1 Paris metro authority 2 Source : http://www.alstom.com/products-services/product-catalogue/rail-systems/signalling/products/urbalis-400/
(y
3 system is here considered in its widest definition
4 CBTC or ETCS configuration data, IXL or RBC parameters, etc. 5 For example, “successive track circuits should have continuously increasing kilometer points”, “there exists a path between two distinct track circuits”, “signals should be positioned a minima 100 meters before the switch they protect”, etc.
-
-
-
-
-
-
-
Top Related