Yzf r1 07 Assembly Full

download Yzf r1 07 Assembly Full

of 20

Transcript of Yzf r1 07 Assembly Full

  • 8/9/2019 Yzf r1 07 Assembly Full

    1/20

     

    Thank you for downloading the "YZF-R1"paper craft model. By simply

    following this manual while referring to the names and numbers shown

    on the parts sheets, you can assemble an authentic-looking replica of

    the YZF-R1.

  • 8/9/2019 Yzf r1 07 Assembly Full

    2/20

  • 8/9/2019 Yzf r1 07 Assembly Full

    3/20

     

     

     

     

     

     

     

     

     

       

     

     

     

    Glue in order from to on the graphic. 

     

     

     

     

     

     

     

     

  • 8/9/2019 Yzf r1 07 Assembly Full

    4/20

     

     

     

     

     

     

     

       

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Glue in order from to on the graphic. 

     

    Glue in order from to on the graphic. 

    *Assemble both sides. The diagramshows the left side. The number inside

      the ( ) is for the right side.

  • 8/9/2019 Yzf r1 07 Assembly Full

    5/20

     

     

     

     

     

     

       

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Glue in order from to on the graphic. 

     

     

    DO NOT glue the upper and the lower partsof the steering column at this stage.

  • 8/9/2019 Yzf r1 07 Assembly Full

    6/20

     

     

     

     

     

       

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Glue in order from to on the graphic.  

  • 8/9/2019 Yzf r1 07 Assembly Full

    7/20

     

     

     

     

     

     

     

       

     

     

     

     

  • 8/9/2019 Yzf r1 07 Assembly Full

    8/20

     

     

     

     

     

       

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Glue in order from to on the graphic. 

  • 8/9/2019 Yzf r1 07 Assembly Full

    9/20

  • 8/9/2019 Yzf r1 07 Assembly Full

    10/20

  • 8/9/2019 Yzf r1 07 Assembly Full

    11/20

     

     

     

     

     

       

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Glue in order from to on the graphic.  

  • 8/9/2019 Yzf r1 07 Assembly Full

    12/20

     

     

     

     

     

     

     

       

     

     

     

     

     

    Glue in order from to on the graphic. 

    * Do not paste J-48 & J-49.

    * Do not paste K-2 & K-8.

    * Do not paste K-1 & K-7.

  • 8/9/2019 Yzf r1 07 Assembly Full

    13/20

     

     

     

     

     

       

     

     

     

    * Do not paste L-39 & L-48.

    * Do not paste  L-52 & L-54.

    * Do not paste  L-51 & L-53.

    * Do not paste  L-42 & L-47.

    * Do not paste  L-38 & L-41,46.

    * Do not paste L-30 & L-31.

    *Assemble both sides. The diagramshows the left side. The number inside

      the ( ) is for the right side.

  • 8/9/2019 Yzf r1 07 Assembly Full

    14/20

     

     

     

     

     

     

     

       

     

     

     

     

     

     

    Glue in order from to on the graphic. 

     

    Glue in order from to on the graphic.  

     

  • 8/9/2019 Yzf r1 07 Assembly Full

    15/20

     

     

     

     

     

       

     

     

     

     

     

     

     

     

     

     

     

     

     

    Glue in order from to on the graphic. 

  • 8/9/2019 Yzf r1 07 Assembly Full

    16/20

     

     

     

     

     

       

     

     

     

     

     

     

     

     

     

     

     

     

     

    Glue in order from to on the graphic. 

  • 8/9/2019 Yzf r1 07 Assembly Full

    17/20

    Glue the radiator to the engine.

    Glue the engine to the frame 1.

    Glue the rear arm to the frame 1.

    Glue the rear suspension 1 to the frame 1.

    Glue the rear suspension 2 to the frame 1.

    Glue the taillight to the seat cowl.

    Glue the exhaust pipes 3 to the seat cowl.

    Glue the seat cowl to the frame 2.

    Glue the tank to the frame 2.

    Glue the frame 2 to the frame 1.

    Glue the exhaust pipes 1 to the engine.

    Glue the meter to the frame 1.

    Glue the under cowl to the frame 1.

    Glue the front cowl to the under cowl.

    Glue the brake caliper to the front tire.

    Glue the front tire to the lower steering column.

    Glue the front fender to the lower steering column.

    Glue the rear tire to the rear arm.

    Glue the left footrests to the frame 1.

    Glue the right footrests to the frame 1.

    Insert exhaust pipes 2 into exhaust pipes 1 and 3.

    Put the lower part of the steering through the frame andglue it to the upper part of the steering.

     

      

     

      

      

     

      

      

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Connect each of the previously assembled parts in

    order from - according to the diagram. 

     

     

     

     

      

     

      

      

      

     

      

      

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

       

       

     

     

     

     

     

     

     

     

     

     

     

     

     

     

       

     

     

     

  • 8/9/2019 Yzf r1 07 Assembly Full

    18/20

     

     

       

       

     

       

       

       

     

       

     

       

     

       

       

       

  • 8/9/2019 Yzf r1 07 Assembly Full

    19/20

     

     

     

       

     

       

     

       

     

       

     

       

     

       

     

       

  • 8/9/2019 Yzf r1 07 Assembly Full

    20/20