ZHJV-W-A1-PT-0001-1

1
GALVANIZED PIPE ARRANGEMENT FOR PILE TESTING ABUTMENT A1 PROJECT DOCUMENT NUMBER: company phase SCALE : FILE NAME: zone document number DRAWING TITLE: ENGINEERING CONSULTANT: REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT. GOVERNMENT OF UGANDA NEW BRIDGE ACROSS RIVER NILE AT JINJA EMPLOYER: UGANDA NATIONAL ROADS AUTHORITY PLOT 11, YUSUF LULE ROAD P O BOX 28487 KAMPALA - UGANDA Email: [email protected] ENGINEERING CONTRACTOR: SCALE : FILE NAME: DRAWING TITLE: ENGINEERING CONSULTANT: DATE EMPLOYER: ENGINEERING CONTRACTOR: PAUL 04-10-2014 0 NISHIO NISHIO PAUL 02-01-2015 1 NISHIO NISHIO FIRST ISSUE FIRST REVISION

description

ZHJV-W-A1-PT-0001-1

Transcript of ZHJV-W-A1-PT-0001-1

Page 1: ZHJV-W-A1-PT-0001-1

GALVANIZED PIPE ARRANGEMENT FOR PILE TESTING

ABUTMENT A1

PROJECT DOCUMENT NUMBER:

company phase

SCALE :

FILE NAME:

zonedocument number

DRAWING TITLE:ENGINEERING CONSULTANT:

REVESTABLISHED CHECKED

APPROVEDDATE DESCRIPTION

STAT.

GOVERNMENT OF UGANDA

NEW BRIDGE ACROSS RIVERNILE AT JINJA

EMPLOYER:

UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

ENGINEERING CONTRACTOR:

SCALE :

FILE NAME:

DRAWING TITLE:ENGINEERING CONSULTANT:

DATE

EMPLOYER:

ENGINEERING CONTRACTOR:

PAUL 04-10-20140 NISHIO NISHIO

PAUL 02-01-20151 NISHIO NISHIO

FIRST ISSUE

FIRST REVISION