U.S. DEPARTMENT OF ENERGY 0 |YUCCA DocumentNo. YMP/cm-0011 c ~~~~~~~~~~~~~~~Revision li C SITE CITHISISA ClNo. C1 1.0000/CI.Q13.000 R \! Dat SN/119 2 w CHARA T WBSNo.____ M 4 PROJE QA Level Yes PROJECT BASELINE DOCUMENT YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM BASELINE (SCPB) VOLUME 1 CHANGES TO THIS DOCUMENT REOUIRE PREPARATION AND APPROVAL OFA CHANGE REQUESTIN ACCORDANCE WITH PROJECTAP-3.3Q UNITED STATES DEPARTMENT OF ENERGY & T YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT OFFICE 92032301011 920313 PDR WASTE PD WM-11 PD

Transcript of YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION...

Page 1: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

U.S. DEPARTMENT OF ENERGY 0

|YUCCA DocumentNo. YMP/cm-0011c ~~~~~~~~~~~~~~~Revision liC SITE CITHISISA ClNo. C1 1.0000/CI.Q13.000

R \! Dat SN/1192

w CHARA T WBSNo.____

M 4 PROJE QA Level Yes

PROJECT BASELINE DOCUMENT

YUCCA MOUNTAINSITE CHARACTERIZATION

PROGRAM BASELINE(SCPB)

VOLUME 1

CHANGES TO THIS DOCUMENT REOUIRE PREPARATIONAND APPROVAL OFA CHANGE REQUESTIN ACCORDANCEWITH PROJECTAP-3.3Q

UNITED STATES DEPARTMENT OF ENERGY & TYUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT OFFICE

92032301011 920313PDR WASTE PDWM-11 PD

Page 2: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2

Document Title: I2 Document Number: YMP/CM-0011

Site Characterization Program Baseline

Note: This document is revised by Section.

The document identified in Blocks I and 2 has been changed. The changed pages attached to this DCN are identifiedin Block 7 opposite the latest DCN number in Block 3. The original issue of this document as modified by all applicableDCN's constitutes the current version of the document identified in Blocks I and 2.

