
. Con
firm
with
cod
e of
ficia
ls if
upg
rade
nee
ded.
Em
erge
ncy
light
ing
requ
ired
in in
terio
r en
clos
ed r
oom
s.
Fire
sto
ppin
g ad
ded
arou
nd th
roug
h-w
all p
ipin
g be
twee
n bo
iler r
oom
and
ele
ctric
al e
quip
men
t roo
m.
Exi
t lig
htin
g up
grad
ed a
t mos
t loc
atio
ns.
Em
erge
ncy
light
ing
inst
alle
d in
inte
rior e
nclo
sed
room
s (2
007)
Kitc
hen
fire
supp
ress
ion
syst
em re
plac
ed (2
010)
.M
ost d
oor h
ardw
are
conv
erte
d to
leve
r sty
le.
No
repo
rted
prob
lem
s.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cod
e (f
ire,A
DA
, etc
.)0
510
85
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 18
Cam
pus
:N
ote
s:A
rea:
26,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
% 5%30
8,40
0$
2005
:
2008
:
2010
:
2013
:
2016
:W
ood
deck
and
sta
irs a
t cre
ek p
lann
ed fo
r rep
lace
men
t.
Pla
za a
rea
unsa
fe d
ue to
pav
emen
t cra
ckin
g, h
eavi
ng, s
inki
ng. C
oncr
ete
step
s de
terio
rate
d. C
ompl
ete
repa
ving
and
gra
ding
wor
k ne
eded
. Som
e w
ater
leak
ing
thro
ugh
plaz
a in
to b
asem
ent m
echa
nica
l roo
ms.
No
pave
men
t pro
blem
s at
ent
ries.
Site
ligh
ting
repl
aced
.
At p
atio
are
a - c
oncr
ete
cove
r on
rei
nfor
cing
ste
el s
palli
ng a
nd fl
akin
g, e
xpos
ing
stee
l, ed
ge b
eam
s se
vere
ly d
eter
iora
ted.
Som
e ex
terio
r st
airs
pat
ched
, rep
aire
d, m
ost
in p
oor
cond
ition
. C
ompl
ete
repl
acem
ent o
f pat
io r
ecom
men
ded.
Site
ligh
ting
upda
ted
durin
g co
nstr
uctio
n of
new
Cam
pus
Cen
ter.
Hot
wat
er s
now
mel
t sys
tem
add
ed to
inne
r-ca
mpu
s w
alkw
ays.
Pat
io a
nd p
atio
sta
irs c
ontin
uing
to d
eter
iora
te.
Gro
und
unde
r pat
io s
tairs
was
hing
out
, req
uire
s re
plac
emen
t of s
and.
Mai
n bu
ildin
g pa
rkin
g lo
t rep
lace
d (p
arki
ng lo
t not
par
t of a
sses
smen
t).D
eck
repl
acem
ent i
s es
timat
ed a
t $15
0,00
0, b
ut n
ot y
et fu
nded
.
Ent
ire p
laza
dec
k, ra
iling
s an
d st
airs
repl
aced
. New
wat
erpr
oof m
embr
ane,
con
cret
e st
ruct
ure
repa
ired,
dec
king
repl
aced
with
con
cret
e pa
vers
, new
ste
ps in
stal
led.
Woo
d de
ck a
t riv
er is
sch
edul
ed fo
r rem
oval
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Imm
ed. S
ite/E
xt L
tg0
2010
70
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Mai
n C
ampu
sP
artia
l bas
emen
t. Li
mite
d re
nova
tion
perfo
rmed
(20
07/2
008)
. B
ooks
tore
, stu
dent
ser
vice
s of
fices
, caf
eter
ia r
eloc
ated
to n
ew
Cam
pus
Cen
ter
Bui
ldin
g. N
ew c
lass
room
ves
tibul
e ad
ded
to
allo
w d
irect
acc
ess
to c
lass
room
(20
09, $
50,0
00)
Yea
r B
uilt:
196
915
% C
lass
room
s25
% K
itche
n/Fo
od S
ervi
ce
60%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 19
EX
CE
SS
GO
OD
$123
,360
$123
,360
$02.
00%
0-5
Yea
r C
umul
ativ
e D
ata
FCI
RA
TIN
G
4.8%
GO
OD
$0$2
98,531
DM
B
$175
,171
Sum
mar
y -
Bui
ldin
g N
o: 0
1 -
Ad
min
& C
onf
eren
ce B
uild
ing
(fo
rmer
Cam
pus
Cen
ter)
Pri
ori
ty Is
sues
Dat
aD
MB
EX
CE
SS
FCI
RA
TIN
G
CR
V T
ota
ls:
Imm
edia
te1-
5 yr
s6-
10 y
rs
$564
,372
$5,3
05,0
97
11+
yrs
AMM 2016 Campus Facilities Master Plan Section 8 - 20
Summaryof
AllSystems/
Compo
nents
Build
ingNo.
02:TechnicalCen
ter(orig
inal)
CRV:
6,85
0,42
2$
Immed
.Va
lue
15
Value
610
Value
11+
Value
System
%%
$%
$%
$%
$
Structure
0.18
1,23
3,07
6$
0.00
$0.02
24,662
$0.03
36,992
$0.95
1,17
1,42
2$
Roof
0.05
342,52
1$
0.00
$0.85
291,14
3$
0.05
17,126
$0.10
34,252
$
Glazing
0.05
342,52
1$
0.00
$0.30
102,75
6$
0.50
171,26
1$
0.20
68,504
$
Clad
ding
0.06
411,02
5$
0.00
$0.04
16,441
$0.10
41,103
$0.86
353,48
2$
HVAC
0.16
1,09
6,06
8$
0.00
$0.02
21,921
$0.10
109,60
7$
0.88
964,53
9$
Plum
bing
0.1
685,04
2$
0.00
$0.02
13,701
$0.10
68,504
$0.88
602,83
7$
Prim
ary/Second
ary
0.06
411,02
5$
0.00
$0.00
$0.05
20,551
$0.95
390,47
4$
Distrib
ution
0.06
411,02
5$
0.12
49,323
$0.08
32,882
$0.08
32,882
$0.72
295,93
8$
Lightin
g0.04
274,01
7$
0.00
$0.04
10,961
$0.10
27,402
$0.86
235,65
5$
Voice/Da
ta0.02
137,00
8$
0.00
$0.02
2,74
0$
0.10
13,701
$0.88
120,56
7$
Ceilings
0.04
274,01
7$
0.00
$0.02
5,48
0$
0.08
21,921
$0.90
246,61
5$
Walls
0.05
342,52
1$
0.00
$0.05
17,126
$0.10
34,252
$0.85
291,14
3$
Doors
0.04
274,01
7$
0.00
$0.08
21,921
$0.12
32,882
$0.80
219,21
4$
Floo
rs0.03
205,51
3$
0.00
$0.05
10,276
$0.10
20,551
$0.85
174,68
6$
Code
(fire,A
DA,etc.)
0.03
205,51
3$
0.05
10,276
$0.05
10,276
$0.05
10,276
$0.85
174,68
6$
Immed
.Site
0.03
205,51
3$
0.00
$0.00
$0.05
10,276
$0.95
195,23
7$
CRV
6,85
0,42
2$
DMB
59,599
$58
2,28
6$
669,28
6$
5,53
9,25
1$
FCI
0.9%
DMB
641,88
5$
FCI
9.4%
AMM 2016 Campus Facilities Master Plan Section 8 - 21
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
18%
1,23
3,07
6$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
No
repo
rted
pro
blem
s
No
repo
rted
pro
blem
s
Set
tlem
ent a
t lin
tel a
bove
OH
doo
r be
twee
n w
eldi
ng a
nd m
achi
ne to
ol la
bs.
No
repo
rted
cha
nges
. Set
tlem
ent d
oes
not a
ppea
r to
be
wor
seni
ng.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Str
uctu
re0
23
95
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 22
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
5%34
2,52
1$
2005
:
2008
:
2010
:
2013
:
2016
:N
ew r
oof i
nclu
ded
in p
lann
ed im
prov
emen
ts u
nder
cap
ital o
utla
y pr
ogra
m.
Ant
icip
ated
con
stru
ctio
n in
201
8.
***W
eldi
ng la
b ro
om (
245)
roo
f rep
lace
men
t TO
P P
RIO
RIT
Y.
Orig
inal
roo
f rep
lace
d w
ith G
oody
ear
EP
DM
in 1
990.
Oth
er r
oofin
g is
Dur
olas
t EP
DM
(19
98).
Met
al r
oofin
g in
stal
led
on m
ansa
rds
in 1
994.
No
repo
rted
pro
blem
s
Sin
gle
ply
roof
ove
r ro
om 2
45 d
ue fo
r re
plac
emen
t.N
orth
roo
f are
a du
e fo
r re
plac
emen
t with
in 5
yea
rs, i
f mai
ntai
ned.
Bal
ance
of r
oof i
nsta
lled
in 2
005,
no
repo
rted
pro
blem
s.
Wel
ding
lab
room
(24
5) r
oof r
epla
ced
(200
9). P
robl
ems
reso
lved
.R
oof i
nspe
cted
ann
ually
. Rep
lace
men
t not
ant
icip
ated
in s
hort
term
.
Roo
f nea
r en
d of
life
, but
no
repo
rted
pro
blem
s. R
oof o
f bot
h or
igin
al a
nd a
dditi
on s
ched
uled
for
repl
acem
ent w
ithin
10
year
s.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Roo
f0
855
10
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 23
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
5%34
2,52
1$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Orig
inal
aw
ning
-type
win
dow
s, s
eldo
m o
pene
d, n
o re
port
ed p
robl
ems.
No
repo
rted
pro
blem
s.
No
chan
ges
repo
rted
.
No
repo
rted
cha
nges
or
prob
lem
s.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Gla
zing
030
5020
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 24
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
16%
1,09
6,06
8$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Fum
e ho
ods
rem
oved
dur
ing
reno
vatio
n. F
ans
rem
ain
on r
oof,
need
to b
e re
mov
ed.
New
AC
roo
ftop
units
inst
alle
d ab
ove
room
s 22
4-28
4, n
o re
port
ed p
robl
ems.
Con
trol
s a
mix
of e
lect
roni
c an
d pn
eum
atic
. Pne
umat
ic c
ontr
ols
in u
nits
for
room
s 22
3,22
5,22
7,22
9,23
1 de
terio
rate
d, h
ave
wat
er in
sys
tem
. due
for
repl
acem
ent w
ithin
5 y
ears
.M
akeu
p ai
r un
it fo
r ro
om 2
44A
unn
eces
sary
, can
be
rem
oved
.M
akeu
p ai
r un
it fo
r ro
om 2
45 u
nrel
iabl
e, d
ue fo
r re
plac
emen
t - R
EP
LAC
E D
UR
ING
RO
OF
RE
PLA
CE
ME
NT
PR
OJE
CT.
11+
yrs
6-10
yrs
1-5
yrs
Imm
edia
te%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t
Hig
h hu
mid
ity p
robl
ems
near
roo
ms
242,
244
, cau
sing
cei
ling
tiles
to s
ag -
inve
stig
ate
and
corr
ect t
o pr
even
t con
tinue
d da
mag
e.A
ir ha
ndlin
g un
its fu
nctio
ning
.Fe
w fu
me
hood
s, in
stal
led
late
r (r
oom
s 24
0, 2
42).
Lab
s be
ing
relo
cate
d to
futu
re b
uild
ing.
Sys
tem
/ C
om
po
nent
No
tes
Boi
lers
che
cked
dai
ly a
nd in
spec
ted
twic
e an
nual
ly.
Pne
umat
ic c
ontr
ols
for
room
s 22
3,22
5,22
7,22
9,23
1 re
paire
d, N
o re
port
ed p
robl
ems.
New
exh
aust
hoo
ds a
nd m
akeu
p ai
r un
its in
stal
led
abov
e w
eldi
ng s
tatio
ns (
2002
, 200
4). I
ndoo
r ai
r qu
ality
impr
oved
.
Sys
tem
CR
V o
f S
yste
m
HV
AC
Boi
lers
rep
lace
d w
ith 4
Loc
hinv
ar K
nigh
t sta
ged
boile
rs (
2009
).R
oofto
p un
its r
epla
ced
(200
9).
Pne
umat
ic s
yste
m c
ontr
ols
repl
aced
with
DD
C.
No
chan
ges
repo
rted
.
$
8810
20
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 25
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
6%41
1,02
6$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed
No
chan
ges
repo
rted
No
chan
ges
repo
rted
, no
repo
rted
pro
blem
s.
No
chan
ges
repo
rted
.
Bric
k, n
o re
port
ed p
robl
ems.
Min
or c
rack
abo
ve 2
45G
bet
wee
n or
igin
al b
uild
ing
and
addi
tion.
Cra
ck in
bric
k at
lint
el in
sid
e of
Roo
m 2
47.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cla
ddin
g0
410
86
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 26
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
10%
685,
042
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Wel
l rep
lace
d. S
tora
ge ta
nk u
nuse
d, c
ould
be
rem
oved
.W
ater
pre
ssur
e flu
ctua
tions
(60
psi
-30
psi)
typi
cal t
hrou
ghou
t cam
pus.
Hot
wat
er ta
nk d
ue fo
r re
plac
emen
t. In
adeq
uate
hot
wat
er s
uppl
y co
mpe
nsat
ed b
y ne
w o
n-de
man
d he
ater
s, b
ut s
uppl
y st
ill in
suffi
cien
t. N
o lo
op o
n H
W s
uppl
y lin
es -
take
s se
vera
l m
inut
es fo
r H
W to
rea
ch fi
xtur
es.
Som
e se
dim
ent i
n ho
t wat
er ta
nks
(due
to w
ell w
ater
).To
ilet p
artit
ions
rep
lace
d in
200
0.
New
bal
last
tank
and
wel
l add
ed to
incr
ease
wat
er v
olum
e an
d re
duce
ove
rall
pres
sure
and
pre
ssur
e flu
ctua
tions
.U
tility
/han
d w
ash
sink
s in
roo
m 2
45 p
ast e
nd o
f life
, due
for
repl
acem
ent.
Dom
estic
wat
er h
eate
r re
plac
ed, c
ircul
atin
g pu
mp
adde
d.
Sin
ks in
roo
m 2
45 u
pgra
ded.
Dom
estic
HW
tank
due
for
repl
acem
ent (
see
2005
not
es).
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Plu
mbi
ng0
210
88
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 27
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
6%41
1,02
5$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Prim
ary
from
on-
site
sub
stat
ion.
Pow
er to
bui
ldin
gs th
roug
h ne
w c
ampu
s-w
ide
loop
sys
tem
, ste
pped
dow
n at
bui
ldin
g. N
o re
port
ed p
robl
ems.
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
Tran
sfor
mer
s te
sted
in 2
012,
upd
ated
and
rep
aire
d as
req
uire
d. N
o re
port
ed p
robl
ems.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Prim
ary
/ Sec
onda
ry0
05
95
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 28
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
6%41
1,02
5$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Dis
trib
utio
n pa
nels
ope
ratin
g at
cap
acity
.
Upg
rade
of p
hase
1 p
lann
ed d
urin
g la
b re
nova
tions
.
Wel
ding
lab
pane
ls a
t cap
acity
, add
ition
al p
anel
s re
quire
d.
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Dis
trib
utio
n12
88
72
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 29
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%27
4,01
7$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Con
vert
ing
to L
ED
ligh
ting
as n
eede
d an
d pl
anne
d as
par
t of t
he c
apita
l out
lay
proj
ect.
Con
stru
ctio
n in
201
8.
Cor
ridor
ligh
ting
upgr
aded
to T
8 2x
2 la
y-in
fluo
resc
ent (
2006
).
No
repo
rted
pro
blem
s or
cha
nges
.
Mos
tly n
ew, n
o re
port
ed p
robl
ems,
just
typi
cal m
aint
enan
ce.
Cor
ridor
s ar
e un
der-
lit. U
pgra
de fi
xtur
es w
ithin
1-5
yea
rs to
cor
rect
pro
blem
.S
outh
end
cla
ssro
om li
ghtin
g re
plac
ed.
No
chan
ges
repo
rted
. Lig
htin
g up
grad
ed o
n re
gula
r ba
sis
as n
eede
d.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Ligh
ting
04
1086
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 30
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
2%13
7,00
8$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted
.
Wi-F
i add
ed to
all
build
ings
.
No
repo
rted
pro
blem
s, o
r ch
ange
s.
Cam
pus
phon
e sy
stem
bei
ng s
witc
hed
to V
OIP
sys
tem
.
No
repo
rted
pro
blem
s.
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Fibe
r to
eac
h bu
ildin
g (1
998)
.C
AT5
E/C
AT6
cab
ling
typi
cal.
Wire
less
inst
alle
d in
sel
ect l
ocat
ions
.N
etw
ork
switc
hes
on 4
-yea
r up
grad
e cy
cle.
No
repo
rted
pro
blem
s.
Voi
ce/D
ata
02
1088
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 31
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%27
4,01
7$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted
. A
ll ne
w c
eilin
gs p
lann
ed a
s pa
rt o
f cap
ital o
utla
y pr
ojec
t. C
onst
ruct
ion
in 2
018.
Mos
tly s
uspe
nded
cei
lings
. Som
e sa
ggin
g fro
m h
umid
ity in
roo
ms
242,
244
.
Dam
aged
and
sag
ging
cei
ling
tiles
rep
lace
d as
par
t of r
enov
atio
n. N
o re
port
ed p
robl
ems.
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cei
lings
02
890
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 32
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
5%34
2,52
1$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted
.
Mos
tly c
oncr
ete
bloc
k th
roug
hout
. Wal
ls r
epai
nted
on
regu
lar
sche
dule
. No
repo
rted
pro
blem
s.
Wal
ls r
epai
nted
sin
ce 2
003.
No
repo
rted
pro
blem
s.
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Wal
ls0
510
85
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 33
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%27
4,01
7$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted
.
Ext
erio
r –
typi
cal s
teel
doo
rs, n
o re
port
ed p
robl
ems.
