© 2005 Hewlett-Packard Development Company, L.P.The information contained herein is subject to change without notice
Blade everything- NDA -
16-Mai-2006
Wolfgang BendischSenior Presales ConsultantTechnology Solution Group Germany
Vortrag 1L08
June 20, 2006 HP Confidential - NDA Requred
HP Proprietary Information andNon-disclosure Reminder• The information contained in this presentation is
proprietary to Hewlett-Packard Company, and is offered in confidence with certain slides consisting of HP Confidential Information, subject to the terms and conditions of a Non-Disclosure Agreement.
• HP makes no warranties regarding the accuracy of this information. HP does not warrant or represent that it will introduce any product to which the information relates. It is presented for evaluation by the recipient and to assist HP on defining product direction.
HP Confidential
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA Requred
It’s a racked, stacked and wired worldThe root cause of datacenter pain
Inflexible: Static and hardwiredManually coordinated: Changerequires too many people and stepsOver-provisioned: Wasting power, cooling, space, people and money Managed 1 by 1: Processesare unique, with unique tools and inconsistencyExpensive: More expensive to own than to build
The functionality of today’s datacenter is constrained by the form of their building blocks and the processes required to manage them
Because of conventional IT’s limited form and processes, the potential to improve the operational efficiency, cost and flexibility are limited
June 20, 2006 HP Confidential - NDA Requred
The HP BladeSystem approach to simplify infrastructure
Server Storage
Power & Cooling Connectivity
Consolidate
• Modularize and integrate components
• Surround with intelligence• Manage as one
Reduce time and cost to buy, build and maintain
Virtualize
FacilitiesLAN SAN
• Create logical, abstracted connection to LAN/SAN
• Pool and share server, storage, network, and power
Greater resource efficiency and flexibility
Policy and Task
• Simplify routine tasks and processes to save time
• Keep control
Automate
Free IT resources for revenue bearing projects
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA Requred
The Bladed WorldTime-smart, change-ready and cost-savvy system to give you the greatest
control, most flexibility and best savings for business.
Provisioned JIT: Pre-provisioned and wired-once. Ready for change.
Automated coordination: Domainsand people are isolated from the upheavals of change
Virtual: Devices and connections managed as pools of resources.
Lights-Out, ‘1 to n’ management:Group management. Processes are reduced, streamlined.
Most efficient: Less expensive to own and buy than conventional IT
June 20, 2006 HP Confidential - NDA Requred
Tangible savings for business
HPHPserversservers
andandstoragestorage
PeoplePeopleCostsCosts
Capi
tal E
xpen
ses
Ope
ratio
nal C
osts
Conventional IT
33rdrd partyparty
DataDataCenterCenterCostsCosts
HPHPserversservers
andandstoragestorage
PeoplePeopleCostsCosts
33rdrd partyparty
DataDataCenterCenterCostsCosts
Bladed
•• Integration of componentsIntegration of components•• Sharing of resourcesSharing of resources•• Infrastructure control softwareInfrastructure control software
••Lower power, fewer cablesLower power, fewer cables••Less spaceLess space
•• Reduce or eliminate lengthy Reduce or eliminate lengthy processesprocesses
•• Simplify proceduresSimplify procedures•• Reduce complexityReduce complexity
Lower costs, higher agility
•• Reduced Ethernet/FC costsReduced Ethernet/FC costs•• Lower cost HP management toolsLower cost HP management tools
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA Requred
HP BladeSystem Infrastructure Portfolio
• Common unified management
• Consistent industry standards
• Choice for any environment
PC Bladesolutions
New Nov 7th!AMD based PC blade
Optimized for density
Datacenteroptimized
c-Class
New 2006!
Automated & virtualized infrastructure
New!
p-ClassOptimized to simplify
scale-out servers
New Nov 1st!Integrity BL60p
New 2006BL20p G4
BL25p & BL45p G2
New!