DCN NO. CR NO. ~~~~~DOCUMENT CR AFFECTED Z DATERevJICN # TITLE PAGES C

~~~~~~. lit8~~~~~~~~~~~~~~~~~~~~~~~~~

3

3

4

4

92/020

92/ 021

92/018

92/019

3

3

4

4

Change title of activil8.3.1.2.3.2.3

Change in objectivesfor activity 8.3.1.2.3of YMP-USGS Study Plan8.3.1.3.2 (Saturatedzone hydrochemistry)

Change in objectivesfor Activity8.3.1.2.3.2.3 ofYMP-USGS StudyPlan 8.3.1.2.3.2

Change in objectivesfor Activity8.3.1.2.3.2.1

8.3.1.2-285

2.4

8.3.1.2-286

8.3.1.2-285

8.3.1.2-281

x

x

x

x

2/07/92

2/07/92

3/13/92

3/13/92

d I I - I - I �dUMr-03-UV

Page 3: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

{i -. u l--X~~s~t-s 1- r;

,~~~~~~~~~~~~~~~~~~~~~~ ."-I .r ~ . I .

YMP-034-R2 YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT ' CR No. 92/01811/13/91 CHANGE DIRECTIVE (CD) Page I of 2

SECTION I. IDENTIFICATION2 Title of Change: 3 Change Classification:

Change in objectives for activity 8.3.1.2.3.2.3 of YMP-USGS 300 2SP 8.3.1.2.3.2 (saturated-zone hydrochemistry) 0 1 0 3

SECTION II. DISPOSITION4 CR Disposition:

X Approved 0 Approved with Conditions 0 Disapproved

5 Conditions: (if applicable)

None

(See Change Documentation Continuation Page )

6 Implementation Direction: (if applicable)

1. CR:92/018, is approved as revision to the "Yucca Mountain SiteCharacterization Program Baseline (SCPB)u Document Number YMP/CM-0011.

2. The CCB Secretary shall ensure that the Cover page and Title page forDocument YMP/CM-0011 are updated to reflect this approved change.

3. The Director, RSED shall provide a print ready copy of YMP/CM-0011, to theCCB Secretary for processing. The document number and revision number will beidentified on each page of the Publication Ready Document YMP/CM-0011. A

(See Change Documentation Continuation Page 2 )SECTION 1II. CONCURRENCE Al signaturs lbelow constitute procedural compliance. I have read, understood, and compoed withProcedure LY--ol Rev. b' ICN #! ~in accomplishing my responsibilities in this procedure.

7 Quality Assurance Organization Concurrence

Name: R. E. Spence Org.: YMQAD(Print) . va (Print)

Signature: Yt Date: ________

8 Dsit'on Authority 9 CD Effective Date

N k M. B. Blanchard Title: CCB Chrprsn(PSi n7atur (Print),Z Da: 9 2

Signature:, j ,R V A Z Date: LX/7

OMP-03-0g

Page 4: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

I

YMP036-R0 YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT CR No. 92/0184/23/91 CHANGE DOCUMENTATION CONTINUATION PAGE Page 2 of 2

6 Implementation Direction (continued)

revised Table of Contents and Document Change Notice will also be included.

4. In addition to all affected Project Participants, the PCB Chief, theDirectors of EDD, P&OCD, RSED and YMSO will complete an Affected DocumentNotice (ADN) for implementation planning.

5. The CCB Secretary shall ensure that the Configuration Information System(CIS) and the CCB Register are updated to reflect this approved revision toDocument YMP/CM-0011.

6. Any changes to Document YMP/CM-0011 will require submission of a CR to theProject CCB.

AP-3.3Q

Page 5: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP-034-R2 YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 1 CR No. 92/01911/13/91 CHANGE DIRECTIVE (CD) Page 1 of 2

SECTION 1. IDENTIFICATION2 Title of Change: 3 Change Classification:

Change in objectives for activity 8.3.1.2.3.2.1 of YMP-USGS O E12SP 8.3.1.2.3.2 (saturated-zone hydrochemistry) 01 03

SECTION 11. DISPOSITION4 CR Disposition:

lI Approved 0 Approved with Conditions 0 Disapproved

5 Conditions: (if applicable)None

(See Change Documentation Continuation Page )6 Implementation Direction: (if applicable)

1. CR:92/019, is approved as revision to the "Yucca Mountain SiteCharacterization Program Baseline (SCPB)' Document Number YMP/CM-0011.

2. The CCB Secretary shall ensure that the Cover page and Title page forDocument YMP/CM-0011 are updated to reflect this approved change.

3. The Director, RSED shall provide a print ready copy of YMP/CM-0011, to theCCB Secretary for processing. The document number and revision number will beidentified on each page of the Publication Ready Document YMP/CM-0011. A

(See Change Documentation Continuation Page 2L)SECTION Ill. CONCURRENCE Al sgnatures below constit procedural compline. I have read, understood, and coiplied with

Procedurem= P- .Rev. 3 ICN # F= in aocomplishing my responsibilities in this procedure.

7 Quality Assurance Organization Concurrence

Name: R. E. Spence Org.: YMQAD(Print) (Pdnt)

Signature: L-- t' Date: ,_ '/L.

Disp Ition Authority CD Effective Date

M. B. B ard. ,, Ttle: CCB Chrprsn(Print) & / j(/. li # (Print) / Z

Signature: /4.- t4 G od) Date: a...-

I IQMP-03 -09

Page 6: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

p

YMP-036-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT ' CR No. 92/0194/23/91 CHANGE DOCUMENTATION CONTINUATION PAGE Page 2of 2

6 Implementation Direction (continued)

revised Table of Contents and Document Change Notice will also be included.

4. In addition to all affected Project Participants, the PCB Chief, theDirectors of EDD, P&OCD, RSED and YMPO will complete an Affected DocumentNotice (ADN) for implementation planning.

5. The CCB Secretary shall ensure that the Configuration Information System(CIS) and the CCB Register are updated to reflect this approved revision toDocument YMP/CM-0011.

6. Any changes to Document YMP/CM-OOll will require submission of a CR to theProject CCB.

AP-3.30

Page 7: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS

TotalNo. of

Page Rev. Pages

8.0 Introduction . . . . . . . . . . . . . . . . . . .8.1 Rationale for the site characterization program

8.1.1 The issues-based approach to planning sitecharacterization . . . . . . . . . . . . . . .

8.1.1.1 Derivation, structure, and scope . . . . .8.1.1.2 Application in the site characterization

plan . . . . . . . . . . . . . . . . . . .8.1.2 Issue resolution strategy . . . . . . . . . . .

8.1.2.1 Issue identification . . . . . . . . . . .8.1.2.2 Performance allocation . . . . . . . . . .8.1.2.3 Data collection and analysis . . . . . . .8.1.2.4 Issue resolution documentation . . . . . .8.1.2.5 Application of the issue resolution

strategy . . . . . . . . . . . . . . . . .8.2 Issues to be resolved and information required

during site characterization . . . . . . . . . . .8.2.1 Issues to be resolved . . . . . . . . . . . . .

8.2.1.1 Site-specific issues hierarchy . . . . . .8.2.1.2 Other issues . . . . . . . . . . . . . . .

8.2.2 Approach to issue resolution . . . . . . . . .8.2.3 Issue tracking . . . . . . . . . . . . . . . .

8.3 Planned tests,.analyses, and studies . . . . . . .8.3.1 Site program8.3.1.1 Overview of the site program: Role of

alternative conceptual models . . . . . . .8.3.1.2 Overview of the geohydrology program:

Description of the present and expectedgeohydrologic characteristics required bythe performance and design issues . . . . .

8.3.1.2.1 Investigation: Studies to provide adescription of the regional hydrologicsystem . . . . .

8.3.1.2.1.1 Study: Characterization of themeteorology for regionalhydrology

8.3.1.2.1.1.1 Activity: Precipitation andmeteorological monitoring .

8.3.1.2.1.2 Study: Characterization ofrunoff and streamflow . . . . . .

8.3.1.2.1.2.1 Activity: Surface-waterrunoff monitoring . . . . . .

8.3.1.2.1.2.2 Activity: Transport ofdebris by severe runoff . . .

8.3.1.2.1.3 Study: Characterization of theregional ground-water flowsystem . . . . . . . . . . . . .

8.0-1 28.1-1 2

8.1-1 28.1-1 2

10*1

1-4

8.1-48.1-58.1-58.1-5

8.1-118.1-14

222222

2116*4*4*

8.1-17 2 1

8.2-18.2-1

8.2-138.2-138.2-588.2-638.3-1

8.3.1-1

8.3.1.1-1

8.3.1.2-1

8.3. 1.2-92

8.3.1.2-97

8.3.1.2-97

8.3.1.2-102

8.3.1.2-102

8.3.1.2-109

8.3.1.2-110

22222222

113*

145*6*3*2*1

2 9*

2 92*

2 6*

2 1

2 6*

2 1

2 8*

2 2

2 2

* Includes figures and tables

iii

Page 8: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.2.1.3.1

8.3.1.2.1.3.2

8.3.1.2.1.3.3

8.3.1.2.1.3.4

Activity: Assessment of theregional hydrogeologic dataneeds in the saturated zoneActivity: Regional potentio-metriclevel distribution andhydrogeologic frameworkstudies . . . . . . . . . .Activity: Fortymile Washrecharge study . . . . . . .Activity: Evapotranspirationat 11iei -I .~

8.3.1.2.1.4 Study: Regional hydrologicsystem synthesis and modeling

8.3.1.2.1.4.1 Activity: Conceptualizationof regional hydrologic flowmodels . . . . . . . . . . .

8.3.1.2.1.4.2 Activity: Subregional two-dimensional areal hydrologic

8.3.1.2.1.4.3

8.3.1.2.1.4.4

modeling . . . .Activity: Subregional two-dimensional cross-sectionalhydrologic modeling . . . . . .Activity: Regional three-dimensional hydrologic

8.3.1.2-111

8.3.1.2-114

8.3.1.2-118

8.3.1.2-121

8.3.1.2-124

8.3.1.2-124

8.3.1.2-125

8.3.1.2-127

8.3.1.2-128

8.3.1.2-131

8.3.1.2-141

8.3.1.2-141

8.3.1.2-146

8.3.1.2-1528.3.1.2-156

2 4*

2 4

2 4*

2 3*

2 1

3 2

2 3

2 2

3 4*

2 11*

2 1

2 6

2 7*

modeling . . . . . . . . . . .8.3.1.2.2 Investigation: Studies to provide a

description of the unsaturated zonehydrologic system at the site . . . .

8.3.1.2.2.1 Study: Characterization ofunsaturated-zone infiltration

8.3.1.2.2.1.1 Activity: Characterization ofhydrologic properties ofsurficial materials . . . . . .

8.3.1.2.2.1.2 Activity: Evaluation ofnatural infiltration . . . . .

8.3.1.2.2.1.3 Activity: Evaluation ofartificial infiltration . . .

8.3.1.2.2.2 Study: Water movement test . . .23

51

* Includes figures and tables

iv

Page 9: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.2.2.2.1 Activity: Chloride andchlorine-36 measurements ofpercolation at Yucca Mountain

8.3.1.2.2.3 Study: Characterization ofpercolation in the unsaturatedzone--surface-based study . . .

8.3.1.2.2.3.1 Activity: Matrix hydrologicproperties testing . . . . . .

8.3.1.2.2.3.2 Activity: Site verticalborehole studies . . . . . . .

8.3.1.2.2.3.3 Activity: Solitario Canyonhorizontal borehole study

8.3.1.2.2.4 Study: Characterization of YuccaMountain percolation in theunsaturated zone--exploratorystudies facility study . . . . .

8.3.1.2.2.4.1 Activity: Intact-fracture testin the exploratory studiesfacility . . . . . . . . . . .

8.3.1.2.2.4.2 Activity: Percolation testsin the exploratory studiesfacility . . . . . . . . . . .

8.3.1.2.2.4.3 Activity: Bulk-permeabilitytest in the exploratorystudies facility . . . . . . .

8.3.1.2.2.4.4 Activity: Radial boreholetests in the exploratorystudies facility . . . . . . .

8.3.1.2.2.4.5 Activity: Excavation effectstest in the exploratorystudies facility . . . . . . .

8.3.1.2.2.4.6 Activity: Calico Hills testingin the exploratory studiesfacility . . . . . . . . . . .

8.3.1.2.2.4.7 Activity: Perched-water testin the exploratory studiesfacility . . . . . . . . . . .

8.3.1.2.2.4.8 Activity: Hydrochemistry testsin the exploratory studiesfacility . . . . . . . . . . .

8.3.1.2.2.4.9 Activity: Multipurpose-borehole testing . . . . . . .

8.3.1.2.2.4.10 Activity: Hydrologic propertiesof major faults encountered inmain test level of theexploratory studiesfacility (ESF) . . . . . . . .

8.3.1.2-157

8.3.1.2-158

8.3.1.2-159

8.3.1.2-167

8.3.1.2-178

8.3.1.2-180

8.3.1.2-185

8.3.1.2-190

8.3.1.2-195

8.3.1.2-199

8.3.1.2-202

8.3.1.2-204

8.3.1.2-205

8.3.1.2-206

8.3.1.2-207

8.3.1.2-212

2 1

2 2

2 9*

2 12*

2 3

2 6

2 6

2 6

2 5

2 4

2 3

2 1

2 1

2 2

2 6

2 3

* Includes figures and tables

v

Page 10: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.2.2.5 Study: Diffusion tests in theexploratory studies facility . . .

8.3.1.2.2.5.1 Activity: Diffusion testsin the exploratory studiesfacility . . . . . . . . . . .

8.3.1.2.2.6 Study: Characterization ofgaseous-phase movement in theunsaturated zone . . . . . . . .

8.3.1.2.2.6.1 Activity: Gaseous-phasecirculation study . . . . . . .

8.3.1.2.2.7 Study: Hydrochemicalcharacterization of theunsaturated zone . . . . . . . . .

8.3.1.2.2.7.1 Activity: Gaseous-phasechemical investigations . . .

8.3.1.2.2.7.2 Activity: Aqueous-phasechemical investigations . . .

8.3.1.2.2.8 Study: Fluid flow in unsaturated,fractured rock . . . . . . . . .

8.3.1.2.2.8.1 Activity: Development ofconceptual and numerical modelsof fluid flow in unsaturated,fractured rock . . . . . . . .

8.3.1.2.2.8.2 Activity: Validation ofconceptual and numerical modelsof fluid flow through un-saturated, fractured rock . . .

8.3.1.2-214

8.3.1.2-214

8.3.1.2-215

8.3.1.2-216

8.3.1.2-224

8.3.1.2-224

8.3.1.2-226

8.3.1.2-228

8.3.1.2-229

8.3.1.2-230

8.3.1.2-231

8.3.1.2-232

8.3.1.2-234

8.3.1.2-236

8.3.1.2-238

8.3.1.2-239

8.3.1.2-241

2 1

2 2

2 2

2 8*

2 1

2 3*

2 3

2 1

2 2

2 2

2 2

2 3

2 3

2 3

2 2

2 2

2 8*

8.3.1.2.2.9 Stmo(

8.3.1.2.2.9.1

8.3.1.2.2.9.2

8.3.1.2.2.9.3

8.3.1.2.2.9.4

8.3.1.2.2.9.5

ady: Site unsaturated-zoneieling and synthesis.Activity: Conceptualization ofthe unsaturated-zone hydro-geologic system . . . . . . . .Activity: Selection, develop-ment, and testing of hydrologic-modeling computer codes . . .Activity: Simulation of thenatural hydrogeologic systemActivity: Stochastic modelingand uncertainty analysis . . .Activity: Site unsaturated-zone integration andsynthesis . . . . . . . . . . .

8.3.1.2.3 Investigation: Studies to provide adescription of the saturated zonehydrologic system at the site . . .

* Includes figures and tables

vi

Page 11: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.2.3.1 Study: Characterization of thesite saturated-zone ground-waterflow system . . . . . . . . . . .

8.3.1.2.3.1.1 Activity: Solitario Canyonfault study in the saturatedzone . . . . . . . . . . . . .

8.3.1.2.3.1.2 Activity: Site potentiometric-level evaluation . . . . . . .

8.3.1.2.3.1.3 Activity: Analysis of single-and multiple-well hydraulic-stress tests . . . . . . . . .

8.3.1.2.3.1.4 Activity: Multiple-wellinterference testing . . . . .

8.3.1.2.3.1.5 Activity: Testing of theC-hole sites with conservativetracers . . . . . . . . . . . .

8.3.1.2.3.1.6 Activity: Well testing withconservative tracersthroughout the site . . . . .

8.3.1.2.3.1.7 Activity: Testing of theC-hole sites with reactivetracers . . . . . . . . . . .

8.3.1.2.3.1.8 Activity: Well testing withreactive tracers throughoutthe site . . . . . . . . . . .

8.3.1.2.3.2 Study: Characterization of thesaturated-zone hydrochemistry

8.3.1.2.3.2.1 Activity: Assessment ofsaturated-zone hydrochemicaldata availability and needs

8.3.1.2.3.2.2 Activity: Hydrochemicalcharacterization of water inthe upper part of thesaturated-zone . . . . . . . .

8.3.1.2.3.2.3 Activity: Regional hydro-chemical tests and analyses

8.3.1.2.3.2.4 Activity: Synthesis ofsaturatedzone hydrochemistry

8.3.1.2.3.3 Study: Saturated-zone hydrologicsystem synthesis and modeling . .

