Contents
一
二二
Background
Research and Application of DSM
三三 Application of Smart End R&D
四四 Conclusion
1.1 Concept of DSM and Its Development
Technical Conditions on The Background of
Smart Grid
Competitive Mechanisms of Power Market
Smart End;Infrastructure of Measurement
and Communication ;Analytic and Decision Method ;Standards of Smart Power Utilization.
Competitive MarketVariety of Electricity Price;Sufficient Incentives
Demand Side Management
Demand Response(DR)
DSM was introduced in USA.
Power crisis in California in early 2000s
In early 1990s
In 1970s, the oil crisis caused a sharp rise in energy prices.
Researches on and implementation of demand side management (DSM) began in China.
DR and demand side bidding (DSB) were introduced.
Effective incentives were taken to induce changes in power consumption patterns by customers, improve end-use efficiency and achieve systematic power-saving management.
1.2 The Meanings of DSM Implementation
九
Custom
er
Grid
Com
pany
Reliability
Retailing
Promotion
Diversified C
hoicesM
arketStabilized
Energy
Independence
Maximized benefits could be reached only by
the joint effort of customers, grid company and government!
Implementation of DSM fits the benefits of the whole society!
1.3 Methods of China DSM Implementation
Orderly use of electricityDSM
Programs Methods
Energy efficiency planning
Electricity price project
• government and grid company play an leading role
• It’s not a market behavior
• EPP construction in China has obtained great efficiency
• contract energy management project
• TOU• CPP• Step Tariff (ST)
• Reliability Power Price (RPP)
• Interruptible Power Price (IPP)
Contents
二
一一 Background
Research and Application of DSM Criteria
三三 Application of Smart End Research and Development
四四 Conclusion
2.1 The Status quo of CSG’s DSM Implementation
Standards compilation is promoted by basic research, and pilot project is guided by the standards.
Load characteristics analysis;Research on DR mechanism;energy efficiency analysis;Design and implementation of DR mechanisms
Pilot of energy efficiency and load response;Platform of DSM in CSG has promoted the value-added business of electricity utilization.
Establishment of proper DSM technical criteria systems of China;Compilation of country/industry /enterprise standards;Promotion of international standards compilation. Basic
research
Pilot of project and platform
2.2 Establishment of DSM StandardizationTechnology Committee
Establishment of DSM Standardization Technology Committee
In December 2012, the Electric Power Research Institute of CSG applied to CEC for
the establishment of the DSM Standardization Technology Committee.
It is intended to prepare a total of 23 DSM and DR standard systems falling into
three categories and eight series as the standard basis of the implementation and
technical and economic evaluation of DR projects and the energy savings and energy
efficiency assessment of power grids and enterprise customers.
In December 2012, the Electric Power Research Institute of CSG applied to CEC for
the establishment of the DSM Standardization Technology Committee.
It is intended to prepare a total of 23 DSM and DR standard systems falling into
three categories and eight series as the standard basis of the implementation and
technical and economic evaluation of DR projects and the energy savings and energy
efficiency assessment of power grids and enterprise customers.
• Basics• DR• Management of
energy efficiency
• DR technologies and classification• DR estimation• DR performance and efficiency• DR trading mechanism• Grid company energy-saving
technologies• Grid company energy savings
statistics• Customer's energy efficiency and
monitoring• Customer's energy-saving
technologies and estimation
3 categories
8 series
2.3 Organizing International DSM StandardizationBusiness
In 2012, the data of electricity use of more than 40 customers involved in DR were collated and analyzed, and many technicians and experts were consulted for comments. The environment of DR implementation in different countries
was taken into account.
In 2012, the Electric Power Research Institute of CSG led the
development of the national standard - Guide for the Benefit Evaluation of Electric Power Grid
Customer Demand Response.At the end of 2012, Beijing,
Foshan and others were determined to be the DSM pilot
cities to test the standard.
In October 2013, the standard was approved as a project (No.
P2030.6) by IEEE.In November and December
2013, the outline of and descriptions for IEEE P2030.6
were completed.
Task summary and planning
National standard
developmentIEEE standard
application
IEEE P2030.6 Guide for the Benefit Evaluation of Electric Power Grid Customer Demand Response
2.3 Organizing International DSM StandardizationBusiness
Members of IEEE P2030.6 Working Group
Electric Power Research Institute of CSG
Alstom Grid Technology Center
Honeywell Ltd.
Datang Telecom Technology & Industry Group
Panasonic R & D Center (China)
North China Electric Power University
Southeast University
Smart Metering Solutions Co.,Ltd.
2.3 Organizing International DSM StandardizationBusiness
IEEE P2030.6 Guide for the Benefit Evaluation of Electric Power Grid Customer Demand Response
Applicable for:
•to audit the effects of demand response programs
Government
2.3 Organizing International DSM StandardizationBusiness
IEEE P2030.6 Outline
Foreword
1 Scope
2 Normative References
3 Terms and Definitions
4 Application Procedure of
The Guide
5 DR Effect Monitoring
6 DR Benefits Evaluation6.1 Benefits Description
6.2 Calculation of Costs and Benefits
Appendices (baseline
calculation & examples)
This standard consists of 6 chapters and 2 appendices, covering the
benefit evaluation of customer demand response. The main contents include
4 parts: application of the guide, indexes of effects monitoring, benefit
evaluation and appendices (baseline calculation & examples).
This standard consists of 6 chapters and 2 appendices, covering the
benefit evaluation of customer demand response. The main contents include
4 parts: application of the guide, indexes of effects monitoring, benefit
evaluation and appendices (baseline calculation & examples).