Doo
r to
roo
m 2
38 r
uste
d, d
ue fo
r re
plac
emen
t.In
terio
r –
stee
l, ge
nera
lly in
goo
d co
nditi
on, s
ome
plas
tic la
min
ate
com
ing
off o
rigin
al in
terio
r do
ors,
due
for
refin
ishi
ng.
Ent
ranc
e do
ors
and
fram
es r
ustin
g an
d at
end
of l
ife. d
ue fo
r re
plac
emen
t.
Ext
erio
r - d
oors
rep
lace
d (2
007)
.In
terio
r - d
amag
ed p
last
ic la
min
ate
door
s re
paire
d an
d re
pain
ted.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Doo
rs0
812
80
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 34
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
3%20
5,51
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted
.
Cla
ssro
om fl
oorin
g du
e fo
r re
plac
emen
t dur
ing
reno
vatio
n.
Car
pet r
epla
ced.
Som
e Q
uarr
y til
e cr
acke
d, r
epla
ced
as r
equi
red.
Qua
rry
tile
repa
ired
and
regr
oute
d as
req
uire
d.R
oom
s 23
7, 2
39 c
arpe
t pas
t end
of l
ife, d
ue fo
r re
plac
emen
t.
All
carp
et r
epla
ced
(200
9).
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Floo
rs0
510
85
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 35
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
3%20
5,51
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted
.
No
emer
genc
y lig
htin
g, n
o ba
ttery
bac
kup
on e
xit l
ight
ing
Som
e fir
e al
arm
hor
ns n
ot a
udib
le in
cla
ssro
oms,
fire
ala
rm s
yste
m n
ot fu
lly A
DA
com
plia
nt
Em
erge
ncy
light
ing
upgr
aded
- on
bat
tery
sys
tem
. Exi
t lig
htin
g cu
rren
tly b
eing
upg
rade
d - o
n ba
ttery
sys
tem
.Fi
re A
larm
tied
into
new
bui
ldin
g sy
stem
, but
lack
s st
robe
s.
No
chan
ges
repo
rted
.
No
chan
ges
repo
rted
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cod
e (f
ire,A
DA
, etc
.)5
55
85
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 36
Cam
pus
:N
ote
s:A
rea:
32,6
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
3%20
5,51
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted
. A
ntic
ipat
e sn
owm
elt s
yste
m to
be
plan
ned
for
front
(w
est)
ent
ranc
e.
Sof
fit li
ghtin
g up
grad
ed (
1998
)S
ome
pave
men
t hea
ving
at e
ntry
.
Irrig
atio
n sy
stem
- sp
rinkl
er h
eads
nee
d ad
just
ing
to e
limin
ate
wat
er s
tain
s on
bui
ldin
g.
Site
ligh
ting
upda
ted
durin
g co
nstr
uctio
n of
new
Cam
pus
Cen
ter.
No
repo
rted
cha
nges
.
No
repo
rted
cha
nges
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Imm
ed. S
ite/E
xt L
tg0
05
95
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Mai
n C
ampu
sA
dditi
on: 1
990
Tech
pre
p cl
assr
oom
s (2
40-2
44)
and
loun
ge (
238)
ren
ovat
ed in
199
9La
bs r
enov
ated
to c
lass
room
s in
200
4 w
hen
scie
nce
labs
rel
ocat
ed to
new
fa
cilit
y
Yea
r B
uilt:
196
940
% V
oc-T
ech
60%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 37
Imm
edia
te
59,9
99$
$
582,
286
$
6
69,2
86
$
5,5
39,2
51
GO
OD
DM
BE
XC
ES
S
641,88
5$
Sum
mar
y -
Bui
ldin
g N
o: 0
2 -
Tech
nica
l Cen
ter
(ori
gin
al)
Pri
ori
ty Is
sues
Dat
aD
MB
EX
CE
SS
FCI
RA
TIN
G
1-5
Yrs
.6-
10 Y
rs.
11+
Yrs
.
CR
V T
ota
ls
59,9
99$
$0
0.9%
GO
OD
0-5
Yea
r C
umul
ativ
e D
ata
FCI
RA
TIN
G
299,
363.
0$
9.4%
AMM 2016 Campus Facilities Master Plan Section 8 - 38
Summaryof
AllSystems/
Compo
nents
02.1:TechnicalCen
ter(ad
ditio
n)
CRV:
9,24
9,27
8$
Immed
.Va
lue
15
Value
610
Value
11+
Value
System
%%
$%
$%
$%
$
Structure
0.19
1,75
7,36
3$
0.00
$0.03
52,721
$0.05
87,868
$0.92
1,61
6,77
4$
Roof
0.05
462,46
4$
0.00
$0.25
115,61
6$
0.65
300,60
2$
0.10
46,246
$
Glazing
0.05
462,46
4$
0.00
$0.10
46,246
$0.20
92,493
$0.70
323,72
5$
Clad
ding
0.06
554,95
7$
0.00
$0.00
$0.05
27,748
$0.95
527,20
9$
HVAC
0.15
1,38
7,39
2$
0.00
$0.05
69,370
$0.15
208,10
9$
0.80
1,10
9,91
3$
Plum
bing
0.1
924,92
8$
0.00
$0.02
18,499
$0.10
92,493
$0.88
813,93
6$
Prim
ary/Second
ary
0.06
554,95
7$
0.00
$0.02
11,099
$0.05
27,748
$0.93
516,11
0$
Distrib
ution
0.06
554,95
7$
0.00
$0.05
27,748
$0.10
55,496
$0.85
471,71
3$
Lightin
g0.04
369,97
1$
0.00
$0.05
18,499
$0.05
18,499
$0.90
332,97
4$
Voice/Da
ta0.02
184,98
6$
0.00
$0.02
3,70
0$
0.05
9,24
9$
0.93
172,03
7$
Ceilings
0.04
369,97
1$
0.00
$0.00
$0.05
18,499
$0.95
351,47
3$
Walls
0.05
462,46
4$
0.00
$0.05
23,123
$0.05
23,123
$0.90
416,21
8$
Doors
0.04
369,97
1$
0.00
$0.05
18,499
$0.10
36,997
$0.85
314,47
5$
Floo
rs0.03
277,47
8$
0.00
$0.10
27,748
$0.20
55,496
$0.70
194,23
5$
Code
(fire,A
DA,etc.)
0.03
277,47
8$
0.00
$0.05
13,874
$0.05
13,874
$0.90
249,73
1$
Immed
.Site
0.03
277,47
8$
0.00
$0.00
$0.05
13,874
$0.95
263,60
4$
9,24
9,27
8$
DMB
$44
6,74
0$
1,08
2,16
6$
7,72
0,37
2$
FCI
0.0%
DMB
446,74
0$
FCI
4.8%
AMM 2016 Campus Facilities Master Plan Section 8 - 39
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
19%
1,75
7,36
3$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Sla
b m
ovem
ent a
t atr
ium
ent
ranc
es c
ause
d pa
st d
oor
stic
king
pro
blem
s.S
ome
settl
ing
at c
orne
rs a
long
nor
th w
all o
f pha
se 3
add
ition
, wal
ls a
nd fl
oor
show
ing
crac
ks.
Diff
eren
tial m
ovem
ent b
etw
een
Pha
se 2
and
Pha
se 3
No
new
set
tlem
ent c
rack
s.A
triu
m d
oor
stic
king
pro
blem
res
olve
dS
ettle
men
t cau
sing
tran
som
win
dow
cra
ck a
t eas
t ent
ry
Slo
ped
tran
som
win
dow
s ab
ove
entr
y ve
stib
ule
rem
oved
(no
w o
pen
fram
es o
nly)
to r
esol
ve g
lass
cra
ckin
g. S
truc
tura
l mov
emen
t con
tinue
s.
No
repo
rted
cha
nges
.
See
gla
zing
not
es fo
r ve
stib
ule
tran
som
sol
utio
n.
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Str
uctu
re0
35
92
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus Y
ear
Bui
lt: 1
992
20%
Lab
80%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 40
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
5%46
2,46
4$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Sch
edul
ed to
be
repl
aced
as
part
of c
apita
l out
lay
prog
am.
Con
stru
ctio
n in
201
8
No
chan
ges
repo
rted
.
Fire
ston
e E
PD
M in
stal
led
in 1
993.
No
repo
rted
pro
blem
s
Roo
f in
good
con
ditio
n. P
reve
ntiv
e m
aint
enan
ce a
t cor
ners
, cur
bs, s
umm
er 2
005.
Roo
f ins
pect
ed a
nnua
lly. R
epla
cem
ent n
ot a
ntic
ipat
ed in
sho
rt te
rm.
Roo
f nea
r en
d of
life
, but
no
repo
rted
pro
blem
s. R
oof o
f bot
h or
igin
al a
nd a
dditi
on s
ched
uled
for
repl
acem
ent w
ithin
10
year
s
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Roo
f0
2565
10
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 41
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
5%46
2,46
4$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
No
repo
rted
pro
blem
s.
Tran
som
win
dow
at e
ast e
ntra
nce
crac
king
due
to s
ettli
ng.
Slo
ped
tran
som
win
dow
s ab
ove
entr
y ve
stib
ule
rem
oved
(no
w o
pen
fram
es o
nly)
to r
esol
ve g
lass
cra
ckin
g. S
truc
tura
l mov
emen
t con
tinue
s.
No
repo
rted
cha
nges
. Ins
talla
tion
of p
olyc
arbo
nate
pan
els
abov
e ve
stib
ule
unde
r co
nsid
erat
ion
to c
lose
ves
tibul
es a
nd p
reve
nt g
lass
failu
re.
Win
dow
s in
tran
som
abo
ve v
estib
ule
repl
aced
. New
uni
ts a
re u
nder
size
d to
allo
w m
ovem
ent w
ithou
t bre
akag
e.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Gla
zing
010
2070
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 42
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
15%
1,38
7,39
2$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
DD
C c
ontr
ols
faili
ng (
7 zo
nes)
Diff
user
spr
ings
faili
ng, r
equi
re o
ngoi
ng m
aint
enan
ce.
Eco
nom
izer
sys
tem
on
one
AH
U fa
iling
, req
uirin
g re
pair.
Par
ts a
re d
iffic
ult t
o ob
tain
.
11+
yrs
6-10
yrs
1-5
yrs
Imm
edia
te%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t
8 M
cQua
y pa
ckag
e R
TUs
Air
dist
ribut
ion
in p
hase
s 2
and
3 pr
oble
mat
ic, e
cono
miz
er d
ampe
rs m
alfu
nctio
ning
.A
ir ha
ndlin
g un
its fu
nctio
ning
, exc
ept f
or r
outin
e fa
ilure
of m
otor
bra
cket
s (e
quip
men
t des
ign
flaw
)
Sys
tem
/ C
om
po
nent
No
tes
2 of
7 D
DC
con
trol
zon
es r
epla
ced
with
ther
mos
tats
.**
* C
ompr
esso
rs fa
iling
on
RTU
s 5,
6,8.
Eac
h un
its h
as 2
com
pres
sors
, all
at e
nd o
f life
, due
for
repl
acem
ent w
ithin
5 y
ears
. TO
P P
RIO
RIT
YFa
iled
econ
omiz
er s
yste
m r
epai
red
(200
7)
Sys
tem
CR
V o
f S
yste
m
HV
AC
All
roof
top
units
rep
lace
d (2
008)
. New
DD
C c
ontr
ols
inst
alle
d.N
o re
port
ed p
robl
ems.
No
chan
ges
repo
rted
.
$
8015
50
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 43
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
6%55
4,95
7$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
No
chan
ges
repo
rted
No
chan
ges
repo
rted
, no
repo
rted
pro
blem
s.
No
chan
ges
repo
rted
.
Bric
k, n
o re
port
ed p
robl
ems.
No
repo
rted
pro
blem
s
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cla
ddin
g0
05
95
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 44
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
10%
924,
928
$
2005
:
2008
:
2010
:
2013
:
2016
:S
inks
add
ed in
the
Nur
sing
are
a.
On-
dem
and
wat
er h
eate
rs s
ched
uled
for
repl
acem
ent w
ith s
ingl
e H
W ta
nk.
Flus
h va
lves
upg
rade
d to
sen
sor
syst
em a
s re
quire
d.W
ater
less
urin
als
repl
aced
with
plu
mbe
d un
its d
ue to
freq
uent
mai
nten
ance
issu
es a
nd s
anita
tion
conc
erns
.To
ilet p
artit
ions
due
for
repl
acem
ent.
Som
e se
dim
ent i
n ho
t wat
er ta
nks
(due
to w
ell w
ater
).
New
bal
last
tank
and
wel
l add
ed to
incr
ease
wat
er v
olum
e an
d re
duce
ove
rall
pres
sure
and
pre
ssur
e flu
ctua
tions
.To
ilet r
oom
s in
Pha
se 3
hav
e no
HW
loop
on
HW
sup
ply
lines
- ta
kes
seve
ral m
inut
es fo
r H
W to
rea
ch fi
xtur
es.
Gas
fire
d H
W ta
nk in
stal
led
(200
5)
Dom
estic
HW
sup
ply
prob
lem
res
olve
d w
ith a
dditi
on o
f circ
ulat
ing
pum
ps.
Dom
estic
HW
pro
blem
s co
ntin
ue. N
o re
port
ed c
hang
es.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Plu
mbi
ng0
210
88
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 45
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
6%55
4,95
7$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Prim
ary
from
on-
site
sub
stat
ion.
Pow
er to
bui
ldin
gs th
roug
h ne
w c
ampu
s-w
ide
loop
sys
tem
, ste
pped
dow
n at
bui
ldin
g. N
o re
port
ed p
robl
ems.
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
Tran
sfor
mer
s te
sted
in 2
012,
upd
ated
and
rep
aire
d as
req
uire
d. N
o re
port
ed p
robl
ems.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Prim
ary
/ Sec
onda
ry0
25
93
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 46
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
6%55
4,95
7$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
No
eart
h gr
ound
, pro
blem
rem
edia
ted.
Onl
y 11
0v a
vaila
ble
in b
uild
ing.
Ade
quat
e ci
rcui
ts a
vaila
ble.
220V
for
heat
ed s
idew
alk
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Dis
trib
utio
n0
510
85
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 47
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%36
9,97
1$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d. C
onve
rting
ligh
t fix
ture
s to
LE
D a
s fix
ture
s ar
e re
plac
ed.
New
ligh
ting
bein
g te
sted
in a
triu
m to
impr
ove
light
leve
ls.
New
atr
ium
fluo
resc
ent l
ight
ing
prov
ides
ade
quat
e lig
ht le
vels
.N
o re
port
ed p
robl
ems.
Typi
cal m
aint
enan
ce o
nly,
exc
ept t
hat i
ndire
ct fi
xtur
es in
atr
ium
too
clos
e to
bea
ms,
cau
sing
hea
t bui
ldup
that
lead
s to
pre
mat
ure
lam
p fa
ilure
and
bea
m s
hrin
kage
.
Fixt
ures
in a
triu
m r
emov
ed a
nd r
efitt
ed in
200
2 to
add
ress
lam
p fa
ilure
.Li
ght l
evel
s in
atr
ium
inad
equa
te, e
spec
ially
at n
ight
.
No
chan
ges
repo
rted
. Lig
htin
g up
grad
ed o
n re
gula
r ba
sis
as n
eede
d.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Ligh
ting
05
590
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 48
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
2%18
4,98
6$
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Wi-F
i add
ed to
all
build
ings
.
No
repo
rted
pro
blem
s, o
r ch
ange
s.
Cam
pus
phon
e sy
stem
bei
ng s
witc
hed
to V
OIP
sys
tem
.
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)
Fibe
r to
eac
h bu
ildin
g (1
998)
.C
AT5
E/C
AT6
cab
ling
typi
cal.
Wire
less
inst
alle
d in
sel
ect l
ocat
ions
.N
etw
ork
switc
hes
on 4
-yea
r up
grad
e cy
cle.
No
repo
rted
pro
blem
s.
Voi
ce/D
ata
02
593
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Mai
n C
ampu
sP
hase
2 -
1992
Pha
se 3
- 19
93V
estib
ules
add
ed (
2005
)N
ursi
ng la
bs c
onne
cted
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 49
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%36
9,97
1$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Mos
tly s
uspe
nded
cei
lings
, ope
n to
woo
d de
ck in
atr
ium
.
No
repo
rted
pro
blem
s.
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cei
lings
00
595
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 50
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
5%46
4,46
4$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Mos
tly b
rick
and
conc
rete
blo
ck th
roug
hout
, som
e dr
ywal
l in
offic
es. W
alls
rep
aint
ed o
n re
gula
r sc
hedu
le. N
o re
port
ed p
robl
ems.
Cra
ckin
g at
nor
th e
xter
ior
wal
l and
whe
re in
terio
r w
alls
mee
t nor
th w
all.
No
chan
ges
repo
rted
.
No
repo
rted
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Wal
ls0
55
90
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 51
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%36
9,97
1$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Ext
erio
r –
alum
inum
at a
triu
m a
nd n
orth
end
, ste
el d
oors
els
ewhe
re, n
o re
port
ed p
robl
ems.
Inte
rior
– w
ood,
gen
eral
ly in
goo
d co
nditi
on.
Faile
d lo
ckse
ts r
epla
ced
as r
equi
red,
ong
oing
rep
lace
men
t typ
ical
.C
lass
room
doo
r ha
rdw
are
need
s ro
utin
e ad
just
men
t.To
ilet r
oom
doo
rs s
how
ing
wea
r.
Doo
r ha
rdw
are
repl
aced
with
new
lock
sets
as
they
fail
to r
esol
ve a
djus
tmen
t pro
blem
s.
No
repo
rted
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Doo
rs0
510
85
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan
e a o s
m w dg
Section 8 - 52
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
3%27
7,47
8$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Som
e sl
ate
tiles
in a
triu
m p
oppe
d, r
epla
ced.
Car
pet f
ailin
g, s
eam
s de
terio
rate
d.
