Briefing on
The Procedure & Principles of Awarding Distribution Tariffs
NATIONAL ELECTRIC POWER REGULATORY AUTHORY (NEPRA)
TRANSMISSION
N T D C1
POWER WING
GENERATION DISTRIBUTION
Grid Station / Trans. LinesOperation & Maintenance
Thermal PowerStations
GENCOs5
DISCOs12
Area Electricity Boards
TRANSFORMING THESE ORGANIZATIONAL COMPONENTSINTO INDEPENDENT CORPORATISED ENTITIES
Restructuring of WAPDA
2
One HydelFour Thermal
3
Fuel Suppliers Refineries/ Gas Cos.
Public Sector GENCOs Thermal / Hydel / Nuclear
Private SectorIPPs
Transmission / CPPA
IESCO LESCO GEPCO MEPCO FESCO PESCO HESCO QESCO KESC
CONSUMERSResidential/ Commercial/ Industrial/ Agriculture/ Others
Gen
era
tion
Cost
Tra
ns.
Cost
&Loss A
dj.
Dis
t. C
ost
&
Loss A
dj.
Chain of Cost Components
4
Transfer Price Mechanism
The generation cost is transferred to the DISCOs according to the Transfer Price Mechanism (TPM) as prescribed by the Authority.
NTDC shall charge the DISCOs formed consequent to the unbundling of WAPDA (termed as XWDISCOs) and KESC, a transfer charge for procuring power from approved generating companies (termed as CPGENCOs) and its delivery to DISCOs for a billing period as under:
XTC = XCTC + XETC
Where:
XTC = Transfer charge to XWDISCOs & KESC
XCTC = Capacity Transfer Charge to XWDISCOs & KESC
XETC = Energy Transfer Charge to XWDISCOs & KESC
XCTC = CpGenCap + USCF
XWD
5
Transfer Price Mechanism …continued
Where:
(i) CPGenCap = the summation of the capacity cost in respect of all CPGencos in Rs for a billing period minus the amount of liquidated damages received during the month.
(ii) XWD = the sum of the maximum demand of the XWDISCOs & KESC in kW recorded during a billing period at all the delivery metering points at which power is received by the XWDISCOs & KESC.
(iii) USCF = the fixed charge part of the use of system charges in Rs per kW per month.
XETC = CpGenE (Rs)
XWUs (kWh)
6
Transfer Price Mechanism
Where:
(i) CPGenE = the summation of the variable charge rate (Rs per kWh) approved for each of the CPGenCOs times the energy in kWh procured from the respective CPGENCO during the billing period.
(ii) XWUs = the summation of the energy units (kWh) recorded at the delivery metering point of all the XWDISCOs & KESC during a billing period.
COMPONENTS OF DETERMINATION OF TARIFF FOR GENERATION PROJECT
Energy Charge- Fuel- Variable O&M
Capacity Charge- Fixed O&M
- Local- Foreign
- Return on Equity- Return on Equity during Construction- Insurance- Withholding Tax- Debt Repayment
- Principal Amount- Interest Payment
Consumer-end Tariff = Generation Costs + Transmission Costs +
Distribution & Prior Year Adjust.
Costs
(around)(85% of sale rate)
(around)(2% of sale rate)
(around)(13% of sale rate)
Break-up of Generation Cost (GC)
Generation Cost = Capacity Purchase Price (CPP) + Energy Purchase Price (EPP)
(around)(21% of GC)
(around)(79% of GC)
Fuel Cost Variable O&M
(around)(97% of EPP)
(around)(3% of EPP)
TYPICAL COMPOSITION OF TARIFF
8
+Energy Purchase Price (EPP) =
9
• The Company/ Licensee files a petition for determination of its tariff according to NEPRA Tariff Standard Procedure Rules -1998;
• The Authority on the basis of information decides whether prima facie case exists for admission of the tariff petition;
• In case Authority admits the petition for consideration it gives notice to all the stakeholders through advertisement in the national newspapers inviting them for intervention to participate in the tariff proceedings through personal participation or through written comments;
TARIFF DETERMINATION PROCEDURES
10
o After public hearing, based on the evidence provided by the petitioner and the stakeholders, the Authority after due diligence determines the tariff and recommends to the Federal Government for notification in the official gazette;
o Generation and Transmission Tariff are determined on cost plus basis.
TARIFF DETERMINATION PROCEDURES
11
Tariffs to be determined, modified or revised, interalia, on the basis of Procedures prescribed under Rule 17(3) of the NEPRA Tariff Standards & Procedure Rules, 1998.
•tariffs should allow licensees the recovery of any and all costs prudently incurred to meet the demonstrated needs of their customers
tariffs should reflect marginal cost principles to the extent feasible, keeping in view the financial stability of the sector
the tariff regime should clearly identify inter-class and inter-region subsidies
PRINCIPLES OF TARIFF DETERMINATION
12
• tariffs should, to the extent feasible, reflect the full cost of service to consumer groups with similar service requirements;
• tariffs should take into account Government subsidies or the need for adjustment to finance rural electrification in accordance with the policies of the Government;
PRINCIPLES OF TARIFF DETERMINATION
13
• tariffs may be set below the level of cost of providing the service to consumers consuming electric power below the consumption levels determined for the purpose from time to time by the Authority, as long as such tariffs are financially sustainable;
• tariffs should seek to provide stability and predict-ability for customers; and
• tariffs should be comprehensible, free of misinterpretation and shall state explicitly each component thereof.