2.4 863 Program on AMI & DSM
Pilot of intelligent utilization of electricity——Scope
Location of demonstration project: Nanning, Guangxi
More than 10,000 customers: including residential electricity customers, business electricity customers and industrial electricity customers
Demonstration features:
Smart electricity meters / smart terminals
AMI communication network
Metering database management system (MDMS)
DSM: 8% peak load saving is expected.
2.4 863 Program on AMI & DSM
Residential Demonstration Zone
Residential Demonstration
Zone
Business Demonstration Zone
High-end Residential Demonstration Zone
Residential Demonstration
Zone
Industrial Demonstratio
n Zone
Guangxi Power Grid Company
10,000 residential electricity customers
86 villas
40 industrial electricity customers
58 business electricity customers
Pilot of intelligent utilization of electricity——Scope
2.4 863 Program on AMI & DSM
系统架构
Pilot of intelligent utilization of electricity—Technical Infrastructure
In Guangxi demonstration project, The AMI system consists of three parts: smart home and community
energy management system, AMI system and advanced application system.
In Guangxi demonstration project, The AMI system consists of three parts: smart home and community
energy management system, AMI system and advanced application system.
二二
Contents
三
一一 Background
Research and Application of DSM Criteria
Application of Smart End Research and Development
四四 Conclusion
3.1 Smart Metering Criteria and Its Implementation in CSG
Smart Metering Criteria System
Smart Metering Criteria System
Transformer Smart end Master Station
Safety Certificationsmart meter
3.1 Smart Metering Criteria and Its Implementation in CSG
Smart meter with high reliability
Smart End
Meters &Meters &Smart endSmart end
CSG has Promoted the metering technical infrastructure, application and communication criteria; Considering the distributed energy integrated, bidirectional meters with high reliability and low power have been developed.
Smart end R&D is implemented in modularization, considering the requirement of basic, smart and advanced application .According to actual demands, smart end is targeted integrated.
3.1 Smart Metering Criteria and Its Implementation in CSG
StandardsStandards
single-phase fee-control energy metersingle-phase fee-control energy meter
three-phase fee-control energy meterthree-phase fee-control energy meter
Outline structure of single-phase fee-control energy meter
Outline structure of single-phase fee-control energy meter
Outline structure of three-phase fee-control energy meter
Outline structure of three-phase fee-control energy meter
Extended communication protocols of multifunction energy meter
Extended communication protocols of multifunction energy meter
three-phase multifunction energy meterthree-phase multifunction energy meter
…………
Technical Standards of smart meter & end
CSG criteria have described the type, size, function, communication protocol and outline structure of energy meter; and Function deployment is defined as well. With advanced technical indices, such energy meter could meet the demand of CSG’s metering procedure.
3.2 Application requirements of Smart Metering in CSG
Functions RequirementsMetering energy bidirectional metering, four quadrants reactive power metering,combined
reactive and active power metering, settling day recorded.
Max Capacity Metering
Metering total amount of active and reactive power, and each one in peak/off-peak/valley time,with time recorded.
Monitoring Measurement, collect and display the whole and each phase electrical parameters, off-limit monitoring and recorded as an event.
Event Recording Recording the event times and accumulative events, with meter reading
Time adjusting When the time difference between master station and meters is ±5min, meters should be adjusted to consistency with the master station.
Consumption Time Recording
Equipped with timetables of two different time zone, of which the upper amount of time zones around the year is 14.The span of each timetable is 8 days, and another price strategy could be triggered in preset time, which include the prices of critical peak/peak/off-peak/valley time.
Freezing Timing/Instantaneous/Convention/Day/Hour Freezing
Load Recording voltage, current, frequency, active power, reactive power, four quadrants reactive energy consumption, real time capacity.
Display automatically recycling display & button triggered recycling display
3.2 Application requirements of Smart Metering in CSG
Functions RequirementsCommunication more than 1 interface of infrared communication, 2 interfaces of RS458,
selectable PLC communication pattern.
Alarming Alarming signals include light, sounds and LCD display.
Switches The ON/OFF command could be send to meters to control switches.
Metering in Outage
The meter could be triggered by buttons or other indirect operations during outage, with infrared metering and displayed functions.
Signal Out put Output by light pulse, electric pulse, multi-function signals, alarming signals.
Fee Controlling Supported with functions of local/remote fee controlling.
Power Supply Keeping Remote supply keeping and automatic supply keeping.
Data Storage Electricity/capacity consumption data storage keep fine in 10 years.
Security Security patterns combines the key protection and coding switches protection.
3.3 The State Quo of Smart End R&D in CSG
GPRS/CDMA/APN专网
RS-485/
...
...采集器
RS-485/
低压用户 专变用户
RS485/微功率无线/220V载波
智能终端...
数据采集与设备监控一体化平台/计量自动化系统
采集服务器1#
数据库服务器2#数据库服务器1# 应用服务器 业务工作站
采集服务器2#
负载均衡器
Compared with traditional end, advantages of smart end include:
1、Low power, high reliability, easy to maintain;2、Standards of ends are uniformed, making that each application of the end could be developed independently;3、Statistics of outage duration, power quality, distribution transformers monitoring, peak time management, energy efficiency management, electricity stealing monitoring.
3.4 Trends of Smart End R&D in CSG
Smart endAdaptable to Web of Things
technologyAdaptable to Web of Things
technology
Multi-functions of distribution ends
Multi-functions of distribution ends
Adaptable to automatic testing of smart ends
Adaptable to automatic testing of smart ends
Low powerLow power
Network based and variablecommunication methods
Network based and variablecommunication methods
High reliability andeasy to maintain
High reliability andeasy to maintain
Trends of Smart End
三三
二二
Contents
四
一一 Background
Research and Application of DSM Criteria
Application of Smart End Research and Development
Conclusion