    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Sr. No. Description of Items &Item Code Unit

    Completed Labour Completed Labour

    FOUNDATION

    1 Excavation for foundation in earthsoils of all types, sands, gravel, softmurum etc. including shoring andstrutting as necessary and disposing off excavated stuff as directed etc. excludingdewatering.

    Cum. 97.00 97.00

    Spec.No.BR 3a, Page No.102,

    2 Excavation for foundation in hard

    murum including shoring and strutting asnecessary and disposing off excavatedstuff as directed etc. excludingdewatering.

    Cum. 111.00 111.00

    Spec.No.BR 3b, Page No.102,

    3 Excavation for foundation in hardmurum and boulders including shoringand strutting as necessary and disposingoff excavated stuff as directed etc.

    complete

    Cum. 125.00 125.00

    Spec.No.BR 3c, Page No.102,

    4 Excavation for foundation in soft rock including shoring and strutting asnecessary and disposing off excavatedstuff as directed etc. complete.

    Cum. 275.00 275.00

    Spec.No.BR 3d, Page No.102,

    5 Excavation for foundation in hard rock(blasted) including shoring & strutting asnecessary and disposing of excavatedstuff as directed.

    Cum. 435.00 364.00

    Spec.No.BR 3e, Page No.102,

    6 Excavation for foundation in hard rockchiseled and wedged or line drilledincluding disposing off excavated stuff asdirected

    Cum. 581.00 509.00

    Spec.No.BR 3f, Page No.102,

    - 1 -

  • 7/30/2019 02_Bridge Foundation Works

    2/13

  • 7/30/2019 02_Bridge Foundation Works

    3/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Description of Items &Item Code Unit

    CompletedSr. No.

    Labour Completed Labour

    12 Providing & laying in situ . cement

    concreteof trap metal

    for the top plugof wells in the dry or under water including compaction and curingwherever necessary etc. complete.

    i) Using Concrete Mixera) M 15 Cum. 3845.00 461.00b) M 20 Cum. 4038.00 485.00c) M - 25 Cum. 4352.00 522.00

    ii) Using batching plant, Transit mixerconcrete pump. (RMC)

    a) M - 15 Cum. 3864.00 232.00b) M - 20 Cum. 4143.00 249.00c) M - 25 Cum. 4487.00 269.00

    MORT&H. SectionNo. 1200 & 1700

    13 Providing and cuttingbending, hooking,laying in position and tyingmild steelbars for reinforcement as per detaileddrawings for R.C.C. work.

    MT 36185.00 1664.00

    MORT&H. SectionNo. 1600

    14 Providing and cuttingbending, hooking,laying in position and tyingH.Y.S.D. / Torsteel bars for reinforcement as per detailed drawings for R.C.C. work.

    MT 43738.00 2102.00

    MORT&H. SectionNo. 1600

    15 Providing & fixing pressure relief pipeof 100 mm dia metre of A.C. as per drawing for R.C.C. raft etc. complete

    Rmt. 105.00 25.00

    [As per instructions of Engr.-In-Charge]

    16 Providing and laying rubble stoneof approved quality for aprons on d/s andu/s side as per drawing.

    Cum. 404.00 53.00

    [As per instructions of Engr.-In-Charge]

    17 Providing fabricating, launching,floating and grounding in positionsteel curbs for wells with necessarysteel bracings and steel cutting edge of mild steel weighing 40kg per meter for well foundation as shown in the detaileddrawing.

    MT. 53593.00 8220.00

    MORT&H. SectionNo. 1200

    - 3 -

  • 7/30/2019 02_Bridge Foundation Works

    4/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Description of Items &Item Code Unit

    CompletedSr. No.

    Labour Completed Labour

    18 Providing and laying in situ

    cement concreteof trap metal

    forR.C.C. well curbs including necessaryshuttering, compacting by vibrating,finishing and curing etc. complete.(excluding reinforcement)i) Using concrete Mixera) M - 15 Cum. 4321.00 518.00b) M - 20 Cum. 4604.00 552.00c) M - 25 Cum. 4957.00 595.00d) M - 30 Cum. 5311.00 637.00

    ii) Usin

    g batching plant, Transit mixerconcrete pump. (RMC)

    a) M - 15 Cum. 4366.00 262.00b) M - 20 Cum. 4676.00 281.00 c) M - 25 Cum. 5064.00 304.00 d) M - 30 Cum. 5452.00 327.00

    MORT&H. SectionNo. 1200,19 Providing and laying in situ

    cement concrete of trap metal for wellstaining including necessary shuttering,scaffolding, compacting by vibrating andcuring etc. complete.

