TGOOD engineers set out to create a better urban substation, patenting 38 features that combine to create a next generation solution for modern cities and industrial sites around the globe.
Increased urbanization and growing demand for electricity necessitates new substation construction in congested built-up areas.
Traditional substations create fears of noise and radiation and may be prone to vandalism.
Traditional substations require a footprint of up to 3300m2 and require at least 18 months to construct, straining scarce land resources and subjecting the area to expensive and unsightly construction projects.
PRODUCT CONCEPT
The TGOOD 145kV Compact GIS Substation reduces construction times to between 3 and 6 months and uses only 20% of the space required by a traditional substation
3145kV Compact GIS Substationwww.tgood.com
KEY BENEFITS
SPEED
Compared to traditional substations, construction times are reduced to between 3 and 6 months and commissioning times are reduced to just one month or less.
SAFETY AND APPEARANCE
Acoustic and electromagnetic shielding reduce noise and radiation for safe and silent operation (below 40dB). E-House enclosures are safe to touch and provide exceptional protection against vandalism. Custom paint work helps the station blend in with surroundings.
SPACE SAVINGS
Compact substations reduce the land space required to as little as 420m2, conserving valuable land in congested urban and industrial areas.
4
Entire substations ready for turnkey operation in just 6 months
5145kV Compact GIS Substation
WEEKS1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TOTAL: 26 weeks1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DESIGN
MANUFACTURING
TRANSPORT
CIVIL WORKS
INSTALLATION
COMMISSIONING
3 weeks
8 weeks
6 weeks
14 weeks
5 weeks
4 weeks
Typical Timeline:145kV Compact GIS Substation
Configurable modules vastly reduce design and manufacturing times.
In-house manufacturing of E-House shells and electrical components allow for rapid customization.
Modular E-House reduces shipping costs and allows for easy transport.
TGOOD is strategically located in major port city of Qingdao, China.
Rigorous factory testing reduces commissioning times to one month or less.
6 145kV Compact GIS Substation
38m
14.5mTypical layout with 2 x 50MVA transformers requires a footprint of only 550m2 (pictured)
TGOOD holds 38 patents on technologies used in the 145kV Compact GIS Substation
7145kV Compact GIS Substationwww.tgood.com
38m
14.5m
Sealed design provides outstanding performance in harsh environments, including high altitude, heavily polluted, coastal, desert and arctic sites.
Modular “building block” structures allow for multiple arrangements that maximize available space.
Low audible noise and electromagnetic emissions make this product attractive for densely populated areas.
Intelligent design eliminates the need for traditional buildings, walls, and support structures while allowing for remote control and operation.
Damping technology eliminates seismic effects on GIS in earthquake-prone areas.
Corrosion resistant coatings and maintenance free GIS modules deliver an operational lifespan of up to six decades.
PRODUCT OVERVIEW
8 145kV Compact GIS Substation
Substation modules are designed to maximize use of available space and can be arranged to fit a wide variety of locations
10 145kV Compact GIS Substation
145kV Prefabricated Cabin
15kV Prefabricated Cabin15kV Prefabricated Cabin Prefabricated Cabin for Low Voltage, Protection and ControlEquipment
Fire Exit Fire Exit
145kV Prefabricated Cabin15kVPrefabricatedCabin
15kVPrefabricatedCabin
TransformerPrefabricated Cabin
TransformerPrefabricated Cabin20
0032
00
1450
0
2000
3200
200033950
4000
4000
4000
38000
10000
3000
2000
10600
THE WORLD’S MOST COMPACT GIS SUBSTATION SOLUTION
“BUILDING BLOCKS” – SEVEN COMPACT MODULES
145kV prefabricated GIS module.
36KV prefabricated GIS switchgear module.
15KV prefabricated AIS switchgear module.
Monitoring and control equipment module.
Prefabricated transformer module.
Neutral grounding module.
Reactive power compensation module.
KEY ADVANTAGES – PREFABRICATED MODULES
Customized layouts conform to space and topography requirements.
Electrical equipment kept in a constant temperature and humidity, dust-free operating environment.
The substation is largely maintenance-free, remotely controlled and operated.
Custom paint schemes enhance appearance and beautify neighbourhoods.
Advanced construction methods deliver a useful lifespan of six decades.
KEY COMPONENTS – PREFABRICATED MODULES
Incoming and outgoing connections made with shielded cables.