8.3.1.2.3.3.1 Activity: Conceptualization ofsaturated zone flow modelswithin the boundaries of theaccessible environment . . . .

8.3.1.2.3.3.2 Activity: Development offracture network model . . . .

8.3.1.2-248

8.3.1.2-248

8.3.1.2-249

8.3.1.2-255

8.3.1.2-265

8.3.1.2-269

8.3.1.2-273

8.3.1.2-276

8.3.1.2-280

8.3.1.2-281

8.3.1.2-281

8.3.1.2-282

8.3.1.2-285

8.3.1.2-286

8.3.1.2-287

8.3.1.2-287

8.3.1.2-288

2 1

2 2

3 9*

2 11*

2 4*

2 4*

2 4*

2 4

2 2

4 1 I

2 2

4 4*

3 2

3 2

2 1

2 2

2 5

* Includes figures and tables

vii

Page 12: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Paqe Rev. Pages

8.3.1.2.3.3.3 Activity: Calculation offlow paths, fluxes, andvelocities within thesaturated-zone to theaccessible environment . . . . 8.3.1.2-293 2 3'

* Includes figures and tables

viii

Page 13: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES

TotalNo. of

Figure Title Page Rev. Pages

8.0-1 Major system elements expected toaffect waste isolation at theYucca Mountain Site . . . . . . . . . 8.0-6 2 1

8.1-1 Issue resolution strategy . . . . . . 8.1-6 2 1

8.1-2 Data collection and analysis process . 8.1-12 2 1

8.1-3 Issue resolution documentation . . . . 8.1-15 2 1

8.2-1 Correlation of performance and designissues for Key Issue 1 (postclosureperformance) with regulatoryrequirements . . . . . . . . . . . . . 8.2-9 2 1

8.2-2 Correlation of performance and designissues for Key Issue 2 (preclosureradiological safety) with regulatoryrequirements . . . . . . . . . . . . . 8.2-10 2 1

8.2-3 Correlation of performance and designissues for Key Issue 4 (preclosureperformance) with regulatoryrequirements . . . . . . . . . . . . . 8.2-11 2 1

8.2-4 Hierarchy of functions and componentsthat make up the Yucca Mountain minedgeologic disposal system . . . . . . . 8.2-12 2 1

8.2-5 Correlation of the Department ofEnergy Mission Plan issues and Officeof Geologic Repositories (OGR)issues . . . . . . . . . . . . . . . . 8.2-14 2 1

8.2-6 Schematic diagram showing utilizationof site data by performance assess-ment and design, and for preparationof regulatory documents . . . . . . . 8.2-64 2 1

8.3.1.1-1 Strategy for the conduct of the siteprogram . . . . . . . . . . . . . . . 8.3.1.1-2 2 1

8.3.1.2-1 Interface of the geohydrology programwith design and performance issuesand other characterization programs . 8.3.1.2-5 2 1

ix

Page 14: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFigure Title Paqe

8.3.1.2-2

8.3.1.2-3

8.3. 1.2-4

8 .3.1.2-5

8 .3.1.2-6

8.3.1.2-7

8.3. 1.2-8

8.3. 1.2-9

8 .3.1.2-10

8.3.1.2-11

8 .3.1.2-12

Logic diagram of the surface-waterhydrology component of thegeohydrology program . . . . . . . . .

Logic diagram of the unsaturated-zonehydrology component of thegeohydrology program . . . . . . . . .

Logic diagram of the saturated-zonehydrology component of thegeohydrology program . . . . . . . . .

Hydrogeologic study area, showingthree ground-water subbasins . . . . .

Regional precipitation and streamflowstations . . . . . . . . . . . . . . .

Site precipitation, streamflow, andproposed weather stations . . . . . .

Location of existing and proposedwater-table holes . . . . . . . . . .

Location of existing and proposeddrillholes for the Fortymile Washrecharge study . . . . . . . . . . .

Subregional ground-water flow studyarea showing principal dischargeareas at Furnace Creek Ranch andFranklin Lake Playa . . . . . . . . .

Location of the flow line for thesubregional two-dimensional crosssection of hydrologic model . . . . .

Process for providing parametersrequired by Issue 1.6 (pre-waste-emplacement ground-watertravel-time) . . . . . . . . . . . . .

8.3.1.2-6

8.3. 1.2-7

8.3.1.2-8

8.3. 1.2-95

8.3.1.2-99

8.3.1.2-106

8.3.1.2-113

8.3.1.2-120

8.3.1.2-122

8.3.1.2-129

8.3.1.2-138

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

3 1

2 1

x

Page 15: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

Figure

8.3.1.2-13a

8.3.1.2-13b

8.3.1.2-13c

8.3.1.2-14

8.3.1.2-15

8.3.1.2-16

8.3.1.2-17

8.3.1.2-18

8.3.1.2-19

8.3.1.2-20

8.3.1.2-21

8.3.1.2-21a

8.3.1.2-22

8.3.1.2-23

Title

Neutron access hole locations . . . .

Insert 1 to Figure 8.3.1.2-13a,neutron access hole locations . . . .

Insert 2 to Figure 8.3.1.2-13a,neutron access hole locations . . . .

Map of existing and proposedunsaturated-zone borehole locations

Map depicting location of gas tracerdiffusion and vertical seismicprofiling testing programs . . . . . .

Gaseous-phase sampling locations

Gaseous and liquid-phase chemicalsampling locations . . . . . . . . . .

Preliminary composite potentiometric-surface map of the saturated zone,Yucca Mountain . . . . . . . . . . .

Location of the proposed drillholesfor the Solitario Canyon fault studyin the vicinity of perimeter drift . .

Locations of the proposed water-tableholes for the site potentiometric-level evaluation . . . . . . . . . . .

Location of existing and proposedgeologic drillholes . . . . . . . . .

Locations of the three proposedwells . . . . . . . . . . . . . . . .

Test well configuration for drillholeUE-25c#1 packer-injection and open-hole pumping tests . . . . . . . . . .

Test well configurations for drill-hole UE-25c#2 pumping test(March 1984) . . . . . . . . . . . . .

Paqe i

8.3.1.2-148

8.3.1.2-149

8.3.1.2-150

8.3.1.2-169

8.3.1.2-176

8.3.1.2-221

8.3.1.2-225

8.3.1.2-245

8.3.1.2-250

8.3.1.2-252

8.3.1.2-253b

8.3.1.2-254

8.3.1.2-259

8.3.1.2-260

Rev.

2

TotalNo. ofPages

1

2 1

2 1

2 1

2

2

1

1

2 1

2 1

3 1

3 1

3 1

3 1

2 1

2 1

xi

Page 16: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFiqure Title Page

8.3.1.2-24

8.3.1.2-25

8.3.1.2-26

8.3. 1.2-27

8.3.1.2-28

Test well configurations for drill-hole UE-25c13 pumping tests (May1984, November 1984) and drillholeUE-25c#2 packer injection test(October 1984) . . . . . . . . . . . . 8.3.1.2-261

Test well configuration for analysisof C-hole earth-tide and barometricinduced water-level fluctuations . . . 8.3.1.2-264

Location of C-hole complex . . . . . . 8.3.1.2-267

Location of test intervals for thedrift-pumpback tests . . . . . . . . . 8.3.1.2-270

Location of the saturated-zone wellsthat might be used for additionaltracer testing . . . . . . . . . . . 8.3.1.2-274

2 1

2 1

2 1

2 1

2 1

xii

Page 17: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES

Table Title Page

8.2-1

8.2-2

8.2-3

8.2-4

8.2-5

8.2-6

8.3-1

Statement of the key issues in theOffice of Geologic Repositoriesissues hierarchy . . . . . . . . . . .

Site-specific information needs forthe Yucca Mountain site . . . . . . .

Correlation of site-related technicalconcerns and Site CharacterizationPlan (SCP) sections where concernsare addressed . . . . . . . . . . . .

Correlation of engineered systemrelated technical concerns and SiteCharacterization Plan (SCP)sections where concerns areaddressed . . . . . . . . . . . . . .

Overview of contents of Section 8.3showing order of presentation of siteprograms and performance and designissues within major programs . . . . .

Potential topics for issue resolutionreports . . . . . . . . . . . . . . .

Overview of contents of Section 8.3showing order of presentation of siteprograms and performance and designissues within major programs . . . . .

8.2-2

8.2-3

8.2-15

8.2-47

8.2-59

8.2-60

8.3-2

TotalNo. of

Rev. Pages

2 1

2 6

2 32

2 11

2 1

2 3

2 1

8.3.1.2-1

8.3.1.2-2a

8.3.1.2-2b

Activity parameters provided by thegeohydrology program that supportperformance and design issues . . . .

Current representation and alterna-tive hypotheses for unsaturated-zonehydrologic system conceptual modelsfor the geohydrology program . . . . .

Current representation and alterna-tive hypotheses for the saturatedzone hydrologic system conceptualmodels for the geohydrology program

8.3.1.2-10

8.3.1.2-52

8.3.1.2-68

2 38

2 16

2 20

xiii

Page 18: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.1.2-3

8.3.1.2-4

8.3.1.2-5

8.3.1.2-6

8.3.1.2-7

8.3.1.2-8

8.3.1.2-9

8 .3. 1.2-10

Regional precipitation and streamflowstations . . . . . . . . . . . . . . .

Site precipitation and streamflowstations . . . . . . . . . . . . . . .

Borehole information and estimates ofnumbers of core samples available forpermeability related tests . . . . . .

Estimated number of unsaturated zonecore samples available for matrix-hydrologic property testing . . . . .

Summary of construction details ofvertical boreholes . . . . . . . . . .

Status of drillhole logging activi-ties in the unsaturated zone . . . . .

Summary of gas-phase tests . . . . . .

Existing (November 1986) and plannedwater-table wells to be sampled andlogged . . . . . . . . . . . . . . . .

8.3.1.2-100

8.3.1.2-107

8.3.1.2-161

8.3.1.2-163

8.3.1.2-170

8.3.1.2-175

8.3.1.2-217

8.3.1.2-284

2 2

2 2

2 2

2 1

2 3

2 1

2 3

2 1

xiv

Page 19: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 2 YMP/CM-0011, Rev. 2

Multiple-well tests

If single-well tests do not provide sufficient information, a multiple-well location will be proposed and, if accepted, additional tests will beconducted. If this occurs and the C-hole tests indicate that multiple-welltests give useful information about radionuclide retardation properties inthe saturated zone, then this multiple-well location will be used for furtherreaction tracer tests.

Analysis of test results

Analyses will proceed in the same fashion as was used in the C-holestudy (Activity 8.3.1.2.3.1.7). A conservative tracer will be injected withthe reactive tracer, and the conservative tracer will be used to estimatevelocity and dispersion parameters. Then using laboratory-derived sorptionparameters, the response of the reactive tracer will be predicted andcompared with the field test. By making a connection in the laboratorybetween radionuclides and these tracers, inferences about radionuclideretardation can be made.

8.3.1.2.3.2 Study: Characterization of the saturated-zone hydrochemistry

The objectives of this study are to (1) describe the chemical composi-tion of, and spatial compositional variations in, saturated-zone groundwaters using new and extant data; (2) identify the chemical and physicalprocesses that influence ground-water chemistry; and (3) aid in the identifi-cation and quantification of fluxes to, from, and within the saturated zone.

Four activities are planned to meet these objectives. The activitiesare (1) assessment of saturated-zone hydrochemical data availability andneeds, (2) hydrochemical characterization of water in the upper part of thesaturated zone, (3) regional hydrochemical characterization, and (4) syn-thesis of saturated-zone hydrochemistry.___________________________________________________________________________

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

8.3.1.2.3.2.1 Activity: Assessment of saturated-zone hydrochemical dataavailability and needs

Objectives

The objectives of this activity are to

1. Compile and evaluate extant hydrochemical data for the saturatedzone at the site and regional scales, and

2. identify data deficiencies and potential sampling sites and assemblerequisite materials for sample and field data collection.

8.3.1.2-281

Page 20: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

Parameters

The parameters for this activity are

1. Chemical concentration.2. Stable-isotope ratio.3. Radioisotope activity.

Description

Extant hydrochemical data for the saturated-zone at Yucca Mountain, theNevada Test Site, and the surrounding region will be compiled. The ionicbalance of each analysis will be calculated as a means of initially assessingthe quality of the data. Preliminary maps and cross sections of the spatialdistributions of selected dissolved species and/or physical parameters willbe prepared to depict the extant level of information. Published water-levelmaps will provide information about ground-water flow directions andgradients. This information will be reexamined as additional data becomeavailable. Published geologic descriptions of the site and the surroundingregion will provide the locations of major structural features and informa-tion regarding formation geometries and lithologies. All the previouslynoted information will be integrated to delineate areas where additional dataare needed.

Water samples will be collected to satisfy identified data needs when-sampling opportunities arise in the course of other investigative activities,or when other satisfactory sampling sites are identified. All samples willbe analyzed in the field for unstable constituents and intensive properties.They will be analyzed in USGS and contract laboratories for inorganicchemical concentrations; activities of selected radioisotopes, includingtritium (hydrogen-3), carbon-14, and chlorine-36; and ratios of selectedstable isotopes, including those of carbon, hydrogen, oxygen, strontium, andsulfur._____________________________________________________________________________

YMP/CM-0011, Rev. 2 YMP/CM-0011, Rev. 2

8.3.1.2.3.2.2 Activity: Hydrochemical characterization of water in theupper part of the saturated-zone

Objectives

The objectives of this activity are

1. To describe the hydrochemistry of the upper part of the saturated-zone by collecting representative water samples from intervalswithin the upper 100 m of the saturated zone, within and adjacent tothe site area, and studying their chemical and isotopiccompositions.

8.3.1.2-282

Page 21: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 2 YMP/CM-0011, Rev. 2

Caliper, epithermal-neutron porosity, magnetometer, magnetic,susceptibility, and possibly other experimental and supporting logs will berun from total well depth to land surface in each of the extent WT wells.These data will (1) aid in the evaluation of physical formation properties,(2) aid in stratigraphic correlations, and (3) determine vertical profiles ofwater content in the unsaturated zone. This data-collection activity will becarried out under Activity 8.3.1.4.2.1.3 (borehole geophysical surveys), andwill precede sampling if it is logistically more efficient._____________________________________________________________________________

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

8.3.1.2.3.2.3 Activity: Regional hydrochemical tests and analyses

Objectives

The objective of this activity is to describe regional spatialvariations in ground-water chemistry by examining extant data and in thesaturated zone by collecting representative water samples from wells andsprings within the region and by studying their chemical and isotopiccompositions.

Parameters

The parameters of this activity are

1. Chemical concentration.2. Stable-isotope ratio.3. Radioisotope activity.

Description