PRINCIPLES OF TARIFF DETERMINATION
14
•The tariff so determined is forwarded to the Federal Government pursuant to the Section 31(4) of the NEPRA Act for notification in the Official Gazette.
•Federal Government in pursuant to Section 31(4) of NEPRA Act read with Rule 16(12) of Tariff Rules – 1998 may file reconsideration request with reference to determination / decision of the Authority.
•Whereupon the Authority within 15 days shall decide upon the matter and intimated to the Federal Government for Notification in the official gazette.
NOTIFICATION OF DETERMINED TARIFFS
1515
Power Purchase Price
Return on Rate Base (Return on Assets)
Depreciation
Other income
PYA
Distribution Margin
- O&M
- Salaries, wages and other benefits
- Repair & Maintenance
- Traveling Allowance
- Vehicle maintenance
- Other/miscellaneous expenses
COMPONENTS OF DETERMINATION OFTARIFF FOR DISTRIBUTION COMPANIES
Back
16
Reasons for Different Consumer-End Tariff for Different DISCOs
The tariff of all the Distribution Companies (DISCOs) cannot be the same due to following reasons:
• Different consumer-mix
• Different transmission and distribution losses
• Pilferage/theft
• Network constraints (old/obsolete networks)
• Law & Order situation
17
• As per Regulation of Generation, Transmission and Distribution of
Electric Power (Amendment) Act, 2011:
“…the Authority may, on a monthly basis and not later than a
period of seven days, make adjustment in the approved tariff on
account of any variation in the fuel charges and policy guidelines
as the Federal Government may issue and, notify the tariff so
adjusted in the official gazette.”
• NEPRA, while determining monthly FCA, does not consider any
other electricity cost factors and makes the adjustment strictly to the
extent of variation in fuel price and energy mix.
• FCA is determined by the Authority for every month separately and
it does not have cumulative effect on subsequent months tariff.
FUEL CHARGES ADJUSTMENT MECHANISM
Month IESCO LESCO FESCO GEPCO MEPCO PESCO HESCO SEPCO QUESCO KESC
Jan-12 1.87 1.87 1.87 1.87 1.87 1.87 1.87 1.87 1.87 1.04
Feb-12 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.04
Mar-12 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.60
Apr-12 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.15
May-12 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 0.51
Jun-12 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.17
Jul-12 (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.07)
Aug-12 (0.64) (0.64) (0.64) (0.64) (0.64) (0.64) (0.64) (0.64) (0.64) (0.37)
Sep-12 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 (0.40)
Oct-12 (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) 0.35
Nov-12 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.10
Dec-12 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.02
Jan-13 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 1.13
Feb-13 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.38
Mar-13 (1.06) (1.06) (1.06) (1.06) (1.06) (1.06) (1.06) (1.06) (1.06) 1.76
Apr-13 (1.78) (1.78) (1.78) (1.78) (1.78) (1.78) (1.78) (1.78) (1.78) (0.26)
May-13 (0.93) 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 (0.71)
Jun-13 (1.15) (1.15) (1.15) (1.15) (1.15) (1.15) (1.15) (1.15) (1.15) (1.63)
NEPRA's Monthly Fuel Price AdjustmentsIncrease / (Decrease) Rs. / kWh
19
Month IESCO LESCO FESCO GEPCO MEPCO PESCO HESCO SEPCO QUESCO KESC
Jul-13 (0.30) (0.30) (0.30) (0.30) (0.30) (0.30) (0.30) (0.30) (0.30) (0.03)
Aug-13 (0.32) (0.32) (0.32) (0.32) (0.32) (0.32) (0.32) (0.32) (0.32) (0.43)
Sep-13 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.39
Oct-13 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.76 0.44
Nov-13 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 (0.63)
Dec-13 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 -
Jan-14 2.24 2.24 2.24 2.24 2.24 2.24 2.24 2.24 2.24 1.34
Feb-14 (0.27) (0.27) (0.27) (0.27) (0.27) (0.27) (0.27) (0.27) (0.27) 0.25
Mar-14 (1.01) (1.01) (1.01) (1.01) (1.01) (1.01) (1.01) (1.01) (1.01) 0.87
Apr-14 (1.48) (1.48) (1.48) (1.48) (1.48) (1.48) (1.48) (1.48) (1.48)
May-14 (0.82) (0.82) (0.82) (0.82) (0.82) (0.82) (0.82) (0.82) (0.82)
Jun-14 (0.08) (0.08) (0.08) (0.08) (0.08) (0.08) (0.08) (0.08) (0.08)
Jul-14 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43
NEPRA's Monthly Fuel Price AdjustmentsIncrease / (Decrease) Rs. / kWh
20
23