Air to overhead GIS bushings also available.
Lightning surge arrestors.
Perimeter protection systems and video surveillance systems.
Internal and external lighting, emergency lighting.
Positive pressure environmental control system.
Smoke detection and SF6 monitoring system with alarm.
Balconies, stairways, escape doors with panic bars.
SIDE VIEW
TOP VIEW
145kV Prefabricated Cabin
15kV Prefabricated Cabin15kV Prefabricated Cabin Prefabricated Cabin for Low Voltage, Protection and ControlEquipment
Fire Exit Fire Exit
145kV Prefabricated Cabin15kVPrefabricatedCabin
15kVPrefabricatedCabin
TransformerPrefabricated Cabin
TransformerPrefabricated Cabin20
0032
00
1450
0
2000
3200
200033950
4000
4000
4000
38000
10000
3000
2000
10600
SIDE VIEW
TOP VIEW
11145kV Urban GIS Substationwww.tgood.com
12 145kV Compact GIS Substation
GIS MODULE FEATURES
Incoming and outgoing 145kV lines: overhead, cable.
Largely maintenance free GIS modules.
Compact inline arrangement.
Operating voltage up to 145kV, short-time withstand current of 40kA, breaker rated current of 3150A, busbar rated current of 4000A.
Arc-quenching breaker design has a lifespan of 10,000 mechanical operations and short-circuit trip lifespan of up to 22 operations.
Three position switch integrates isolation and earthing switches into a single module.
Each three-phase GIS module is only 0.8m wide.
Aluminum alloy tanks provide corrosion resistance and eliminate eddy current losses.
STRUCTURAL ARRANGEMENT
Standard, configurable prefabricated modules for fast assembly.
Modules shipped separately for fast transport.
Inline layout with fixed maintenance corridor.
SF6 monitoring system with alarm and automatic ventilation system.
Utilizes damping technology to reduce effects of seismic activity on GIS.
Inspection PassageInspection Passage1030
3300
17110
145KV PREFABRICATED GIS MODULE
TOP VIEW
Inspection PassageInspection Passage1030
3300
17110
TOP VIEW
13145kV Urban GIS Substationwww.tgood.com
14 145kV Compact GIS Substation www.tgood.com
15KV MODULE FEATURES
Incoming and outgoing 15kV lines: outdoor busbar, cable.
Maintenance-free vacuum circuit breakers available.
36KV MODULE FEATURES
Incoming and outgoing 36kV lines: cable.
Fully insulated and sealed gas insulated switchgear eliminates maintenance and ensures safe and reliable operation.
Maintenance-free SF6 and vacuum circuit breakers available.
One quarter the size of the equivalent conventional AIS switchgear module.
#1 Ground Transform
er
Cable Shaft
Cable Shaft
Cable Shaft
Cable Shaft
Cable Shaft
Cable Shaft
Micro PositivePressure
Air Conditioner
Micro PositivePressure
Air Conditioner
#1 Ground Transform
er
#2 Incoming
Line
BusSw
itch Cabinet
BusIsolation Cabinet
#1 Outgoing Line
#3 Outgoing Line
#5 Outgoing Line
#7 Outgoing Line
#8 Outgoing Line
#6 Outgoing Line
#4 Outgoing Line
#2 Outgoing Line
#1 Incoming
Cabinet
#1 Incoming
Side Cabinet
#2 Incoming
Side Cabinet
2-2 Capacitor
1-2 Capacitor
1-1 Capacitor
2-1 Capacitor
#2 PT Cabinet
#1 PT Cabinet
Backup Outgoing Line
Backup Outgoing Line
15KV AND 36KV PREFABRICATED SWITCHGEAR MODULES
TOP VIEW: 15KV MODULE
STRUCTURAL ARRANGEMENT
Standard, configurable prefabricated modules for fast assembly.
German-engineered arc-resistant switchgear design ensures highest level of personnel safety.
Arc-resistant switchgear cabinet doors incorporates mechanical interlock labyrinth seals.
Integrated switchgear cabinets allow for compact and transportable modules.
Single-row layouts simplify maintenance access.
Cable shaft integrated into module.
Very early warning fire alarm and fault detection.