    .

    i) Using concrete Mixera) M - 20 Cum. 4220.00 506.00b) M - 25 Cum. 4544.00 545.00

    ii) Using batching plant, Transit mixerconcrete pump. (RMC)

    a) M - 20 Cum. 4286.00 257.00b) M - 25 Cum. 4642.00 279.00

    MORT&H. Section No.1700

    20 Providing sump in hard rock in wells including necessary excavation bymanual or mechanical means disposingoff the excavated stuff as directed in dryor under water etc. complete.

    Cum. 2420.00 395.00

    [As per instructions of Engr.-In-Charge]

    21 Providing steel anchor dowels[at thebase of the well] including drilling holesplacing the dowels in position andeffectively grouting the hole.

    Spec. No. BR-16 Page No. 120a) 40mm M. S. Bar (4 m Long) Number 6268.00 1035.00

    b) 32mm M.S. Bar (5 m Long) Number 7631.00 1233.00

    - 4 -

  • 7/30/2019 02_Bridge Foundation Works

    5/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Description of Items &Item Code Unit

    CompletedSr. No.

    Labour Completed Labour

    22 Providing & laying in situ cement

    concreteof trap metal

    for R.C.C. raft

    foundation including necessary formwork,compacting and curing. Includingdewatering the trench if necessary asdirected.( excluding reinforcement )

    i) Using Concrete Mixera) M - 20 Cum. 4516.00 542.00

    ii) Using Batching plant, Transit mixerconcrete pump. (RMC)

    a) M - 20 Cum. 4648.00 279.00

    MORT&H. SectionNo. 1700 & 210023 Providing & laying in situ cement

    concrete of trap metal for R.C.C. well / pile caps including necessary formwork,compacting by vibrating, finishing andcuring etc. complete. ( excludingreinforcement )

    Cum.

    i) Using Concrete Mixera) M - 20 Cum. 4224.00 507.00b) M - 25 Cum. 4551.00 546.00 c) M - 30 Cum. 4879.00 585.00

    ii) Using Batching plant, Transit mixerconcrete pump. (RMC)

    a) M - 20 Cum. 4344.00 261.00b) M - 25 Cum. 4701.00 282.00 c) M - 30 Cum. 5058.00 303.00

    MORT&H. SectionNo. 1700 & 1100/1200

    24 Providing & filling in wells with sandincluding compaction between the top

    and bottom plugs etc. complete.

    Cum. 896.00 110.00

    Spec.No.BR 18, Page No.122,

    25 Dewatering including diversion ofstream & providing coffer dams/ bunds etc. as may be necessary for foundation or pipe trenches and steer parts of the work and bailing out water during and after excavation as required.

    a) 3 H.P. & above but less than 5 H.P. Hour 84.00 23.00

    b) 6 H.P. & above but less than 9 H.P. Hour 110.00 25.00c) 10 H.P.& above but less than 20 H.P. Hour 152.00 26.00

    Spec.No.BR-4, Page No.103

    - 5 -

  • 7/30/2019 02_Bridge Foundation Works

    6/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Description of Items &Item Code Unit

    CompletedSr. No.

    Labour Completed Labour

    26 Providing U.C.R.trap stone masonry in

    cement mortar 1:5for wings, curtain

    walls, apron side supports and headwalls of C.D. works and retaining wallsetc. including dewatering, striking out joints, racking of joints, watering etc.complete.

    Cum. 2365.00 700.00

    Spec.No.BR 6, Page No.107,

    27 Providing coursed rubble trap stonemasonry in cement mortar 1:5 forabutment, returns, wings etc. with

    khandki facing and pointing withcement mortar 1:3 for khandki faces andrubble facing with struck joints for rubblebacking including scaffolding, bailing outwater and watering etc. complete.

    Cum. 3381.00 1471.00

    Spec.No.BR 25, Page No.125,

    28 Providing coursed rubble trap / granite/ quartize / genesis stone masonry incement mortar 1:4 for returns, wingsetc. with khandki facing etc. with struck joints for rubble backing includingscaffolding and watering etc. complete.

