• JIT Defined
• The Toyota Production System
• JIT Implementation Requirements
• JIT in Services
OBJECTIVES
©The McGraw-Hill Companies, Inc., 2004
3
Just-In-Time (JIT)Defined
• JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories (raw materials, work in process, and finished goods)
• JIT also involves the elimination of waste in production effort
• JIT also involves the timing of production resources (i.e., parts arrive at the next workstation “just in time”)
©The McGraw-Hill Companies, Inc., 2004
4
Characteristics of JIT
• JIT is popularly known as stockless production
• Produce just enough to meet demand
• Inventory is wasteful— Labor and materials— Equipment and time— Storage and insurance— Capital, etc.
• Quality must be at the source
©The McGraw-Hill Companies, Inc., 2004
5
JIT and Lean Management
• JIT can be divided into two terms: “Big JIT” and “Little JIT”
• Big JIT (also called Lean Management) is a philosophy of operations management that seeks to eliminate waste in all aspects of a firm’s production activities: human relations, vendor relations, technology, and the management of materials and inventory
• Little JIT focuses more narrowly on scheduling goods inventory and providing service resources where and when needed
©The McGraw-Hill Companies, Inc., 2004
6
JIT Demand-Pull Logic
Customers
Sub
Sub
Fab
Fab
Fab
Fab
Vendor
Vendor
Vendor
Vendor
Final Assembly
Here the customer starts the process, pulling an inventory item from Final Assembly…
Here the customer starts the process, pulling an inventory item from Final Assembly…
Then sub-assembly work is pulled forward by that demand…
Then sub-assembly work is pulled forward by that demand…
The process continues throughout the entire production process and supply chain
The process continues throughout the entire production process and supply chain
©The McGraw-Hill Companies, Inc., 2004
7
The Japanese Approach to Productivity
• Imported technologies
• Efforts concentrated on shop floor
• Quality improvement focus
• Elimination of waste
• Respect for people
©The McGraw-Hill Companies, Inc., 2004
8
The Toyota Production System
• Based on two philosophies:
1. Elimination of waste
2. Respect for people
©The McGraw-Hill Companies, Inc., 2004
9
Waste in Operations
1. Waste from overproduction
2. Waste of waiting time
3. Transportation waste
4. Inventory waste
5. Processing waste
6. Waste of motion
7. Waste from product defects
©The McGraw-Hill Companies, Inc., 2004
10
Minimizing Waste:Focused Factory Networks
• Small specialized plants
• Thinner is better— Better control— Bolsters specialization and excellence— More economical to manage
• Large vertically integrated operations are:— Bureaucratic— Difficult to manage
©The McGraw-Hill Companies, Inc., 2004
11Minimizing Waste:
Focused Factory Networks
CoordinationSystem Integration
These are small specialized plants that limit the range of products produced (sometimes only one type of product for an entire facility)
These are small specialized plants that limit the range of products produced (sometimes only one type of product for an entire facility)
Some plants in Japan have as few as 30 and as many as 1000 employees
Some plants in Japan have as few as 30 and as many as 1000 employees
©The McGraw-Hill Companies, Inc., 2004
12
Minimizing Waste:Group Technology
• Identification of:— Machine cells— Part families
• Based on similarities in:— Design— Manufacture
• Saves time and effort
©The McGraw-Hill Companies, Inc., 2004
13
Minimizing Waste: Group Technology (Part 1)
• Using Departmental Specialization for plant layout can cause a lot of unnecessary material movement
• Using Departmental Specialization for plant layout can cause a lot of unnecessary material movement
Saw Saw
Lathe PressPress
Grinder
LatheLathe
Saw
Press
Heat Treat
Grinder
Note how the flow lines are going back and forthNote how the flow lines are going back and forth
©The McGraw-Hill Companies, Inc., 2004
14
Minimizing Waste: Group Technology (Part 2)
• Revising by using Group Technology Cells can reduce movement and improve product flow
• Revising by using Group Technology Cells can reduce movement and improve product flow
Press
Lathe
Grinder
Grinder
A
2
BSaw
Heat Treat
LatheSaw Lathe
PressLathe
1
©The McGraw-Hill Companies, Inc., 2004
15
Minimizing WasteUse of Other Technologies
• Robotics• Supply chain management• Value stream mapping• Flexible manufacturing systems• Computer integrated manufacturing
systems• Expert systems• Neural networks
©The McGraw-Hill Companies, Inc., 2004
16
Minimizing Waste: Quality at the Source
Self-inspection— Limited use of QC departments
Automated inspection
Line-stopping empowerment— Quality before quantity
©The McGraw-Hill Companies, Inc., 2004
17
Minimizing Waste: JIT Production
Produce...
...what is needed...