CableShaft
CableShaft
#1 Incoming
Cabinet
BackupOutgoing Line
#1 Outgoing Line
#2 Outgoing Line
#3 OutgoingLine
#4 OutgoingLine
#5 Outgoing Line
#6 Outgoing Line
Bus Isolation Cabinet
Bus Switch
Cabinet
#7 Outgoing Line
#8 Outgoing Line
#9 Outgoing Line
#10 Outgoing Line
#11 Outgoing Line
Backup Outgoing Line
Backup Outgoing Line
#2 Incoming
Cabinet
Micro Positive
PressureAir
Conditioner
Micro Positive
PressureAir
Conditioner
15145kV Compact GIS Substationwww.tgood.com
#1 Ground Transform
er
Cable Shaft
Cable Shaft
Cable Shaft
Cable Shaft
Cable Shaft
Cable Shaft
Micro PositivePressure
Air Conditioner
Micro PositivePressure
Air Conditioner
#1 Ground Transform
er
#2 Incoming
Line
BusSw
itch Cabinet
BusIsolation Cabinet
#1 Outgoing Line
#3 Outgoing Line
#5 Outgoing Line
#7 Outgoing Line
#8 Outgoing Line
#6 Outgoing Line
#4 Outgoing Line
#2 Outgoing Line
#1 Incoming
Cabinet
#1 Incoming
Side Cabinet
#2 Incoming
Side Cabinet
2-2 Capacitor
1-2 Capacitor
1-1 Capacitor
2-1 Capacitor
#2 PT Cabinet
#1 PT Cabinet
Backup Outgoing Line
Backup Outgoing Line
TOP VIEW: 15KV MODULE
CableShaft
CableShaft
#1 Incoming
Cabinet
BackupOutgoing Line
#1 Outgoing Line
#2 Outgoing Line
#3 OutgoingLine
#4 OutgoingLine
#5 Outgoing Line
#6 Outgoing Line
Bus Isolation Cabinet
Bus Switch
Cabinet
#7 Outgoing Line
#8 Outgoing Line
#9 Outgoing Line
#10 Outgoing Line
#11 Outgoing Line
Backup Outgoing Line
Backup Outgoing Line
#2 Incoming
Cabinet
Micro Positive
PressureAir
Conditioner
Micro Positive
PressureAir
Conditioner
TOP VIEW: 35KV MODULE
16 145kV Compact GIS Substation
MAIN TRANSFORMER
Capacity range of 20MVA~60MVA without fans depending on power load density.
Main transformer windings may be two or three winding.
On-load tap changers available.
Transformer body is completely enclosed while radiator cabinet is perforated to facilitate cooling.
Online dissolved gas-in-oil analyzer.
Insulated cable bushings at 145kV primary and 36/15kV secondary.
Standard, configurable prefabricated modules for fast assembly.
Sound barrier technology: German technology reduces transformer noise to below 40dB.
Firewall technology: double steel casing allows the inner wall of the module to completely replace a traditional firewall.
Electromagnetic shielding technology: full metal shielding attenuates electromagnetic radiation.
PREFABRICATED TRANSFORMER MODULE
PREFABRICATED TRANSFORMER CABIN
TOP VIEW
17145kV Compact GIS Substationwww.tgood.com
Radiator CabinetTransformer Box Body
PREFABRICATED TRANSFORMER CABIN
TOP VIEW
18 145kV Urban GIS Substation
12 13 14 15 16 17 18 19 20 21 2228
123456781011 9
Protection and Control Module
Battery and Charger Systems
Assorted Protection and Control Panels
Positive PressureClimate Control
System
Positive PressureClimate Control
System
2425 23
2726
PROTECTION SYSTEMS
State of the art protective relaying systems designed to meet the highest utility standards.
AUTOMATION AND CONTROL
Remotely accessible control systems allow for real-time operation of the substation with a wide range of SCADA systems for remote metering and data collection.
STATION SERVICE POWER
Highly reliable and redundant DC charger and battery systems provide uninterruptible power to all circuit breakers and control devices. Absorbent Glass Mat battery technology eliminates the need for a separate ventilation battery room.
UTILITY SYSTEM
Fire alarm systems, security systems, video surveillance and environmental monitoring available.
MAINTENANCE ACCESS
Rear access door allows for easy overhaul of secondary equipment modules.