    Cum. 3047.00 1144.00

    Spec.No.BR 25, Page No.125,

    29 Providing coursed rubble trap stonemasonry incement mortar 1:5 for piers with khandki facing andpointing withcement mortar 1:3 on all sides includingcut and ease water, necessaryscaffolding and watering etc. complete.

    Cum. 3465.00 1471.00

    Spec.No.BR 26, Page No.127,

    30 Providing coursed rubble trap stonemasonry incement mortar 1:4 for piers with khandki facing and pointing withcement mortar 1:3 on all sides includingcut and ease water, necessaryscaffolding and watering etc. complete.

    Cum. 3674.00 1144.00

    Spec.No.BR 26, Page No.127,

    - 6 -

  • 7/30/2019 02_Bridge Foundation Works

    7/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Description of Items &Item Code Unit

    CompletedSr. No.

    Labour Completed Labour

    31 Providing & laying cement

    concrete of trap metal for cast in situpiers, abutments, returns, wings etc. including provision of V shaped false joints to form suitable panels on the facesto approved design with necessarycentering, shuttering, scaffolding,compacting by vibrating, finishing andconveying etc. complete.

    i) Using Concrete Mixera) M - 10 Cum. 3271.00 393.00b) M - 15 Cum. 4023.00 487.00c) M - 20 Cum. 4298.00 516.00d) M - 25 Cum. 4629.00 555.00e) M - 30 Cum. 4959.00 595.00

    ii) Using Batching plant, Transit mixerconcrete pump. (RMC)

    a) M - 15 Cum. 4096.00 205.00 b) M - 20 Cum. 4393.00 264.00 c) M - 25 Cum. 4764.00 238.00d) M - 30 Cum. 5135.00 308.00

    MORT&H. SectionNo. 1700 & 2200

    32 Providing & laying M-10 cement concrete oftrap metal for cast in si tu piers, abutments,returns, wings etc. including provision of Vshaped false joints to form suitable panels onthe faces to approved design with necessarycentering, shuttering, scaffolding, compactingby vibrating, finishing and conveying etc.complete. (With Plums of trap metal stone).

    Cum.

    33 Providing & laying control led cementconcrete of trap metal for R.C.C. capsover piers and abutments includingnecessary scaffolding, centering, formwork,compacting by vibrating, finishing and curingetc. complete.( excluding reinforcement )

    i) Using Concrete Mixera) M - 20 Cum. 4719.00 566.00b) M - 25 Cum. 5009.00 601.00 c) M - 30 Cum. 5496.00 660.00

    ii) Usin

    g Batching plant, Transit mixerconcrete pump. (RMC)

    a) M - 20 Cum. 4752.00 285.00b) M - 25 Cum. 5146.00 309.00 c) M - 30 Cum. 5539.00 332.00

    MORT&H. SectionNo. 1700 & 2200

    - 7 -

  • 7/30/2019 02_Bridge Foundation Works

    8/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Description of Items &Item Code Unit

    CompletedSr. No.

    Labour Completed Labour

    34 Providing and laying in situ ..controlled cement concrete of trap metalfor R.C.C. concrete block below thebearing including formwork, compactingby vibrating, finishing and curing etc.complete.(excluding reinforcement ) i) Using Concrete Mixera) M - 25 Cum. 5100.00 612.00b) M - 30 Cum. 5595.00 671.00

    ii) Using Batching plant, Transit mixerconcrete pump. (RMC)

    a) M - 25 Cum. 5239.00 314.00b) M - 30 Cum. 5640.00 338.00

    MORT&H. SectionNo. 1700, & 2200

    SUPERSTRUCTURE

    35 Providing and laying in situ cement concrete of trap metal for R.C.C. work including ramming,vibrating, finishing, centering, formworkand curing etc. complete in solidslab.(excluding reinforcement)

    i) Using Concrete Mixera) M - 20 Cum. 5175.00 621.00b) M - 25 Cum. 5581.00 670.00 c) M - 30 Cum. 5987.00 718.00d) M - 35 Cum. 6393.00 707.00

    ii) Using Batching plant, Transitmixer, concrete pump.(RMC)a) M - 20 Cum. 5250.00 263.00b) M - 25 Cum. 5686.00 284.00 c) M - 30 Cum. 6122.00 306.00d) M - 35 Cum. 6558.00 393.00

    MORT&H. SectionNo.1700 &2300,Providing and laying in situ cement concrete of trap metal for R.C.C. work including ramming,vibrating, finishing, centering, form-work,scaffolding and curing etc. complete indeck slab, main & cross girdersdiaphragms, arches etc. complete.