...when it’s needed...
...NOTHING MORE!
©The McGraw-Hill Companies, Inc., 2004
18
Minimizing Waste: Uniform Plant Loading
This does not mean building a single product.
But maintaining a stable mix of products,
and firm monthly schedules.
©The McGraw-Hill Companies, Inc., 2004
19
Minimizing Waste: Uniform Plant Loading (heijunka)
Not uniform Jan. Units Feb. Units Mar. Units Total
1,200 3,500 4,300 9,000
UniformJan. Units Feb. Units Mar. Units Total
3,000 3,000 3,000 9,000
Suppose we operate a production plant that produces a single product. The schedule of production for this product could be accomplished using either of the two plant loading schedules below.
Suppose we operate a production plant that produces a single product. The schedule of production for this product could be accomplished using either of the two plant loading schedules below.
How does the uniform loading help save labor costs?How does the uniform loading help save labor costs?
or
©The McGraw-Hill Companies, Inc., 2004
20
Minimizing Waste: Just-In-Time Production
• Management philosophy• “Pull” system through the plant
WHAT IT IS
• Employee participation• Industrial engineering/basics• Continuing improvement• Total quality control• Small lot sizes
WHAT IT REQUIRES
• Attacks waste• Exposes problems and bottlenecks• Achieves streamlined production
WHAT IT DOES
• Stable environment
WHAT IT ASSUMES
©The McGraw-Hill Companies, Inc., 2004
21
Minimizing Waste: Inventory Hides Problems
Work inprocess queues(banks)
Changeorders
Engineering designredundancies
Vendordelinquencies
Scrap
Designbacklogs
Machine downtime
Decisionbacklogs
Inspectionbacklogs
Paperworkbacklog
Example: By identifying defective items from a vendor early in the production process the downstream work is saved
Example: By identifying defective work by employees upstream, the downstream work is saved
©The McGraw-Hill Companies, Inc., 2004
22
Minimizing Waste:Kanban Production Control System
• Uses signaling system to regulate JIT flows
• Kanban—sign or instruction card
• Kanban system is a pull system
— Authority to produce comes from downstream
— It is a form of information system
— Production kanban--can be single card if move distance is short
— Move (withdrawal, conveyance) kanban
©The McGraw-Hill Companies, Inc., 2004
23
Kanban Production System
• Objectives
— Lead time reduction
— Lot size reduction
— Waste elimination
• One of several tools of Lean Mfg.
— Ineffective without others
— Prerequisites must be met
©The McGraw-Hill Companies, Inc., 2004
24
Rules of Kanban Production System
• Withdraw only the quantity needed
• Produce only the quantity given by kanban
• Kanban is withdrawal/production authority
• Move only good parts
• Smooth and level production
• Decrease number of cards to reduce inventory
©The McGraw-Hill Companies, Inc., 2004
25
Minimizing Waste: Kanban Production Control Systems
Storage Part A
Storage Part AMachine
Center Assembly Line
Material Flow
Card (signal) Flow
Withdrawal kanban
Once the Production kanban is received, the Machine Center produces a unit to replace the one taken by the Assembly Line people in the first place
This puts the system back were it was before the item was pulled
The process begins by the Assembly Line people pulling Part A from Storage
Production kanban
©The McGraw-Hill Companies, Inc., 2004
26
Determining the Number of Kanbans Needed
• Setting up a kanban system requires determining the number of kanbans cards (or containers) needed
• Each container represents the minimum production lot size
• An accurate estimate of the lead time required to produce a container is key to determining how many kanbans are required
©The McGraw-Hill Companies, Inc., 2004
27
The Number of Kanban Card Sets
C
SDL
k
)(1
container theof Size
stockSafety timelead during demand Expected
C
SDL
k
)(1
container theof Size
stockSafety timelead during demand Expected
k = Number of kanban card sets (a set is a card)D = Average number of units demanded over some time periodL = lead time to replenish an order (same units of time as demand)S = Safety stock expressed as a percentage of demand during lead timeC = Container size
©The McGraw-Hill Companies, Inc., 2004
28
Example of Kanban Card Determination: Problem Data
• A switch assembly is assembled in batches of 4 units from an “upstream” assembly area and delivered in a special container to a “downstream” control-panel assembly operation
• The control-panel assembly area requires 5 switch assemblies per hour
• The switch assembly area can produce a container of switch assemblies in 2 hours
• Safety stock has been set at 10% of needed inventory
©The McGraw-Hill Companies, Inc., 2004
29
Example of Kanban Card Determination: Calculations
3or ,75.24
5(2)(1.1))(1
container theof Size
stockSafety timelead during demand Expected
C
SDL
k
3or ,75.24
5(2)(1.1))(1
container theof Size
stockSafety timelead during demand Expected
C
SDL
k
Always round up!