June 20, 2006 HP Confidential - NDA RequredHP Confidential
Vision for anIntegrated Infrastructure
One Infrastructure for
• Xeon, Opteron, Itanium servers
• Storage
• Networking
Modular design
• Add servers or storage just-in-time capacity
• Add services – just-in-time capacity
Common interfaces
• Common hardware elements
• Common management software
• Industry-standard interfaces
Simple
• Capacity added simply by plugging in:
no tools, no cables
• Wizard-based configuration
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA Requred
HP c-Class BladeSystemThe best-run IT infrastructure out of the box
HP innovations that solve the biggest cost drivers and change barriers of today’s datacenters.
The new, modular building block
of next-generation datacenters.
Build IT Change-ReadyNew! HP Virtual Connect architectureEliminating manual coordination across domains.
Build IT Time-SmartNew! HP Insight Control managementBest savings, greatest control and most flexibility across your infrastructure.
Build IT Cost-SavvyNew! HP Thermal Logic technologyMost energy efficiency at a rack, row anddatacenter level.
June 20, 2006 HP Confidential - NDA RequredHP Confidential
Automating BladeSystem InfrastructureSimple GUI to manipulate BladeSystem components
Available servers
Web servers Citrix servers Maintenance
Provision1. Connect VLANs, assign IP addresses
2. Connect LUNs, zones
3. Deploy OS, app install scripts
Failover1. Disconnect VLANs, de-assign IP addresses
2. Disconnect LUNs, zones
3. Reconnect all to available spare server
4. Move failed server to Maintenance
Migration1. Erase contents of LUNs, internal drives
2. Disconnect VLANs, zones, LUNs
3. Return IP addresses, LUNs to available pool
4. Provision server with new provisioning policy
Add capacity1. Add server from available
2. Provision server per provisioning policy
Create Automation Environment1. Select servers to automate
2. Create collections
3. Assign provisioning and failover policies
4. Select servers via physical or logical view
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA RequredHP Confidential
Simplify and make your datacenter change-ready with Virtual Connect• Simplify networks
Reduce cables without adding switches to manage• Simplify server connections
Cleanly separate Server enclosure from LAN & SAN• Change servers in minutes, not days
Add, move, & replace servers fast without affecting your LANs or SANs
June 20, 2006 HP Confidential - NDA Requred
HP c-Class BladeSystemThe best-run IT infrastructure out of the box
HP innovations that solve the biggest cost drivers and change barriers of today’s datacenters.
The new, modular building block
of next-generation datacenters.
Build IT Change-ReadyNew! HP Virtual Connect architectureEliminating manual coordination across domains.
Build IT Time-SmartNew! HP Insight Control managementBest savings, greatest control and most flexibility across your infrastructure.
Build IT Cost-SavvyNew! HP Thermal Logic technologyMost energy efficiency at a rack, row anddatacenter level.
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA RequredHP Confidential
I. Easy to Configure Enclosure
II. Easy to Install & Setup Mgmt Software
III. Easy to Operate and Maintain BladeSystem
Reduce time to production – Increase availability & control
Insight ControlFor Time Smart Management
June 20, 2006 HP Confidential - NDA Requred
BladeSystem Insight ControlIntegrated management environments
Enterprise EditionEnterprise
Virtualization EditionLinux Edition
Idealfor:
• Linux-centric environment• A few or many blades
• Windows or multi-OS environments
• Multiple enclosures• Medium to large data centers
• Virtualized server environment
• SOA datacenters
Key Features:
• Wizard driven, single install of all components• Discounted, license package, fully tested• Integrated with BladeSystem enclosure
• Virtual server, storage and network control
• Virtual migration – V to P, V to V and P to V
• Associate virtual machines to physical hosts and their virtual I/O connections
• Optional VM licenses
• Server provisioning• Fault management• Library of task chains for
common tasks• Optional advanced
modules for policy-based automation and cluster management
• Server provisioning• LAN/SAN connection
provisioning• Fault and performance
monitoring• Automated server
