ZHJV-W-P2-PT-0001-1
1
GALVANIZED PIPE ARRANGEMENT FOR PILE TESTING PYLON P2 PROJECT DOCUMENT NUMBER: company phase SCALE : FILE NAME: zone document number DRAWING TITLE: ENGINEERING CONSULTANT: REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT. GOVERNMENT OF UGANDA NEW BRIDGE ACROSS RIVER NILE AT JINJA EMPLOYER: UGANDA NATIONAL ROADS AUTHORITY PLOT 11, YUSUF LULE ROAD P O BOX 28487 KAMPALA - UGANDA Email: [email protected] ENGINEERING CONTRACTOR: SCALE : FILE NAME: DRAWING TITLE: ENGINEERING CONSULTANT: DATE EMPLOYER: ENGINEERING CONTRACTOR: PAUL 04-10-2014 0 NISHIO NISHIO
-
Upload
samuel-acidri -
Category
Documents
-
view
216 -
download
0
description
ZHJV-W-P2-PT-0001-1
Transcript of ZHJV-W-P2-PT-0001-1
GALVANIZED PIPE ARRANGEMENT FOR PILE TESTING
PYLON P2
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zonedocument number
DRAWING TITLE:ENGINEERING CONSULTANT:
REVESTABLISHED CHECKED
APPROVEDDATE DESCRIPTION
STAT.
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVERNILE AT JINJA
EMPLOYER:
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
ENGINEERING CONTRACTOR:
SCALE :
FILE NAME:
DRAWING TITLE:ENGINEERING CONSULTANT:
DATE
EMPLOYER:
ENGINEERING CONTRACTOR:
PAUL 04-10-20140 NISHIO NISHIO