Z00A-IN-MIS-1-545B-19-00_Rev 00

1
INPUT/OUTPUT LIST (I/O) (DOC No# Z00A-IN-MIS-1-545B-54-00) 00 21/02/ 12 Issued For Construction SG NS JM A1 2/2/20 12 Issued For Review SG NS JM Rev . Date Issue Purpose Prepare d By Checked By JPK Approved By JPK Approved By ME Approved Total Pages: 3 Category Code Client Rep. Dragon Oil Client: Contract Code 545B Description Document Type MIS Offshore Installation General Area Code Discipli ne Code Classificat ion Code Country Code Cluster Number Serial Number Sheet Number Z00A IN MIS 1 545B 54 00 Project: EPIC OF BLOCK – 4 RISER PLATFORM AND SUBSEA PIPELINES Contract Number File No: Z00A-IN-MIS-1-545B-54-00 CFT/DG/45/10/545B

description

io list

Transcript of Z00A-IN-MIS-1-545B-19-00_Rev 00

Pls Revise Pro Title from File - Properties - Title - Update Field

EPIC OF SUBMARINE PIPELINES 18 (LAMB BLOCK1) &20 (BLOCK1 BLOCK2)Page 2 of 7DATA SHEET FOR ESD PUSH BUTTONS

GNRL-IN-DAT-1-0508-20-00

Project:

EPIC OF BLOCK 4 RISER PLATFORM AND SUBSEA PIPELINES

Contract NumberFile No: Z00A-IN-MIS-1-545B-54-00

CFT/DG/45/10/545B

INPUT/OUTPUT LIST (I/O) (DOC No# Z00A-IN-MIS-1-545B-54-00)

0021/02/12Issued For ConstructionSGNSJM

A12/2/2012Issued For ReviewSGNSJM

Rev.DateIssue PurposePrepared By JPKChecked By JPKApproved By JPKApproved By MEApproved

Total Pages: 3CategoryCodeClient Rep.

Dragon Oil

Client:

Contract Code545BDescription

Document TypeMISOffshore Installation

General

Area CodeDiscipline CodeClassification CodeCountry CodeCluster Number Serial NumberSheet Number

Z00AINMIS1545B5400

Rev. A2

Date: 23/01/12