PROTECTION AND CONTROL MODULE
TOP VIEW
19145kV Compact GIS Substationwww.tgood.com
12 13 14 15 16 17 18 19 20 21 2228
123456781011 9
Protection and Control Module
Battery and Charger Systems
Assorted Protection and Control Panels
Positive PressureClimate Control
System
Positive PressureClimate Control
System
2425 23
2726
TOP VIEW
20 145kV Compact GIS Substation www.tgood.com
REACTIVE POWER COMPENSATION MODULE
Substation power-factor correction and/or harmonic filtering may be included as a module.
Capacitor banks may be tuned or detuned as required for the application.
Fixed or variable stages of compensation available.
NEUTRAL GROUNDING MODULE
Customers may choose between solid grounding, resistive grounding, reactor grounding or resonant (Peterson coil) grounding.
Zigzag transformer grounding also available.
CLIMATE CONTROL AND ALARM SYSTEMS
System guarantees ideal environment for reliable operation and long lifespan of electrical components.
Patented positive-pressure and air conditioning system provide a constant temperature and constant humidity, dust-free operating environment.
Positive pressure environmental control system ensures that internal cabin pressure is always greater than external atmospheric pressure (typically 105%) to repel dust. This technology has been tested and proven in the world’s harshest operating environments, including the world’s highest railway in Tibet.
Alarm system detects deviations from standard operating tolerances to ensure safe and reliable operation.
Early warning fire alarm is calibrated to detect a fire hazard hours before visible smoke is produced while eliminating the risk of false positives.
Climate control system utilizes a heat pump to precisely control the cabin temperature and humidity at all times.
AUXILIARY SYSTEMS
21145kV Compact GIS Substationwww.tgood.com
1. Foam-Insulated Panels (with Bridge-Cutoff Insulation Technology)
2. Make-up air from outside3. Heat pump exhaust, shown cooling
building
4. Return air (inside air combined with make-up air to maintain positive-pressure environment)
5. Inside air
1
2
3
4
5
Constant temperature and humidity, with an internal air pressure greater than outside (typically 105%), ensures dust does not infiltrate building
Positive Pressure Environmental Control System
22 145kV Compact GIS Substation
1. Thermal Barrier2. Spot Weld3. Injected Foam Insulation4. Internal Metal Surface5. External Metal Surface
1. Internal Metal Skin2. Thermal Barrier3. Injected Foam Insulation4. Spot Weld5. External Metal Skin
1. Sandblasted Steel Frame2. Hot Zinc Layer3. Zinc + Paint Layer4. Epoxy Coating5. Hammertone Finish
INSULATION DETAIL: CORNER COLUMN
INSULATION DETAIL: PANEL
LAYERED ANTI-CORROSION TECHNOLOGY 1
3
2
4
5
1
4
35
2
1
23
24
5
1
Our insulation methods effectively eliminate thermal bridging across steel parts, providing the best overall thermal performance in the E-House industry
23145kV Compact GIS Substationwww.tgood.com
TYPICAL SPECIFICATIONS
Switchgear cabinets are welded to the cabin floor for structural integrity.
Wall construction: 2.5mm cold-rolled steel plate.
Roof panel construction: 2mm cold-rolled steel plate.
Mechanical impact protection rating: 1K10.
Seismic intensity rating: horizontal acceleration of 0.25g.
DUAL LAYER PANELS
Insulated panels are at least 50mm thick to effectively maintain internal E-House temperatures in all seasons and environmental conditions.
THERMAL BARRIER
Injected foam insulation with a thermal break between panels effectively prevent heat conduction and eliminates condensation.
SEALED SEAMS
Rubber seals qualify for IP33D rating on doors. E-House panel seams are not less than IP54.
FIRE RATING
Optional two hour fire rated designs available.
WINDPROOF DOOR
Windproof door remains open at an angle of 90 degrees to ensure personnel safety in high wind areas.
ANTICORROSION TECHNOLOGY
Layered anti-corrosion technology ensures thirty years of corrosion resistance before refinishing is required and an overall lifespan of six decades.
Coating and spraying production lines are developed by the Nordson company in the United States.
Hammertone finish incorporates anti-UV coating that provides at least a decade of fade and oxidation resistance.