Water samples will be collected from selected springs and extant wellswithin the Nevada Test Site and the surrounding region. As appropriate,newly drilled wells will be sampled, but no drilling is proposed for thisactivity. Sites selected will include some of those where alternativeconceptual models of the regional geohydrologic system will be tested byStudy 8.3.1.2.1.3 (characterization of the regional ground-water flowsystem), particularly with regard to ground-water flow rates and directions,and to support the designation of flow-system boundaries. Hydrochemical datafrom these sites will also provide insight as to the origin of anomalousfeatures in the regional potentiometric surface.

Water samples will be analyzed in the field for unstable constituentsand intensive properties. They will be analyzed in USGS and contractlaboratories for inorganic chemical concentrations; activities of electedradioisotopes, including tritium, carbon-14, and chlorine-36; and ratios ofselected stable isotopes, including those of carbon, hydrogen, oxygen,strontium and sulfur. Water-level drawdown and recovery data will be col-lected from wells during and after sampling, and used by Study 8.3.1.2.1.3(characterization of the regional ground-water flow system) to estimatesaturated hydraulic conductivities.

Hydrochemical data will be combined with existing data (Walker andEakin, 1963; Schoff and Moore, 1964; Robinson and Beetem, 1965; Naff, 1973;Winograd and Thordarson, 1975; Benson et al., 1983; Classen, 1985) to

8.3.1.2-285

Page 22: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

describe the spatial compositional variations in regional ground-waterchemistry. Radioisotope data will enable estimates of ground-water ages andflow rates. Stable isotope and inorganic concentration data will provideinsight as to the origins, evolution, and mixing of ground waters, and willaid in comparison of site-specific data in order to delineate possible flowpaths. These data will also be used by Activity 8.3.1.2.3.2.4 (synthesis ofsaturated-zone hydrochemistry) to identify the chemical and physical proc-esses that influence ground-water chemistry; to aid in the identificationand/or quantification of ground-water travel times, flow paths, and fluxesto, from, and within the saturated zone; and to estimate climatic conditions.during periods of recharge. The data will also be part of the informationbase used by Study 8.3.1.3.1.1 (ground-water chemistry model)._____________________________________________________________________________

YMP/CM-0011, Rev. 3 YMP/CM-0011, Rev. 3

8.3.1.2.3.2.4 Activity: Synthesis of saturated-zone hydrochemistry

Objectives

The objectives of this activity are to

1. Describe the saturated-zone hydrochemistry.

2. Identify the chemical and physical processes that influence ground-water chemistry.

3. Relate compositional variations to water/rock interactions and thephysical nature of the ground-water flow system to aid in theidentification and/or quantification of ground-water travel times;climatic conditions during periods or recharge; flow paths; andfluxes to, from, and within the saturated zone.

Parameters

The parameter for this activity is geochemical reaction modeling.

Description

Graphical methods will be used to describe spatial distributions ofselected chemical and isotopic data. Variations will be integrated withextant information describing ground-water flow directions, spatialdistributions of secondary minerals, spatial petrologic variations, andwhole-rock and mineralogic compositions, in order to identify sources andsinks of dissolved materials, to infer sources and areas of recharge, and toestimate ground-water flow paths, flow rates, and residence times.

The geochemical modeling code EQ3NR/EQ6 (Wolery, 1979; 1983) will beused with the bases of hydrochemical and mineralogic data to (1) calculatethe specifications of dissolved materials, (2) determine the saturationstates of relevant solid phases, and (3) test plausible water-rock reactionmodels. The results of these efforts will aid in the identification of thegeochemical process that have combined with ground-water flow to determinethe present ground-water chemistry. Process identification will also con-tribute to an understanding of the paleohydrology of the region, and to

8.3.1.2-286

Page 23: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

LIN DocurmentNo. YMP/CM-oo11

Revision 4Cl NoCI. 11.0000/CI. 13.0000

Date 03.12139

WBS No. 1.2.3IONMI BASELINEA Level Yes

PROJECT BASELINE DOCUMENT

YUCCA MOUNTAINSITE CHARACTERIZATION

PROGRAM BASELINE(SCPB)

VOLUME 2

CHANGES TO THIS DOCUMENT REQUIRE PREPARATIONAND APPROVAL OFA CHANGE REQUEST IN ACCORDANCEWITH PROJECTAP-3.3Q

UNITED STATES DEPARTMENT OF ENERGYYUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT OFFICE

Page 24: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS

TotalNo. ofPagesPage Rev.

8.3.1.3 Overview of the geochemistry program:Description of the present and expectedgeochemical characteristics required bythe performance and design issues . . . . .

8.3.1.3.1 Investigation: Studies to provideinformation on water chemistry withinthe potential emplacement horizonand along potential flow paths . . . .

8.3.1.3.1.1 Study: Ground-water chemistrymodel . . . . . . . . . . . I I .

8.3.1.3.2 Investigation: Studies to provideinformation on mineralogy,petrology, and rock chemistrywithin the potential emplacementhorizon and along potentialflow paths . . . . . . . . . . . . . .

8.3.1.3.2.1 Study: Mineralogy, petrology,and chemistry of transportpathways . . .

8.3.1.3.2.1.1 Activity: Petrologicstratigraphy of the TopopahSpring Member . . . . . . . . .

8.3.1.3.2.1.2 Activity: Mineral distribu-tions between the host rockand the accessibleenvironment . . . . . . . . . .

8.3.1.3.2.1.3 Activity: Fracturemineralogy . . . . . . . . . .

8.3.1.3.2.2 Study: History of mineralogicand geochemical alteration ofYucca Mountain . . . . . . . . . .

8.3.1.3.2.2.1 Activity: History ofmineralogic and geochemicalalteration of Yucca Mountain

8.3.1.3.2.2.2 Activity: Smectite, zeolite,manganese minerals, glassdehydration and trans-formation . . . . . . . ...

8.3.1.3.3 Investigation: Studies to provideinformation required on stability ofminerals and glasses . . . . . .

8.3.1.3.3.1 Study: Natural analog of hydro-thermal systems in tuff . . . . .

8.3.1.3.3.2 Study: Kinetics and thermo-dynamics of mineral evolution

8 .3.1. 3-1

8.3. 1. 3-36

8 .3.1. 3-37

8.3.1.3-39

8.3.1. 3-42

8.3.1. 3-42

8.3. 1.3-43

8.3.1. 3-45

8.3.1. 3-46

8.3. 1. 3-46

8 .3.1. 3-47

8.3.1.3-49

8.3.1.3-51

8.3. 1. 3-52

2 35*

2 2

2 3

2 4

2 1

2 2

2 2

2 1

2 1

2 2

2 3

2 3

2 2

2 2

* Includes figures and tables

iii

Page 25: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPaqe Rev.

8.3.1.3.3.2.1

8.3.1.3.3.2.2

8.3.1.3.3.2.3

Activity: Kinetic studies ofzeolite and related frameworksilicates . . . . . . . . . . .Activity: Determination ofend-member free energies forclinoptilolite-heulandite,albite, and analcime . . . . .Activity: Solid solutiondescriptions of clinoptilolite-heulandite and analcime . . . .

8.3.1.3.3.3 Study: Conceptual model ofmineral evolution . . . . . . . .

8.3.1.3.4 Investigation: Studies to providethe information required on radio-nuclide retardation by sorptionprocesses along flow paths to theaccessible environment . . . . . . . .

8.3.1.3.4.1 Study: Batch sorption studies8.3.1.3.4.1.1 Activity: Batch sorption

measurements as a function ofsolid phase composition . . . .

8.3.1.3.4.1.2 Activity: Sorption as afunction of sorbing elementconcentrations (isotherms)

8.3.1.3.4.1.3 Activity: Sorption as afunction of ground-watercomposition . . . . . . . ... .

8.3.1.3.4.1.4 Activity: Sorption on parti-culates and colloids . . i . .

8.3.1.3.4.1.5 Activity: Statistical analysisof sorption data . . . . . . .

8.3.1.3.4.2 Study: Biological sorption andtransport . ... . . . . . . . . .

8.3.1.3.4.3 Study: Development of sorptionmodels . . . . . . . . . . . . . .

8.3.1.3.5 Investigation: Studies to providethe information required on radio-nuclide retardation' by precipitationprocesses along flow paths to theaccessible environment . . . . . . . .

8.3.1.3.5.1 Study: Dissolved speciesconcentration limits . . . . . . .

8.3.1.3.5.1.1 Activity: Solubilitymeasurements . . . . . . . . .

8.3.1.3-53

8.3.1.3-54

8 .3.1. 3-55

8.3. 1. 3-55

8.3.1.3-568.3.1.3-59

8.3.1.3-60

8.3.1.3-64

8.3. 1.3-65

8.3.1.3-66

8.3.1.3-68

8.3.1.3-69

8.3.1.3-70

8.3.1.3-71

8 .3.1.3-75

8.3.1.3-75

2 2

2 1

2 1

2 2

22

42

2 4*

2 2*

2 2

2 3*

2 1

2 2

2 2

2 5

2 1

2 3*

* Includes figures and tables

iv

Page 26: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.3.5.1.2 Activity: Speciationmeasurements . . . . . . . . .

8.3.1.3.5.1.3 Activity: Solubilitymodeling . . . . . . . . . . .

8.3.1.3.5.2 Study: Colloid behavior . . . . .8.3.1.3.5.2.1 Activity: Colloid formation

characterization andstability . . . . . . . . . . .

8.3.1.3.5.2.2 Activity: Colloid modeling8.3.1.3.6 Investigation: Studies to provide

the information required on radio-nuclide retardation by dispersive,diffusive, and advective transportprocesses along flow paths to theaccessible environment . . . . . . .

8.3.1.3.6.1 Study: Dynamic transportcolumn experiments . . . . . . .

8.3.1.3.6.1.1 Activity: Crushed tuffcolumn experiments . . . . . .

8.3.1.3.6.1.2 Activity: Mass transferkinetics . . . . . . . . . . .

8.3.1.3.6.1.3 Activity: Unsaturated tuffcolumns . . . . . . . . . . .

.8.3.1.3.6.1.4 Activity: Fractured tuffcolumn studies . . . . . . . .

8.3.1.3.6.1.5 Activity: Filtration . . . .8.3.1.3.6.2 Study: Diffusion . . . . . . .8.3.1.3.6.2.1 Activity: Uptake of radio-

nuclides on rock beakers ina saturated system . . . . . .

8.3.1.3.6.2.2 Activity: Diffusion througha saturated tuff slab . . . .

8.3.1.3.6.2.3 Activity: Diffusion in anunsaturated tuff block . . .

8.3.1.3.7 Investigation: Studies to providethe information required on radio-nuclide retardation by all processesalong flow paths to the accessibleenvironment . . . . . . . . . . . . .

8.3.1.3.7.1 Study: Retardation sensitivityanalysis . . . . . . . . . . . .

8.3.1.3.7.1.1 Activity: Analysis ofphysical/chemical processesaffecting transport . . . . .

8.3.1.3-77

8.3.1.3-788.3. 1.3-79

8.3.1.3-798.3. 1.3-80

8.3.1.3-80

8.3.1.3-85

8.3.1. 3-86

8.3.1.3-90

8.3.1.3-91

8.3.1.3-938.3.1.3-948.3.1.3-95

8.3.1. 3-96

8.3.1. 3-97

8.3.1.3-97

8.3.1.3-98

8.3.1.3-100

8.3.1.3-101

2 2

22

11

22

21

2 6*

2 2

2 5

2 2

2 3

222

222

2 1

2 1

2 2

2 3

2 2

2 4

* Includes figures and tables

v

Page 27: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

.8.3.1.3.7.1.2 Activity: Geochemical/Geophysical model of YuccaMountain and integratedgeochemical transportcalculations . . . . . . . .

8.3.1.3.7.1.3 Activity: Transport modelsand related support . . . . .

8.3.1.3.7.2 Study: Demonstration ofapplicability of laboratory datato repository transportcalculations . . . . . . . . . .

8.3.1.3.8 Investigation: Studies to providethe required information onretardation of gaseous radionuclidesalong flow paths to the accessibleenvironment . . . . . . . . . . . . .

8.3.1.3.8.1 Study: Gaseous radionuclidetransport calculations andmeasurements . . i . . . . . . .

8.3.1.3.8.1.1 Activity: Physical transportmechanisms and rates--retarda-tion mechanisms and transportwith retardation . . . . . . .

8.3.1.3.8.1.2 Activity: Gas transportmeasurements . . . . . . . . .

8.3.1.4 Overview of the rock characteristicsprogram: Description of the present andexpected rock characteristics required byperformance and design issues . . . . . .

8.3.1.4.1 Investigation: Development of anintegrated drilling program andintegration of geophysicalactivities . . . . . . . . . . . . .

8.3.1.4.1.1 Activity: Development of anintegrated drilling program . . .

8.3.1.4.1.2 Activity: Integration of geo-physical activities . . . . . . .

8.3.1.4.2 Investigation: Geologic frameworkof the Yucca Mountain site . . . . .

8.3.1.4.2.1 Study: Characterization of thevertical and lateral distributionof stratigraphic units withinthe site area . . . . . . . . . .

8.3.1.3-105

8.3.1.3-107

8.3.1.3-109

8.3.1.3-114

8.3.1.3-116

8.3.1.3-116

8.3.1.3-117

8.3.1.4-1

8.3.1. 4-24

8 .3.1.4-24

8.3.1.4-26

8.3.1.4-28

8.3.1.4-32

2 2

2 2

2 6

2 2

2 1

2 2

2 2

2 24*

2 1

2 3

2 2

2 5*

2 1

* Includes figures and tables

vi

Page 28: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.4.2.1.1

8.3.1.4.2.1.2

8.3.1.4.2.1.3

8.3.1.4.2.1.4

8.3.1.4.2.1.5

8.3.1.4.2.1.6

Activity: Surface and sub-surface stratigraphic studiesof the host rock andsurrounding units . . . . . .Activity: Surface-based geo-physical surveys . . . . . . .Activity: Borehole geo-physical surveys . . . . . . .Activity: Petrophysicalproperties testing . . . . . .Activity: Magneticproperties and stratigraphiccorrelations . . . . . . . . .Activity: Integration ofgeophysical activities . . . .

8.3.1.4-32

8.3.1. 4-39

8.3.1.4-54

8.3.1.4-56

8.3.1.4-56

8.3. 1. 4-588.3.1.4.2.2 Study: Characterization of the

structural features within thesite area . . . . . . . . . . . .

8.3.1.4.2.2.1 Activity: Geologic mappingof zonal features in thePaintbrush Tuff . . . . . . .

8.3.1.4.2.2.2 Activity: Surface-fracturenetwork studies . . . . . . .

8.3.1.4.2.2;3 Activity: Borehole evalua-tion of faults and fractures

8.3.1.4.2.2.4 Activity: Geologic mappingof the exploratory studiesfacility . . . . . . . . . . .

8.3.1.4.2.2.5 Activity: Seismic tomography/vertical seismic profiling

8.3.1.4.2.3 Study: Three-dimensionalgeologic model . . . . . . . . .

8.3.1.4.2.3.1 Activity: Development of athree-dimensional geologicmodel of the site area . . . .

8.3.1.4.3 Investigation: Development ofthree-dimensional models of rockcharacteristics at the repository

8.3.1.4-59

8.3.1.4-60

8.3.1.4-61

8.3.1.4-64

8.3. 1. 4-66

8.3.1.4-69

8.3.1.4-71

8.3.1.4-71

8.3.1.4-72

8.3.1.4-75

8.3.1.4-75

2 8*

2 16*

2 2

2 1

2 3

2 2

2 2

2 2

2 4*

2 3

2 4

2 3

2 1

2 2

2 4

2 1

2 13*

site . . . .8.3.1.4.3.1 Study: Systematic acquisition

of site-specific subsurfaceinformation . . . . . . . . . .

8.3.1.4.3.1.1 Activity: Systematicdrilling program . . . . . .

* Includes figures and tables

vii

Page 29: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.4.3.2 Study: Three-dimensional rockcharacteristics models . . . . .

8.3.1.4.3.2.1 Activity: Development ofthree-dimensional models ofrock characteristics at therepository site . . . . .

8.3.1.5 Overview of the climate program:Description of future climate conditions,required by the performance and designissues . . . . . . . . . . . . . . . . . .

8.3.1.5.1 Investigation: Studies to providethe information required on natureand rates of change in climaticconditions to predict futureclimates . . . . . . . . . . . . . .

