    ZENG RUIJIA 5E

    From earth hour to saving electric power Task 2: Waste not, want not

    Evaluation of material

    Better Green Business is credited by business personnel1, its first chapter discusses

    drivers and barriers for enterprise to adopt some green practices and is very relevant

    for the persuasion and development of our project to counter these challenges.The book is published on November 3rd 2009 by Wharton School Publishing,

    University of Pennsylvania, an eminent university press renowned for its innovative

    and leading business insights and perceptions. The writer, Doctor Golson, is

    currently a lecturer on business and economics in London School of Economics.

    The writer mentions:

    He lobbies for deployment of a measurement system to establish projects

    accountability because there are sufficient information to gauge and monitor energy-

    saving performance.

    This is helpful as our target group House Development Board (HDB) flat has adopted

    green measures like dimming of corridors flouroscent lights. Therefore we need to

    assert why our LED plus infra-red switch combo is better by measuring, controlling

    and tracking long-term cost and electric energy savings through a trial, because

    estimation is rarely accurate to include numerous costs involved over the revamp

    1http://www.business-citation.com/

    http://www.business-citation.com/http://www.business-citation.com/http://www.business-citation.com/http://www.business-citation.com/
  • 7/30/2019 Zrj eom

    2/4

    ZENG RUIJIA 5E

    From earth hour to saving electric power Task 2: Waste not, want not

    period and across different structures of corridors.

    HDB is the initiator because it is managing most of the flats directly or indirectly and

    it has carried out energy-saving experiments under the Greenprint Programme.

    Online bidding enables HDB to seize bidders to find a reliable and experienced

    contractor and choose a fairly lower price and Phase 2 is implemented at a time

    when corridors usage is at minimum since most of the residents would have gone for

    work. It is important to conduct the trail at a few build-to-order blocks for two reasons:

    1. lighting facilities of surrounding blocks are new so fair and meaningful comparison

    is established to reflect the true electricity savings of our trial. 2. There must be

    residents using the corridors. After all the compilation of data, analysis sets in to

    evaluate whether our plan can save more.

    However, an experiment at a build-to-order block may not reflect the true cost of

    revamping existing flats. Because:

    1. More working days are needed to compensate the loss in effective working

    hours per day.

    2. Logistic fees might be higher in a crowded and congested neighborhood than

    a new one.

    Extrapolatetimerequired tocalculatebreak evenwithexpense of

    ravamp

    Phase 4

    Documentelectricityconsumption ofcorridor'slighting for onemonth andcosts of revamp

    Phase 3

    Revampfrom 8am to4pm onweekdays

    Phase 2

    HDB put uponline bidding tofind a contractorto install censorswitch andchange the lightbulb

    Phase 1

  • 7/30/2019 Zrj eom

    3/4

    ZENG RUIJIA 5E

    From earth hour to saving electric power Task 2: Waste not, want not

    3. There might be other unfathomable intangible societal cost- inconvenience

    during the installation, compromise on safety level, which could dent residents

    welfare and render unease.

    Therefore conducting a trial at inhabited block is compelling as it could gauge the

    uncertainty in revamp period and magnitude of costs and benefits that stem from

    myriad factors.

    The author also highlights that

    This helps us to realise that our project is flawed by failure to recognise the

    importance of public perceptions of the project executant, since a common mind set

    predominant People Action Party (PAP) equates the government is deeply

    ingrained in literally every Singaporean, whether young or old. Any nonwell-

    addressed dissatisfaction about the project may in turn convert to loss in votes, so

    we formulate a plan to make public perception a positive driving force.

    Post-survey athousehold's door

    step by NEAvolunteers to

    collate residentsfeedbacks

    Present theenergy saving

    benefits inflat notice

    board

    Pre-survey sentby email to

    colmpile peakcorridor usage

    timing

    By various town councils

    and community centers, in

    collaboration with NEA.

  • 7/30/2019 Zrj eom

    4/4

    ZENG RUIJIA 5E

    From earth hour to saving electric power Task 2: Waste not, want not

    Pre-survey is sent by Community centres (CC) through emails because it is mainly to

    inform the residents about this project and sample initial public reactions about this

    project so feedback from every household is not necessary.Poster display at notice

    board is cheap and effective to inform all if not most of the residents about the full

    benefits of revamp-cost-savings can be passed down to fuel other HDB upgrading

    projects like block-washing, repainting and landscaping management. CCs suitable

    driver since it has access to household information and is managing the notice

    board. With myriad volunteers and same agenda in environment preservation, NEAs

    help to collect residents feedback is cheap and give residents a say in operating

    hours of corridor electricity-saving project.