Sla
te in
atr
ium
con
tinui
ng to
chi
ps a
nd c
rack
. Som
e til
es c
rack
ing
thro
ugho
ut b
uild
ing.
Car
pet r
epla
ced
(200
5)
Sla
te in
atr
ium
rep
lace
d (2
007)
.C
arpe
t - N
o re
port
ed p
robl
ems.
Atr
ium
tile
s re
plac
ed a
s re
quire
d.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Floo
rs0
1020
70
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 53
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
3%27
7,47
8$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Spr
inkl
ed; A
DA
com
plia
nt; b
atte
ry b
acku
p on
em
erge
ncy
light
ing.
Toile
t roo
ms
AD
A c
ompl
iant
.
No
emer
genc
y lig
htin
g in
som
e in
terio
r ro
oms
( 20
3, 2
16)
. Bat
tery
bac
kup
fluor
esce
nt a
dded
to r
esol
ve is
sue
Acc
essi
ble
door
ope
rato
rs a
dded
(20
05)
No
chan
ges
repo
rted
.
No
chan
ges
repo
rted
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cod
e (f
ire,A
DA
, etc
.)0
55
90
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 54
Cam
pus
:N
ote
s:A
rea:
39,2
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
3%27
7,47
8$
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
No
repo
rted
pro
blem
sS
ite li
ghtin
g up
date
d du
ring
cons
truc
tion
of n
ew C
ampu
s C
ente
r.
No
repo
rted
pro
blem
s or
cha
nges
.
No
repo
rted
pro
blem
s or
cha
nges
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Imm
ed. S
ite/E
xt L
tg0
05
95
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)M
ain
Cam
pus
Pha
se 2
- 19
92P
hase
3 -
1993
Ves
tibul
es a
dded
(20
05)
Nur
sing
labs
con
nect
ed
Yea
r B
uilt:
199
220
% L
ab80
% C
lass
room
AMM 2016 Campus Facilities Master Plan Section 8 - 55
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
$0 $
1
78,6
34
$
814,
968
$
7,2
38,3
98
$446
,740
4.8%
GO
OD
FCI
$0E
XC
ES
S
Sum
mar
y -
Bui
ldin
g N
o: 0
2.1
- Te
chni
cal C
ente
r (a
dd
itio
n)
DM
BR
ATI
NG
Pri
ori
ty Is
sues
Dat
aE
XC
ES
SFC
I$0
$00.
0%G
OO
D
0-5
Yea
r C
umul
ativ
e D
ata
DM
B
CR
V T
ota
ls
RA
TIN
G
AMM 2016 Campus Facilities Master Plan Section 8 - 56
Summaryof
AllSystems/
Compo
nents
Build
ingNo.
03:Arts&Sciences
Center
(orig
inalan
d20
10)
CRV:
11,089
,084
$Im
med
.Va
lue
15
Value
610
Value
11+
Value
System
%%
$%
$%
$%
$
Structure
0.2
2,21
7,81
7$
0.00
$0.00
$0.00
$1.00
2,21
7,81
7$
Roof
0.05
554,45
4$
0.00
$0.00
$0.05
27,723
$0.95
526,73
1$
Glazing
0.05
554,45
4$
0.00
$0.00
$0.05
27,723
$0.95
526,73
1$
Clad
ding
0.06
665,34
5$
0.00
$0.00
$0.00
$1.00
665,34
5$
HVAC
0.15
1,66
3,36
3$
0.00
$0.02
33,267
$0.10
166,33
6$
0.88
1,46
3,75
9$
Plum
bing
0.09
998,01
8$
0.00
$0.00
$0.05
49,901
$0.95
948,11
7$
Prim
ary/Second
ary
0.05
554,45
4$
0.00
$0.00
$0.05
27,723
$0.95
526,73
1$
Distrib
ution
0.04
443,56
3$
0.00
$0.00
$0.05
22,178
$0.95
421,38
5$
Lightin
g0.04
443,56
3$
0.00
$0.00
$0.05
22,178
$0.95
421,38
5$
Voice/Da
ta0.04
443,56
3$
0.00
$0.00
$0.05
22,178
$0.95
421,38
5$
Ceilings
0.04
443,56
3$
0.00
$0.00
$0.05
22,178
$0.95
421,38
5$
Walls
0.05
554,45
4$
0.00
$0.00
$0.05
27,723
$0.95
526,73
1$
Doors
0.03
332,67
3$
0.00
$0.00
$0.05
16,634
$0.95
316,03
9$
Floo
rs0.04
443,56
3$
0.00
$0.00
$0.05
22,178
$0.95
421,38
5$
Code
(fire,A
DA,etc.)
0.04
443,56
3$
0.00
$0.00
$0.00
$1.00
443,56
3$
Immed
.Site
0.03
332,67
3$
0.00
$0.00
$0.05
16,634
$0.95
316,03
9$
CRV
11,089
,084
$DM
B$
33,267
$47
1,28
6$
10,584
,531
$FCI
0.0%
DMB
33,267
$FCI
0.3%
AMM 2016 Campus Facilities Master Plan Section 8 - 57
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1
Use
Typ
es:
%
20%
2,21
7,81
7$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Set
tling
of f
loor
at d
ress
ing
room
s.P
revi
ous
settl
emen
t of f
loor
cau
sed
floor
cra
ck th
roug
h m
iddl
e of
med
ia c
ente
r an
d un
der
slab
dra
in li
nes
from
roo
f to
back
up
- rep
aire
d bu
t fut
ure
settl
emen
t may
occ
ur.
Col
lege
to c
onsi
der
rero
utin
g ro
of d
rain
line
s th
roug
h ce
iling
spa
ce.
Floo
r se
ttlin
g pr
oble
m p
ersi
sts,
sub
floor
dra
in b
acku
p pr
oble
m s
till o
ccur
s 2
or m
ore
times
per
yea
r.
Floo
r stil
l une
ven,
but
set
tlem
ent s
tabi
lized
.U
nder
floo
r dra
ins
in m
edia
cen
ter -
pro
blem
reso
lved
.
Set
tlem
ent a
nd d
rain
age
issu
es re
solv
ed a
s pa
rt of
reno
vatio
n.
No
repo
rted
prob
lem
s.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Str
uctu
re0
00
100
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)
Yea
r B
uilt:
197
0
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
25%
Aud
itoriu
m35
% L
ab
40%
Cla
ssro
om
Mai
n C
ampu
s
AMM 2016 Campus Facilities Master Plan Section 8 - 58
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%5%
554,
454
$
2005
:
2008
:
2010
2013
2016
:N
o ch
ange
s re
porte
d.
Sin
gle
ply
EP
DM
roo
f and
orig
inal
cem
ent s
hake
man
sard
s re
plac
ed in
200
1.M
ansa
rds
repl
aced
with
pre
finis
hed
stee
l.D
iffer
entia
l set
tlem
ent o
f bui
ldin
g ha
s al
tere
d ro
of s
lope
cau
sing
pon
ding
on
roof
whe
re d
rain
s ar
e no
w h
ighe
r th
an a
djac
ent r
oof a
reas
.
Roo
f lea
ks a
t Com
mon
s, th
eate
r an
d ro
om 3
05 r
epai
red
(200
3)P
ondi
ng o
n ro
of n
ot r
esol
ved.
Roo
f dra
ins
mod
ified
to re
dire
ct a
nd c
ontro
l out
flow
and
elim
inat
e po
ndin
g.
Ent
ire ro
of a
nd a
ll ro
of c
ondu
ctor
s an
d un
derfl
oor p
ipin
g re
plac
ed a
s pa
rt of
reno
vatio
n.
No
repo
rted
prob
lem
s.
CR
V o
f S
yste
m
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
% o
f sy
stem
to
bud
get
fo
r re
pai
r/re
pla
cem
ent
$Im
med
iate
1-5
yrs
6-10
yrs
11+
yrs
Roo
f0
05
95
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 59
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
5%55
4,45
4$
2005
:
2008
:
2010
:
2013
:
2016
:N
o re
porte
d pr
oble
ms.
Orig
inal
Alu
min
um fr
ames
, som
e op
erab
le. I
nsul
ated
gla
zing
is fo
ggin
g up
as
seal
s fa
il at
mos
t win
dow
s.
Fogg
ing
prob
lem
has
wor
sene
d, a
ffect
ing
appr
oxim
atel
y 40
-45%
of w
indo
ws.
Har
dwar
e in
goo
d co
nditi
on, g
aske
ts b
egin
ning
to s
how
det
erio
ratio
n
No
chan
ges
repo
rted.
Win
dow
s re
plac
ed a
s pa
rt of
reno
vatio
n
No
repo
rted
prob
lem
s.
Gla
zing
00
595
Sys
tem
/ C
om
po
nent
No
tes
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
AMM 2016 Campus Facilities Master Plan Section 8 - 60
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
15%
1,66
3,36
3$
2005
:
2008
:
2010
:
2013
:
2016
:
HV
AC
for
thea
ter
repl
aced
dur
ing
reno
vatio
n B
oile
r (n
atur
al g
as, 1
.5m
BTU
) in
spec
ted
perio
dica
lly, i
n fa
ir co
nditi
on. W
ater
is tr
eate
d to
pre
vent
cor
rosi
on.
Chi
ller
unit
still
in o
pera
ting
cond
ition
, but
par
ts r
emai
n di
fficu
lt to
obt
ain
Hea
ting
pipe
insu
latio
n in
boi
ler
room
may
con
tain
asb
esto
s at
elb
ows.
Air
hand
ling
units
for
libra
ry a
nd r
oom
305
orig
inal
, req
uire
typi
cal m
aint
enan
ce o
nly.
Uni
t ven
tilat
ors
in b
alan
ce o
f bui
ldin
g - r
unni
ng, b
ut m
otor
s ar
e fa
iling
.Li
brar
y fin
tube
s an
d ca
bine
t uni
t hea
ters
in g
ood
cond
ition
.R
oom
303
Roo
ftop
unit
mot
or r
epla
ced
in 2
004.
Pne
umat
ic c
ontr
ols
- no
repo
rted
pro
blem
s. C
ompr
esso
r in
wor
king
con
ditio
n.
11+
yrs
6-10
yrs
1-5
yrs
Imm
edia
te%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t
Chi
ller
unit
orig
inal
, at e
nd o
f life
, but
ope
ratin
g. P
arts
diff
icul
t to
obta
in.
Boi
ler
orig
inal
but
upg
rade
d, n
o re
port
ed p
robl
ems.
New
er r
oofto
p un
its in
thea
ter
(200
1) a
nd r
oom
s 30
1, 3
03 (
1999
).
Sys
tem
/ C
om
po
nent
No
tes
Boi
lers
che
cked
dai
ly a
nd in
spec
ted
twic
e an
nual
ly.
Uni
t ven
tilat
or m
otor
s in
room
s 30
1,30
3 re
plac
ed.
Sys
tem
CR
V o
f S
yste
m
HV
AC
Sys
tem
repl
aced
with
new
VA
V gr
ound
-sou
rce
geot
herm
al h
eat p
ump
syst
em (3
8 w
ells
, 34
heat
pum
ps).
Con
trols
repl
aced
with
DD
C.
Hea
t pum
ps lo
cate
d ab
ove
ceili
ngs
- may
be
diffi
cult
to a
cces
s fo
r mai
nten
ance
.
Hea
t pum
ps w
orki
ng w
ell,
but a
re re
porte
d as
diff
icul
t to
acce
ss. N
o re
porte
d pr
oble
ms.
$
8810
20
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 61
Rep
lace
d bo
iler i
n 20
15.
Rep
lace
d tw
o ou
tsid
e A
/C c
ompr
esso
rs (o
f a to
tal o
f 6)
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
6%66
5,34
5$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
Bric
k, n
o re
port
ed p
robl
ems.
Mas
onry
in g
ood
shap
eFa
scia
and
sof
fit p
aint
ed in
200
1
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cla
ddin
g0
00
100
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 62
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
9%99
8,01
8$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Cam
era
sent
thro
ugh
drai
n lin
es b
ut n
o ob
stru
ctio
ns n
oted
. (20
02)
Cam
pus
now
on
city
sew
er. D
rain
line
obs
truc
tion
near
sci
ence
win
g ad
ditio
n.N
ew w
ell i
n 20
02 -
serv
es A
SC
, CC
, TC
and
new
Aut
o/m
aint
. Bui
ldin
g,pr
essu
re fl
uctu
ates
(30
-60p
si).
Fauc
ets
in to
ilet r
oom
s re
plac
ed in
200
1, w
orki
ng w
ith ty
pica
l rep
airs
, but
nea
r en
d of
life
.S
uppl
y lin
es -
mix
of g
alva
nize
d an
d co
pper
- or
igin
al, n
o re
port
ed p
robl
ems.
Toile
t par
titio
ns r
epla
ced
durin
g re
nova
tion,
but
toile
t roo
ms
due
for
gene
ral u
pgra
ding
.D
rinki
ng fo
unta
ins
leak
ing
- due
for
repl
acem
ent
Orig
inal
plu
mbi
ng a
nd fi
xtur
es, n
o re
port
ed p
robl
ems.
Toile
t par
titio
ns r
epla
ced
in 2
000.
Mai
n do
mes
tic w
ater
hea
ter
repl
aced
in 1
980s
, no
repo
rted
pro
blem
s.S
epar
ate
80ga
l hea
ter
in g
ood
cond
ition
.
New
bal
last
tank
and
wel
l add
ed to
incr
ease
wat
er v
olum
e an
d re
duce
ove
rall
pres
sure
and
pre
ssur
e flu
ctua
tions
. (20
07).
Cam
era
sent
thro
ugh
drai
n lin
es b
ut n
o ob
stru
ctio
ns n
oted
. (20
07)
Wor
st s
ink
hard
war
e re
plac
ed, b
alan
ce a
wai
ting
repl
acem
ent w
ith re
nova
tion.
Drin
king
foun
tain
s re
plac
ed (2
007)
.
No
repo
rted
prob
lem
s.
All
plum
bing
repl
aced
as
part
of re
nova
tion.
Toi
let r
oom
s re
nova
ted,
now
mee
t AD
A.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Plu
mbi
ng0
05
95
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 63
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
5%55
4,45
4$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Prim
ary
from
on-
site
sub
stat
ion.
Pow
er to
bui
ldin
gs th
roug
h ne
w c
ampu
s-w
ide
loop
sys
tem
, ste
pped
dow
n at
bui
ldin
g. N
o re
port
ed p
robl
ems.
OK
- B
ackh
oe c
ut li
ne d
urin
g co
nstr
uctio
n. L
ine
repa
ired.
Sw
itchg
ear,
orig
inal
- no
rep
orte
d pr
oble
ms
Und
ergr
ound
line
s un
der
docu
men
ted,
sur
vey
requ
ired.
Und
ergr
ound
util
ity s
urve
y be
ing
upda
ted
(200
8).
Ele
ctric
al s
yste
m u
pgra
ded
as p
art o
f ren
ovat
ion.
Tran
sfor
mer
s te
sted
in 2
012,
upd
ated
and
repa
ired
as re
quire
d. N
o re
porte
dbl
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Prim
ary
/ Sec
onda
ry0
05
95
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 64
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%44
3,56
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Pan
els
at c
apac
ityE
lect
rical
upg
rade
s fu
nded
for
2002
.
Ele
ctric
al u
pdat
es s
till r
equi
red,
pan
els
at c
apac
ity.
No
GFI
exc
ept i
n br
eakr
oom
.
No
chan
ges
repo
rted.
Ele
ctric
al s
yste
m u
pgra
ded
as p
art o
f ren
ovat
ion.
No
repo
rted
prob
lem
s.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Dis
trib
utio
n0
05
95
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 65
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%44
3,56
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
Ligh
ting
syst
em, i
nclu
ding
thea
ter l
ight
ing,
repl
aced
as
part
of re
nova
tion.
Orig
inal
T12
fixt
ures
, exc
ept f
or r
oom
s 30
1, 3
03 (
1999
) an
d 30
5 (1
997)
-up
grad
ed to
T8.
No
repo
rted
pro
blem
s.Th
eate
r lig
htin
g –
no r
epor
ted
prob
lem
s.M
edia
cen
ter
light
ing
– no
rep
orte
d pr
oble
ms.
Orig
inal
thea
ter
light
ing
func
tioni
ng, b
ut in
effic
ient
and
req
uire
s fre
quen
t lam
p ch
ange
s. C
onsi
der
upgr
ade
to im
prov
e ef
ficie
ncy.
Lam
ps a
nd b
alla
sts
upgr
aded
to T
8 as
req
uire
d.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Ligh
ting
00
595
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 66
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%44
3,56
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Wi-F
i add
ed to
all
build
ings
.
Sys
tem
upg
rade
d as
nee
ded
as p
art o
f ren
ovat
ion.
Cam
pus
phon
e sy
stem
bei
ng s
witc
hed
to V
OIP
sys
tem
.
Fibe
r to
eac
h bu
ildin
g (1
998)
.C
AT5
E/C
AT6
cab
ling
typi
cal.
Net
wor
k sw
itche
s on
4-y
ear
upgr
ade
cycl
e.N
o re
port
ed p
robl
ems.
Inte
rnet
and
tele
phon
e m
ain
line
ente
r th
roug
h th
is b
uild
ing
– no
rep
orte
d pr
oble
ms.
New
dat
a lin
es th
roug
hout
bui
ldin
g.
Voi
ce/D
ata
00
595
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 67
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%44
3,56
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
2x2
susp
ende
d ce
iling
s th
roug
hout
bui
ldin
g, b
eing
rep
lace
d w
here
wat
er d
amag
ed fr
om p
ast r
oof l
eak.
Cof
fere
d su
spen
ded
ceili
ng in
med
ia c
ente
r di
fficu
lt to
mai
ntai
n du
e to
des
ign.
New
cei
lings
in r
oom
s 30
1, 3
03.
Orig
inal
cei
lings
rem
ain
in g
ood
cond
ition
.
No
chan
ges
repo
rted.