    36

    ( excluding reinforcement ) i) Using Concrete Mixera) M - 20 Cum. 5515.00 662.00b) M - 25 Cum. 5947.00 713.00 c) M - 30 Cum. 6380.00 765.00

    - 8 -

  • 7/30/2019 02_Bridge Foundation Works

    9/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Description of Items &Item Code Unit

    CompletedSr. No.

    Labour Completed Labour

    d) M - 35 Cum. 6813.00 818.00

    ii) Using Batching plant, Transitmixer concrete pump. (RMC)a) M - 20 Cum. 5594.00 336.00b) M - 25 Cum. 6059.00 363.00 c) M - 30 Cum. 6523.00 391.00d) M - 35 Cum. 6988.00 419.00

    MORT&H. SectionNo.1700 &2300,

    37 Providing and laying in situ .cement concrete of trap metal for R.C.C. work including ramming,vibrating, finishing, centering, form-work,scaffolding and curing etc. complete indeck slab, main & cross girdersdiaphragms, arches etc. (For work increek area with tidal effects &excluding reinforcement)

    i) Using Concrete Mixera) M - 20 Cum. 5642.00 677.00b) M - 25 Cum. 6085.00 730.00 c) M - 30 Cum. 6527.00 783.00

    d) M - 35 Cum. 6970.00 836.00 ii) Using Batching plant, Transitmixer concrete pump. (RMC)a) M - 20 Cum. 5723.00 343.00b) M - 25 Cum. 6198.00 372.00 c) M - 30 Cum. 6674.00 400.00d) M - 35 Cum. 7149.00 429.00

    MORT&H. SectionNo. 1700 &2200,

    38 Providing & applying anticorrosivetreatment to Mild Steel / H.Y.S.D. barsreinforcement cut and bend to therequired length, shape and size includingtransportation of the steel bars for treatment and bringing back the samefor fixing in position including allaccessories and material required for giving the treatment using chemicals etc.complete.

    (As per C.E.C.R.I. method) MT. 6700.00 1800.00

    - 9 -

  • 7/30/2019 02_Bridge Foundation Works

    10/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Description of Items &Item Code Unit

    CompletedSr. No.

    Labour Completed Labour

    39 Providing fusion bonded epoxy to

    reinforcement barsas per I.S. : 3620-

    1933 specifications for a thickness of 175 +/- 50 microns including testing of coating at plant, extra cost for carefulhandling using PVC coated bindingwires, instead of G.I. Wire, touching upthe material supplied, repair work etc.complete as per detailed specifications.(Lead upto 340 Km. to and fro fromplant) for all diametre.

    MT. 12240.00 ---

    40 Providing fixing restrained neoprenepad bearings as per detailed designdrawing and specification.

    Cucm. 1.10 ---

    MORT&H. SectionNo.2005

    41 Providing expansion joints of copper as per detailed drawings.1.63mm thick(16 gauge) & 30 cm width

    Rmt. 1533.00 275.00

    Spec.No.BR 43, Page No.138,

    42 Providing expansion joints of M.S.

    plate as per detailed drawings.43 Providing and casting special grade

    in si tu .. controlled cement concrete of specified strength for prestressedconcrete work for main girderincluding slab, cross girder etc.including centering and scaffolding or launching including necessary plant andmachinery for the job shuttering,vibrating, curing, finishing etc.

    complete.(excluding reinforcement &prestressing)

    i) Using Concrete Mixera) M - 35 Cum. 7026.00 843.00b) M - 40 Cum. 7100.00 852.00

    ii) Using Batching plant, Transitmixer concrete pump. (RMC) a) M - 35 Cum. 7178.00 431.00b) M - 40 Cum. 7323.00 439.00

    MORT&H. SectionNo.1700 &2300

    - 10 -

  • 7/30/2019 02_Bridge Foundation Works

    11/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Sr. No. Description of Items &Item Code Unit

    Completed Labour Completed Labour

    44 Providing and casting special grade insitu controlled cement concreteof specified strength for prestressedconcrete work for main girder includingslab, cross girder etc. including centeringand scaffolding or launching includingnecessary plant and machinery for the jobshuttering, vibrating, curing, finishing etc.complete. (For work in creek area withtidal effects & excludingreinforcement & prestressing)

    i) Using Concrete Mixer

    a) M - 35 Cum. 7188.00 863.00b) M - 40 Cum. 7326.00 879.00 ii) Using Batching plant, Transitmixer concrete pump. (RMC) a) M - 35 Cum. 7343.00 441.00b) M - 40 Cum. 7492.00 450.00

    MORT&H. SectionNo.1700 &2300

    45 Providing and fixing in position toexact profile and prestressing hightensile steel of specified ultimatestrength including, preparing cable withsheathing and spacers.

