Yung Shue Wan Harbour Reclamation Plans

11
Yung Shue Wan Harbour Reclamation Phase 2 A Chronology By Living Lamma April 2011

description

A history of plans put forward by government for the reclamation of Yung Shue Wan and alternatives suggested by professional planners and designers within the community.

Transcript of Yung Shue Wan Harbour Reclamation Plans

Page 1: Yung Shue Wan Harbour Reclamation Plans

Yung Shue WanHarbour Reclamation Phase 2

A ChronologyBy

Living Lamma April 2011

Page 2: Yung Shue Wan Harbour Reclamation Plans

In 1995, Government plans for the reclamation of Yung Shue Wan were opposed by the community. This is

what the government did:

Page 3: Yung Shue Wan Harbour Reclamation Plans

These were the plans put forward by residents in 1995:

Page 4: Yung Shue Wan Harbour Reclamation Plans

In 2003, Government plans for the phase 2 reclamation of Yung Shue Wan were rejected by the community.

This is what the government proposed:

Page 5: Yung Shue Wan Harbour Reclamation Plans

These were the plans put forward by residents in 2003:

Page 6: Yung Shue Wan Harbour Reclamation Plans

In 2009, government posted plans for a new cycle park. The design, a concrete platform with type 2 railings, was proposed

for the last remaining bit of unspoilt coastline in the bay.

Page 7: Yung Shue Wan Harbour Reclamation Plans

Since 2009, Living Lamma has been lobbying government for better design and environmental

improvement. These was our alternative design for the cycle park, to transform a derelict part of the harbour:

Page 8: Yung Shue Wan Harbour Reclamation Plans

We have recently found out that government is once again intending to go ahead with the phase 2 reclamation of Yung

Shue Wan harbour. Here are the plans:

Page 9: Yung Shue Wan Harbour Reclamation Plans

This plan will kill Yung Shue WanEven if businesses are able to survive the two year construction period, waterfront properties will no longer be able to offer visitors harbourfront seating.

Instead, there will be a 4.5 metre emergency vehicle access that, according to the plan, will go over the fishermen’s den and existing restaurant space.

Page 10: Yung Shue Wan Harbour Reclamation Plans

We need better design • Yung Shue Wan’s harbour is too important to be designed by

engineers• We need sensitive design that retains the bay’s rural and

natural character • Planning Department promises this in its statement of

planning principles for the islands• CEDD does not deliver on this promise, but instead draws

straight lines across the harbour where concrete must be poured

• Despite requests for information, these plans are not shared with the community until after the consultation period has closed.

Page 11: Yung Shue Wan Harbour Reclamation Plans

STOP THE PHASE 2 RECLAMATION OF YUNG SHUE WAN

• Write to:– SCMP – www.scmp.com– Apple Daily - http://hk.nextmedia.com/– Oriental Daily - http://orientaldaily.on.cc/– Local District Councillor, Ms. Yu Lai Fan - Tel: 29820976,

Email: [email protected]– Chairman Chan, North Lamma Rural Committee - Tel:

29820350: Secretary, Ms. Lam: [email protected]• Join Living Lamma and volunteer to help. Go to