Cei
lings
repl
aced
with
a m
ix o
f sus
pend
ed a
nd o
pen
as p
art o
f ren
ovat
ion.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cei
lings
00
595
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 68
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
5%55
4,45
4$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Con
cret
e bl
ock
and
bric
k.G
ypsu
m b
oard
wal
ls in
libr
ary
and
offic
es.
Wal
ls r
epai
nted
on
regu
lar
sche
dule
. No
repo
rted
pro
blem
s.
Typi
cal o
ngoi
ng r
epai
ntin
g.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Wal
ls0
05
95
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 69
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
3%33
2,67
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Ext
erio
r –
orig
inal
hol
low
met
al d
oors
, in
fair
cond
ition
, som
e re
pairs
mad
e.H
ardw
are
wea
ring
out.
Rep
lace
men
t pla
nned
for
futu
re, n
ot fu
nded
.In
terio
r –
woo
d, n
o re
port
ed p
robl
ems.
Ext
erio
r - d
oors
rus
ting
and
hard
war
e at
end
of l
ife, e
spec
ially
at t
he S
outh
ent
ry a
nd b
acks
tage
doo
rs. d
ue fo
r re
plac
emen
t.In
terio
r - S
olid
cor
e w
ood
door
s du
e fo
r re
finis
hing
.
No
chan
ges
repo
rted.
Rep
lace
d as
par
t of r
enov
atio
n.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Doo
rs0
05
95
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 70
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%44
3,56
3$
2005
:
2008
:
2010
:
2013
:
2016
:
Floo
ring
repl
aced
in tw
o m
usic
room
s in
201
5.
New
car
pet t
hrou
ghou
t.Q
uarr
y til
e in
cor
ridor
s, n
o re
port
ed p
robl
ems.
VC
T in
dre
ssin
g ro
oms
in g
ood
cond
ition
.
New
car
pet i
n lib
rary
and
in th
eatr
e.S
tage
floo
r re
plac
ed (
2002
).
No
chan
ges
repo
rted.
Rep
lace
d as
par
t of r
enov
atio
n. M
ix o
f car
pet,
conc
rete
, bam
boo,
lino
leum
and
vin
yl.
No
repo
rted
prob
lem
s.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Floo
rs0
05
95
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 71
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
4%44
3,56
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Thea
ter
area
and
med
ia c
ente
r w
orkr
oom
spr
inkl
ed.
AD
A c
ompl
iant
toile
t roo
m a
dded
.O
rigin
al fi
re a
larm
sys
tem
, due
for
upgr
ade
in 2
002.
Fire
ala
rm s
yste
m u
pgra
ded
with
hor
ns a
nd s
trob
es in
200
2 as
par
t of s
cien
ce w
ing
addi
tion.
Bui
ldin
g on
bac
kup
gene
rato
r fo
r em
erge
ncy
light
ing
and
fire
supp
ress
ion.
No
chan
ges
repo
rted.
Fire
ala
rm s
yste
m, f
ire s
uppr
essi
on s
yste
m, e
mer
genc
y lig
htin
g an
d ex
it lig
htin
g re
plac
ed a
s pa
rt of
reno
vatio
n.B
uild
ing
fully
AD
A c
ompl
iant
.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cod
e (f
ire,A
DA
, etc
.)0
00
100
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 72
Cam
pus
:N
ote
s:A
rea:
35,0
00 s
fFl
oo
rs:
1U
se T
ypes
:
%
3%33
2,67
3$
2005
:
2008
:
2010
:
2013
:
2016
:
New
sno
w m
elt a
nd h
eat e
xcha
nger
in 2
015.
Ent
ry w
alks
in g
ood
cond
ition
, muc
h w
ill b
e re
plac
ed w
ith a
dditi
on.
Bui
ldin
g so
ffit l
ight
ing
wor
king
, wal
kway
ligh
ting
at n
orth
end
of b
uild
ing
repl
aced
.
Som
e de
terio
ratio
n of
asp
halt
wal
ks a
t nor
th a
nd s
outh
ent
ries.
Hea
ted
wal
k at
sou
th e
nd c
onst
ruct
ed a
s pa
rt o
f bui
ldin
g ad
ditio
n.
Hot
wat
er s
now
mel
t sys
tem
add
ed to
inne
r-ca
mpu
s w
alkw
ays.
Asp
halt
wal
ks re
plac
ed a
s pa
rt of
pro
ject
.S
ite li
ghtin
g up
date
d du
ring
cons
truct
ion
of n
ew C
ampu
s C
ente
r.
Bui
ldin
g lig
htin
g, b
uild
ing
entry
pad
s an
d su
rrou
ndin
g si
dew
alks
upg
rade
d as
par
t of r
enov
atio
n.
No
chan
ges
repo
rted.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Imm
ed. S
ite/E
xt L
tg0
05
95
Bui
ldin
g N
o: 0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)M
ain
Cam
pus
2010
Ent
ire b
uild
ing
reno
vate
d, n
ew 6
,800
SF
addi
tion
cons
truc
ted
($6,
900,
00)
Yea
r B
uilt:
197
025
% A
udito
rium
35%
Lab
40%
Cla
ssro
om
AMM 2016 Campus Facilities Master Plan Section 8 - 73
11,0
89,0
84$
0$
33,2
67 $
471
,286
$
1
0,58
4,53
1 C
RV
To
tals
11,0
89,0
84$
$0
$00.
00%
GO
OD
0-5
Yea
r C
umul
ativ
e D
ata
DM
BE
XC
ES
SFC
I$/
YR
MA
INTA
INR
ATI
NG
Sum
mar
y -
Bui
ldin
g N
o:0
3 -
Art
s &
Sci
ence
s C
ente
r (o
rig
inal
& 2
010
add
itio
n)
Pri
ori
ty Is
sues
Dat
aC
RV
DM
BE
XC
ES
SFC
IR
ATI
NG
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
$ 33
,267
$00.
3%$
221,
782
GO
OD
AMM 2016 Campus Facilities Master Plan Section 8 - 74
Summaryof
AllSystems/
Compo
nents
Build
ingNo.
03.1:Arts&Sciences
Center
(200
2Ad
ditio
n)
CRV:
6,08
7,31
6$
Immed
.Va
lue
15
Value
610
Value
11+
Value
System
%%
$%
$%
$%
$
Structure
0.2
1,21
7,46
3$
0.00
$0.03
36,524
$0.05
60,873
$0.92
1,12
0,06
6$
Roof
0.05
304,36
6$
0.00
$0.05
15,218
$0.15
45,655
$0.80
243,49
3$
Glazing
0.03
182,61
9$
0.00
$0.00
$0.05
9,13
1$
0.95
173,48
9$
Clad
ding
0.07
426,11
2$
0.00
$0.00
$0.00
$1.00
426,11
2$
HVAC
0.18
1,09
5,71
7$
0.02
21,914
$0.04
43,829
$0.10
109,57
2$
0.84
920,40
2$
Plum
bing
0.1
608,73
2$
0.00
$0.00
$0.05
30,437
$0.95
578,29
5$
Prim
ary/Second
ary
0.04
243,49
3$
0.00
$0.00
$0.05
12,175
$0.95
231,31
8$
Distrib
ution
0.04
243,49
3$
0.00
$0.00
$0.05
12,175
$0.95
231,31
8$
Lightin
g0.04
243,49
3$
0.00
$0.00
$0.05
12,175
$0.95
231,31
8$
Voice/Da
ta0.02
121,74
6$
0.00
$0.00
$0.05
6,08
7$
0.95
115,65
9$
Ceilings
0.04
243,49
3$
0.00
$0.00
$0.05
12,175
$0.95
231,31
8$
Walls
0.05
304,36
6$
0.00
$0.00
$0.05
15,218
$0.95
289,14
8$
Doors
0.03
182,61
9$
0.00
$0.00
$0.05
9,13
1$
0.95
173,48
9$
Floo
rs0.04
243,49
3$
0.00
$0.00
$0.05
12,175
$0.95
231,31
8$
Code
(fire,A
DA,etc.)
0.04
243,49
3$
0.00
$0.00
$0.05
12,175
$0.95
231,31
8$
Immed
.Site
0.03
182,61
9$
0.00
$0.00
$0.05
9,13
1$
0.95
173,48
9$
CRV
6,08
7,31
6$
DMB
21,914
$95
,571
$36
8,28
3$
5,60
1,54
8$
FCI
0.4%
DMB
117,48
5$
FCI
1.9%
AMM 2016 Campus Facilities Master Plan Section 8 - 75
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
20%
1,21
7,46
3$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Yea
r B
uilt:
200
2
100%
Lab
Mai
n C
ampu
s
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Str
uctu
re0
35
92
Set
tlem
ent a
nd s
hrin
kage
cra
ckin
g at
wes
t wal
l of r
oom
352
(po
or c
onst
ruct
ion
join
t fill
ed w
ith e
xces
sive
mor
tar)
.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges.
No
repo
rted
chan
ges.
AMM 2016 Campus Facilities Master Plan Section 8 - 76
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%5%
304,
366
$
2005
:
2008
:
2010
2013
2016
:N
o ch
ange
s re
porte
d.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
CR
V o
f S
yste
m
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
% o
f sy
stem
to
bud
get
fo
r re
pai
r/re
pla
cem
ent
$Im
med
iate
1-5
yrs
6-10
yrs
11+
yrs
Roo
f0
515
80
EP
DM
- m
echa
nica
lly a
ttach
ed, n
o re
port
ed p
robl
ems
No
chan
ges
repo
rted.
Roo
f ins
pect
ed a
nnua
lly.
Som
e m
inor
leak
s un
der i
nves
tigat
ion,
pos
sibl
y ca
used
by
loos
e pi
ece
ofm
etal
from
rece
nt w
inds
torm
s cu
tting
roof
mem
bran
e.
No
repo
rted
leak
s or
pro
blem
s.
AMM 2016 Campus Facilities Master Plan Section 8 - 77
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
3%18
2,61
9$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Sys
tem
/ C
om
po
nent
No
tes
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Gla
zing
00
595
Alu
min
um fr
ame,
gas
fille
d, o
pera
ble
case
men
ts.
Inte
rior
borr
owed
lite
s w
ith d
ispl
ay b
etw
een
clas
sroo
m &
cor
ridor
.N
o re
port
ed p
robl
ems
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
No
repo
rted
chan
ges
or p
robl
ems.
AMM 2016 Campus Facilities Master Plan Section 8 - 78
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
18%
1,09
5,71
7$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
2
(4)
Bur
nham
boi
lers
, Yor
k A
HU
, gro
und-
mou
nted
chi
ller,
no
repo
rted
pro
blem
s
11+
yrs
6-10
yrs
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
1-5
yrs
Imm
edia
te%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t
Sys
tem
/ C
om
po
nent
No
tes
Boi
lers
che
cked
dai
ly a
nd in
spec
ted
twic
e an
nual
ly.
Sys
tem
CR
V o
f S
yste
m
HV
AC
Two
of s
ix c
ompr
esso
rs o
n ch
iller
faile
d, re
mai
ning
four
stil
l fun
ctio
ning
, chi
ller o
pera
ting
norm
ally
. Rep
lace
men
t is
not u
rgen
t
Two
faile
d co
mpr
esso
rs re
plac
ed. N
o re
porte
d pr
oble
ms.
$
8410
4
AMM 2016 Campus Facilities Master Plan Section 8 - 79
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
7%42
6,11
2$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cla
ddin
g0
00
100
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges.
Bric
k w
ith m
etal
fasc
ia. N
o re
port
ed p
robl
ems
AMM 2016 Campus Facilities Master Plan Section 8 - 80
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
10%
608,
732
$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Pla
n to
con
nect
with
city
wat
er s
yste
m a
s a
sepa
rate
pro
ject
in th
e fu
ture
.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
sTh
is b
uild
ing
is th
e di
strib
utio
n po
int o
f the
cam
pus
wat
er s
yste
m.
Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Plu
mbi
ng0
05
95
Mai
n dr
ain
line
obst
ruct
ed, m
ay n
ot b
e sl
oped
ade
quat
ely.
New
bal
last
tank
and
wel
l add
ed to
incr
ease
wat
er v
olum
e an
d re
duce
ove
rall
pres
sure
and
pre
ssur
e flu
ctua
tions
.M
ain
drai
n lin
e m
odifi
ed, o
bstru
ctio
n pr
oble
m re
solv
ed.
No
repo
rted
chan
ges.
No
repo
rted
chan
ges
or p
robl
ems.
AMM 2016 Campus Facilities Master Plan Section 8 - 81
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
4%24
3,49
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Prim
ary
/ Sec
onda
ry0
05
95
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
Tran
sfor
mer
s te
sted
in 2
012,
upd
ated
and
repa
ired
as re
quire
d. N
o re
porte
d pr
oble
ms.
AMM 2016 Campus Facilities Master Plan Section 8 - 82
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
4%24
3,49
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Dis
trib
utio
n0
05
95
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
No
repo
rted
chan
ges.
AMM 2016 Campus Facilities Master Plan Section 8 - 83
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
4%24
3,49
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Ligh
ting
00
595
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
2 x
4 de
ep c
ell p
arab
olic
in c
lass
room
s, 2
x 4
acr
ylic
in c
orrid
or, s
uspe
nded
dire
ct/in
dire
ct in
hig
h ba
y, c
ompa
ct fl
uore
scen
t dow
nlig
hts
in c
orrid
or.
No
repo
rted
pro
blem
s
No
repo
rted
chan
ges.
Lig
htin
g up
grad
ed a
s ne
cess
ary.
AMM 2016 Campus Facilities Master Plan Section 8 - 84
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
2%12
1,74
6$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Voi
ce/D
ata
00
595
Wi-F
i add
ed to
all
build
ings
.
No
repo
rted
chan
ges
or p
robl
ems.
Cam
pus
phon
e sy
stem
bei
ng s
witc
hed
to V
OIP
sys
tem
.
Fibe
r to
eac
h bu
ildin
g (1
998)
.C
AT5
E/C
AT6
cab
ling
typi
cal.
Net
wor
k sw
itche
s on
4-y
ear
upgr
ade
cycl
e.N
o re
port
ed p
robl
ems.
AMM 2016 Campus Facilities Master Plan Section 8 - 85
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
4%24
3,49
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cei
lings
00
595
2 x
2 te
gula
r A
CT
typi
cal,
som
e pe
rfora
ted
met
al p
anel
, som
e gy
p so
ffits
& v
estib
ule
ceili
ngs.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 86
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
5%30
4,36
6$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Wal
ls0
05
95
Pai
nted
CM
U. W
alls
rep
aint
ed o
n re
gula
r sc
hedu
le. N
o re
port
ed p
robl
ems.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
No
repo
rted
chan
ges.
AMM 2016 Campus Facilities Master Plan Section 8 - 87
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
3%18
2,61
9$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Doo
rs0
05
95
Ext
erio
r - a
lum
inum
Inte
rior
- woo
d w
ith s
idel
ight
s, s
ome
visi
on p
anel
s, A
DA
har
dwar
e.N
o re
port
ed p
robl
ems.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
No
repo
rted
chan
ges.
AMM 2016 Campus Facilities Master Plan Section 8 - 88
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
4%24
3,49
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Floo
rs0
05
95
She
et v
inyl
in c
orrid
or, V
CT
in la
bs, C
arpe
t in
clas
sroo
ms.
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 89
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
4%24
3,49
3$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cod
e (f
ire,A
DA
, etc
.)0
05
95
Spr
inkl
edN
o re
port
ed p
robl
ems
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 90
Cam
pus
:N
ote
s:A
rea:
17,7
00sf
Flo
ors
:1
Use
Typ
es:
%
3%18
2,61
9$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Mai
n C
ampu
s Yea
r B
uilt:
200
210
0% L
ab
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Imm
ed. S
ite/E
xt L
tg0
05
95
Hea
ted
wal
ksN
o re
port
ed p
robl
ems
Hot
wat
er s
now
mel
t sys
tem
add
ed to
inne
r-ca
mpu
s w
alkw
ays.
Site
ligh
ting
upda
ted
durin
g co
nstru
ctio
n of
new
Cam
pus
Cen
ter
No
repo
rted
chan
ges
or p
robl
ems.
No
repo
rted
chan
ges
or p
robl
ems.
AMM 2016 Campus Facilities Master Plan Section 8 - 91
%
6,08
7,31
6$
21
914
9557
1 $
368
,283
$
5,6
01,5
48
$/Y
R M
AIN
TAIN
RA
TIN
G11
7485
$01.
9%12
1746
GO
OD
Sum
mar
y -
Bui
ldin
g N
o:0
3.1
- A
rts
& S
cien
ces
Cen
ter
(200
2 ad
diti
on)
Pri
ori
ty Is
sues
Dat
aC
RV
DM
BE
XC
ES
SFC
IR
ATI
NG
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
CR
V T
ota
ls
6087
316
2191
4$0
0.40
%G
OO
D
0-5
Yea
r C
umul
ativ
e D
ata
DM
BE
XC
ES
SFC
I
AMM 2016 Campus Facilities Master Plan Section 8 - 92
Summaryof
AllSystems/
Compo
nents
Build
ingNo.
04:Re
creatio
nCe
nter
CRV:
10,960
,800
$Im
med
.Va
lue
15
Value
610
Value
11+
Value
System
%$
%$
%$
%$
%$
Structure
0.18
1,97
2,94
4$
0.00
$0.05
98,647
$0.05
98,647
$0.90
1,77
5,65
0$
Roof
0.04
438,43
2$
0.00
$0.00
$0.00
$1.00
438,43
2$
Glazing
0.02
219,21
6$
0.00
$0.10
21,922
$0.15
32,882
$0.75
164,41
2$
Clad
ding
0.07
767,25
6$
0.00
$0.05
38,363
$0.05
38,363
$0.90
690,53
0$
HVAC
0.14
1,53
4,51
2$
0.00
$0.10
153,45
1$
0.10
153,45
1$
0.80
1,22
7,61
0$
Plum
bing
0.2
2,19
2,16
0$
0.08
175,37
3$
0.05
109,60
8$
0.05
109,60
8$
0.82
1,79
7,57
1$
Prim
ary/Second
ary
0.04
438,43
2$
0.00
$0.00
$0.05
21,922
$0.95
416,51
0$
Distrib
ution
0.04
438,43
2$
0.00
$0.00
$0.05
21,922
$0.95
416,51
0$
Lightin
g0.04
438,43
2$
0.00
$0.00
$0.05
21,922
$0.95
416,51
0$
Voice/Da
ta0.02
219,21
6$
0.00
$0.00
$0.05
10,961
$0.95
208,25
5$
Ceilings
0.03
328,82
4$
0.00
$0.00
$0.05
16,441
$0.95
312,38
3$
Walls
0.05
548,04
0$
0.00
$0.04
21,922
$0.05
27,402
$0.91
498,71
6$
Doors
0.03
328,82
4$
0.00
$0.07
23,018
$0.05
16,441
$0.88
289,36
5$
Floo
rs0.04
438,43
2$
0.00
$0.00
$0.05
21,922
$0.95
416,51
0$
Code
(fire,A
DA,etc.)
