ZS080 BB-6000_4000-FSA Crankset (English-20090109) v0
Transcript of ZS080 BB-6000_4000-FSA Crankset (English-20090109) v0
BB-6000 / BB-4000BB-6000 / BB-4000 MegaExo Crankset MegaExo Crankset Service Instructions Service InstructionsService Instructions
Congratulations on your Full Speed Ahead product. Please read these instructions and follow them for
correct use. Since specific tools and experience are necessary for proper installation, it is recommended
that the Bottom Bracket be installed by a qualified bicycle technician. These instructions and instructions
for other FSA products are available for download at http://www.fullspeedahead.com/techdoc
Warranty
Full Speed Ahead (FSA) warrants all FSA, Gravity, Vision and RPM products to be free from defects in
materials or workmanship for a period of two years after original purchase unless otherwise stated in the full
warranty policy. The warranty is non-transferable and valid to the original purchaser of the product only. Full
warranty policy is available at www.fullspeedahead.com
Contact
If you have questions, please visit our web site contact page at :http://www.fullspeedahead.com/contact
Specification
Model No. / Model Name BB-6000 / MegaExo Bottom Bracket for alloy Road crankset
BB Shell 68mm English (BC1.37”) / 70mm ITA (M36x24t)
Model No. / Model Name BB-4000 / MegaExo Bottom Bracket for alloy Road crankset
BB Shell 68mm English (BC1.37”)
Components
Follow the assembly order in the illustration:
ⓞ Bottom Bracket (BB) Shell
① Right BB Cup x1
② Plastic Center Sleeve x1
③ Left BB Cup x1
④ Right Crank x1
⑤ Left Crank x1
⑥ M18 Preload Bolt x1
or M12 Preload Bolt x1
⑦ M6 Pinch Bolt x2
Crankset Installation
Follow the assembly order as in the illustration:
1. Ensure that the Bottom Bracket (BB) shell ⓞ is clean and free of debris, dirt and excess paint.
2. Install the R. bearing cup and plastic center sleeve ②. Tighten the R. bearing cup to 400-500
Revision Date 9-Jan-09 www.fullspeedahead.com ZS080-v0 Page 1 of 2
kgf.cm / 40-50 Nm / 354-443 in.lbs (Use FSA Mega Exo cup tool part no. E0139.)
3. Install the L. bearing cup ③. Tighten the cup to 400-500 kgf.cm / 40-50 Nm / 354-443 in.lbs.
4. Gently and completely insert the R. crank through the BB cups. Take great care not to damage
the plastic bearing cover of the left BB cup.
5. Install the L. crank ⑤ onto the spindle.
6. Tighten the M18 or M12 Preload Bolt ⑥ to torque value of 7-15 kgf.cm / 0.7-1.5 Nm / 6-13
in.lbs. Tighten the Inner M6 ⑦ Pinch Bolt . Then tighten the Outer M6 Pinch Bolt . Alternately
tighten each M6 Pinch Bolt evenly until a torque value of 110-150 kgf.cm / 10.8-14.7 Nm / 95-
130 in.lbs is achieved.
Full Speed Ahead, USA
12810 NE 178th St. Suite 102
Woodinville, WA 98072
Tel: 1_425_488_8653
Fax: 1_425_489_1082
Full Speed Ahead, Europe
Via Del Lavoro, 56
20040 Busnago, Milan, ltaly
Tel: +39_039_688_5265
Fax: +39_039_682_3336
TH INDUSTRIES / FSA Asia
487 Ko-Chung Rd. Ta-Li City 412
Taichung County, Taiwan
Tel: +886_4_2406_8641
Fax: +886_4_2406_8076
Revision Date 9-Jan-09 www.fullspeedahead.com ZS080-v0 Page 2 of 2