8.3.1.5.1.1 Study: Characterization ofmodern regional climate . . . . .

8.3.1.5.1.1.1 Activity: Synopticcharacterization of regionalclimate . . . . . . . . . . .

8.3.1.5.1.2 Study: Paleoclimate study:lake, playa, marsh deposits . . .

8.3.1.5.1.2.1 Activity: Paleontologicanalyses . . . . . . . . . . .

8.3.1.5.1.2.2 Activity: Analysis of thestratigraphy-sedimentology ofmarsh, lacustrine, and playadeposits . . . . . . . . . . .

8.3.1.5.1.2.3 Activity: Geochemicalanalyses of lake, marsh,and playa deposits . . . . . .

8.3.1.5.1.2.4 Activity: Chronologicanalyses of lake, playa, andmarsh deposits . . . . . . . .

8.3.1.5.1.3 Study: Climatic implications ofterrestrial paleoecology . . . .

8.3.1.5.1.3.1 Activity: Analysis of packrat middens . . . . . . . . .

8.3.1.5.1.3.2 Activity: Analysis of pollensamples . . . . .

8.3.1.5.1.3.3 Activity: Determination ofvegetation-climate relation-ships . . . . . . . . . . . .

8.3.1.5.1.4 Study: Analysis of the paleo-environmental history of theYucca Mountain region . . . . . .

8.3.1.4-87

8.3.1.4-87

8.3.1.5-1

8.3. 1.5-33

8.3.1.5-39

8.3.1.5-40

8.3.1.5-41

8.3.1.5-41

8.3.1.5-45

8.3.1.5-46

8.3.1.5-47

8.3.1.5-49

8.3.1.5-49

8.3.1.5-50

8.3.1.5-52

8.3.1.5-53

2 1

2 3*

2 33*

2 7

2 2

2 2

2 1

2 5*

2 2

2 2

2 3

2 1

2 2

2 2

2 2

2 2

* Includes figures and tables

viii

Page 30: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Aqe Rev. Pages

8.3.1.5.1.4.1 Activity: Modeling of soilproperties in the YuccaMountain region . . . . . . .

8.3.1.5.1.4.2 Activity: Surficial depositsmapping of the Yucca Mountainarea . . . . . . . . . . . . .

8.3. 1.5-54

8.3.1.5-578.3.1.5.1.4.3 Activity: Eolian history of

the Yucca Mountain region8.3.1.5.1.5 Study: Paleoclimate-

paleoenvironmental synthesis8.3.1.5.1.5.1 Activity: Paleoclimate-

paleoenvironmental synthesis8.3.1.5.1.6 Study: Characterization of the

future regional climate andenvironments . . . . . . . . . .

8.3.1.5.1.6.1 Activity: Global climatemodeling . . . . . . . . . .

8.3.1.5.1.6.2 Activity: Regional climatemodeling . . . . . . . . . . .

8.3.1.5.1.6.3 Activity: Linked global-regional climate modeling

8.3.1.5.1.6.4 Activity: Empirical climatemodeling . . . . . . . . . . .

8.3.1.5.2 Investigation: Studies to providethe information required onpotential effects of future climaticconditions on hydrologiccharacteristics . . . . . . . . . . .

8.3.1.5.2.1 Study: Characterization of theQuaternary regional hydrology

8.3.1.5.2.1.1 Activity: Regional paleo-flood evaluation . . . . . . .

8.3.1.5.2.1.2 Activity: Quaternaryunsaturated zone hydro-

8.3. 1.5-62

8.3.1. 5-65

8 .3.1. 5-66

8.3.1.5-67

8 .3.1.5-68

8.3.1.5-71

8.3.1.5-72

8.3.1. 5-73

8.3.1.5-75

8.3.1.5-79

8.3.1. 5-79

8.3. 1.5-81

8.3.1.5-82

8.3. 1.5-85

8.3.1.5-87

8 .3.1.5-90

2 4

2 6*

2 4

2 1

2 2

2 2

2 4

2 2

2 2

2 2

2 5

2 1

2 3

2 2

2 4

2 3

2 4

2 1

8.3.1.5.2.1.3

8.3.1.5.2.1.4

8.3.1.5.2.1.5

chemical analysis . . . . . .Activity: Evaluation of pastdischarge areas . . . . . . .Activity: Analog rechargestudies . . . . . . . . . . .Activity: Studies of calciteand opaline silica veindeposits . . . . . . . . . . .

8.3.1.5.2.2 Study: Characterization of thefuture regional hydrology dueto climate changes . . . . . . .

* Includes figures and tables

ix

Page 31: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.5.2.2.1

8.3.1.5.2.2.2

8.3.1.5.2.2.3

8.3.1.6 Overview ofDescriptionrequired by

Activity: Analysis of futuresurface hydrology due toclimate changes . . . . . . .Activity: Analysis of futureunsaturated zone hydrologydue to climate changes . . . .Activity: Synthesis ofeffects of possible futurerecharge due to climatechanges on hydrologiccharacteristics of the YuccaMountain saturated zone . . .the erosion program:of the future erosional ratesthe performance and design

8.3. 1. 5-90

8.3.1.5-91

8.3. 1.5-91

8.3.1.6-1

8.3.1.6-6

8.3. 1. 6-10

issues . . . . . . . . . . . . . . . . . .8.3.1.6.1 Investigation: Studies to determine

present locations and rates ofsurface erosion . . . . . . . . . . .

8.3.1.6.1.1 Study: Distribution andcharacteristics of present andpast erosion . . . . . . . . . .

8.3.1.6.1.1.1 Activity: Development of a

8.3.1.6.1.1.2

8.3.1.6.1.1.3

geomorphic map of YuccaMountain . .Activity: Analysis of thedown-cutting history ofFortymile Wash and itstributaries . . . . . . .Activity: An analysis ofhillslope erosion at YuccaMniinta in

8.3.1.6.2 Investigation: Potential effects offuture climatic conditions onlocations and rates of erosion . . .

8.3.1.6.2.1 Study: Influence of futureclimatic conditions on locationsand rates of erosion . . . . . .

8.3.1.6.2.1.1 Activity: Synthesis and dataevaluation of impact offuture climatic conditionson locations and rates oferosion . . . . . . . . . . .

8.3.1.6.3 Investigation: Studies to providethe information required to determinethe potential effects of futuretectonic activity on locations andrates of erosion . . . . . . . . . .

8.3.1.6-10

8 .3 .1. 6-11

8 .3. 1. 6-12

8 .3.1. 6-13

8.3.1.6-15

8.3. 1. 6-15

8.3.1.6-17

2 1

2 1

2 2

2 6*

2 4*

2 1

2 2

2 2

2 2

2 3*

2 1

2 2

2 3*

* Includes figures and tables

x

Page 32: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

8.3.1.6.3.1 Study: Evaluation of theeffects of future tectonicactivity on erosion at YuccaMountain . . . . . . . . . . . .

8.3.1.6.3.1.1 Activity: Synthesis and dataevaluation of the impact offuture uplift or subsidenceand faulting on erosion atYucca Mountain and vicinity

8.3.1.6.4 Investigation: Potential effectsof erosion on hydrologic,geochemical, and rock character-istics . . . . . . . . . . . . . . .

8.3.1.6.4.1 Study: Development of atopical report to address theeffects of erosion on the hydro-logic, geochemical, and rockcharacteristics at YuccaMountain . . . . . . . . . . . .

8.3.1.7 Overview of rock dissolution program:Description of rock dissolution requiredby the performance and design issues . . .

8.3.1.7.1 Investigation: Rates of dissolutionof crystalline and noncrystallinecomponents in tuff . . . . . . . . .

8.3.1.8 Overview of the postclosure tectonicsprogram: Description of future tectonicprocesses and events required by theperformance and design issues . . . . . .

8.3.1.8.1 Investigation: Studies to provideinformation required on directreleases resulting from volcanicactivity . . . . . . . . . . . . . .

8.3.1.8.1.1 Study: Probability of avolcanic eruption penetratingthe repository . . . . . . . . .

8.3.1.8.1.1.1 Activity: Location andtiming of volcanic events

8.3.1.8.1.1.2 Activity: Evaluation of thestructural controls ofbasaltic volcanic activity

8.3.1.8.1.1.3 Activity: Presence of magmabodies in the vicinity of thesite . . . .

8.3.1.8.1.1.4 Activity: Probability cal-culations and assessment . . .

8.3.1.6-19

8.3.1.6-20

8.3. 1. 6-21

8.3.1.6-24

8.3.1.7-1

8.3.1.7-1

8.3.1.8-1

8 .3. 1. 8-48

8.3.1.8-51

8.3.1.8-51

8.3.1. 8-52

8.3.1.8-54

8.3. 1. 8-56

2. 1

2 1

2 4*

2 1

2 1

2 2

2 47*

2 3*

2 1

2 1

2 2

2 3

2 2

* Includes figures and tables

xi

Page 33: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page R. Pages

8.3.1.8.1.2 Study: Effects of a volcaniceruption penetrating therepository . . . . . . . . . .

8.3.1.8.1.2.1 Activity: Effects of Strom-bolian eruptions . . . . . .

8.3.1.8.1.2.2 Activity: Effects of hydro-volcanic eruptions . . . . .

8.3.1.8.2 Investigation: Studies to provideinformation required on rupture ofwaste packages due to tectonicevents . . . . .

8.3.1.8.2.1 Study: Analysis of waste pack-age rupture due to tectonicprocesses and events

8.3.1.8.2.1

8.3.1.8.2.1

8.3.1.8.2.1

8.3.1.8.2.1

8.3.1.8.2.1

8.3.1.8.2.1

8.3.1.8.2.1

..1 Activity: Assessment ofwaste package rupture due toigneous intrusion . . . . .

1.2 Activity: Calculation of thenumber of waste packagesintersected by a fault . . .

A.3 Activity: Probability andrate of faulting . . . . . .

..4 Activity: Assessment ofwaste package rupture due tofaulting . . . . . . . . . .

..5 Activity: Assessment ofpostclosure ground motion inthe subsurface . . . . . . .

..6 Activity: Nature, age, andrate of folding and deforma-tion in the repositoryhorizon . . . . . . . . . .

..7 Activity: Assessment ofwaste package rupture due tofolding and deformation . .

8.3.1.8-57

8.3.1.8-57

8.3.1.8-58

8.3.1.8-59

8.3.1.8-62

8.3.1.8-63

8.3.1.8-63

8.3.1.8-64

8.3.1.8-65

8.3.1.8-66

8.3.1.8-67

8.3.1.8-67

8.3.1.8-68

8.3.1.8-77

8.3.1.8-77

2 1

2 2

2 2

2 4*

2 1

2 1

2 2

2 2

2 2

2 1

2 1

2 2

2 9*

2 1

2 1

8.3.1.8.3 Investigation: Studies to provideinformation required on changes inunsaturated and saturated zone hydrology due to tectonic events . . . .

8.3.1.8.3.1 Study: Analysis of the effectsof tectonic processes and eventson average percolation fluxrates over the repository . .

8.3.1.8.3.1.1 Activity: Annual probabilityof volcanic or igneous eventsin the controlled area . .

* Includes figures and tables

xii

Page 34: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPages

8.3.1.8.3.1.2 Activity: Assessment of theeffects of igneous intrusionsand volcanic events on fluxrates . . . . . . . . . . . .

8.3.1.8.3.1.3 Activity: Faulting rates,recurrence intervals, andprobable cumulative offsetin 10,000 yr . . . . . . . . .

8.3.1.8.3.1.4 Activity: Effects of fault-ing on average flux rates

8.3.1.8.3.1.5 Activity: Assessment of theeffects of faulting on fluxrates . . . . . . . . . . . .

8.3.1.8.3.1.6 Activity: Uplift rates inthe controlled area . . .

8.3.1.8.3.1.7 Activity: Assessment of theeffects of folding, uplift,and subsidence on flux rates

8.3.1.8.3.2 Study: Analysis of the effectof tectonic processes and eventson changes in water-tableelevation . . . . . . . . . . . .

8.3.1.8.3.2.

8.3.1.8.3.2.

8.3.1.8.3.2.

8.3.1.8.3.2.

8.3.1.8.3.2.

8.3.1.8.3.2.

8.3.1.8.3.3

1 Activity: Thermal andbarrier-to-flow effects ofigneous intrusions on water-table elevation . . . . . . .

2 Activity: Assessment of theeffects of igneous intrusionson water-table elevations . .

3 Activity: Assessment of theeffect of strain changes onwater-table elevation . . . .

4 Activity: Assessment of theeffect of folding, uplift, orsubsidence on water-tableelevation . . . . . . . . . .

5 Activity: Effects of fault-ing on water-table elevation

6 Activity: Assessment-of theeffect of faulting on water-table elevation . . . . . . .

Study: Analysis of the effectsof tectonic processes and eventson local fracture permeabilityand effective porosity . . . . .

8.3.1.8-77

8.3.1. 8-78

8.3.1. 8-79

8.3.1. 8-80

8.3.1.8-81

8.3.1.8-81

8.3.1..8-82

8. 3. 1. 8-82

8.3. 1. 8-83

8.3.1.8-84

8.3.1.8-85

8.3. 1. 8-86

8.3.1.8-87

8.3. 1. 8-88

2 2

2 2

2 2

2 2

2 1

2 2

2 1

2 2

2 2

2 2

2 2

2 1

2 1

2 1

* Includes figures and tables

xiii

Page 35: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

ae Re. Pages

8.3.1.8.3.3.1

8.3.1.8.3.3.2

8.3.1.8.3.3.3

Activity: Assessment of theeffects of igneous intrusionson local fracture permeabil-ity and effective porositiesActivity: Assessment of theeffects of faulting on localfracture permeability andeffective porosities . . . .Activity: Assessment of theeffects of stress or strainon hydrologic properties ofthe rock mass . . . . . . .

8.3.1.8.4 Investigation: Studies to provideinformation required on changes inrock geochemical properties result-ing from tectonic processes . . . .

8.3.1.8.4.1 Study: Analysis of the effectsofon

8.3.1.8.4.1.1

8.3.1.8.4.1.2

8.3.1.8.4.1.3

8.3.1.8.4.1.4

tectonic processes and eventsrock geochemical propertiesActivity: Assessment of thechange in rock geochemicalproperties due to igneousintrusions . . . . . . . . .Activity: Assessment of thedegree of mineral changealong fault zones in 10,000yr . . . . . . . . . . . .Activity: Assessment of theeffects of fault offset ontravel pathway . . . . . . .Activity: Assessment of thedegree of mineral change inthe controlled area resultingfrom tectonically inducedchange in water-tableelevations . . . . . . . . .

8.3.1.8-88

8.3.1.8-88

8.3.1.8-89

8.3.1.8-90

8.3.1.8-94

8.3.1.8-94

8.3.1.8-94

8.3.1.8-95

8.3.1.8-96

8.3.1.8-97

8.3.1.8-99

8.3.1.8-99

8.3.1.8-102

2 1

2 2

2 2

2 4*

2 1

2 1

2 2

2 2

2 1

2 2

2 1

2 3*

2 3

8.3.1.8.5 Investigation: Studies to providethe information reqUired by theanalysis and assessment investiga-tions of the tectonics program

8.3.1.8.5.1 Study: Characterization ofvolcanic features . . . . . . .

8.3.1.8.5.1.1 Activity: Volcanism drill-holes . . . . . . . . . . .

8.3.1.8.5.1.2 Activity: Geochronologystudies . . . . . . . . . .

* Includes figures and tables

xiv

Page 36: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPages

8.3.1.8.5.1.3 Activity: Field geologicstudies . . . . . . . . . . .

8.3.1.8.5.1.4 Activity: Geochemistry ofscoria sequences . . . . . . .

8.3.1.8.5.1.5 Activity: Geochemical cyclesof basaltic volcanic fields

8.3.1.8.5.2 Study: Characterization ofigneous intrusive features . . .

8.3.1.8.5.2.1 Activity: Evaluation ofdepth of curie temperatureisotherm . . . . . . . . . . .

8.3.1.8.5.2.2 Activity: Chemical andphysical changes arounddikes . . . . . . . . . . . .

8.3.1.8.5.2.3 Activity: Heat flow at YuccaMountain and evaluation ofregional ambient heat flowand local heat flowanomalies . . . . . . . . . .

8.3.1.8.5.3 Study: Investigation of foldsin Miocene and younger rocks ofregion

8.3.1.8.5.3.1 Activity: Evaluation offolds in Neogene rocks ofthe region . . . . . . . . . .

8.3.1.9 Overview of the human interferenceprogram: Description of potential futurehuman activities at or near the site,required by performance and designissues . . . . . . . . . . . .

8.3.1.9.1 Investigation: Studies to providethe information required on naturalphenomena and human activities thatmight degrade surface markers andmonuments . . . . . . . . . . . . . .

8.3.1.9.1.1 Study: An evaluation of naturalprocesses that could affect thelong-term survivability of thesurface marker system at YuccaMountain . . . . . . . . . . . .

8.3.1.9.1.1.1 Activity: Synthesis oftectonic, seismic, and vol-canic hazards data from othersite characterizationactivities . . . . . . . . . .

8.3.1.8-104

8.3.1.8-105

8.3.1.8-106

8.3.1.8-108

8.3.1.8-108

8.3.1.8-109

8.3.1.8-110

8.3.1.8-111

8.3.1.8-111

8 .3. 1. 9-1

8 .3.1. 9-12

8 .3. 1. 9-18

8 .3. 1 .9-18

2 2

2 2

2 2

2 1

2 2

2 1

2 2

2 1

2 2

2 12*

2 7*

2 1

2 2

* Includes figures and tables

xv

Page 37: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

8.3.1.9.1.1.2 Activity: Synthesis: eval-uation of the effects offuture erosion and depositionon the survivability of themarker system at YuccaMountain . . . . . . . . . . .