0.04
438,43
2$
0.00
$0.00
$0.05
21,922
$0.95
416,51
0$
Immed
.Site
0.02
219,21
6$
0.00
$0.00
$0.10
21,922
$0.90
197,29
4$
CRV
10,960
,800
$DM
B17
5,37
3$
466,93
0$
635,72
6$
9,68
2,77
1$
FCI
1.6%
DMB
642,30
3$
FCI
5.9%
AMM 2016 Campus Facilities Master Plan Section 8 - 93
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
18%
1,97
2,94
4$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Dra
inag
e pr
oble
m a
long
eas
t sid
e of
bui
ldin
g ca
usin
g si
nkho
le in
par
king
lot a
nd p
artia
l cra
ckin
g in
are
na fl
oor.
Cra
ckin
g ha
s be
en p
atch
ed in
floo
r.S
ever
al m
inor
cra
cks
in a
rena
mas
onry
wal
l. M
oist
ure
pene
trat
ion
thro
ugh
wal
l ret
aini
ng e
arth
on
east
sid
e of
are
na.
Som
e w
ater
thro
ugh
wal
l see
ping
into
wel
lnes
s ce
nter
occ
asio
nally
.
Lack
of c
ontr
ol jo
ints
in a
rena
wal
l are
like
ly c
ause
of c
rack
ing
at e
ast w
all.
Cra
ck in
floo
r (li
kely
due
to c
orne
r se
ttlem
ent)
ope
ning
aga
in, b
ut o
nly
slig
htly
.R
oof d
rain
at W
elln
ess
Cen
ter
redi
rect
ed in
to s
torm
dra
in to
res
olve
was
hout
pro
blem
.
Foun
datio
n dr
ain
syst
em re
plac
ed, w
all a
nd fl
oor c
rack
s re
paire
d, n
o ne
w p
robl
ems
(200
6).
***
TOP
PR
IOR
ITY:
Wat
er in
filtra
tion
at b
ase
of g
ym w
all c
ontin
uing
. Rec
ent r
emov
al o
f bas
e tri
m to
repl
ace
floor
sho
wed
that
wat
er w
as b
eing
hel
d ba
ck b
y tri
m. W
all i
s bo
win
g ve
rtica
lly a
nd
horiz
onta
lly, c
ausi
ng in
crea
sed
crac
king
. An
in-d
epth
stru
ctur
al in
vest
igat
ion
and
cam
era
insp
ectio
n of
foun
datio
n dr
ains
is re
com
men
ded.
Rec
ent g
ym fl
oor r
epla
cem
ent m
ay b
e co
mpr
omis
ed if
stru
ctur
al m
ovem
ent a
nd w
ater
infil
tratio
n co
ntin
ues.
Stru
ctur
al in
vest
igat
ion
of w
all b
owin
g pe
rform
ed. C
ondi
tion
repo
rted
to b
e st
abili
zed
and
will
be
mon
itore
d. W
ater
infil
tratio
n ha
s no
t bee
n an
issu
e si
nce
2010
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Str
uctu
re0
55
90
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Yea
r B
uilt:
197
5
Kiln
roo
m a
dditi
on: 1
994
Rem
odel
ed o
ne r
acqu
etba
ll co
urt t
o w
eigh
t roo
m (
2005
)E
xpan
ded
Wel
lnes
s C
ente
r (2
005)
Hum
an r
esou
rces
offi
ces
relo
cate
d, s
pace
s un
occu
pied
(20
08)
Art
pro
gram
s re
loca
ted
to n
ew A
rts
and
Sci
ence
s C
ente
r (2
010)
20%
Cla
ssro
om30
% N
atat
oriu
m
50%
Ath
letic
Mai
n C
ampu
s
AMM 2016 Campus Facilities Master Plan Section 8 - 94
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%4%
438,
432
$
2005
:
2008
:
2010
2013
2016
:N
o ch
ange
s re
porte
d.
Roo
f was
rep
lace
d w
ith s
ingl
e pl
y E
PD
M in
198
9, n
o re
port
ed p
robl
ems.
Som
e m
inor
leak
ing
at th
e ar
ena
roof
in p
ast,
but n
o re
cent
occ
urre
nces
.C
emen
t sha
ke m
ansa
rds
in g
ood
cond
ition
, due
for
repa
intin
g.
Mai
n ro
of in
goo
d sh
ape
- res
eale
d in
200
5. M
ansa
rds
repl
aced
with
met
al.
Und
ersi
zed
roof
dra
ins
and
stor
m d
rain
s ca
usin
g co
ntin
ued
park
ing
lot w
asho
ut a
nd o
ther
pro
blem
s.B
oile
r ro
om r
oof a
t end
of l
ife, d
ue fo
r im
med
iate
rep
lace
men
t.
***G
ym ro
of a
nd b
oile
r roo
m ro
of a
t end
of l
ife, d
ue fo
r rep
lace
men
t. TO
P P
RIO
RIT
Ypr
oble
ms
with
und
ersi
zed
drai
ns re
solv
ed -
no n
ew p
arki
ng lo
t was
hout
pro
blem
s (2
006)
.
(200
9) G
ym a
nd b
oile
r roo
m ro
of re
plac
ed. R
oof i
s in
spec
ted
annu
ally
.N
o re
porte
d pr
oble
ms.
Roo
f rep
lace
d w
ith fu
lly a
dher
ed E
PD
M m
embr
ane,
incl
udin
g ne
w in
sula
tion,
man
sard
fasc
ias
and
curb
ing
for r
oofto
p eq
uipm
ent.
CR
V o
f S
yste
m
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
% o
f sy
stem
to
bud
get
fo
r re
pai
r/re
pla
cem
ent
$Im
med
iate
1-5
yrs
6-10
yrs
11+
yrs
Roo
f0
00
100
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 95
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
2%21
9,21
6$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Orig
inal
and
min
imal
, onl
y at
wel
lnes
s ce
nter
and
art
cla
ssro
oms,
no
repo
rted
pro
blem
s.
No
repo
rted
pro
blem
s.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted
Gla
zing
010
1575
Sys
tem
/ C
om
po
nent
No
tes
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
AMM 2016 Campus Facilities Master Plan Section 8 - 96
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
14%
1,53
4,51
2$
2005
:
2008
:
Boi
ler
stac
k sh
owin
g co
rros
ion,
rus
ted
thou
gh a
t elb
ow, d
ue fo
r re
plac
emen
t.S
ingl
e bo
iler,
nat
ural
gas
fire
d - n
o m
ajor
rep
airs
, typ
ical
mai
nten
ance
- no
rep
orte
d pr
oble
ms.
AC
uni
t add
ed a
t Roo
m 4
04.
Sep
arat
e ro
of to
p un
its w
ith A
C fo
r cl
assr
oom
s &
offi
ces,
HR
offi
ces
and
wel
lnes
s ce
nter
.Fi
n tu
be r
adia
tors
- no
rep
orte
d pr
oble
ms
AH
Us
- wor
king
but
som
e pr
evio
us fa
ilure
s.P
ool h
umid
ity c
ontr
ol e
xhau
st fa
n sy
stem
orig
inal
, req
uire
s ro
utin
e m
aint
enan
ce.
Pne
umat
ic c
ontr
ols
- Sw
itche
s ne
ed to
be
eval
uate
d. M
ain
cont
rol b
oard
s ob
sole
te, u
nrel
iabl
e an
d at
end
of l
ife, n
ot m
aint
aine
d si
nce
2002
. Sys
tem
due
for
repl
acem
ent.
Sep
arat
e co
ntro
ls in
404
, 425
& 4
26, n
o re
port
ed p
robl
ems.
11+
yrs
6-10
yrs
1-5
yrs
Imm
edia
te%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t
Are
na, p
ool a
nd r
acke
t bal
l cou
rts
are
not a
ir-co
nditi
oned
.N
ew e
quip
men
t at W
elln
ess
cent
er, n
ew r
oofto
p un
its a
t roo
ms
425,
426
.
Sys
tem
/ C
om
po
nent
No
tes
Boi
lers
che
cked
dai
ly a
nd in
spec
ted
twic
e an
nual
ly.
Boi
ler t
uned
up,
som
e co
ntin
ued
tripp
ing
prob
lem
s (2
006)
Boi
ler s
tack
repa
ired
(200
6)B
oile
r exh
aust
fan
mot
or a
t end
of l
ife, d
ue fo
r rep
lace
men
t.O
ffice
AC
RTU
ove
rsiz
ed, o
ne c
ompr
esso
r rem
oved
to im
prov
e ef
ficie
ncy.
No
repo
rted
prob
lem
s..
AH
Us
wor
king
. No
repo
rted
prob
lem
s.P
ool e
xhau
st fa
n m
otor
s an
d co
ntro
ls re
plac
ed, a
ir qu
ality
impr
oved
. Mot
ors
may
con
tinue
to h
ave
high
er th
an n
orm
al fa
ilure
rate
due
to c
hlor
ine
caus
ing
mot
or d
eter
iora
tion.
Pne
umat
ic c
ontro
l sys
tem
repa
ired
and
upgr
aded
, now
func
tions
pro
perly
, No
repo
rted
prob
lem
s.
Sys
tem
CR
V o
f S
yste
m
HV
AC
$
8010
100
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 97
2010
:
2013
:
2016
:A
ir-ha
ndle
rs a
nd c
ontro
ls s
houl
d be
upg
rade
d to
DD
C c
ontro
ls.
(Pne
umat
ic c
ontro
ls c
urre
ntly
mix
ed w
ith d
igita
l con
trols
).
Air-
cond
ition
ing
curr
ently
exi
sts
in la
w e
nfor
cem
ent c
lass
room
s, a
nd in
wel
lnes
s ce
nter
. R
emai
nder
of b
uild
ing
is n
ot c
ondi
tione
d.
HVA
C s
yste
m re
plac
emen
t wor
k un
derw
ay d
urin
g as
sess
men
t ($1
90,0
00).
Boi
lers
repl
aced
with
(4) L
ochi
nvar
Kni
ght s
tage
d bo
ilers
with
hea
t exc
hang
es fo
r hea
ting
pool
and
whi
rlpoo
l wat
er (2
010)
.(2
) new
boi
lers
inst
alle
d fo
r dom
estic
hot
wat
er s
uppl
y.
Pne
umat
ic c
ontro
l sys
tem
repl
aced
with
DD
C c
ontro
ls. S
ome
seco
ndar
y pn
eum
atic
s re
tain
ed.
AH
Us
in w
orki
ng c
ondi
tion,
wel
l mai
ntai
ned,
not
repl
aced
.P
ool h
umid
ity c
ontro
l exh
aust
fan
syst
em o
rigin
al, r
equi
res
rout
ine
mai
nten
ance
.
Poo
l exh
aust
fans
repl
aced
.A
HU
sch
edul
ed fo
r rep
lace
men
t with
in 5
yea
rs a
s pa
rt of
pla
nned
air
cond
ition
ing
inst
alla
tion
for g
ym.
Sys
tem
/ C
om
po
nent
No
tes
(co
ntin
ued
)
AMM 2016 Campus Facilities Master Plan Section 8 - 98
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
7%76
7,25
6$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
No
chan
ges
repo
rted.
Boi
ler r
oom
lint
el re
plac
ed.
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted.
Bric
k. S
ome
min
or d
amag
e by
veh
icle
s on
eas
t sid
e of
bui
ldin
g.Li
ntel
at d
oor
open
ing
into
boi
ler
room
is r
ustin
g.
No
chan
ges
to c
ondi
tions
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cla
ddin
g0
55
90
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 99
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
20%
2,19
2,16
0$
2005
:
2008
:
2010
:
Dra
in p
ipin
g in
poo
r co
nditi
on, s
ome
corr
oded
and
spl
it, e
xten
t unk
now
n as
som
e pi
pes
are
burie
d an
d di
fficu
lt to
acc
ess.
Dra
in p
ipin
g in
poo
l mec
hani
cal r
oom
are
away
bac
ks u
p 2-
3 fe
et, s
ome
sect
ions
hav
e fa
iled
in th
e pa
st.
Leve
l one
toile
t roo
ms
fixtu
res
at e
nd o
f life
, due
for
repl
acem
ent.
Res
iden
tial g
rade
sho
wer
fixt
ures
inst
alle
d in
200
2 ar
e fa
iling
, val
ves
not w
ithst
andi
ng a
buse
.To
ilet r
oom
sin
ks n
eed
new
fixt
ures
.W
hirlp
ool s
and
filte
rs u
pgra
ded.
Whi
rlpoo
l dra
ins
are
faili
ng a
nd d
ue fo
r re
plac
emen
t. W
ork
will
req
uire
rem
oval
of w
hirlp
ool t
o ac
cess
pip
ing.
Poo
l pip
ing:
Filt
er s
yste
m s
witc
hed
to c
artr
idge
filte
r. S
ome
valv
es r
epla
ced
with
pla
stic
and
sta
inle
ss s
teel
uni
ts. O
lder
val
ves
due
for
repl
acem
ent s
oon.
Sho
wer
fixt
ures
in m
en a
nd w
omen
’s lo
cker
roo
ms
in n
eed
of r
epla
cem
ent;
eith
er in
poo
r co
nditi
on o
r do
not
mee
t AD
A c
ompl
ianc
e.P
ool p
lum
bing
is in
goo
d co
nditi
on. F
ilter
tank
upg
rade
d in
199
3, p
lan
to s
witc
h fro
m c
artr
idge
sys
tem
to s
and
filtr
atio
n w
hen
cam
pus
conn
ecte
d to
sew
er s
yste
m. S
ome
cast
iron
pi
ping
may
nee
d re
plac
emen
t in
a fe
w y
ears
due
to d
eter
iora
tion.
Toile
t par
titio
ns r
epla
ced
thro
ugho
ut b
uild
ing
- exc
ept l
ocke
r ro
oms.
New
bal
last
tank
and
wel
l add
ed to
incr
ease
wat
er v
olum
e an
d re
duce
ove
rall
pres
sure
and
pre
ssur
e flu
ctua
tions
.W
ater
sof
tene
r add
ed to
reso
lve
valv
e an
d fix
ture
det
erio
ratio
n (2
005)
.W
hirlp
ool d
rain
s re
paire
d w
here
pos
sibl
e.W
hirlp
ool f
iller
pip
ing
begi
nnin
g to
leak
.W
hirlp
ool d
ue fo
r rep
lace
men
t. In
acce
ssib
le d
eter
iora
ted
pipi
ng w
ill b
e re
plac
ed a
t sam
e tim
e.O
lder
poo
l val
ves
repl
aced
as
requ
ired.
Sho
wer
val
ves
repa
ired
as re
quire
d. N
o re
porte
d pr
oble
ms.
Whi
rlpoo
l rep
lace
d. A
ssoc
iate
d dr
ains
, dra
in p
ipin
g an
d fil
ler p
ipin
g re
plac
ed(2
009)
.C
ast i
ron
pipi
ng u
nder
toile
t roo
m fl
oors
sus
pect
ed o
f sig
nific
ant d
eter
iora
tion.
Due
for r
epla
cem
ent.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Plu
mbi
ng8
55
82
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 100
2013
:
2016
:Lo
cker
Roo
m re
nova
tion
in 2
014
Cur
rent
ly a
ddin
g va
lves
and
rem
odel
ing
pum
ps fo
r the
poo
l.
Futu
re p
roje
ct w
ill re
plac
e po
ol ti
le a
nd p
ipin
g fro
m th
e po
ol in
to th
e ba
sem
ent.
Sys
tem
/ C
om
po
nent
No
tes
(co
ntin
ued
)
No
chan
ges
repo
rted
AMM 2016 Campus Facilities Master Plan Section 8 - 101
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
4%43
8,43
2$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Prim
ary
from
on-
site
sub
stat
ion.
Pow
er to
bui
ldin
gs th
roug
h ne
w c
ampu
s-w
ide
loop
sys
tem
, ste
pped
dow
n at
bui
ldin
g. N
o re
port
ed p
robl
ems.
Line
s to
bui
ldin
g up
grad
ed w
hen
new
sew
er li
nes
inst
alle
d 2
year
s ag
o. N
o re
port
ed p
robl
ems.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
Tran
sfor
mer
s te
sted
in 2
012,
upd
ated
and
repa
ired
as re
quire
d. N
o re
porte
d pr
oble
ms.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Prim
ary
/ Sec
onda
ry0
05
95
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 102
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
4%43
8,43
2$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
At c
apac
ity w
ithin
bui
ldin
g, n
o fu
ture
circ
uits
ava
ilabl
e.
Sho
rtag
e of
circ
uits
res
olve
d by
elim
inat
ing
unne
eded
circ
uits
, few
er r
equi
red.
No
chan
ges
repo
rted.
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Dis
trib
utio
n0
05
95
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 103
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
4%43
8,43
2$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d. C
onve
rting
to L
ED
ligh
t fix
ture
s as
cha
nges
are
mad
e.
Cor
ridor
ligh
ting
on lo
wer
leve
l pla
nned
for r
epla
cem
ent (
$3,0
00).
Gym
and
poo
l lig
htin
g re
plac
ed w
ith T
8 flu
ores
cent
fixt
ures
(201
0).
