ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona 12-15 May 2003 1 Question 7 (7.1)...
-
Upload
barbra-fox -
Category
Documents
-
view
213 -
download
0
description
Transcript of ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona 12-15 May 2003 1 Question 7 (7.1)...
1ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13
Barcelona 12-15 May 2003
Question 7 (7.1)
10-CYCLE
INSTRUMENT X
INSTRUMENT Y2 CYCLES
Instrument X V = 1 p.u.Instrument Y V = 1.043p.u.Error = 4.3% for 200ms intervalOver 3 s interval Error = 0.29% > Class A accuracy limit = 0.1%
2ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13
Barcelona 12-15 May 2003
Question 8 (8.1, 8.2, 8.3)Definition of events• System events• Complex events examples
Methods of processing dips, swells and short interruptions• Summation• Phase aggregation (IEC 61000-4-30)• Temporal aggregation (one-minute) (IEC 61000-2-8, IEEE 1159)
– On a phase-by-phase basis– On a 3-phase basis– Severity and duration of aggregated events
Statistical processing of voltage dips and short interruption data• Extrapolation up to one year not recommended
3ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13
Barcelona 12-15 May 2003
Question 8 (8.1, 8.2, 8.3)
4ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13
Barcelona 12-15 May 2003
Question 13(13.2, 13.3, 13.4)
An Overhead Distribution Line has the potential to provide PQ raw and processed data from:• Substation Located Circuit Breaker Controller (MV) or PQ Analyser connected to the
Substation Busbar• Reclosers Controllers (MV)• Voltage Regulator Controller (MV)• Intelligent Revenue Meters (LV)• PQ Analysers connected to the distribution line at strategic locations (if necessary)
Substation
Recloser Recloser
Revenue Meter Revenue Meter
Voltage regulator