Construction Industry in India is largely a convention driven
sector, devoid of professionalism. Much so particularly in private
construction industry; which constitute @ 90 % of total
constructions in India. As such it is marred by lot of
uncertainties. To cover these uncertainties it is general tendency
to price everything on higher scale. The first casualty is price
driven customer, which the builder is likely to lose. Second
casualty is the trust between the buyer and seller. Probably the
third casualty is the quality of work itself. All these have
compounding effect on cash flow on all the fronts. All these can be
avoided with professional help which is in abundance in India but
ignored so far. To obviate above eventualities we have started a
consultancy venture in the name of M/S Aayra Nirman. Our area of
expertise would be Project feasibility consultancy, Quantity
Assessment, Preparation of Bills, Quality Assessment, Project
Management Consultancy, Project Audit, Maintenance Consultancy etc.
We have well qualified and experienced team of professionals with
us. Of course this would cost a bit. But it would ensure
reasonability of quality, cost, cash flow and customer
satisfaction; the worth of which is incalculable. And let us assure
you that this exercise would lead to cheaper alternative in
ultimate reality.
Slide 4
Our Core Competency: Our highly qualified, experienced,
seasoned staff, trust worthiness and confidence in self. Objective:
To give professional and cost efficient consultancy service to full
satisfaction to all concerned. 3 WWW.AARYANIRMANA.COM/WP, PH.+91
7043-922083 & +91 9879-968965 Strategic initiatives are
significantly more successful when the indicated practices are in
place. Source: 2014 Pulse of the Profession 2014 Pulse of the
Profession Process Maturity Leads to Success
Slide 5
4 WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965 Managerial Functions (Managers do the following): Plan
what they are to do Organize to meet the plan Staff their
organization with resources Direct them to execute the plan Control
the resources, keeping them on course Periodic Review and
Corrective actions.
Time bound Project Logical sequencing and Execution. Risk
Management Schedule Delay analysis. Bill making Project failure
Mainly due to 6 WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 &
+91 9879-968965 Project formulation stage Planning of the activity
Execution stage FAILURE
Slide 8
Construction Cost Estimation:- Drawing verification Receive all
the drawings from client Crosscheck all the drawing for any
discrepancy. Quantity workout Calculate the quantity of all the
civil works. Workout the raw material required for the same. Amount
finalization Summarize the material detail calculated with material
and labor rate for the same. With some contingency we have the
amount of the project. The payment with the Material/Service
received is also very important factor in the project. One has to
perform the check that there is no double payment for single entry
of material / service has made. By this one can protect the company
from possible loss and sometime it is found that this kind of
mistake has been done intentionally and in that case fraud
prevention can be achieved. 7 WWW.AARYANIRMANA.COM/WP, PH.+91
7043-922083 & +91 9879-968965
Slide 9
Project Audit reports:- The Audit reports can be generated at
regular interval to measure the health of the project. The regular
interval varies from weekly, Monthly, yearly or all of them,
depends on the client requirement. Since marketing of the project
is not within the domain of project audit, the managements
co-operation in sharing the details of cash flow pattern is also an
essential requirement. The Audit can be of various type:- -
Contract Audit (at the starting of the project), - Financial Audit
The payment to the subcontractor can be controlled with help of
this audit. The total expense track can be monitored with regular
audit of this kind. (at intermediate and at the end of the project)
- Material consumption Audit The quality of the work, Theft of the
material and fraud of the supplier can be tracked. (at the
intermediate and at the end of the project). - Quantity of work
done Audit To monitor the project status with respect to the total
project and to support the expense level it is required (it
requires at regular interval and at the end of the project) etc..
The interpretation of report depends on the type of contract. 8
WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965
Slide 10
Example:- If the remaining material(Brick) brought on site is
found to be more after audit. The conclusion drawn are as mentioned
below, The contract is with material and company does not have to
pay for material separately The contract is without material and
company have to pay for the material separately The material
consumption is Low. The wastage of material is Low The contractor
falsely claim more material bill so the chances over payment to
him. The quantum of work done is not as per drawing. The different
situation analysis is heavily dependent on which type of contract
you are in with contractor or which condition is mentioned in the
contract. The detail study of the contract and provide the
loopholes in it is the main purpose of this audit. The problem
analysis is heavily dependent on the contractual conditions. One
example is as shown below, The Monetary control over the contractor
is weak in this case. The work done is of inferior quality.
Contractual Audit: 9 WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083
& +91 9879-968965
Slide 11
By performing the contractual audit one can held responsible on
firm ground and chances of dispute can be controlled effectively.
10 WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965
Slide 12
Financial Audit: In a project one has to constantly monitor the
quantum of the work performed and payment made to individual
contractor. By keeping the record one can provide a balance
situation between the contractor and the client as none of the
beneficiary has to face the loss. 11 WWW.AARYANIRMANA.COM/WP,
PH.+91 7043-922083 & +91 9879-968965
Slide 13
Material Audit: The basic purpose to perform Material audit is
to synchronize between the material Received on site, Material
consumed in work and Remaining material available on site.