Low
er le
vel c
orrid
or li
ghtin
g re
plac
ed w
ith T
8 flu
ores
cent
fixt
ures
(200
9).
New
fixt
ures
in 4
02, 4
03, 4
06, 4
25, 4
26. O
rigin
al c
orrid
or fl
uore
scen
t fix
ture
s ob
sole
te, l
ense
s no
t ava
ilabl
e. O
rigin
al a
rena
fluo
resc
ent f
ixtu
res
requ
ire c
onst
ant l
amp
repl
acem
ent.
Upp
er le
vel c
orrid
or fi
xtur
es r
epla
ced
in 2
002.
Bal
last
s re
plac
ed a
nd la
mps
cha
nged
to T
8 as
nec
essa
ry.
Are
na fi
xtur
es r
epla
ced,
no
repo
rted
pro
blem
s.
No
chan
ges
repo
rted
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Ligh
ting
00
595
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 104
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
2%21
9,21
6$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Wi-F
i add
ed to
all
build
ings
.
No
repo
rted
chan
ges
or p
robl
ems.
Cam
pus
phon
e sy
stem
bei
ng s
witc
hed
to V
OIP
sys
tem
.
Fibe
r to
eac
h bu
ildin
g (1
998)
.C
AT5
E/C
AT6
cab
ling
typi
cal.
Net
wor
k sw
itche
s on
4-y
ear
upgr
ade
cycl
e.N
o re
port
ed p
robl
ems.
Min
imal
, upd
ated
in 1
996-
97 fo
r of
fices
and
cla
ssro
oms,
no
repo
rted
pro
blem
s.
Voi
ce/D
ata
00
595
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 105
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
3%32
8,82
4$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
New
spr
ay-o
n ce
iling
fini
sh in
poo
l, w
elln
ess
cent
er a
nd r
oom
s 42
5, 4
26. A
ll ot
her
room
s ar
e or
igin
al, n
o re
port
ed p
robl
ems.
Spr
ayed
on
acou
stic
cei
ling
finis
h at
poo
l and
Wel
lnes
s C
ente
r sh
owin
g ye
llow
/ora
nge
disc
olor
atio
n. C
ause
unk
now
n an
d m
ay r
equi
re r
epla
cem
ent o
f cei
lings
if it
wor
sens
. If o
nly
clea
ning
req
uire
d, th
e ce
iling
text
ure
will
mak
e cl
eani
ng e
xtre
mel
y di
fficu
lt.
Gym
cei
ling
repa
inte
d (2
005)
.C
eilin
g di
scol
orat
ion
appe
ars
to h
ave
stop
ped
once
ven
tilat
ion
impr
oved
.C
ause
for d
isco
lora
tion
shou
ld b
e in
vest
igat
ed.
No
chan
ges.
Poo
l cei
ling
disc
olor
atio
n ha
s st
oppe
d, b
ut c
ontra
ctor
won
't su
ppor
t cos
t of r
epla
cem
ent o
r rem
oval
.
Poo
l cei
ling
plan
ned
for r
epla
cem
ent a
fter r
oof r
epla
cem
ent.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cei
lings
00
595
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 106
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
5%54
8,04
0$
2005
:
2008
:
2010
:
2013
:
2016
:A
dditi
onal
aco
ustic
trea
tmen
t nee
ded
in a
rena
.
Blo
ck th
roug
hout
, som
e gy
p bo
ard
wal
ls in
ren
ovat
ed c
lass
room
are
as. B
lock
wal
l in
aren
a sh
owin
g m
inor
cra
ckin
g at
col
umn
loca
tions
.
Are
na r
epai
nted
in 2
004,
wel
lnes
s ce
nter
par
tially
rep
aint
ed in
200
5. L
ocke
r ro
oms
due
for
repa
int.
Insi
de fa
ce o
f Are
na e
xter
ior
wal
ls s
how
ing
cont
inue
d cr
acki
ng.
Insi
de fa
ce o
f Are
na e
xter
ior w
alls
repa
ired
afte
r set
tlem
ent p
robl
em re
solv
ed.
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted.
Som
e ac
oust
ical
pan
els
adde
d in
201
3.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Wal
ls0
45
91
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 107
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
3%32
8,82
4$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Ext
erio
r –
Orig
inal
hol
low
met
al/g
lass
doo
rs, h
inge
s an
d ha
rdw
are
faili
ng, s
ome
show
poo
r fit
a th
resh
old.
Inte
rior
- Doo
rs in
poo
l are
a ar
e co
rrod
ed/ r
ustin
g ou
t, fla
king
pai
nt
Ext
erio
r: H
ollo
w m
etal
doo
rs a
t ent
ries
and
aren
a ru
stin
g, h
ardw
are
is a
t end
of l
ife, d
ue fo
r re
plac
emen
t.In
terio
r: P
last
ic la
min
ate
door
dam
age
typi
cal.
Doo
rs d
ue fo
r re
finis
hing
.A
rena
inte
rior
hollo
w m
etal
doo
rs n
earin
g en
d of
life
. Har
dwar
e is
faili
ng,
repa
irs a
re c
onsi
dere
d te
mpo
rary
. Har
dwar
e du
e fo
r re
plac
emen
t.
Ext
erio
r: A
ll ex
terio
r doo
rs e
xcep
t one
HM
exi
t doo
r rep
lace
d (2
007)
Inte
rior:
Doo
rs fr
om p
ool t
o co
rrid
or re
plac
ed (2
007)
Bal
ance
of i
nter
ior p
last
ic la
min
ate
door
s st
ill s
how
ing
dam
age
and
hard
war
e pr
oble
ms.
Boi
ler r
oom
doo
r and
fram
e re
plac
ed. N
o ot
her c
hang
es re
porte
d.
No
chan
ges
repo
rted
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Doo
rs0
75
88
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 108
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
4%43
8,43
2$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
New
car
pet i
n co
rrid
ors
and
offic
es. N
ew fl
oorin
g in
roo
ms
425,
426
. New
rub
ber
floor
in lo
wer
leve
l cor
ridor
s. N
ew q
uarr
y til
e in
upp
er le
vel c
orrid
ors.
New
sho
ck-a
bsor
bing
floo
r in
Wel
lnes
s C
ente
r. S
ynth
etic
gym
nasi
um fl
oor
is o
rigin
al a
nd s
how
ing
age.
Rep
lace
men
t is
bein
g co
nsid
ered
but
not
pre
sent
ly fu
nded
.
New
car
pet n
eede
d in
427
.R
ubbe
r til
e in
leve
l one
cor
ridor
s - a
dhes
ive
faili
ng d
ue to
moi
stur
e le
vels
in c
oncr
ete
slab
ben
eath
.N
ew c
arpe
t in
HR
offi
ce a
rea.
Gym
floo
r re
finis
hed
but n
ot r
epla
ced.
Cra
ckin
g/te
arin
g of
rub
ber
show
ing
agai
n ne
ar c
orne
r se
ttlem
ent a
rea.
Cer
amic
tile
in lo
cker
roo
ms
repa
ired
in 2
005.
Cer
amic
tile
in lo
cker
roo
ms
and
pool
are
a re
paire
d an
nual
ly a
s pa
rt o
f mai
nten
ance
pro
gram
.
Car
pet i
n ro
om 2
47 re
plac
ed (2
007)
.Fa
iling
rubb
er ti
le in
leve
l one
cor
ridor
s re
plac
ed w
ith q
uarr
y til
e (2
006)
.G
ym fl
oor c
rack
ing
stab
ilize
d.
Gym
floo
r rep
lace
d w
ith n
ew ru
bber
floo
r (20
09, $
87,6
00).
Wat
er in
filtra
tion
alon
g w
all n
ot fu
lly re
solv
ed a
nd m
ay d
amag
e ne
w fl
oor.
Wat
er in
filtra
tion
has
not r
etur
ned.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Floo
rs0
05
95
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 109
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
4%43
8,43
2$
2005
:
2008
:
2010
:
2013
:
2016
:E
leva
tor r
efur
bish
ed in
201
6.
Fire
ala
rm s
yste
m u
pgra
ded
in to
ilets
, wel
lnes
s ce
nter
and
lock
ers
room
s, b
alan
ce o
f sys
tem
orig
inal
. Pul
l sta
tions
wer
e id
entif
ied
as n
eedi
ng to
be
upgr
aded
. AD
A to
ilet r
oom
ad
ded
in 1
998.
Loc
ker
and
show
er r
oom
s do
not
com
ply
with
AD
A.
Ele
vato
r se
als
wer
e no
ted
as p
ossi
bly
leak
ing.
Ele
vato
rs o
n se
rvic
e co
ntra
ct.
Ele
vato
r on
ser
vice
con
trac
t with
Otis
. Ele
vato
r un
relia
ble,
sea
ls le
akin
g an
d pa
rts
diffi
cult
to o
btai
n. E
leva
tor
due
for
repl
acem
ent.
Sho
wer
Roo
m &
lock
ers
upgr
aded
to A
DA
.Le
ver
hard
war
e on
new
er d
oors
, kno
b ha
rdw
are
on o
lder
doo
rs.
Fire
ala
rm p
ull s
tatio
ns u
pgra
ded
in 2
002.
Fire
ala
rm s
yste
m re
paire
d by
Sim
plex
. One
duc
t det
ecto
r stil
l pro
blem
atic
.E
leva
tor m
aint
enan
ce a
nd o
pera
tion
impr
oved
.
No
repo
rted
chan
ges
or p
robl
ems.
Som
e A
DA
upg
rade
s m
ade
in w
omen
's lo
cker
room
. Fur
ther
upg
rade
s pl
anne
d in
futu
re.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cod
e (f
ire,A
DA
, etc
.)0
05
95
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 110
Cam
pus
:N
ote
s:A
rea:
47,7
10sf
Flo
ors
:2
Use
Typ
es:
%
2%21
9,21
6$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Upp
er a
nd lo
wer
par
king
lots
sch
edul
ed fo
r rep
lace
men
t.
Wes
t sid
e ro
ad is
in n
eed
of r
epla
cem
ent,
num
erou
s lo
catio
ns o
f hea
ving
and
cra
ckin
g. S
inkh
ole
in p
avem
ent a
s no
ted
unde
r st
ruct
ure
note
s.N
orth
end
exi
t con
cret
e pa
d is
cra
ckin
g.
Sin
khol
es r
epai
red,
som
e dr
aina
ge p
robl
ems
cont
inue
.R
oad
repa
ved.
Ext
erio
r lig
htin
g up
grad
ed, f
unct
ioni
ng N
orth
exi
t con
cret
e pa
d re
mai
ns c
rack
ed
Par
king
lot s
inkh
ole
prob
lem
reso
lved
with
dra
in li
ne re
pairs
(200
6). P
arki
ng lo
t rep
aire
d.N
orth
exi
t con
cret
e pa
d re
plac
ed w
ith e
lect
ric h
eate
d si
dew
alk
(200
6).
No
repo
rted
chan
ges
or p
robl
ems.
Sig
nific
ant s
ite w
ork
may
be
requ
ired
to re
solv
e w
ater
infil
tratio
n an
d w
all m
ovem
ent i
ssue
s.
Site
wor
k de
term
ined
to b
e un
nece
ssar
y as
wat
er in
filtra
tion
issu
e ap
pear
s re
solv
ed.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Imm
ed. S
ite/E
xt L
tg0
010
90
Bui
ldin
g N
o: 0
4 -
Rec
reat
ion
Cen
ter
Mai
n C
ampu
sK
iln r
oom
add
ition
: 199
4R
emod
eled
one
rac
quet
ball
cour
t to
wei
ght r
oom
(20
05)
Exp
ande
d W
elln
ess
Cen
ter
(200
5)H
uman
res
ourc
es o
ffice
s re
loca
ted,
spa
ces
unoc
cupi
ed (
2008
)A
rt p
rogr
ams
relo
cate
d to
new
Art
s an
d S
cien
ces
Cen
ter
(201
0)
Yea
r B
uilt:
197
520
% C
lass
room
30%
Nat
ator
ium
50%
Ath
letic
AMM 2016 Campus Facilities Master Plan Section 8 - 111
%
10,9
60,8
00$
4669
30 $
635
,726
$
9,6
82,7
71
1096
0800
1753
73$0
1.60
%G
OO
D
0-5
Yea
r C
umul
ativ
e D
ata
DM
BE
XC
ES
SFC
I$/
YR
MA
INTA
INR
ATI
NG
6423
03
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te
CR
V T
ota
ls17
5373
1-5
yrs
6-10
yrs
11+
yrs
9426
35.
9%21
9216
FAIR
Sum
mar
y -
Bui
ldin
g N
o:0
4 -
Rec
reat
ion
Cen
ter
Pri
ori
ty Is
sues
Dat
aC
RV
DM
BE
XC
ES
SFC
IR
ATI
NG
Sys
tem
AMM 2016 Campus Facilities Master Plan Section 8 - 112
Summaryof
AllSystems/
Compo
nents
Build
ingNo.
05:IceAren
a
CRV:
5,06
8,600
$Im
med
.Va
lue
15
Value
610
Value
11+
Value
System
%$
%$
%$
%$
%$
Structure
0.2
1,01
3,720
$0.00
$0.00
$0.05
50,686
$0.95
963,034
$
Roof
0.05
253,430
$0.00
$0.05
12,672
$0.05
12,672
$0.90
228,08
7$
Glazing
0.01
50,686
$0.00
$0.00
$0.05
2,53
4$
0.95
48,152
$
Clad
ding
0.06
304,116
$0.00
$0.05
15,206
$0.05
15,206
$0.90
273,704
$
HVAC
0.13
658,91
8$
0.00
$0.10
65,892
$0.10
65,892
$0.80
527,134
$
Plum
bin g
0.04
202,744
$0.00
$0.02
4,05
5$
0.05
10,137
$0.93
188,55
2$
Prim
ary/Second
ary
0.04
202,744
$0.00
$0.00
$0.05
10,137
$0.95
192,60
7$
Distrib
ution
0.04
202,744
$0.00
$0.00
$0.05
10,137
$0.95
192,60
7$
Lightin
g0.04
202,744
$0.00
$0.00
$0.05
10,137
$0.95
192,60
7$
Voice/Da
ta0.01
50,686
$0.00
$0.00
$0.00
$1.00
50,686
$
Ceilings
0.02
101,37
2$
0.00
$0.02
2,02
7$
0.05
5,06
9$
0.93
94,276
$
Walls
0.04
202,744
$0.00
$0.03
6,08
2$
0.05
10,137
$0.92
186,524
$
Doors
0.01
50,686
$0.00
$0.02
1,01
4$
0.05
2,53
4$
0.93
47,138
$
Floo
rs0.03
152,05
8$
0.00
$0.05
7,60
3$
0.05
7,60
3$
0.90
136,85
2$
Code
(fire,A
DA,etc.)
0.02
101,37
2$
0.00
$0.00
$0.05
5,06
9$
0.95
96,303
$
Immed
.Site
0.03
152,05
8$
0.00
$0.00
$0.05
7,60
3$
0.95
144,45
5$
SpecialCon
struction
0.23
1,16
5,778
$0.00
$0.15
174,86
7$
0.10
116,57
8$
0.75
874,334
$
CRV
5,06
8,600
$DM
B$
289,41
7$
342,13
1$
4,43
7,05
2$
FCI
0.0%
DMB
289,41
7$
FCI
5.7%
AMM 2016 Campus Facilities Master Plan Section 8 - 113
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
20%
1,01
3,72
0$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Yea
r B
uilt:
200
2
Faci
lity
is o
wne
d by
Mas
on C
ount
y an
d op
erat
ed b
y th
e C
olle
ge o
n a
50 y
ear
leas
e/pu
rcha
se a
gree
men
t.
100%
Ath
letic
Mai
n C
ampu
s
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Str
uctu
re0
05
95
No
base
men
t - s
lab
on g
rade
. Pre
-eng
inee
red
stee
l tru
ss. N
o w
ater
infil
trat
ion
note
d.no
rep
orte
d pr
oble
ms
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 114
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%5%
253,
430
$
2005
:
2008
:
2010
2013
2016
:N
o ch
ange
s re
porte
d.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
CR
V o
f S
yste
m
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
% o
f sy
stem
to
bud
get
fo
r re
pai
r/re
pla
cem
ent
$Im
med
iate
1-5
yrs
6-10
yrs
11+
yrs
Roo
f0
55
90
Slo
ped
roof
ove
r ar
ena
(mat
eria
l not
con
firm
ed -
may
be
EP
DM
), E
PD
M fl
at r
oof o
ver
bala
nce
of b
uild
ing.
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted.
OS
B w
ood
stru
ctur
al d
eck
(fast
ened
to m
etal
pur
lins)
is s
how
ing
sign
ifica
nt s
igns
of m
old
grow
th n
ear t
he w
est e
nd o
f the
bui
ldin
g. D
amag
ed s
ectio
ns w
ill li
kely
requ
ire re
plac
emen
t due
to
long
term
exp
osur
e to
moi
stur
e. B
alan
ce o
f roo
f dec
k w
ill re
quire
an
up-c
lose
insp
ectio
n no
t pos
sibl
e du
ring
this
ass
essm
ent.
Insp
ectio
n of
roof
dec
k re
porte
d th
at in
tegr
ity o
f dec
k is
goo
d. M
old
clea
ned
- see
HVA
C s
ectio
n fo
r pre
vent
ativ
e m
easu
res
take
n to
reso
lve
issu
e.
AMM 2016 Campus Facilities Master Plan Section 8 - 115
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
1%50
,686
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Sys
tem
/ C
om
po
nent
No
tes
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Gla
zing
00
595
Min
imal
, no
repo
rted
pro
blem
s.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 116
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
13%
658,
918
$
2005
:
2008
:
2010
:
2013
:
2016
:Im
prov
ed a
ir su
pply
and
retu
rn d
uct s
yste
m c
ompl
eted
.
0
HW
boi
ler.
VA
V s
yste
m.
DD
C C
ontr
ols.