recovery• Patch management
2Q’06 3Q’06 4Q’06
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA RequredHP Confidential
Introducing . . .Integrated Lights-Out 2• Now a complete equivalent to KVM –
graphical remote console performance is never going to be an issue
• Next generation iLO ASICExtends Lights-Out leadership tradition
• Leverages first generation hardware and firmware
Investment protection • Dramatic performance improvements
Ready for everyday system administration• Implemented on all next generation
serversNow available on DL360 G5, DL380 G5, ML350 G5, ML370 G5, BL20p G4
June 20, 2006 HP Confidential - NDA RequredHP Confidential
BladeSystem Insight Control
HP-UX 11i
HP OpenView
Systems Insight Manager
iLO agen
t
Insight OnboardAdministrator
…..BladeServers
ProLiantEssentials
StorageWorksEssentials
IntegrityEssentials
Storagedevices
otherservers
= optional element
BladeSystemEssentials
= standard element
• Intelligent InfrastructureiLO 2 xx editionInsight Onboard AdministratorHP SmartUpdate Manager
• Firmware update utilityThermal Logic Control
• Systems Insight Manager• Graphical BladeSystem view• Enterprise Edition
RDPPMPAutomated ProvisioningAutomated Server RecoveryVulnerability and Patch Management
• Linux EditionProvisioningMonitoringTask Sequencer
• Single CD or DVD Media• Optional add-ons
iLO + pack ?VMMP2PStorageWorks, Integrity Essentials
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA RequredHP Confidential
ProLiant EssentialsProvisioning and Recovery Pack
• Major new enhancement to HP Systems Insight Manager
• Policy-based management for HP BladeSystem infrastructures
• Delivered with Insight Control – Data Center Edition
• Builds on HP SIM & Essentials management tools
• Defined usage scenarios & wizard-driven policy creation
Modular packages deliver valuable usage scenariosCustomer-defined policies address
individual IT needs Extended capabilities in future releases
Scheduled Re-provisioning
ProvisioningServers-Network-Storage-Software
ServerConsolidation
HP Systems Insight Manager
AutomationEngine
Automated Recovery
Virtual Machine Management
App Dynamic Scaling
Web Dynamic ScalingFuture
Modules
Provisioning and Recovery
Pack
June 20, 2006 HP Confidential - NDA Requred
HP c-Class BladeSystemThe best-run IT infrastructure out of the box
HP innovations that solve the biggest cost drivers and change barriers of today’s datacenters.
The new, modular building block
of next-generation datacenters.
Build IT Change-ReadyNew! HP Virtual Connect architectureEliminating manual coordination across domains.
Build IT Time-SmartNew! HP Insight Control managementBest savings, greatest control and most flexibility across your infrastructure.
Build IT Cost-SavvyNew! HP Thermal Logic technologyMost energy efficiency at a rack, row anddatacenter level.
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA RequredHP Confidential
Problem:Limited power budget and growing power demand
More performance and density
Whichgenerates
moreheat
Thatrequires
morecooling
Drawsmorepower
Which eventually impacts
performance, reliability and cost
June 20, 2006 HP Confidential - NDA RequredHP Confidential
HP Thermal Logic technologyDelivering energy efficient IT
Power usage and distribution
Rack-level BTU/Hr.
Enclosure Inflow & Outflow Temp.
Actual Power Utilization
Max Power Available
Dynamically adapt thermal controls to optimize performance, power and cooling capacity to maximize power budget and ensure availability.
Instant view of power usage and temperature at server, enclosure and rack level. Workload
Performance
Airflow and acoustics
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA Requred
Why Thermal Logic matters• Understand your actual power consumption and
cooling capacity (greater insight)• Save money on power and cooling expenses• More servers in the same power and cooling
envelope• Simplifies up front planning• Lives with your datacenter’s existing power budget
June 20, 2006 HP Confidential - NDA Requred
Thermal Logic Management(Monitoring actual power and cooling in datacenter)
Rack-level
BTU/Hr.Enclosure
Inflow &
Outflow
Temp.
Actual Power
Utilization
Max Power
Available
IT-Symposium 2006
www.decus.de
June 20, 2006 HP Confidential - NDA RequredHP Confidential
The power of +hp
Questions?
IT-Symposium 2006
www.decus.de
Top Related