Eric V. Silk, CEM October 14, 2015
![Page 2: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/2.jpg)
Agenda
Q & A
Conclusions
Design and Implementation Strategies
Project Challenges
Project Introduction
![Page 3: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/3.jpg)
Pepco Energy Services (customer) partnered with Thermo Systems, a Rockwell Automation Solution Partner, to design, build, deploy and commission a turnkey replacement of its aging DCS system serving the district energy system in Midtown Atlantic City. The successful migration included zero customer downtime, ease of service, increased operational efficiency, billing accuracy, and expansion possibilities moving forward.
DCS Replacement in a 24/7 Critical District Energy Facility
![Page 4: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/4.jpg)
Site ProfilePES In Atlantic City, NJ
• Fourteen (14) Chillers – 16,000 ton capacity
• Three (3) Saturated Steam Boilers – 210,000 Lb/hr capacity
• Combined Heat and Power – 5.5MW w/ 50,000 Lb/hr waste
heat recovery (2011 Project)
• Thirteen (13) Customers on District Energy Loop
• Energy Transfer Stations with dedicated metering PACs
Midtown Thermal Control Center (MTCC)
![Page 5: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/5.jpg)
Profile - PES In Atlantic City, NJ
• Remote Locations • Golden Nugget Plant• Convention Center Thermal Plant• Convention Center Solar System• Wilmington, DE Loop
MTCC
ACCC
2.4Mw PV
GN• MTCC Overview
• Cogen Plant• Boiler Plant• Chiller Plant• District Customers
![Page 6: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/6.jpg)
Energy Distribution System• 4 miles of steam & chilled water piping • Fiber optic controls throughout system• Steam Header leaving the plant – 20”• Chilled water header leaving the plant – 42”
Energy Transfer Stations – ETS’s• Chilled water and steam heat exchangers located at various locations within customer sites• Transfer point of product for billing• Chilled water delivered at 42F
Steam Chilled Water• Caesars: 5 ETS’s 5 ETS’s• Bally’s : 2 ETS’s 2 ETS’s• Claridge: 1 ETS 1 ETS• Trump Plaza: 2 ETS’s 2 ETS’s• Boardwalk Hall: 2 ETS’s 2 ETS’s• Pier Shops: 1 ETS
Profile - MTCC In Atlantic City, NJ
![Page 7: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/7.jpg)
Project ProfileMTCC DCS Replacement Project
• Yokogawa/JCI DCS Replacement
• Viking Billing & Reporting System Replacement
Life Cycle Replacement of a Legacy Yokogawa / JCI DCS and Viking Billing & Reporting System
![Page 8: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/8.jpg)
Project ProfileMTCC DCS Replacement Project
• Rockwell Automation Solution Tools• FT View SE SCADA• FT Historian SE• Allen Bradley PACs• RA Transaction Manager (bridge Plant with IT Billing)• FT VantagePoint EMI (for reporting/dashboarding)• Remote Building Integration via Firewalled PACs
• Nexant Utility Billing & Accounting System
Life Cycle Replacement of a Legacy Yokogawa/JCI DCS and Viking Billing & Reporting System
![Page 9: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/9.jpg)
PES’ Business Challenges
• Proprietary • DCS • Billing
• Many independent systems controlled by one DCS• Poor visibility of remote buildings• Highly manual/inefficient billing and reporting software
Now was the time to implement a reliable control systemA global control room was a must that integrated all systems
![Page 10: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/10.jpg)
Technical Challenges
• Lacking expertise of proprietary DCS• Lacking expertise of proprietary Billing System• 24/7 Plant Operation – Contractually obligated to produce chilled
water and steam• Inconsistent connectivity to remote Thermal Plants
• Taj Mahal, Atlantic City Convention Center, Golden Nugget
A non proprietary plant control system with billing integration was needed
![Page 11: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/11.jpg)
Why Thermo Systems?
• Design-Build / Turnkey capabilities (Engaged as MAC)• Ability to take project from UR through commission and life cycle
support• Experience in application: CHP, CHW & Steam Plant• Integrator with good quality control and documentation practices• Thermo Systems is a RA Solution Partner• Current PES Service Provider
![Page 12: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/12.jpg)
DCS Replacement Project Approach
• User Requirements – Thermo Systems knew what questions to ask..