(2)
roof
top
units
with
AC
for
lock
er r
oom
s, (
1) w
ith A
C fo
r of
fice
area
.D
esic
cant
whe
el d
ehum
idifi
catio
n sy
stem
(no
AC
) an
d ra
dian
t hea
t for
are
na.
11+
yrs
6-10
yrs
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
1-5
yrs
Imm
edia
te%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t
Sys
tem
/ C
om
po
nent
No
tes
Boi
lers
che
cked
dai
ly a
nd in
spec
ted
twic
e an
nual
ly.
Lock
er ro
om A
HU
leak
ing
cond
ensa
te in
to b
uild
ing.
Com
pres
sor #
1 tri
pped
rela
y re
peat
ed in
pas
t - n
ot c
urre
ntly
a p
robl
em.
***
Des
icca
nt w
heel
deh
umid
ifica
tion
syst
em lo
sing
effi
cien
cy, a
t end
of l
ife, d
ue fo
r rep
lace
men
t. TO
P P
RIO
RIT
Y
Sys
tem
CR
V o
f S
yste
m
HV
AC
Pas
t hum
idity
and
con
dens
atio
n is
sues
hav
e ca
used
sig
nific
ant m
old
grow
th o
n un
ders
ide
of O
SB
woo
d ro
of d
eck
at w
est e
nd o
f are
na.
***D
ehum
idifi
catio
n sy
stem
may
not
be
func
tioni
ng, d
ue fo
r sig
nific
ant r
epai
r or r
epla
cem
ent.
Indo
or A
ir Q
ualit
y co
nsul
tant
has
insp
ecte
d th
e bu
ildin
g; c
olle
ge h
as re
port.
Moi
stur
e an
d m
old
issu
e ab
ove
lock
er ro
om a
rea
likel
y du
e to
poo
r air
circ
ulat
ion
caus
ed b
y pl
acem
ent a
nd d
esig
n of
air
supp
ly a
nd re
turn
duc
ts.
Hig
h hu
mid
ity a
nd n
on-m
ovin
g ai
r abo
ve lo
cker
room
s ca
used
con
dens
atio
n of
wat
er o
n ro
of d
eck.
Inst
alla
tion
of c
omm
erci
al c
eilin
g fa
ns to
mov
e ai
r app
ears
to b
e w
orki
ng to
redu
ce
hum
idity
and
hea
t at c
eilin
g. S
ituat
ion
bein
g m
onito
red.
Long
term
sol
utio
n sh
ould
con
side
r eng
inee
ring
and
inst
alla
tion
of a
n im
prov
ed a
ir su
pply
and
retu
rn d
uct s
yste
m to
mor
e ev
enly
dis
tribu
te a
ir an
d pl
ace
retu
rn d
ucts
clo
ser t
o en
d o
f rin
k.
$
8010
10
AMM 2016 Campus Facilities Master Plan Section 8 - 117
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
6%30
4,11
6$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cla
ddin
g0
55
90
Dec
orat
ive
bloc
k th
roug
hout
, with
pre
finis
hed
met
al s
idin
g ab
ove
(are
na o
nly)
.E
IFS
col
umn
cove
rs a
t mai
n en
try
dam
aged
from
abu
se a
nd w
ater
run
off f
rom
ove
rhan
g. S
ome
mild
ew s
tain
s.P
aint
faili
ng o
n un
ders
ide
of r
oof d
eck
at m
ain
entr
y ov
erha
ng.
Sof
fit a
t edg
e of
ent
ry c
anop
y - o
rigin
ally
gyp
sum
, rep
lace
d w
ith re
info
rced
fibe
rgla
ss p
anel
s. P
anel
s ar
e w
arpi
ng a
nd p
oppi
ng lo
ose
from
rive
ts.
Und
ersi
de o
f roo
f dec
k re
pain
ted
(200
7).
EIF
S c
olum
n co
vers
dam
aged
.
Fibe
rgla
ss e
ntry
can
opy
soffi
t pan
els
repl
aced
with
alu
min
um s
idin
g (2
009)
.E
IFS
col
umn
cove
rs re
clad
with
con
cret
e bl
ock
(200
9).
Met
al p
anel
cla
ddin
g at
rear
of b
uild
ing
dent
ed fo
r app
roxi
mat
ely
20 fe
et.
Cau
se u
nkno
wn,
but
falli
ng s
heet
s of
ice
from
the
roof
are
sus
pect
ed.
No
chan
ges
repo
rted
AMM 2016 Campus Facilities Master Plan Section 8 - 118
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
4%20
2,74
4$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Plu
mbi
ng0
25
93
Floo
r dr
ains
at r
ink
end
need
to b
e ke
pt c
lear
of d
ebris
, cle
aned
reg
ular
ly.
New
bal
last
tank
and
wel
l add
ed to
incr
ease
wat
er v
olum
e an
d re
duce
ove
rall
pres
sure
and
pre
ssur
e flu
ctua
tions
.
No
repo
rted
chan
ges.
No
repo
rted
chan
ges.
AMM 2016 Campus Facilities Master Plan Section 8 - 119
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
4%20
2,74
4$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Prim
ary
/ Sec
onda
ry0
05
95
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
Tran
sfor
mer
s te
sted
in 2
012,
upd
ated
and
repa
ired
as re
quire
d. N
o re
porte
d pr
oble
ms.
AMM 2016 Campus Facilities Master Plan Section 8 - 120
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
4%20
2,74
4$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Dis
trib
utio
n0
05
95
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 121
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
4%20
2,74
4$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Ligh
ting
00
595
No
chan
ges
repo
rted.
Are
na li
ghtin
g bu
dget
ed fo
r rep
lace
men
t in
2010
.
Fluo
resc
ent 2
x2, o
pen
grid
are
as. S
ome
repl
aced
in lo
cker
roo
ms.
Mer
cury
vap
or in
are
na.
No
repo
rted
pro
blem
s.
Are
na li
ghtin
g re
plac
ed w
ith fl
uore
scen
t fix
ture
s. P
erfo
rman
ce a
nd q
ualit
y of
ligh
ting
impr
oved
.
AMM 2016 Campus Facilities Master Plan Section 8 - 122
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
1%50
,686
$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Voi
ce/D
ata
00
010
0
Wi-F
i add
ed to
all
build
ings
.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
Fibe
r to
eac
h bu
ildin
g (1
998)
.C
AT5
E/C
AT6
cab
ling
typi
cal.
Net
wor
k sw
itche
s on
4-y
ear
upgr
ade
cycl
e.N
o re
port
ed p
robl
ems.
AMM 2016 Campus Facilities Master Plan Section 8 - 123
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
2%10
1,37
2$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cei
lings
02
593
2x2
in o
ffice
s, o
pen
grid
2x2
in p
ro s
hop,
cor
ridor
s an
d lo
cker
roo
ms.
Ope
n to
dec
k in
are
na.
No
repo
rted
pro
blem
s
2x2
lay
in ti
les
plac
ed in
ope
n gr
id in
cor
ridor
to re
duce
hea
t los
s.
No
repo
rted
chan
ges.
Issu
es w
ith u
nder
side
of r
oof d
eck
acco
unte
d fo
r in
stru
ctur
al n
otes
.
No
chan
ges
repo
rted
AMM 2016 Campus Facilities Master Plan Section 8 - 124
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
4%20
2,74
4$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Wal
ls0
35
92
Pai
nted
blo
ck ty
pica
l, ex
pose
d w
rapp
ed in
sula
tion
in a
rena
.S
ome
Zam
boni
dam
age
at e
nd o
f rin
k.
Zam
boni
dam
age
repa
ired
(200
7).
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 125
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
1%50
,686
$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Doo
rs0
25
93
Ext
erio
r: H
ollo
w m
etal
, Alu
min
um fr
ame
at b
uild
ing
entr
y an
d rin
k en
try.
No
repo
rted
pro
blem
s.In
terio
r: H
ollo
w m
etal
, No
repo
rted
pro
blem
s..
(2)
mot
oriz
ed o
verh
ead
door
s fo
r Za
mbo
ni -
som
e ty
pica
l Zam
boni
-rel
ated
dam
age,
den
ts.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 126
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
3%15
2,05
8$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Floo
rs0
55
90
Car
pet i
n of
fice
- shr
eddi
ng a
t sea
ms,
due
for
repl
acem
ent
Rub
ber
floor
ing
- nor
mal
wea
r &
tear
Ska
te r
enta
l are
a - V
CT
Ser
vice
and
sto
rage
- co
ncre
teC
once
ssio
n st
and
- Cer
amic
tile
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 127
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
2%10
1,37
2$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cod
e (f
ire,A
DA
, etc
.)0
05
95
Spr
inkl
edN
o re
port
ed p
robl
ems.
Spr
inkl
ers
in c
orrid
or n
eed
to b
e lo
wer
ed in
to s
uspe
nded
cei
ling
- cur
rent
ly a
bove
new
lay-
in c
eilin
g.
Spr
inkl
ers
shou
ld b
e re
loca
ted
(see
abo
ve)
Spr
inkl
ers
head
s re
loca
ted
to re
solv
e co
vera
ge is
sue.
AMM 2016 Campus Facilities Master Plan Section 8 - 128
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
3%15
2,05
8$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Imm
ed. S
ite/E
xt L
tg0
05
95
Site
ligh
ting
wor
king
- ju
st r
elam
ped
& c
lean
ed.
No
repo
rted
pro
blem
s.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 129
Cam
pus
:N
ote
s:A
rea:
34,6
00sf
Flo
ors
:1
Use
Typ
es:
%
23%
1,16
5,77
8$
2005
:
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
5 Ic
e A
rena
Mai
n C
ampu
sFa
cilit
y is
ow
ned
by M
ason
Cou
nty
and
oper
ated
by
the
Col
lege
on
a 50
ye
ar le
ase/
purc
hase
agr
eem
ent.
Yea
r B
uilt:
200
210
0% A
thle
tic
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Spe
cial
Con
stru
ctio
n0
1510
75
Sys
tem
/ C
om
po
nent
No
tes
Incl
udes
rin
k re
frige
ratio
n sy
stem
, das
her
boar
ds, b
leac
hers
.(2
) rin
k re
frige
ratio
n co
mpr
esso
rs, r
un a
lmos
t con
tinuo
usly
to m
aint
ain
rink.
No
repo
rted
pro
blem
s.
Ref
riger
atio
n sy
stem
com
pres
sors
- to
p en
ds re
built
- ap
prox
. $3,
000
(200
6).
Con
trol s
yste
m e
lect
rical
wor
k do
ne (2
006)
.N
ew c
ompr
esso
rs e
xpec
ted
to b
e ne
eded
by
2018
.
No
repo
rted
chan
ges.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 130
%
5,06
8,60
0$
$2
89,4
17
$342
,131
$4
,437
,052
$35,
987
5.7%
$101
,372
FAIR
Sum
mar
y -
Bui
ldin
g N
o:0
5 Ic
e A
rena
Pri
ori
ty Is
sues
Dat
aC
RV
DM
BE
XC
ES
SFC
IR
ATI
NG
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te
CR
V T
ota
ls-
$
1-5
yrs
6-10
yrs
11+
yrs
$5,0
68,6
000
$00.
00%
GO
OD
0-5
Yea
r C
umul
ativ
e D
ata
DM
BE
XC
ES
SFC
I$/
YR
MA
INTA
INR
ATI
NG
$289
,417
AMM 2016 Campus Facilities Master Plan Section 8 - 131
Summaryof
AllSystems/
Compo
nents
Build
ingNo.
06:Au
toRe
pairan
dMainten
ance
Center
CRV:
1,34
3,80
0$
Immed
.Va
lue
15
Value
610
Value
11+
Value
System
%$
%$
%$
%$
%$
Structure
0.18
241,88
4$
0.00
$0.00
$0.00
$1.00
241,88
4$
Roof
0.05
67,190
$0.00
$0.00
$0.00
$1.00
67,190
$
Glazing
0.02
26,876
$0.00
$0.00
$0.00
$1.00
26,876
$
Clad
ding
0.08
107,50
4$
0.00
$0.00
$0.05
5,37
5$
0.95
102,12
9$
HVAC
0.16
215,00
8$
0.10
21,501
$0.40
86,003
$0.10
21,501
$0.40
86,003
$
Plum
bing
0.1
134,38
0$
0.00
$0.00
$0.10
13,438
$0.90
120,94
2$
Prim
ary/Second
ary
0.06
80,628
$0.00
$0.00
$0.10
8,06
3$
0.90
72,565
$
Distrib
ution
0.06
80,628
$0.00
$0.00
$0.10
8,06
3$
0.90
72,565
$
Lightin
g0.04
53,752
$0.00
$0.05
2,68
8$
0.05
2,68
8$
0.90
48,377
$
Voice/Da
ta0.02
26,876
$0.00
$0.00
$0.05
1,34
4$
0.95
25,532
$
Ceilings
0.03
40,314
$0.00
$0.00
$0.05
2,01
6$
0.95
38,298
$
Walls
0.05
67,190
$0.00
$0.00
$0.05
3,36
0$
0.95
63,831
$
Doors
0.05
67,190
$0.00
$0.00
$0.05
3,36
0$
0.95
63,831
$
Floo
rs0.04
53,752
$0.00
$0.15
8,06
3$
0.10
5,37
5$
0.75
40,314
$
Code
(fire,A
DA,etc.)
0.03
40,314
$0.10
4,03
1$
0.05
2,01
6$
0.05
2,01
6$
0.80
32,251
$
Immed
.Site
0.03
40,314
$0.00
$0.15
6,04
7$
0.10
4,03
1$
0.75
30,236
$
CRV
1,34
3,80
0$
DMB
25,532
$10
4,81
6$
80,628
$1,13
2,82
3$
FCI
1.9%
DMB
130,34
9$
FCI
9.7%
AMM 2016 Campus Facilities Master Plan Section 8 - 132
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
18%
241,
884
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Pre
-eng
inee
red
stee
l bui
ldin
g.
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted
.
No
chan
ges
repo
rted
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Str
uctu
re0
00
100
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 133
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
5%67
,190
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
No
chan
ges
repo
rted
.
Pai
nted
met
al R
-pan
el ty
pe r
oof -
insu
late
d
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Roo
f0
00
100
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 134
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
2%26
,876
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
Min
imal
- at
offi
ce a
rea
only
No
repo
rted
pro
blem
s.
No
chan
ges
repo
rted
.
No
chan
ges
repo
rted
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Gla
zing
00
010
0
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 135
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
16%
215,
008
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
No
chan
ges
repo
rted
.
11+
yrs
6-10
yrs
1-5
yrs
Imm
edia
te%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t
Offi
ce a
rea
- gro
und
mou
nted
DX
/gas
hea
t pac
kage
uni
t. U
nit o
vers
ized
, run
inef
ficie
ntly
, exh
aust
s to
o m
uch
air.
Cla
ssro
oms
- ver
tical
AC
/hea
t uni
t ven
tilat
ors.
Uni
ts u
nrel
iabl
e, o
vers
ized
, run
inef
ficie
ntly
.S
hop
- rad
iant
tube
hea
t, no
AC
- no
rep
orte
d pr
oble
ms.
Sys
tem
/ C
om
po
nent
No
tes
No
chan
ges
repo
rted
.
Sys
tem
CR
V o
f S
yste
m
HV
AC
Cla
ssro
om v
ertic
al u
nit v
entil
ator
s m
odifi
ed to
impr
ove
effic
ienc
y an
d op
erat
ion.
Gro
und
mou
nted
DX
/gas
hea
t uni
t unr
elia
ble,
diff
icul
t to
cont
rol.
Issu
e be
ing
inve
stig
ated
for
reso
lutio
n.C
lass
room
uni
ts a
re n
oisy
, unr
elia
ble.
Noi
se le
vel m
akes
teac
hing
in th
ese
room
cha
lleng
ing,
ofte
n re
quiri
ng u
nits
to b
e tu
rned
off
durin
g le
ctur
es.
$
4010
4010
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 136
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
8%10
7,50
4$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
port
ed.
No
chan
ges
repo
rted
No
chan
ges
repo
rted
, no
repo
rted
pro
blem
s.
No
chan
ges
repo
rted
.
Pai
nted
met
al s
idin
g.
No
repo
rted
pro
blem
s
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cla
ddin
g0
05
95
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 137
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
10%
134,
380
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
No
repo
rted
pro
blem
s
Sm
all d
omes
tic w
ater
hea
ter
- no
repo
rted
pro
blem
s.
New
bal
last
tank
and
wel
l add
ed to
incr
ease
wat
er v
olum
e an
d re
duce
ove
rall
pres
sure
and
pre
ssur
e flu
ctua
tions
.
No
repo
rted
cha
nges
or
prob
lem
s.
No
repo
rted
cha
nges
or
prob
lem
s.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Plu
mbi
ng0
010
90
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 138
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
6%80
,628
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
Tran
sfor
mer
s te
sted
in 2
012,
upd
ated
and
rep
aire
d as
req
uire
d. N
o re
port
ed p
robl
ems.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Prim
ary
/ Sec
onda
ry0
010
90
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 139
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
6%80
,628
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d. N
ew s
tora
ge b
uild
ing
(30'
x80'
- un
der c
onst
ruct
ion)
to b
e fe
d fro
m e
xist
ing
dist
ribut
ion
pane
l in
the
Aut
o R
epai
r Cen
ter
No
prob
lem
s re
port
ed.
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Dis
trib
utio
n0
010
90
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 140
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
4%53
,752
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d. C
onve
rt to
LE
D fi
xtur
es a
s ch
ange
s ar
e m
ade.
No
chan
ges
repo
rted
No
repo
rted
pro
blem
s or
cha
nges
.
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted
11+
yrs
Ligh
ting
05
590
T8 fl
uore
scen
t typ
ical
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs
AMM 2016 Campus Facilities Master Plan Section 8 - 141
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
2%26
,876
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Wi-F
i add
ed to
all
build
ings
.
No
repo
rted
pro
blem
s, o
r ch
ange
s.
Cam
pus
phon
e sy
stem
bei
ng s
witc
hed
to V
OIP
sys
tem
.