©The McGraw-Hill Companies, Inc., 2004
30
Minimizing Waste: Minimized Setup Times
What are the consequences of long setup times?— Long manufacturing lead times— Increased cost— Reduced capacity
A requirement for small-lot-size, mixed-model production?— Practice more setups to reduce time/setup— Fixed production quantity--improves setup— SMED
©The McGraw-Hill Companies, Inc., 2004
31
Respect for People
• Strive to maintain level payrolls
• Workers as assets
• Cooperative employee unions
• Subcontractor networks
• Bottom-round management style
• Quality circles (Small Group Involvement Activities or SGIA’s)
©The McGraw-Hill Companies, Inc., 2004
32
Toyota Production System’s Four Rules
1. All work shall be highly specified as to content, sequence, timing, and outcome
2. Every customer-supplier connection must be direct, and there must be an unambiguous yes-or-no way to send requests and receive responses
3. The pathway for every product and service must be simple and direct
4. Any improvement must be made in accordance with the scientific method, under the guidance of a teacher, at the lowest possible level in the organization
©The McGraw-Hill Companies, Inc., 2004
33
JIT Implementation Requirements: Design Flow Process
• Link operations
• Balance workstation capacities
• Redesign layout for flow
• Emphasize preventive maintenance
• Reduce lot sizes
• Reduce setup/changeover time
©The McGraw-Hill Companies, Inc., 2004
34
JIT Implementation Requirements: Total Quality Control
• Design for quality and quality at the source
• Worker responsibility/quality culture
• Measure SQC and use achievable goals
• Enforce compliance
• Fail-safe methods
• Automatic inspection
©The McGraw-Hill Companies, Inc., 2004
35
JIT Implementation Requirements: Stabilize Schedule
• Level schedule– Pull materials into final assembly in uniform
pattern
• Underutilize capacity– Realized by removing excess inventory– Inventory less likely with quality and equipment
maintenance
• Establish freeze windows– Fixed schedule with no further changes possible
©The McGraw-Hill Companies, Inc., 2004
36
JIT Implementation Requirements: Kanban-Pull
• Demand pull
• Backflush– Used to explode end item’s BOM to determine
how many of each product went into it
• Reduce lot sizes
©The McGraw-Hill Companies, Inc., 2004
37
JIT Implementation Requirements: Work with Vendors
• Limited number of suppliers for better control
• Reduce lead times
• Frequent deliveries
• Project usage requirements
• Quality expectations
©The McGraw-Hill Companies, Inc., 2004
38
JIT Requirements:Planning and Control
• Plan for quality
• Uniform production rate— Smooth flow of materials— Emphasize rate not capacity— Refocused productivity
Less expensive machines Push towards lot size of one
— Less expensive machines
©The McGraw-Hill Companies, Inc., 2004
39
JIT Implementation Requirements: Reduce Inventory More
• Look for other areas
• Stores
• Transit
• Carousels
• Conveyors
©The McGraw-Hill Companies, Inc., 2004
40
JIT Implementation Requirements: Improve Product Design
• Standard product configuration
• Standardize and reduce number of parts
• Process design with product design
• Quality expectations
©The McGraw-Hill Companies, Inc., 2004
41
JIT Implementation Requirements: Concurrently Solve Problems
• Root cause • Solve permanently
• Team approach
• Line and specialist responsibility
• Continual education
©The McGraw-Hill Companies, Inc., 2004
42
JIT Implementation Requirements: Measure Performance
• Emphasize improvement
• Track trends
©The McGraw-Hill Companies, Inc., 2004
43
JIT in Services (Examples)
• Organize Problem-Solving Groups
• Upgrade Housekeeping
• Upgrade Quality
• Clarify Process Flows
• Revise Equipment and Process Technologies
©The McGraw-Hill Companies, Inc., 2004
44
JIT in Services (Examples)
• Level the Facility Load
• Eliminate Unnecessary Activities
• Reorganize Physical Configuration
• Introduce Demand-Pull Scheduling
• Develop Supplier Networks
©The McGraw-Hill Companies, Inc., 2004
45
Performance Measurement
•Quality levels
•Customer satisfaction
•Equipment effectiveness
•Supplier performance
•Throughput time
•Inventory levels
•Setup/lead time reduction
•Layout efficiency
©The McGraw-Hill Companies, Inc., 2004
46
Other Tools: Visual Control (5s)
• Sort—Seiri (organization; find what’s not needed)
• Set in order—Seiton (place for everything)
• Shine—Seiso (cleanliness)
• Standardize—Seiketsu (develop/maintain stds.)
• Sustain—Shitsuke (self-discipline)