• Phased Approach• Design – Drawings, Software Specification
• Implementation
• Up front coordination with Plant Operations• Transition Plan – Key to Success
– Minimize Downtime
• Client Support
![Page 13: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/13.jpg)
DCS Replacement Project Approach
• Transition Plan – Implementation in multiple phases• Dearator Tank and Boiler feedwater
• Boiler CCS w/ PanelView (phased install qty. 3)
• Data Concentrator – comms to 13 Customer ETS
• Chilled Water Balance of Plant (BOP)
• Remote Terminal Units (RTUs) - Golden Nugget, Taj Mahal, ACCC
• Nexant billing integration via Transaction Manger
• Steam metering upgrade and standardization
![Page 14: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/14.jpg)
DCS Replacement Project Approach
• Leverage SCADA implemented during a previous Cogeneration Project• FT View SE
• FT Historian SE
![Page 15: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/15.jpg)
DCS Replacement Solution (old)
ETS ...
ETS 1
ETS 13
PLC5 DCS
BOILER 1 CCS
BOILER 2 CCS
BOILER 3 CCS
DA TANK BFW
CHW BOP
ETS 7A
ETS 7B
ETS 5
![Page 16: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/16.jpg)
DCS Replacement Solution (new)
ETS ...
ETS 1
ETS 13
ControlLogix Data Concentrator
PLC
CompactLogixPLC w/PVSCADA
FT View SE w/Historian BOILER 2
CCS
BOILER 3CCS
DA TankBFW
CHWBOP
ETS 5
ETS 7A
ETS 7B
BOILER 1CCS
ControlLogixPLC
CompactLogixPLC
CompactLogixPLC w/PV
CompactLogixPLC w/PV
CompactLogixPLC
Point IO
CompactLogixPLC
![Page 17: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/17.jpg)
DCS Replacement Sequence
![Page 18: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/18.jpg)
DCS Replacement Sequence
![Page 19: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/19.jpg)
DCS Replacement Sequence
![Page 20: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/20.jpg)
Billing Replacement Solution - old data flow
![Page 21: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/21.jpg)
Billing Replacement Solution - new data flow
ETS ...
ETS 1
ETS 13
ControlLogix PLCData Concentrator
ETS 5
ETS 7A
ETS 7B
Transaction Manager
Golden NuggetACCC
Nexant Billing Software
MicroLogixPLC
MicroLogixPLC
MicroLogixPLC
Taj Mahal CompactLogixPLC
MicrologixPLC
CompactLogixPLC
![Page 22: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/22.jpg)
Dashboard
![Page 23: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/23.jpg)
Dashboard
![Page 24: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/24.jpg)
Summary of Rockwell Equipment
• Software• Transaction Manager (billing)• VantagePoint EMI (reporting)• FT View SE• FT Historian
• Hardware• ControlLogix PAC (qty 2)• CompactLogix PAC (qty 6)• Point IO (qty 1)• PanelView HMI (qty 3)• MicroLogix RTU panel (qty 4)
![Page 25: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/25.jpg)
Conclusions
User Requirements & Transition Plan is key Phased approach for complex retrofits Understanding of plant operations FATs help minimize troubleshooting during startup Deploying PACs logically (separation of plants) PES teamed with Thermo Systems from start to finish (continuity) Rockwell Automation provided the tools for success Thermo Systems leveraged our experience in application
![Page 26: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/26.jpg)
• Our engineers have depth and expertise in:
• Energy: Utilities / Facilities, CHP, critical HVAC, chilled water, boiler plants, power generation, data center critical HVAC
• Consumer: Life Sciences, Food & Beverage, Consumer Packaged Goods (CPG)
Thermo Systems – Industry Expertise
![Page 27: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/27.jpg)
• Thermo Systems LLC is more than a systems integrator. We are a design-build control systems engineering and construction firm, managing and delivering turnkey (MAC) Main Automation Contractor projects
• Comprehensive Services (Greenfield or Brownfield) include:• Automation & Information Master Plan including Program/Project Management and Plant/OEM/Sub-
Contractor Coordination• Project Specifications, Documentation and Automation Architecture Standards • Automation & Information and I&C Design Services • Fabrication, Assembly and Testing• Systems Integration and Programming• Turn key I&C Electrical and Mechanical Installation• Start up, Commissioning and IQ/OQ• Staff augmentation through turnkey• 24/7/365 On-Site and Remote Support• Life-cycle Automation support including Assessments, Modernizations/Migrations
Thermo Systems – Overview
![Page 28: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/28.jpg)
Thermo Systems – Across America
![Page 29: Zero downtime upgrate for dcs migration Thermo Systems](https://reader036.fdocuments.us/reader036/viewer/2022062503/58ee006a1a28ab3c078b46f1/html5/thumbnails/29.jpg)
Questions