E-HOUSE DESIGN
24 145kV Compact GIS Substation www.tgood.com
Oil Reservoir
H=35m#1 Lightning Rod
O
4000
3000
0
Duty Room
Tool Room
Archive Room
74000
2400
0
#2 Lightning Rod
~7500
3200
#1 Primary Transformer #2 Primary Transformer
10kV Reactive Compensation Prefabricated Cabinet
35kV Prefabricated Cabinet10kV Prefabricated Cabinet
145kV Prefabricated Cabinet
Prefabricated Cabinet for10kV Ground Transformer
Arc-Suppression Coil
35kV Neutral Point Arc-Suppression Coil
6700
#1 Secondary Prefabricated Cabinet
#2 Secondary Prefabricated Cabinet
1300
0
1300
0
1190
0
5400 58003200
2200
1260
0
1710 37800
3400
110kV Prefabricated Cabinet Deployed on the Second Floor145kV Prefabricated Cabinet Deployed on the Second Floor
FLOOR LAYOUT OF THE 145KV CENTRAL POWER STATION IN THE CITY OF YULIN, SHANXI PROVINCE, CHINA
25145kV Compact GIS Substationwww.tgood.com
Oil Reservoir
H=35m#1 Lightning Rod
O
4000
3000
0
Duty Room
Tool Room
Archive Room
74000
2400
0
#2 Lightning Rod
~7500
3200
#1 Primary Transformer #2 Primary Transformer
10kV Reactive Compensation Prefabricated Cabinet
35kV Prefabricated Cabinet10kV Prefabricated Cabinet
145kV Prefabricated Cabinet
Prefabricated Cabinet for10kV Ground Transformer
Arc-Suppression Coil
35kV Neutral Point Arc-Suppression Coil
6700
#1 Secondary Prefabricated Cabinet
#2 Secondary Prefabricated Cabinet
1300
0
1300
0
1190
0
5400 58003200
220012
600
1710 37800
3400
110kV Prefabricated Cabinet Deployed on the Second Floor145kV Prefabricated Cabinet Deployed on the Second Floor
Project Final Stage Current Phase Remarks
Primary Transformer 2X50MVA 2X50MVA
145kV Outgoing Line 6-outlet 5-outlet 1 backup outlet
35kV Outgoing Line 14-outlet 14-outlet
10kV Outgoing Line 10-outlet 10-outlet
10kV Capacitor Bank 1X4.8+1X3.6MVar 1X4.8+1X3.6MVar
10kV Arc-Suppression Coil 2x230kVA 2x230kVA
26 145kV Compact GIS Substation www.tgood.com
4000
4000
10kV
Pre
fabr
icat
ed C
abin
10kV
Pre
fabr
icat
ed C
abin
Secondary Prefabricated Cabinet
Duty Room Tool Room Break Room
Reactive CompensationPrefabricated Cabin
Reactive CompensationPrefabricated Cabin
#1 Primary Transformer #2 Primary Transformer
Lightning Rod
24000200002000 2000
3000
12000
42500
4160
0
91009100
7200
7200
Oil Reservoir
145kV Prefabricated Cabin Deployed on the Second Floor145kV Prefabricated Cabin Deployed on the Second Floor
FLOOR LAYOUT OF THE 145KV CENTRAL POWER STATION IN THE CITY OF HANDAN, HEBEI PROVINCE, CHINA
27145kV Compact GIS Substationwww.tgood.com
4000
4000
10kV
Pre
fabr
icat
ed C
abin
10kV
Pre
fabr
icat
ed C
abin
Secondary Prefabricated Cabinet
Duty Room Tool Room Break Room
Reactive CompensationPrefabricated Cabin
Reactive CompensationPrefabricated Cabin
#1 Primary Transformer #2 Primary Transformer
Lightning Rod
24000200002000 2000
3000
12000
42500
4160
0
91009100
7200
7200
Oil Reservoir
145kV Prefabricated Cabin Deployed on the Second Floor145kV Prefabricated Cabin Deployed on the Second Floor
Project Final Stage Current Phase Remarks
Primary Transformer 2X50MVA 2X50MVA
145kV Outgoing Line 2-outlet 2-outlet Backup 1-outlet
10kV Outgoing Line 8-outlet 8-outlet
TGQDMK000010
www.tgood.com
TGOOD Global Ltd.Unit B, 8/F, Shun Ho Tower, 24-30 Ice House Street, Central, Hong Kong
Tel: + 852 2393 8005 Fax: + 852 2393 [email protected]
Top Related