8.3.1.9.2 Investigation: Studies to providethe information required on presentand future value of energy, mineral,land, and ground-water resources . .

8.3.1.9.2.1 Study: Natural resource assess-ment of Yucca Mountain, NyeCounty, Nevada . . . . . . . . .

8.3.1.9.2.1.1 Activity: Geochemical assess-ment of Yucca Mountain inrelation to the potential formineralization . . . . . . . .

8.3.1.9.2.1.2 Activity: Geophysical/geologic appraisal of thesite relative to mineralresources . . . . . . . . . .

8.3.1.9.3.1.3 Activity: Assessment of thepotential for geothermalenergy at Yucca Mountain,Nevada . . . . . . . . . . . .

8.3.1.9.2.1.4 Activity: Assessment ofhydrocarbon resources at andnear the site . . . . . . . .

8.3.1.9.2.1.5 Activity: Mineral and energyassessment of the site,comparison to known mineral-ized areas, and the potentialfor undiscovered resourcesand future exploration . . . .

8.3.1.9.2.2 Study: Water resource assess-ment of Yucca Mountain, Nevada

8.3.1.9.2.2.1 Activity: Projected trendsin local and regional ground-water development, and esti-mated withdrawal rates insouthern Nevada, proximal toYucca Mountain . . . . . . . .

8.3.1.9.3 Investigation: Studies to providethe information required on poten-tial effects of exploiting naturalresources on hydrologic, geochemical,and rock characteristics . . . . . .

8.3.1.9-19

8.3.1.9-19

8.3.1.9-26

8.3. 1. 9-29

8. 3. 1. 9-32

8.3.1. 9-33

8.3. 1. 9-36

8.3.1. 9-38

8.3.1.9-41

8.3.1.9-41

8.3.1.9-42

2 1

2 8*

2 4

2 4

2 2

2 3

2 3

2 4

2 1

2 2

2 4*

* Includes figures and tables

xvi

Page 38: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.9.3.1 Study: Evaluation of dataneeded to support an assessmentof the likelihood of futureinadvertent human intrusion atYucca Mountain as a result ofexploration and/or extraction ofnatural resources . . . . . . . .

8.3.1.9.3.1.1 Activity: Compilation ofdata to support the assess-ment calculation of thepotential for inadvertenthuman intrusion at YuccaMountain . . . . . . . . . . .

8.3.1.9.3.2 Study: An evaluation of thepotential effects of explorationfor, or extraction of, naturalresources on the hydrologiccharacteristics at YuccaMountain . . . . . i .

8.3.1.9.3.2.1 Activity: An analysis of thepotential effects of futureground-water withdrawals onthe hydrologic system in thevicinity of Yucca Mountain,Nevada . . . . . . . . . . . .

8.3.1.9.3.2.2 Activity: Assessment of ini-tiating events related tohuman interference that areconsidered not to be suf-ficiently credible or signif-icant to warrant furtherinvestigation . . . . . . . .

8.3.1.10 Overview of population density and dist-ribution program: Description of pop-ulation density and distributionrequired by the performance and designissues . . . . . . . . . . .

8.3.1.11 Overview of land ownership and mineralrights program: Description of statusand plans for land ownership and mineralrights required by the performance anddesign issues . . . . . . . . . . . . . .

8.3.1.12 Overview of the meteorology program:Description of meteorological conditionsrequired by the performance and designissues . . . . . . . . . . . . . . . . .

8 .3.1. 9-45

8 .3 .1. 9-45

8.3.1.9-46

8 .3.1. 9-46

8 .3 .1. 9-47

8.3.1.10-1

8 .3 .1. 11-1

8 .3 .1. 12-1

2 1

2 2

2 1

2 2

2 2

2 1

2 3

2 6*

* Includes figures and tables

xvii

Page 39: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

gage Rev. Pages

8.3.1.12.1 Investigation: Studies to providedata on regional meteorologicalconditions . . . . . . . . . . . . .

8.3.1.12.1.1 Study: Characterization of theregional meteorological condi-tions . . . . . . . . . . . . .

8.3.1.12.1.2 Study: Plan for synthesis ofYucca Mountain Project meteoro-logical monitoring . . . . . . .

8.3.1.12.2 Investigation: Studies to providedata on atmospheric and meteoro-logical phenomena at potentiallocations of surface facilities

8.3.1.12.2.1 Study: Meteorological datacollection at the Yucca Moun-tain site . . . . . . . . . . .

8.3.1.12.2.1.1 Activity: Site meteoro-logical monitoring program

8.3.1.12.2.1.2 Activity: Data summary forinput to dose assessments . .

8.3.1.12.3 Investigation: Studies to providedata on the location of populationcenters relative to wind patternsin the general region of the site

8.3.1.12.4 Investigation: Studies to providedata on potential extreme weatherphenomena and their recurrenceintervals . . . . . . . . . . . . .

8.3.1.12.4.1 Study: Characterize the poten-tial extreme weather phenomenaand their recurrence intervals

8.3.1.12-6

8 .3. 1. 12-9

8.3.1.12-11

8.3.1.12-12

8.3.1.12-14

8.3.1.12-14

8.3.1.12-20

8.3.1.12-21

8.3.1.12-22

8.3.1.12-23

2 4*

2 2

2 2

2 3

2 1

2 6*

2 2

2 2

2 2

2 2

* Includes figures and tables

xviii

Page 40: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES

TotalNo. of

Rev. PagesFigure Title Page

8.3.1.3-1

8.3.1.3-2

8.3.1.3-3

8.3.1.3-4

8.3.1.3-5

8.3.1.3-6

8.3.1.3-7

8.3. 1. 3-8

8 .3.1. 3-9

Parameter calls and correspondingmodel from geochemistry testprogram . . . . . . . . . . . . . .

Logic diagram for geochemistryprogram 8.3.1.3 . . . . . . . . . .

Logic diagram for Investigation8.3.1.3.1 (ground-water chemistryalong flow paths to the accessibleenvironment) . . . . . . . . . . . .

Logic diagram for Investigation8.3.1.3.2 (mineralogy, petrology,and rock chemistry along flow pathsto the accessible environment)

Logic diagram for Investigation8.3.1.3.3 (stability of mineralsand glasses) . . . . . . . . . . . .

Logic diagram for Investigation8.3.1.3.4 (radionuclide retardationby sorption processes along flowpaths to the accessible environment)

Logic diagram for Investigation8.3.1.3.5 (radionuclide retardationby precipitation processes alongflow paths to the accessibleenvironment) . . . . . . . . . . . .

Logic diagram for Investigation8.3.1.3.6 (radionuclide retardationby dispersive, diffusive, and advec-tive transport processes along flowpaths to the accessible environment)

Logic diagram for Investigation8.3.1.3.7 (radionuclide retardationby all processes along flow paths tothe accessible environment) . . . .

8.3.1.3-2

8.3.1.3-11

8.3.1.3-24

8.3.1.3-26

8.3.1.3-27

8.3.1.3-29

8.3.1.3-30

8.3.1.3-32

8.3.1.3-33

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

xix

Page 41: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFiqure Title Paqe

8.3.1. 3-10

8.3.1.4-1

8.3.1.4-2

8 .3.1. 4-3

8.3.1. 4-4

8.3.1.4-5

8.3.1.4-6

8.3.1.4-7

8.3.1. 4-8

8.3.1. 4-9

Logic diagram for Investigation8.3.1.3.8 (radionuclide retardationby gaseous transport processes alongflow paths to the accessibleenvironment) . . . . . . . . . . . . . 8.3.1.3-35

Logic diagram for the three-dimensional physical propertiesmodel ..... . . . . . . . . . . . 8.3.1.4-3

Areas of geologic investigation atYucca Mountain . . . . . . . . . . . . . 8.3.1.4-30

Locations of existing and proposedcontinuously cored holes at YuccaMountain . . . . . . . . . . . . . . . . 8.3.1.4-34

Approximate locations of additionalsurface stratigraphic studies of theTopopah Spring Member of the Paint-brush Tuff . . . . . . . . . . . . . . . 8.3.1.4-37

Approximate locations of additionalsurface stratigraphic studies of theYucca Mountain and Pah Canyons Membersof the Paintbrush Tuff, tuffaceous bedsof the Calico Hills, and Prow Pass andBullfrog Members of Crater Flat Tuff . . 8.3.1.4-38

Approximate location of proposedseismic refraction survey acrossYucca Wash . . . . . . . . . . . . . . 8.3.1.4-51

Approximate location of proposedseismic reflection surveys at YuccaMountain . . . . . . . . . . . . . . . 8.3.1.4-52

Approximate locations of proposedgravity and magnetic surveys nearproposed coreholes . . . . . . . . . . 8.3.1.4-53

Approximate areal limits of mappedarea (A) and area of additionalmapping (B) . . . . . . . . . . . . . . 8.3.1.4-62

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

xx

Page 42: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-OO11, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFigure Title Paqe

8.3.1.4-10a

8.3.1.4-lOb

8.3.1.4-11a

8.3.1.4-lib

8.3.1.4-12

8.3.1.4-13

8 .3.1. 4-14

8.3. 1.5-1

8 .3.1.5-2

8.3.1. 5-3

8.3.1.5-4

8.3.1.5-5

Yucca Mountain systematic drillingprogram - areal coverage scheme . . . .

Legend for Figure 8.3.1.4-lOa . . . . .

Yucca Mountain systematic drillingprogram - small scale variabilitytest drill hole location . . . . . . .

Legend for Figure 8.3.1.4-11a . . . . .

Histogram of data pairs for geostat-istical analysis. Based on systematicdrilling program, plus selectedproposed boreholes from the sitevertical boreholes study, sitepotentiometric level monitoringactivity, and Solitario Canyon Faultstudy in the saturated zone . . . . . .

Histogram of data pairs for geostat-istical analysis. Based on systematicdrilling program, plus selected exist-ing and proposed boreholes from thefeature sampling program . . . . . . .

Possible systematic sampling program

General logic diagram showing tiesbetween climate program and othercharacterization programs, designissues, and performance issues . . . .

Logic diagram for climate program . . .

Detail of the climate model step(Study 8.3.1.5.1.6) in logic diagram

Possible sampling sites for paleo-climate studies . . . . . . . . . . . .

Approximate boundaries of YuccaMountain surficial deposits mapping

8.3.1.4-78

8.3.1.4-79

8 .3.1. 4-82

8 .3 .1. 4-83

8 .3.1. 4-84

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

8.3.1.4-85

8.3. 1.4-88

8.3.1.5-2

8.3.1.5-6

8.3.1.5-15

8.3.1. 5-42

8.3. 1.5-59

xxi

Page 43: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFigure Title Page

8.3.1.6-1

8 .3.1. 6-2

8 .3.1. 6-3

8.3.1.6-4

8.3.1.6-5

8.3.1.8-1

8 .3.1. 8-2

8.3.1. 8-3

8.3. 1. 8-4

8 .3.1. 8-5

8 .3.1. 8-6

8.3.1.8-7

8 .3.1. 8-8

Relationship between erosion programand investigations . . . . . . . . . . 8.3.1.6-5

Logic diagram for Investigation8.3.1.6.1 . . . . . . . . . . . . . . . 8.3.1.6-8

Logic diagram for Investigation8.3.1.6.2 . . . . . . . . . . . . . . . 8.3.1.6-14

Logic diagram for Investigation8.3.1.6.3 . . . . . . . . . . . . . . . 8.3.1.6-18

Logic diagram for Investigation8.3.1.6.4 . . . . . . . . . . . . . . . 8.3.1.6-22

Relationships between the postclosuretectonics program, investigations, andperformance design issues . . . . . . . 8.3.1.8-2

Parameter analysis . . . . . . . . . . 8.3.1.8-25

Logic diagram for Investigation8.3.1.8.1 (volcanic activity) . . . . . 8.3.1.8-50

Logic diagram for Investigation8.3.1.8.2 (tectonic effects on wastepackage) . . . . . . . . . . . . . . . 8.3.1.8-61

Logic diagram for Study 8.3.1.8.3.1(analysis of the effects of tectonicprocesses and events on flux rates) . . 8.3.1.8-71

Logic diagram for Study 8.3.1.8.3.2(analysis of effects of tectonicprocesses and events on changes inwater-table elevation) . . . . . . . . 8.3.1.8-72

Logic diagram for Study 8.3.1.8.3.3(effects of faulting on local fracturepermeability and effective porosity) . 8.3.1.8-73

Logic diagram for Study 8.3.1.8.4.1(analysis of the effects of tectonicprocesses on rock geochemicalproperties) . . . . . . . . . . . . . . 8.3.1.8-92

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

xxii

Page 44: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

Figure

8.3.1.8-9

8.3.1.9-1

8.3.1.9-2

8.3. 1.9-3

8.3. 1. 9-4

8.3.1.12-1

8.3.1.12-2

Title

Map showing location of volcanismdrillholes . . . . . . . . . . . . . .

General logic diagram for the HumanInterference Program . . . . . . . . .

Logic diagram for Investigation8.3.1.9.1 . . . . . . . . . . . . . . .

Logic diagram for Investigation8.3.1.9.2 . . . . . . . . . . . . . . .

Logic diagram for Investigation8.3.1.9.3 . . . . . . . . . . . . . . .

General logic diagram for meteorologyprogram . . . . . . . . . . . . . . . .

Meteorological monitoring sitesoperated as part of the Yucca MountainProject . . . . . . . . . . . . . . . .

Page

8.3.1.8-101

8.3.1.9-15

8.3.1.9-17

8.3.1.9-21

8.3.1.9-44

8.3.1.12-4

8.3.1.12-7

Rev.

2

2

2

2

2

2

TotalNo. ofPages

1

1

1

1

1

1

2 1

xxiii

Page 45: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES

TotalNo. of

Rev. PagesTable Title Page

8.3.1.3-1

8.3.1. 3-2

8.3.1. 3-3

8.3.1. 3-4

8.3.1. 3-5

-8.3. 1. 3-6

8.3. 1. 3-7

Activity parameters provided by thegeochemistry program that supportperformance and design issues . . . . .

Current representation and alternativehypotheses for geochemical model forsite geochemistry program . . . . . . .

Testing matrix for batch sorptionmeasurements as a function of solidphase composition . . . . . . . . . . .

Sorbing element concentrations ofprimary waste elements . . . . . . . .

General test matrix to be used inmeasuring batch sorption coefficientsin ground waters of varying composi-tions . . . . . . . . . . . . . . . . .

Test conditions for water used insolubility measurements . . . . . . . .

Dynamic and diffusion study testmatrix . . . . . . . . . . . . . . . .

8.3.1.3-4 2 6

8.3.1.3-13

8.3.1.3-62

8.3. 1. 3-65

8.3. 1.3-67

8.3.1.3-76

8.3. 1. 3-83

2 8

2 2

2 1

2 1

2 1

2 1

8.3.1.4-1 Activity parameters provided by therock characteristics program thatsupport performance and design issues 8.3.1.4-4 2 12

8.3.1.4-2

8 .3.1. 4-3

Current representation and alternativehypotheses for models for the rockcharacterization program . . . . . . .

Volcanic stratigraphy at YuccaMountain . . . . . . . . . . . . . . .

8 .3.1. 4-19

8.3.1. 4-36

2 5

2 1

8 .3.1. 4-4 Summary of geophysical studies forSite Program 8.3.1.4 (rockcharacteristics) . . . . . . . . . . 8.3.1.4-40 2 10

8.3.1.5-1 Initiating events or processes andassociated performance measures (forclimate program) . . . . . . . . . . 8.3.1.5-4 2 2

xxiv

Page 46: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.1.5-2

8.3.1.5-3

8.3.1. 5-4

8.3.1.5-5

8.3.1.6-1

8.3.1.8-la

B.3.1.8-lb

8.3.1.8-2a

8.3.1.8-2b

8.3.1.8-3a

Activity parameters provided by theclimate program that support perform-ance and design issues . . . . . . . .

Current representation and alternativehypotheses for regional model for theclimate program . . . . . . . . . . . .

Current representation and alternativehypotheses for paleoclimate modelingfor the climate program . . . . . . . .

Current representation and alternativehypotheses for paleohydrology modelingfor the climate program . . . . . . . .

Parameters provided by the erosionprogram that support performance anddesign issues . . . . . . . . . . . . .

Investigation 8.3.1.8.1 - Studies toprovide information required on directreleases resulting from volcanicactivity . . . . . . . . . . . . . . .

Investigation 8.3.1.8.1 - Studies toprovide information required on directreleases resulting from volcanicactivity . . . . . . . . . . . . . . .

Investigation 8.3.1.8.2 - Studies toprovide information required on ruptureof waste packages due to tectonicevents . . . . . . . . . . . . . . . .