No
repo
rted
pro
blem
s.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
r
Voi
ce/D
ata
00
595
Mai
n C
ampu
sA
uto
Rep
air
and
Faci
litie
s M
aint
enan
ce O
ffice
s
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 142
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
3%40
,314
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
2x2
lay-
in c
eilin
g in
offi
ce, c
orrid
or, c
lass
room
s. O
pen
to d
eck
in a
uto
lab
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cei
lings
00
595
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 143
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
5%67
,190
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Pai
nted
blo
ck a
nd p
aint
ed g
ypsu
m b
oard
. Wal
ls r
epai
nted
on
regu
lar
sche
dule
. In
good
con
ditio
n.
No
repo
rted
pro
blem
s.
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Wal
ls0
05
95
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 144
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
5%67
,190
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Ext
erio
r:A
lum
inum
fram
e do
ors
at e
ntrie
s, h
ollo
w m
etal
els
ewhe
re. N
o re
port
ed p
robl
ems.
(4)
mot
oriz
ed o
verh
ead
door
s on
aut
o la
b. N
o re
port
ed p
robl
ems
Inte
rior:
Hol
low
met
al ty
pica
l, no
rep
orte
d pr
oble
ms.
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted
.
No
repo
rted
pro
blem
s or
cha
nges
.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Doo
rs0
05
95
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 145
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
4%53
,752
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Car
pet:
offic
e, c
lass
room
sV
CT:
cor
ridor
s, to
ilet r
oom
sC
oncr
ete:
Aut
o la
b
No
repo
rted
pro
blem
s
No
chan
ges
repo
rted
.
No
repo
rted
cha
nges
or
prob
lem
s.
No
chan
ges
repo
rted
.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Floo
rs0
1510
75
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 146
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
3%40
,314
$
2005
:
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
No
repo
rted
pro
blem
s
Pot
entia
l dea
d en
d co
rrid
or fr
om m
ain
corr
idor
to a
uto
lab.
Con
firm
with
cod
e of
ficia
l - d
oor
may
nee
d to
be
mov
ed.
No
repo
rted
cha
nges
or
prob
lem
s. P
oten
tial d
ead-
end
corr
idor
is p
ropo
sed
to b
e re
solv
ed a
s pa
rt o
f upc
omin
g re
nova
tion.
Cod
e re
view
indi
cate
s th
at d
ead-
end
corr
idor
can
be
reso
lved
by
repl
acin
g ex
it si
gn a
bove
doo
r to
allo
w e
xitin
g th
roug
h au
to s
hop
- thi
s re
quire
s th
at th
e do
or b
e a
3 ho
ur r
ated
do
or.
Alte
rnat
e so
lutio
n w
ould
be
to e
limin
ate
corr
idor
by
capt
urin
g th
e sp
ace
with
in th
e au
to c
lass
room
. Thi
s w
ill r
equi
re th
e do
or o
nly
be a
1-1
/2 h
our
rate
d do
or.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cod
e (f
ire,A
DA
, etc
.)10
55
80
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 147
Cam
pus
:N
ote
s:A
rea:
8,70
0 sf
Flo
ors
:1
Use
Typ
es:
%
3%40
,314
$
2005
:
2008
:
2010
:
2016
:N
o ch
ange
s re
porte
d.
No
repo
rted
pro
blem
s
No
repo
rted
cha
nges
or
prob
lem
s.
No
repo
rted
cha
nges
or
prob
lem
s.
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Imm
ed. S
ite/E
xt L
tg0
1510
75
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
rM
ain
Cam
pus
Aut
o R
epai
r an
d Fa
cilit
ies
Mai
nten
ance
Offi
ces
Yea
r B
uilt:
200
570
% V
oc-T
ech
30%
Adm
inis
trat
ion
AMM 2016 Campus Facilities Master Plan Section 8 - 148
%
$1,3
43,8
00$1
04,8
16
$80,
628
130,
349
$
63,1
59.0
$
9.
7%26
,876
$
FA
IR
Sum
mar
y -
Bui
ldin
g N
o: 0
6 -
Aut
o R
epai
r an
d M
aint
enan
ce C
ente
r
Pri
ori
ty Is
sues
Dat
aC
RV
DM
BE
XC
ES
SFC
IR
ATI
NG
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te
CR
V T
ota
ls
1,34
3,80
0$
25,5
32$
-
$
1.90
%G
OO
D
0-5
Yea
r C
umul
ativ
e D
ata
DM
BE
XC
ES
SFC
I$/
YR
MA
INTA
INR
ATI
NG
$25,
532
$1,1
32,8
24
1-5
yrs
6-10
yrs
11+
yrs
AMM 2016 Campus Facilities Master Plan Section 8 - 149
Summaryof
AllSystems/
Compo
nents
Build
ingNo.
07:Scho
enhe
rrCa
mpu
sCen
ter
CRV:
9,49
1,90
0$
Immed
.Va
lue
15
Value
610
Value
11+
Value
System
%$
%$
%$
%$
%$
Structure
0.17
1,61
3,62
3$
0.00
$0.00
$0.05
80,681
$0.95
1,53
2,94
2$
Roof
0.06
569,51
4$
0.00
$0.00
$0.10
56,951
$0.90
512,56
3$
Glazing
0.07
664,43
3$
0.00
$0.00
$0.05
33,222
$0.95
631,21
1$
Clad
ding
0.05
474,59
5$
0.00
$0.00
$0.05
23,730
$0.95
450,86
5$
HVAC
0.19
1,80
3,46
1$
0.00
$0.05
90,173
$0.05
90,173
$0.90
1,62
3,11
5$
Plum
bing
0.07
664,43
3$
0.00
$0.00
$0.05
33,222
$0.95
631,21
1$
Prim
ary/Second
ary
0.04
379,67
6$
0.00
$0.00
$0.05
18,984
$0.95
360,69
2$
Distrib
ution
0.05
474,59
5$
0.00
$0.00
$0.05
23,730
$0.95
450,86
5$
Lightin
g0.05
474,59
5$
0.00
$0.02
9,49
2$
0.05
23,730
$0.93
441,37
3$
Voice/Da
ta0.02
189,83
8$
0.00
$0.00
$0.05
9,49
2$
0.95
180,34
6$
Ceilings
0.03
284,75
7$
0.00
$0.00
$0.05
14,238
$0.95
270,51
9$
Walls
0.07
664,43
3$
0.00
$0.00
$0.05
33,222
$0.95
631,21
1$
Doors
0.03
284,75
7$
0.00
$0.00
$0.05
14,238
$0.95
270,51
9$
Floo
rs0.05
474,59
5$
0.00
$0.00
$0.05
23,730
$0.95
450,86
5$
Code
(fire,A
DA,etc.)
0.03
284,75
7$
0.00
$0.00
$0.05
14,238
$0.95
270,51
9$
Immed
.Site
0.02
189,83
8$
0.00
$0.00
$0.05
9,49
2$
0.95
180,34
6$
CRV
9,49
1,90
0$
DMB
$99
,665
$50
3,07
1$
8,88
9,16
4$
FCI
0.0%
DMB
99,665
$FCI
1.1%
AMM 2016 Campus Facilities Master Plan Section 8 - 150
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
17%
1,61
3,62
3$
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
r
Yea
r B
uilt:
200
7
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
15%
Kitc
hen/
Food
Ser
vice
40%
Stu
dent
Cen
ter/
Boo
ksto
re
45%
Lib
rary
Mai
n C
ampu
s
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Str
uctu
re0
05
95
Ste
el fr
ame,
sla
b on
gra
de. R
aise
d flo
or s
yste
m a
t lib
rary
No
repo
rted
prob
lem
s
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted
AMM 2016 Campus Facilities Master Plan Section 8 - 151
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%6%
569,
514
$
2008
:
2010
2013
2016
:N
o ch
ange
s re
porte
d.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
CR
V o
f S
yste
m
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
% o
f sy
stem
to
bud
get
fo
r re
pai
r/re
pla
cem
ent
$Im
med
iate
1-5
yrs
6-10
yrs
11+
yrs
Roo
f0
010
90
Whi
te r
einf
orce
d P
VC
roo
f. In
tern
ally
dra
ined
at 2
sto
ry p
ortio
n, s
cupp
ers/
dow
nspo
uts
at 1
sto
ry p
ortio
n. S
ome
icin
g pr
oble
ms
occu
rrin
g w
here
dow
nspo
uts
drai
n.
No
repo
rted
prob
lem
s
Roo
f ins
pect
ed a
nnua
lly, n
o pr
oble
ms
repo
rted.
No
repo
rted
prob
lem
s.
AMM 2016 Campus Facilities Master Plan Section 8 - 152
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
7%66
4,43
3$
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Sys
tem
/ C
om
po
nent
No
tes
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Gla
zing
00
595
Insu
late
d gl
ass
in a
lum
inum
fram
ing,
no
repo
rted
pro
blem
s
No
repo
rted
prob
lem
s
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted
AMM 2016 Campus Facilities Master Plan Section 8 - 153
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
19%
1,80
3,46
1$
2008
:
2010
:
2013
:
2016
:Li
brar
y w
as c
arpe
ted
to s
eal f
loor
sys
tem
join
ts.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
CR
V o
f S
yste
m
HV
AC
Pun
ch li
st it
ems
have
bee
n re
solv
ed, b
ut p
robl
ems
with
HVA
C s
yste
m b
alan
cing
con
tinue
.
No
chan
ges
repo
rted.
Sys
tem
stil
l lea
ks e
xces
sive
air
thro
ugh
floor
join
ts.
Pro
posa
l is
to c
ompl
etel
y ca
rpet
the
libra
ry, u
sing
car
pet t
o se
al fl
oor s
yste
m jo
ints
.
$
905
50
11+
yrs
6-10
yrs
1-5
yrs
Imm
edia
te%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t
Roo
ftop
mou
nted
chi
ller
(ser
ves
all u
nits
).E
ast:
2 bo
ilers
; Car
rier
VFD
AH
U in
mec
hani
cal r
oom
.C
ente
r (a
triu
m):
roo
ftop
Car
rier
VFD
AH
U.
Wes
t: C
arrie
r V
FD A
HU
in m
echa
nica
l roo
m.
Libr
ary
- mix
of c
eilin
g V
AV
, in-
floor
forc
ed a
ir sy
stem
(on
rai
sed
floor
sys
tem
), r
adia
nt c
eilin
g pa
nels
in m
eetin
g ro
oms.
Atr
ium
- m
ix o
f VA
V a
nd h
ot w
ater
rad
iant
floo
r.U
pper
leve
l - in
-floo
r fo
rced
air
syst
em (
on r
aise
d flo
or s
yste
m)
DD
C c
ontr
ols.
No
repo
rted
pro
blem
s.
Sys
tem
/ C
om
po
nent
No
tes
Air
leak
s in
rais
ed fl
oor s
yste
m m
ake
bala
ncin
g di
fficu
lt.
AMM 2016 Campus Facilities Master Plan Section 8 - 154
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
5%47
4,59
5$
2008
:
2010
:
2013
:
2016
:N
o ch
ange
s re
porte
d.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cla
ddin
g0
05
95
Bric
k on
blo
ck b
acku
p; e
xter
ior
grad
e gy
psum
boa
rd s
offit
s. L
arge
gap
s in
sof
fit a
llow
ing
in b
irds
and
bugs
No
repo
rted
prob
lem
s
Sof
fit g
ap p
robl
em re
solv
ed.
No
chan
ges
repo
rted
AMM 2016 Campus Facilities Master Plan Section 8 - 155
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
7%66
4,43
3$
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Plu
mbi
ng0
05
95
Cop
per
supp
ly li
nes.
No
repo
rted
prob
lem
s.
No
chan
ges
repo
rted
No
repo
rted
chan
ges
or p
robl
ems.
AMM 2016 Campus Facilities Master Plan Section 8 - 156
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
4%37
9,67
6$
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Prim
ary
/ Sec
onda
ry0
05
95
3 ph
ase
480/
277
Sie
men
s sy
stem
on
cam
pus
elec
tric
al lo
op, s
uffic
ient
cap
acity
No
repo
rted
prob
lem
s.
No
repo
rted
prob
lem
s.
Tran
sfor
mer
s te
sted
in 2
012,
upd
ated
and
repa
ired
as re
quire
d. N
o re
porte
d pr
oble
ms.
AMM 2016 Campus Facilities Master Plan Section 8 - 157
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
5%47
4,59
5$
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Dis
trib
utio
n0
05
95
Sie
men
s pa
nels
and
bre
aker
s, n
o re
port
ed p
robl
ems.
No
repo
rted
prob
lem
s.
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted
AMM 2016 Campus Facilities Master Plan Section 8 - 158
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
5%47
4,59
5$
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Ligh
ting
02
593
No
repo
rted
prob
lem
s
No
repo
rted
chan
ges
or p
robl
ems.
Lib
rary
was
repl
ampe
d in
201
0.
Rep
orte
d as
hav
ing
27 d
iffer
ent l
amp
type
s in
bui
ldin
g, in
clud
ing
mul
tiple
type
s of
T8,
T5,
indu
ctio
n, c
ompa
ct fl
uore
scen
t, ha
loge
n, a
nd m
etal
hal
ide.
Sto
ckin
g la
mps
exp
ecte
d to
be
diff
icul
t.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 159
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
2%18
9,83
8$
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Voi
ce/D
ata
00
595
Wi-F
i add
ed to
all
build
ings
.
No
repo
rted
chan
ges
or p
robl
ems.
VO
IP s
yste
m
AMM 2016 Campus Facilities Master Plan Section 8 - 160
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
3%28
4,75
7$
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cei
lings
00
595
2x2
lay-
in ty
pica
l, op
en to
dec
k in
atr
ium
, som
e gy
psum
boa
rd c
eilin
gs in
lim
ited
area
s.
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 161
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
7%66
4,43
3$
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Wal
ls0
05
95
Gyp
sum
boa
rd o
n m
etal
stu
d ty
pica
l. W
alls
rep
aint
ed o
n re
gula
r sc
hedu
le.
Her
man
Mill
er d
emou
ntab
le p
artit
ion
syst
em in
offi
ce a
reas
.E
xten
sive
cas
ewor
k in
kitc
hen/
serv
ery
area
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 162
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
3%28
4,75
7$
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Doo
rs0
05
95
Ext
erio
r: A
lum
inum
fram
e do
ors
typi
cal.
2 pa
irs o
f aut
omat
ic s
lidin
g do
ors.
Mai
n en
try
door
s st
icki
ng, p
oten
tially
from
sla
b he
avin
g.In
terio
r: S
olid
Cor
e w
ood
typi
cal.
Stic
king
mai
n en
try s
lidin
g do
ors
have
bee
n re
paire
d an
d ar
e on
mai
nten
ance
cont
ract
.
No
chan
ges
repo
rted
AMM 2016 Campus Facilities Master Plan Section 8 - 163
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
5%47
4,59
5$
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Floo
rs0
05
95
Rai
sed
floor
sys
tem
in li
brar
y an
d on
sec
ond
leve
l.S
tain
ed c
oncr
ete
floor
in a
triu
mC
arpe
t in
offic
es a
reas
No
repo
rted
prob
lem
s.
No
repo
rted
chan
ges
or p
robl
ems.
Libr
ary
is s
ched
uled
to b
e co
mpl
etel
y ca
rpet
ed to
sea
l air
leak
s in
rais
ed fl
oor s
yste
m.
AMM 2016 Campus Facilities Master Plan Section 8 - 164
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
3%28
4,75
7$
2008
:
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Cod
e (f
ire,A
DA
, etc
.)0
05
95
Fully
spr
inkl
ed.
Hyd
raul
ic e
leva
tor
No
repo
rted
prob
lem
s.
No
repo
rted
chan
ges
or p
robl
ems.
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 165
Cam
pus
:N
ote
s:A
rea:
38,0
00sf
Flo
ors
:2
Use
Typ
es:
%
2%18
9,83
8$
2010
:
2013
:
2016
:
No
chan
ges
repo
rted.
Bui
ldin
g N
o: 0
7 -
Sch
oen
her
r C
amp
us C
ente
rM
ain
Cam
pus
Caf
é, L
ibra
ry, B
ooks
tore
, and
Stu
dent
Ser
vice
s
Yea
r B
uilt:
200
715
% K
itche
n/Fo
od S
ervi
ce40
% S
tude
nt C
ente
r/B
ooks
tore
45%
Lib
rary
Sys
tem
/ C
om
po
nent
No
tes
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
Imm
ed. S
ite/E
xt L
tg0
05
95
Con
cret
e w
alks
with
hot
wat
er s
now
mel
t sys
tem
. Sec
tions
of c
oncr
ete
dete
riora
ting,
pos
sibl
y du
e to
ove
rwor
king
or
bad
mix
. Bei
ng r
epai
red
unde
r w
arra
nty.
Con
cret
e w
alks
repl
aced
with
new
und
er w
arra
nty
(incl
udin
g si
dew
alk
heat
sys
tem
).
No
chan
ges
repo
rted.
AMM 2016 Campus Facilities Master Plan Section 8 - 166
%
9,49
1,90
0$
$0
$99,
665
$503
,071
$8
,889
,164
$/Y
R M
AIN
TAIN
RA
TIN
G$9
9,66
5$0
1.1%
$189
,838
GO
OD
Sum
mar
y -
Bui
ldin
g N
o:0
7 -
Sch
oen
her
r C
amp
us C
ente
r
Pri
ori
ty Is
sues
Dat
aC
RV
DM
BE
XC
ES
SFC
IR
ATI
NG
Sys
tem
CR
V o
f S
yste
m%
of
syst
em t
o b
udg
et f
or
rep
air/
rep
lace
men
t$
Imm
edia
te1-
5 yr
s6-
10 y
rs11
+ y
rs
CR
V T
ota
ls
$9,4
91,9
00$0
$00.
00%
GO
OD
0-5
Yea
r C
umul
ativ
e D
ata
DM
BE
XC
ES
SFC
I
AMM 2016 Campus Facilities Master Plan Section 8 - 167