1)Material received Material consumed > Material stack on site
2)Material received Material consumed = Material stack on site
3)Material received Material consumed< Material stack on site
There are 3 possibility for any material audit. And the conclusion
of the same can be very depends on the type of contract both the
parties in. The example is available with contract audit (same). 12
WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965
Slide 14
Quantity Audit: This Audit is performed to cross check the
actual quantum of work performed on the project and the status of
the project with respect to the total quantum of work. If only this
audit is performed the purpose of the same would be to know the
remaining quantum of work and on that basis the remaining expense
and time required to complete the balance work can be ascertained.
13 WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965
Slide 15
S-Curve Analysis In any project one must have an idea about the
final product. One can finalize the practical duration with keeping
in the mind the economy of the same. The S-curve is the diagram
representation of the cumulative cost vs. time relationship for any
project which serves as the base line to track the health of the
project. 14 WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965
Slide 16
There are many tested and accepted methods with which we can
determine the health of the project. By this audit company can know
the present condition of the project i.e. the expense born is high
while comparing with the total quantum of the work or the expense
is low and the implication of the same on the project duration and
construction cost. 15 WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083
& +91 9879-968965
Slide 17
Critical Path analysis Def.:- It is the longest logical
sequence in the network analysis method and any delay in this
activities can delay the project by the same time or more. By
knowing CP one can minimize the possibility of delay of the project
by active controlling of the critical activity. 16
WWW.AARYANIRMANA.COM/ WP, PH.+91 7043-922083 & +91 9879-968965
(PERT:- This method of network analysis adopted generally for the
project which doesnt have any past reference of development.)
Slide 18
Bills Generation and cross check: This would require the
working drawings of the work, taking the actual measurement on site
and match with the drawings, study of mutual agreement between the
owner and the contracting agency regarding rates periodicity and
mode of payment. Quality Assesment: This would require the working
drawings of the work, specification of work, taking the actual
measurement on site and match with the drawings and periodic visit
to site. Project Management Consultancy (P.M.C.): Project is a
common goal for which different agencies work in a concerted way.
The main and most difficult task of a project manager is to
identify different tasks in terms of area of expertise, time of
execution, organizing for co-ordination amongst them, fixing
different agencies suitable in terms of expertise; resource and
cost within a fixed time frame, Deciding cash flow behavior etc. 17
WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965
Slide 19
Maintenance Consultancy: Since behavior of a structure is just
like human body, it requires periodic maintenance. Timely
maintenance of a structure would not only enhance the comfort of
end users it would ensure longer life of the structure also.
Periodic maintenance is required because the components of the
building fail earlier than the designed life of a building. The
designed life of a composite structure building is @ 70 years,
whereas the plumbing fails within 12 to 15 years, electric wiring
fails within 20 years, paint fails every three years, water
proofing fails every 5 years, so on and so forth. Unfortunately
there are no gadgets available in India for detecting the faults in
civil structures. It is done by means of close observation,
educated guess work and years of experience to advise the customer
in such matters. In fact it is more difficult than new work. 18
WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91 9879-968965
Life of structure = 70 years Plumbing work life 12 to 15 years.
Water proofing work life 5 to 10 years Color work life 3 to 5 years
Electricity worklife 15 to 20 years DONT YOU THINK ALL THE FACILITY
SHOULD FUNCTION EFFECTIVELY WITH THE LIFESPAN OF HOUSE ? Regular
maintenance will increase the effective life of the house.
Slide 20
Management Information System (MIS): Information System:- A set
of interrelated components which collect, process, store and
distribute information to support quality decision making and
control in an organization. This exercise involves a periodic
glance at fundamentals of the project regularly. It involves
visiting site, taking stock of quantity of works, material on site,
projection of balance work and resource requirement. This exercise
differs from the project audit in that it does not contain any
recommendation. It is left to the discretion of the management to
decide future course of action. The MIS is specially useful in
Planning, Controlling and Monitoring of the progress of the work
and to take preventive measures in time. 19
WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965
Slide 21
20 WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965 DATA Vs. INFORMATION Data:-A given, or fact; a number,
a statement, or a picture Represents something in the real world
the raw materials in the production of information Information:
Data that have meaning within a context Data in relationships Data
after manipulation
Slide 22
Data Loss, Huge loss till the end of Project. 21
WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91
9879-968965
Slide 23
22 WWW.AARYANIRMANA.COM/WP, PH.+91 7043-922083 & +91 9879-
968965 The justification of existence of any new venture is in its
utility to society. We feel that there is big void in the areas
mentioned and we are confident of filling that void without being a
burden on the society. In fact it is a new branch in service
sector. We invite you to experience our service once and we are
sure that the experience would be mutually beneficiary in all
respect.