Investigation 8.3.1.8.2 - Studies toprovide information required onrupture of waste packages due totectonic events . . . . . . . . . . . .

Investigation 8.3.1.8.3 - Studies toprovide information required on changesin unsaturated and saturated zonehydrology due to tectonic events(Study 1; alteration of averagepercolation flux) . . . . . . . . . . .

28.3.1.5-7

8.3.1.5-18

8.3.1.5-22

8.3.1.5-26

8.3.1.6-3

8.3.1.8-4

8.3.1.8-5

8.3.1.8-7

8.3.1.8-8

8.3.1.8-10

6

2 4

2 4

2 6

2 1

2 1

2 2

2 1

2 2

2 2

xxv

Page 47: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.1.8-3b

8.3.1.8-4a

8.3.1.8-4b

8.3.1.8-5a

8.3.1.8-5b

8.3.1.8-6a

8.3.1.8-6b

Investigation 8.3.1.8.3 - Studies toprovide information required on changesin unsaturated and saturated zonehydrology due to tectonic events(Study 1; alteration of averagepercolation flux) . . . . . . . . . . .

Investigation 8.3.1.8.3 - Studies toprovide information required onchanges in unsaturated and saturatedzone hydrology due to tectonic events(Study 2; changes in water tableelevation) . . . . . . . . . . . . . .

Investigation 8.3.1.8.3 - Studies toprovide information required onchanges in unsaturated and saturatedzone hydrology due to tectonic events(Study 2; changes in water tableelevation) . . . . . . . . . . . . . .

Investigation 8.3.1.8.3 - Studies toprovide information required onchanges in unsaturated and saturatedzone hydrology due to tectonic events(Study 3; alteration of rock prop-erties along significant travelpaths) . . . . . . . . . . . . . . . .

Investigation 8.3.1.8.3 - Studies toprovide information required onchanges in unsaturated and saturatedzone hydrology due to tectonic events(Study 3; alteration of rock prop-erties along significant travelpaths) . . . . . . . . . . . . . . . .

Investigation 8.3.1.8.4 - Studies toprovide information required onchanges in rock geochemical propertiesresulting from tectonic processes . . .

Investigation 8.3.1.8.4 - Studies toprovide information required onchanges in rock geochemicalproperties resulting from tectonicprocesses . . . . . . . . . . . . . . .

8.3.1.8-12

8.3.1.8-14

8.3.1.8-16

8.3.1. 8-18

8.3.1.8-19

8 .3. 1. 8-20

8.3.1.8-21

2 2

2 2

2 2

2 1

2 1

2 1

2 2

xxvi

Page 48: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8 .3.1. 8-7

8.3.1. 8-8

8.3.1.9-1

8.3. 1. 9-2

8.3.1.9-3

8.3.1.12-1

8.3.1. 12-2

Current representation and alternativehypotheses for the local model for thepreclosure tectonics program . . . . .

Current representation and alternativehypotheses for the regional model forthe postclosure tectonics program . . .

Initiating events, associated perform-ance parameters, and activity para-meters for the human interferenceprogram . . . . . . . . . . . . . . . .

Studies and activities making up thehuman interference program . . . . . .

Current representation and alternativehypotheses for mineral and resourcemodels for the human interferenceprogram . . . . . . . . . . . . . . . .

Performance allocation table for themeteorology program . . . . . . . . . .

Meteorological monitoring sitesoperated by the Yucca MountainProject . . . . . . . . . . . . . . . .

8.3.1.8-31

8.3.1.8-40

8.3.1.9-4

8.3.1.9-13

8.3.1.9-24

8.3.1.12-2

8.3.1.12-16

2 9

2 6

2 7

2 2

2 2

2 1

2 1

xxvii

Page 49: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

U.S. DEPARTMENT OF ENERGY

I

I

aU C C N Document No. Ymp/cM-001 1

C SITE C XNo.cI ll .000/CI.13.0000

R Date 03/13/92

W CHA A ~ I N WBS No. 1. 2. 3

m~; PROJ ,u OA> Level Yes

PROJECT BA VEDOCUMENT

YUCCA MOUNTAINSITE CHARACTERIZATION

PROGRAM BASELINE(SCPB)

VOLUME 3

CHANGES TO THIS DOCUMENT REQUIRE PREPARATIONAND APPROVAL OFA CHANGE REQUESTIN ACCORDANCEWITRHPROJECTAP-3.3Q

UNITED STATES DEPARTMENT OF ENERGYYUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT OFFICE

Page 50: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS

TotalNo. ofPages

8.3.1.13 Overview of offsite installations andoperations program: Description ofthe offsite installations and operationsrequired by performance and designissues.

8.3.1.13.1 Investigation: Determination ofnearby industrial, transportation,and military installations andoperations (nuclear and nonnuclear)

8.3.1.13.1.1 Activity: Identify near-site

8.3.1.13.1.2

8.3.1.13.1.3

activities . . . . . . . . . . .Activity: Characterize nuclearfuel cycle facilities in thearea . . . . . . . . . . . . . .Activity: Characterize allnuclear facilities not associ-ated with the nuclear fuel cyclenear the Yucca Mountain site . .

8.3.1.13.2 Investigation: Potential impacts ofnearby installations and operations

8.3.1.13.2.1 Activity: Evaluate near-siteactivities . . . . . . . . . . .

8.3.1.13.2.2 Activity: Evaluation of theimpact of nuclear fuel cycleoperations near the Yucca Moun-tain site and Las Vegas . . . . .

8.3.1.13.2.3 Activity: Evaluate the impactof all nuclear facilities notassociated with the nuclear fuelcycle near the Yucca Mountainsite . . . .

8.3.1.13.2.4 Activity: Evaluate the impactof ground motion from nucleartesting activities at the NevadaTest site . . . . . . . . . . . .

8.3.1.14 Overview of the surface and subsurfaceaccess characteristics program: Descrip-tion of the surface and subsurface accesscharacteristics required by the perform-ance and design issues . . . . . . . . . .

8.3.1.14.1 Investigation: Studies to providethe topographic characteristics ofpotential locations of surfacefacilities . . . . . . . . . . . . .

8.3.1.13-1

8.3.1.13-2

8.3. 1. 13-3

8.3. 1. 13-4

8.3.1. 13-5

8.3.1.13-6

8.3.1. 13-7

8.3.1. 13-8

8.3.1.13-9

8.3.1.13-10

8.3.1. 14-1

8.3.1.14-18

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 1

2 18*

2 10*

* Includes figures and tables

iii

Page 51: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPages

8.3.1.14.2 Investigation: Studies to providesoil and rock properties of poten-tial locations of surface facilitiesand subsurface access facilities

8.3.1.14.2.1 Study: Exploration program8.3.1.14.2.1.1 Activity: Site reconnaiss-

ance . . . . . . . . . . . . .8.3.1.14.2.1.2 Activity: Preliminary and

detailed exploration . . . . .8.3.1.14.2.2 Study: Laboratory tests and

material property measurements8.3.1.14.2.2.1 Activity: Physical property

and index laboratory tests8.3.1.14.2.2.2 Activity: Mechanical and

dynamic laboratory propertytests . . . . . . . . . . . .

8.3.1.14.2.3 Study: Field tests and charac-terization measurements . . . . .

8.3.1.14.2.3.1 Activity: Physical propertyfield tests and characteriza-tion measurements . . . . . .

8.3.1.14.2.3.2 Activity: Mechanical property field tests . . . . . . .

8.3.1.14.2.3.3 Activity: Geophysical fieldmeasurements . . . . . . . . .

8.3.1.15 Overview of thermal and mechanical rockproperties program: Description ofthermal and mechanical rock propertiesrequired by the performance and designissues.

8.3.1.15.1 Investigation: Studies to providethe required information for spatialdistribution of thermal and mechani-cal properties . . . . . . . . . . .

8.3.1.15.1.1 Study: Laboratory thermalproperties . . . . . I I . . I .

8.3.1.15.1.1.1 Activity: Density and poros-ity characterization . . . . .

8.3.1.15.1.1.2 Activity: Volumetric heatcapacity characterization

8.3.1.15.1.1.3 Activity: Thermal conductiv-ity characterization . . . . .

8.3.1.15.1.2 Study: Laboratory thermalexpansion testing . . . . . . . .

8.3.1.14-278.3.1.14-32

8.3.1.14-32

8.3.1.14-39

8.3.1.14-42

8.3.1.14-42

8.3.1.14-43

8.3.;1.14-47

8.3.1.14-47

8.3.1.14-49

8.3.1.14-51

8.3.1.15-1

8.3.1.15-22

8.3.1.15-31

8.3.1.15-31

8.3.1.15-33

8.3.1.15-35

8.3.1.15-37

22

51

2 7*

2 4

2 1

2 2

2 5

2 1

2 3

2 3

2 2

2 22*

2 10*

2 1

2 3*

2 3

2 2

2 1

* Includes figures and tables

iv

Page 52: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.15.1.2.1 Activity: Thermal expansioncharacterization . . . . . . .

8.3.1.15.1.3 Study: Laboratory determinationof mechanical properties ofintact rock . . . . . . . . I . .

8.3.1.15.1.3.1 Activity: Compressive mech-anical properties of intactrock at baseline experimentconditions . . . . . . . . . .

8.3.1.15.1.3.2 Activity: Effects of vari-able environmental conditionson mechanical properties . . .

8.3.1.15.1.4 Study: Laboratory determinationof the mechanical properties offractures . . . . . . . . . . . .

8.3.1.15.1.4.1 Activity: Mechanical proper-ties of fractures at baselineexperiment conditions . . . .

8.3.1.15.1.4.2 Activity: Effects of vari-able environmental conditionson mechanical properties offractures . . . . . . . . . .

8.3.1.15.1.5 Study: Excavation investiga-tions . . . . . . . . . . . . . .

8.3.1.15.1.5.1 Activity: Shaft convergence8.3.1.15.1.5.2 Activity: Demonstration

breakout rooms . . . . . . . .8.3.1.15.1.5.3 Activity: Sequential drift

mining . . . . . . . . . . . .8.3.1.15.1.6 Study: In situ thermomechanical

properties . . . . . . . . . . .8.3.1.15.1.6.1 Activity: Heater experiment

in unit TSwl . . . . . . . . .8.3.1.15.1.6.2 Activity: Canister-scale

heater experiment . . . . . .8.3.1.15.1.6.3 Activity: Yucca Mountain

heated block . . i . .8.3.1.15.1.6.4 Activity: Thermal stress

measurements . . . . . . . . .8.3.1.15.1.6.5 Activity: Heated room

experiment . . . . . . . . . .8.3.1.15.1.7 Study: In situ mechanical

properties . . . . . . . . . . .8.3.1.15.1.7.1 Activity: Plate loading

tests . . . . . . . . . . . .

8.3.1.15-37

8.3.1.15-38

8.3.1.15-38

8.3.1.15-39

8.3.1.15-40

8.3.1.15-40

8.3.1.15-41

8.3.1.15-428.3.1.15-42

8.3.1.15-43

8.3.1.15-44

8.3.1.15-45

8.3.1.15-45

8.3.1.15-46

8.3.1.15-47

8.3.1.15-48

8.3.1.15-49

8.3.1.15-50

8.3.1.15-50

2 2

2 1

2 2

2 2

2 1

2 2

2 2

22

12

2 2

2 2

2 1

2 2

2 2

2 2

2 1

2 1

2 1

2 2

* Includes figures and tables

v

Page 53: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

8.3.1.15.1.7.2 Activity: Rock-mass strengthexperiment . . . . . . . . . .

8.3.1.15.1.8 Study: In situ design verifica-tion . . . . . . . . . . . . . .

8.3.1.15.1.8.1 Activity: Evaluation ofmining methods . . . . . . . .

8.3.1.15.1.8.2 Activity: Monitoring ofground-support systems . . . .

8.3.1.15.1.8.3 Activity: Monitoring driftstability . . . . . . . . . .

8.3.1.15.1.8.4 Activity: Air quality andventilation experiment . . . .

8.3.1.15.2 Investigation: Studies to providethe required information for spatialdistribution of ambient stress andthermal conditions . . . . . . . . .

8.3.1.15.2.1 Study: Characterization of thesite ambient stress conditions

8.3.1.15.2.1.1 Activity: Anelastic strainrecovery experiments in coreholes . . . . . . . . . . . .

8.3.1.15.2.1.2 Activity: Overcore stressexperiments in the explor-

- atory studies facility . . . .8.3.1.15.2.2 Study: Characterization of the

site ambient thermal conditions8.3.1.15.2.2.1 Activity: Surface-based

evaluation of ambient thermalconditions . . . . . . . . . .

8.3.1.16 Overview of preclosure hydrology program:Description of preclosure hydrologiccharacteristics and conditions requiredby performance and design issues . . . . .

8.3.1.16.1 Investigation: Flood recurrenceintervals and levels at potentiallocations of surface facilities . . .

8.3.1.16.1.1 Study: Characterization offlood potential of the YuccaMountain site . . . . . . . . . .

8.3.1.16.1.1.1 Activity: Site flood anddebris hazards studies . . . .

8.3.1.16.2 Investigation: Location of adequatewater supplies . . . . . . . . . . .

8.3.1.15-51

8.3.1.15-52

8.3.1.15-52

8.3.1.15-53

8.3.1.15-54

8.3.1.15-54

8.3.1.15-55

8.3.1.15-56

8.3.1.15-56

8.3.1.15-58

8.3.1.15-59

8.3.1.15-59

8.3. 1. 16-1

8.3.1.16-7

8.3.1.16-10

8.3.1.16-10

8.3.1.16-13

2 2

2 1

2 1

2 1

2 1

2 2

2 2

2 1

2 3

2 2

2 1

2 1

2 6*

2 4*

2 1

2 3

2 4*

* Includes figures and tables

vi

Page 54: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPages

8.3.1.16.2.1 Study: Location of adequatewater supply for construction,operation, closure, and decom-missioning of a mined geologicdisposal system at Yucca Moun-tain, Nevada . . . . . . . . . .

8.3.1.16.2.1.1 Activity: Assessment of thecost, feasibility, and ade-quacy of wells J-12 and J-13for use as the alternativewater supply for a mined geo-logic disposal system atYucca Mountain, Nevada . . . .

8.3.1.16.2.1.2 Activity: Location of aprimary water supply for amined geologic disposalsystem at Yucca Mountain,Nevada . . . . . . . . . . . .

8.3.1.16.2.1.3 Activity: Location of altern-ative water supplies for amined geologic disposalsystem at Yucca Mountain,Nevada . . . . . . . . . . . .

8.3.1.16.2.1.4 Activity: Identification andevaluation of potentialeffects of repository relatedwithdrawals on the local flowsystem at Yucca Mountain,Nevada . . . . . . . . . . . .

8.3.1.16.3 Investigation: Ground-water condi-tions within and above the potentialhost rock . . . . . . . . . . . . . .

8.3.1.16.3.1 Study: Determination of thepreclosure hydrologic conditionsof the unsaturated zone at YuccaMountain, Nevada . . . . . . . .

8.3.1.16.3.1.1 Activity: Synthesis of datafrom site program 8.3.1.2 todetermine the preclosurehydrologic characteristicsof the unsaturated zone atYucca Mountain, Nevada . . . .

8.3.1.17 Overview of preclosure tectonics:Description of tectonic and igneousevents required by performance and designrequirements.

8.3.1.16-16

8.3.1.16-16

8.3.1.16-17

8.3.1:16-18

8.3.1.16-19

8.3.1.16-20

8.3.1.16-22

8.3.1.16-22

8.3.1.17-1

2 1

2 2

2 2

2 2

2 1

2 3*

2 1

2 1

2 50*

* Includes figures and tables

vii

Page 55: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPages

8.3.1.17.1 Investigation: Studies to providerequired information on volcanicactivity that could affect reposi-tory design or performance . . . . .

8.3.1.17.1.1 Study: Potential for ash fallat the site . . . . . . . . . . .

8.3.1.17.1.1.1

8.3.1.17.1.1.2

8.3.1.17.1.1.3

Activity: Survey literatureregarding Quaternary silicicvolcanic centers in the west-ern Great Basin . . . . . . .Activity: Assess potentialashfall thickness at thesite . . . . . . . . . . . . .Activity: Assess potentialparticle density and sizedistribution of ash fall atthe site . . . . . . . . . . .

8.3.1.17.2 Investigation: Studies to providerequired information on fault dis-placement that could affect reposi-tory design or performance . . . . .

8.3.1.17.2.1 Study: Faulting potential atthe repository . . . . . . . . .

8.3.1.17.2.1.1 Activity: Assess the poten-tial for surface faulting atprospective sites of surfacefacilities important tosafety . . . . . . . . . . . .

8.3.1.17.2.1.2 Activity: Assess the poten-tial for displacement onfaults that intersect under-ground facilities

8.3.1.17.3 Investigation: Studies to providerequired information on vibratoryground motion that could affectrepository design or performance