    MT. 93223.00 000.00

    MORT&H. SectionNo.1800

    46 Providing and laying in situ M-20cement concrete of trap metal includingcompacting, finishing, curing and filling in joints with bitumen complete forwearing course 75 mm thick.

    i) Using Concrete Mixer

    a) M - 20 Cum. 4473.00 537.00b) M - 25 Cum. 4820.00 578.00 c) M - 30 Cum. 5168.00 620.00

    Spec. No. BR-47 Page No. 140.

    47 Providing and laying in situ cement concrete of trap metal for R.C.C. work of ballast walls, kerbs,box returns etc. including scaffolding,compacting, finishing, curing etc.complete.

    i) Using Concrete Mixera) M - 20 Cum. 4761.00 571.00b) M - 25 Cum. 5126.00 615.00

    - 11 -

  • 7/30/2019 02_Bridge Foundation Works

    12/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Sr. No. Description of Items &Item Code Unit

    Completed Labour Completed Labourii) Using Batching plant, Transitmixer concrete pump. (RMC) a) M - 20 Cum. 4861.00 292.00b) M - 25 Cum. 5262.00 316.00

    Spec. No. BR-50, Page No. 143.

    48 Providing R.C.C. parapet (15 cm x 60cm) with cement concreteof trapmetal with cast in situ panels as per thedetailed drawings includingreinforcement scaffolding, centeringformwork, compacting, finishing, and

    curing etc. complete. a) M - 15 Rmt. 1040.00 336.00b) M - 20 Rmt. 1109.00 336.00c) M - 25 Rmt. 1177.00 347.00

    Spec. No. BR-51(a), Page No. 144.

    49 Providing railing of 40 mm dia in 3rows G.I. Pipeswith M.S. angel posts at2.5 m. c/c as per detailed drawingsscaffolding and painting 3 rows.

    Rmt. 2128.00 216.00

    Spec. No. BR-51( b), Page No. 145.50 Providing railing of cast in situ R.C.C.

    posts at 2.5 m c/c with M-15 cementconcrete of trap metal for approvedquality and 40 mm dia G.I. Pipes in 3rows as per the detailed drawingsincluding scaffolding, centering,formwork, compaction, finishing andcuring etc. complete.

    a) M - 15 Rmt. 1700.00 428.00b) M - 20 Rmt. 1740.00 480.00c) M - 25 Rmt. 1815.00 480.00

    Spec. No. BR-51( c), Page No. 147.51 Providing coursed rubble trap stone

    masonry in cement mortar 1:6 forparapet with khandki facing and pointingwith cement mortar 1:3 on all khandkifaces including scaffolding and wateringmasonry.

    Cum. 3048.00 1149.00

    Spec. No. BR-53, Page No. 149.

    - 12 -

  • 7/30/2019 02_Bridge Foundation Works

    13/13

    Rates as per2009-2010 (in Rs.)

    Rates as per2010-2011 (in Rs.)Sr. No. Description of Items &Item Code Unit

    Completed Labour Completed Labour

    52 Providing galvanised iron 100 mm

    (about 4) diametre water spoutsas

    per drawings (0.6 mtr. Long with G.I.Gratings)

    Number 570.00 50.00

    Spec. No. BR-55, Page No. 149.

    53 Providing vent holes100 m dia in theslab and wearing course with iron grill atthe top and galvanised iron pipe atbottom as per drawings.

    Rmt. 800.00 100.00

    Spec. No. BR-48, Page No. 142.

    54 Providing trap rubble filling behind the abutment returns or wings.

    Cum. 560.00 95.00

    Spec. No. BR-57, Page No. 151.

    55 Providing and fixing cast iron manhole of 750 mm dia.

    Number 10000.00 1500.00