8.3.1.17.3.1 Study: Relevant earthquakesources . . . . . . . . . . . . .

8.3.1.17.3.1.1 Activity: Identify relevantearthquake sources . . . . . .

8.3.1.17.3.1.2 Activity: Characterize10,000-year cumulative slipearthquakes for relevantseismogenic sources . . . . .

8.3.1.17.3.2 Study: Underground nuclearexplosion sources . . . . . . . .

8.3.1.17-51

8.3.1.17-54

8.3.1.17-54

8.3.1.17-54

8.3.1.17-55

8.3.1.17-56

8.3.1.17-60

8.3.1.17-60

8.3.1.17-61

8.3.1.17-62

8.3.1.17-68

8.3.1.17-68

8.3.1.17-71

8.3.1.17-73

2 4*

2 1

2 1

2 2

2 1

2 5*

2 1

2 2

2 2

2 7*

2 1

2 4*

2 3

2 1

* Includes figures and tables

viii

Page 56: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPages

8.3.1.17.3.2.1 Activity: Determine therange of UNE sources . . . . .

8.3.1.17.3.2.2 Activity: Determine maximumunderground nuclear explosionsource(s) . . . . . . . . . .

8.3.1.17.3.3 Study: Ground motion fromregional earthquakes and under-ground nuclear explosions . . . .

8.3.1.17.3.3.1 Activity: Select or developempirical models for earth-quake ground motions . . . . .

8.3.1.17.3.3.2 Activity: Select or developempirical models for groundmotion from undergroundnuclear explosions . . . .

8.3.1.17.3.4 Study: Effects of local sitegeology on surface and sub-surface motions . . . . . . . . .

8.3.1.17.3.4.1 Activity: Determine siteeffects from ground-motionrecordings . . . . . . . . . .

8.3.1.17.3.4.2 Activity: Model site effectsusing the wave properties ofthe local geology . . . . . .

8.3.1.17.3.5 Study: Ground motion at thesite from controlling seismicevents . . . . . . . . . . . . .

8.3.1.17.3.5.1 Activity: Identify controll-ing seismic events . . . . . .

8.3.1.17.3.5.2 Activity: Characterizeground motion from the con-trolling seismic events . . .

8.3.1.17.3.6 Study: Probabilistic seismichazards analyses . . . . . . . .

8.3.1.17.3.6.1 Activity: Evaluate earth-quake sources . . . . . . .

8.3.1.17.3.6.2 Activity: Evaluate groundmotion probabilities . . . . .

8.3.1.17.4 Investigation: Preclosure tectonicsdata collection and analysis . . . .

8.3.1.17.4.1 Study: Historical and currentseismicity . . . . . . . . . . .

8.3.1.17.4.1.1 Activity: Compile historicalearthquake record . . . . . .

8.3.1.17.4.1.2 Activity: Monitor currentseismicity . . . . . . . . . .

8.3.1.17-73

8.3.1.17-74

8.3.1.17-74

8.3.1.17-75

8.3.1.17-75

8.3.1.17-76

8.3.1.17-76

8.3.1.17-77

8.3.1.17-78

8.3.1.17-78

8.3.1.17-79

8.3.1.17-80

8.3.1.17-80

8.3.1.17-81

8.3.1.17-82

8.3.1.17-84

8.3.1.17-84

8.3.1.17-86

*2 2

2 1

2 1

2 1

2 1

2 1

2 2

2 2

2 1

2 1

2 1

2 1

2 2

2 2

2 3

2 1

2 2

2 3

* Includes figures and tables

ix

Page 57: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.17.4.1.3 Activity: Evaluate potentialfor induced seismicity at thesite . . . . . . . . . . . . .

8.3.1.17.4.2 Study: Location and recency offaulting near prospective sur-face facilities . . . . . . .

8.3.1.17.4.2.1 Activity: Identify appropri-ate trench locations inMidway Valley . . . . . . . .

8.3.1.17.4.2.2 Activity: Conduct explora-tory trenching in MidwayValley . . . . . . . . . . . .

8.3.1.17.4.3 Study: Quaternary faultingwithin 100 km of Yucca Mountain,including the Walker Lane . .

8.3.1.17.4.3.1 Activity: Conduct and eval-uate deep geophysical surveysin an east-west transectcrossing the Furnace Creekfault zone, Yucca Mountain,and the Walker Lane . . . . .

8.3.1.17.4.3.2 Activity: Evaluate Quater-nary faults within 100 km ofYucca Mountain . . . . . . . .

8.3.1.17.4.3.3 Activity: Evaluate the CedarMountain earthquake of 1932and its bearing on wrenchtectonics of the Walker Lanewithin 100 km of the site . .

8.3.1.17.4.3.4 Activity: Evaluate the BareMountain fault zone . . . . .

8.3.1.17.4.3.5 Activity: Evaluate struc-tural domains and character-ize the Yucca Mountain region

8.3.1.17-88

8.3.1.17-90

8.3.1.17-90

8.3.1.17-91

8.3.1.17-92

8.3.1.17-99

8.3.1.17-114

8.3.1.17-118

8.3.1.17-119

8.3.1.17-121

8.3.1.17-122

8.3.1.17-124

8.3.1.17-125

8.3.1.17-126

2 3

2 1

2 2

2 2

2 8*

2 16*

2 5

2 2

2 2

2 2

2 3*

2 2

2 2

2 3

with respect to regionalpatterns of faults andfractures . . . . . . . . . .

8.3.1.17.4.4 Study: Quaternary faultingproximal to the site withinnortheast-trending fault zones

8.3.1.17.4.4.1 Activity: Evaluate the RockValley fault system . . . I .

8.3.1.17.4.4.2 Activity: Evaluate the MineMountain fault system . . .

8.3.1.17.4.4.3 Activity: Evaluate theStagecoach Road fault zone . .

* Includes figures and tables

x

Page 58: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.17.4.4.4 Activity: Evaluate the CaneSpring fault system

8.3.1.17.4.5 Study: Detachment faults at orproximal to Yucca Mountain . . .

8.3.1.17.4.5.1 Activity: Evaluate the sig-nificance of the Miocene-Paleozoic contact in theCalico Hills area to detach-ment faulting within the sitearea . . . . . . . . . . . . .

8.3.1.17.4.5.2 Activity: Evaluate postu-lated detachment faults inthe Beatty-Bare Mountainarea . . . . . . . . . . . . .

8.3.1.17.4.5.3 Activity: Evaluate thepotential relationship ofbreccia within and south ofCrater Flat to detachmentfaulting . . . . . . . . . . .

8.3.1.17.4.5.4 Activity: Evaluate postu-lated detachment faults inthe Specter Range and CampDesert Rock areas . . . . . .

8.3.1.17.4.5.5 Activity: Evaluate the ageof detachment faults usingradiometric ages . . . . . . .

8.3.1.17.4.6 Study: Quaternary faultingwithin the site area . . . . . .

8.3.1.17.4.6.1 Activity: Evaluate Quater-nary geology and potentialQuaternary faults at YuccaMountain . . . . . . . . . . .

8.3.1.17.4.6.2 Activity: Evaluate age andrecurrence of movement onsuspected and known Quater-nary faults . . . . . . . . .

8.3.1.17.4.7 Study: Subsurface geometry andconcealed extensions of Quater-nary faults at Yucca Mountain

8.3.1.17.4.7.1 Activity: Evaluate inter-mediate depth (2 to 3 km)reflection and refractionmethods and plan potentialapplication of these methodswithin the site area . . . .

8.3.1.17-128

8.3.1.17-129

8.3.1.17-130

8.3.1.17-131

8.3.1.17-133

8.3.1.17-133

8.3.1.17-134

8.3.1.17-136

8.3.1.17-137

8.3.1.17-138

8.3.1.17-143

8.3.1.17-144

2 1

2 2

2 2

2 3

2 1

2 2

2 2

2 2

2 2

2 6

2 2

2 1

* Includes figures and tables

xi

Page 59: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.17.4.7.2

8.3.1.17.4.7.3

8.3.1.17.4.7.4

8.3.1.17.4.7.5

8.3.1.17.4.7.6

8.3.1.17.4.7.7

8.3.1.17.4.7.8

Activity: Detailed gravitysurvey of the site area . . .Activity: Detailed aeromag-netic survey of the sitearea . . . . . . . . . . . . .Activity: Detailed groundmagnetic survey of specificfeatures within the sitearea . . . . . . . . . . . . .Activity: Evaluate surfacegeoelectric methods and planpotential applications ofthese methods within the sitearea . . . .Activity: Evaluate methodsto detect buried faults usinggamma-ray measurements, andplan potential application ofthese methods within the sitearea . . . . . . . . . . . . .Activity: Evaluate thermalinfrared methods and planpotential applications ofthese methods within the sitearea . . . . . . . . . . . . .Activity: Evaluate shallowseismic reflection (mini-sosie) methods and, ifappropriate, conduct surveysof selected structures atand proximal to the sitearea . . . . . . . . . . . . .

8.3.1.17-145

8.3.1.17-145

8.3.1.17-146

8.3.1.17-146

8.3.1.17-147

8.3.1.17-148

8.3.1.17-149

8.3.1.17-150

8.3.1.17-151

8.3.1.17-152

2 1

2 1

2 1

2 2

2 2

2 2

2 2

2 2

2 2

2 3

8.3.1.17.4.8 Study: Stress field within andproximal to the site area . . . .

8.3.1.17.4.8.1 Activity: Evaluate presentstress field within the site

8.3.1.17.4.8.2area . . . .Activity: Evaluate and testshallow borehole hydrofracand triaxial strain recoverymethods for the determinationof in situ stress, and ifappropriate, plan potentialapplication of these methodswithin and proximal to thesite . . . . . . . . . . . . .

* Includes figures and tables

xii

Page 60: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.1.17.4.8.3 Activity: Evaluate publishedand unpublished data onpaleostress orientation atand proximal to the site andassess the relevance of thesedata to Quaternary tectonics

8.3.1.17.4.8.4 Activity: Evaluate theoreti-cal stress distributionsassociated with potentialtectonic settings (wrenchfault, normal fault, detach-ment fault setting, etc.) ofthe site . . . . . . . . . .

8.3.1.17.4.9 Study: Tectonic geomorphologyof the Yucca Mountain region

8.3.1.17.4.9.1 Activity: Evaluate age andextent of tectonically stableareas at and near YuccaMountain . . . . . . . . . . .

8.3.1.17.4.9.2 Activity: Evaluate extent ofareas of Quaternary upliftand subsidence at and nearYucca Mountain . . . . . . I .

8.3.1.17.4.9.3 Activity: Evaluate varia-tions in the nature andintensity of Quaternaryfaulting within 100 km ofYucca Mountain through morpho-metric and morphologicanalysis . . . . . . . . . . .

8.3.1.17.4.10 Study: Geodetic leveling . . .8.3.1.17.4.10.1 Activity: Relevel base-

station network, Yucca Moun-tain and vicinity . . . . . .

8.3.1.17.4.10.2 Activity: Survey selectedbase stations, Yucca Moun-tain and vicinity, usingglobal positioningsatellite . . . . . . . . . .

8.3.1.17.4.10.3 Activity: Analyze existingreleveling data, YuccaMountain and vicinity . . . .

8.3.1.17.4.11 Study: Characterization ofregional lateral crustalmovement . . . . . . . . . . . .

8.3.1.17-154

8.3.1.17-155

8.3.1.17-156

8.3.1.17-157

8.3.1.17-158

8.3.1.17-1598.3.1.17-160

8.3.1.17-161

8.3.1.17-162

8.3.1.17-163

8.3.1.17-163

2 1

2 2

2 1

2 2

2 2

22

22

2 2

2 2

2 1

2 1

* Includes figures and tables

xiii

Page 61: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

8.3.1.17.4.11.1

8.3.1.17.4.12

8.3.1.17.4.12.1

8.3.1.17.4.12.2

8.3.1.17.4.12.3

Activity: Analyze lateralcomponent of crustal move-ment based on historicalfaulting, seismicity, andtrilateration survey . . .

Study: Tectonic models andsynthesis . . . . . . . . .Activity: Evaluate tectonicprocesses and tectonic sta-bility at the site . . . .Activity: Evaluate tectonicmodels . . . . . . . . . .Activity: Evaluate tectonicdisruption sequences . . .

8.3.2 Repository Program . . . . . . . . . . . . . .8.3.2.1 Overview of repository program . . . . . .

8.3.2.1.1 Verification or measurement ofhost-rock environment . . . . I I I .

8.3.2.1.1.1 Pre-waste-emplacement environ-ment . . . . . . . . . . . . . . .

8.3.2.1.1.2 Post-subsurface-excavationenvironment . . . . . . . . . . .

8.3.2.1.1.3 Post-waste-emplacement environ-ment . . . . . . . . . . . . . . .

8.3.2.1.2 Coupled interaction tests . . . . . .8.3.2.1.3 Design improvement activities and

tests . . . . . . . . . . . . . . . .8.3.2.1.4 Repository modeling . . . . . . . . .

8.3.2.1.4.1 Geomechanical analyses . . . . . .8.3.2.1.4.2 Seismic analyses . . . . . . . . .8.3.2.1.4.3 Ventilation analyses . . . . . . .8.3.2.1.4.4 Safety analyses . . . . . . . . .

8.3.2.2 Issue resolution strategy for Issue 1.11:Have the characteristics and configurationof the repository and repository engineer-ed barriers been adequately establishedto (a) show compliance with the post-closure design criteria of 10 CFR 60.133and (b) provide information for the reso-lution of the performance issues? . . . . .

8.3.2.2.1 Information Need 1.11.1: Sitecharacterization information neededfor design . . . . . . . . . . . . . .

8.3.1.17-164

8.3.1.17-164

8.3.1.17-165

8.3.1.17-167

8.3.1.17-1688.3.2-1

8.3.2.1-1

8.3.2.1-8

8.3.2.1-9

8.3.2.1-11

8.3.2.1-128.3.2.1-13

8.3.2.1-148.3.2.1-198.3.2.1-208.3.2.1-238.3.2.1-248.3.2.1-24

8.3.2.2-1

8.3.2.2-23

222

117*

2 1

2 2

2 3

2 2

2 2

2 2

2 1

22

12

222222

6*2*4212

2 23*

2 16*

* Includes figures and tables

xiv

Page 62: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPages

8.3.2.2.1.1

8.3.2.2.1.2

8.3.2.2.1.3

8.3.2.2.1.4

Design Activity 1.11.1.1:Compile a comprehensive list ofall the information required fromsite characterization to resolvethis issue . . . . . . . . . . . .Design Activity 1.11.1.2: Deter-mine adequacy of existing sitedata . . . . . . . . . . . . . . .Design Activity 1.11.1.3: Docu-ment reference three-dimensionalthermal/mechanical stratigraphyof Yucca Mountain . . . . . . . .Design Activity 1.11.1.4: Prep-aration of reference propertiesfor the reference informationbase . . . . . . . . . . . . . . .

8.3.2.2.2 Information Need 1.11.2: Character-istics of waste package needed fordesign of the underground facility

8.3.2.2.2.1 Design Activity 1.11.2.1: Com-pile waste package informationneeded for repository design . . .

8.3.2.2.3 Information Need 1.11.3: Designconcepts for orientation, geometry,layout, and depth of the undergroundfacility that contribute to wastecontainment and isolation includingflexibility to accommodate site-specific conditions . . . . . . . . .

8.3.2.2.3.1 Desicgn Activity 1.11.3.1: Area

8.3.2.2-39

8.3.2.2-39

8.3.2.2-39

8.3.2.2-39

8.3.2.2-40

8.3.2.2-43

8.3.2.2-43

8.3.2.2-52

8.3.2.2-52

8.3.2.2-53

8.3.2.2-53

8.3.2.2-53

8.3.2.2-53

8.3.2.2-58

2 1

2 1

2 1

2 1

2 3

2 1

2 10*

2 1

2 1

2 1

2 1

2 1

2 6*

2 1

8.3.2.2.3.2

8.3.2.2.3.3

8.3.2.2.3.4

8.3.2.2.3.5

needed determination . . . . . . .Design Activity 1.11.3.2: Usablearea and flexibility evaluationDesign Activity 1.11.3.3: Verti-cal and horizontal emplacementorientation decision . . . . . . .Design Activity 1.11.3.4: Drain-age and moisture control plan . .Design Activity 1.11.3.5: Crite-ria for contingency plan . . . . .

8.3.2.2.4 Information Need 1.11.4: Designconstraints to limit water usage andpotential chemical changes . . . . . .

8.3.2.2.4.1 Design Activity 1.11.4.1: Chem-ical changes resulting from theuse of construction materials . .

* Includes figures and tables

xv

Page 63: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.2.2.4.2 Design Activity 1.11.4.2: Mater-ial inventory criteria . . . . . .

8.3.2.2.4.3 Design Activity 1.11.4.3: Watermanagement criteria . . . I I I .

8.3.2.2.5 Information Need 1.11.5: Designconstraints to limit excavation-induced changes in rock masspermeability . . . . . . . . . . .

8.3.2.2.5.1 Design Activity 1.11.5.1: Exca-vation methods criteria . . . . .

8.3.2.2.5.2 Design Activity 1.11.5.2: Long-term subsidence control strategy

8.3.2.2.6 Information Need 1.11.6: Repositorythermal loading and predicted thermaland thermomechanical response of thehost rock . . . . . . . . . . . . . .

8.3.2.2.6.1

8.3.2.2.6.2

8.3.2.2.6.3

8.3.2.2.6.4

8.3.2.2.6.5

Design Activity 1.11.6.1: Thermalloading for underground facilityDesign Activity 1.11.6.2: Bore-hole spacing strategy . . . . . .Design Activity 1.11.6.3: Sensi-tivity studies . . . . . . . . . .Design Activity 1.11.6.4: Strat-egy for containment enhancementDesign Activity 1.11.6.5: Refer-ence calculations . . . . . . . .

8.3.2.2-58

8.3.2.2-58

8 .3.2.2-59

8.3.2.2-62

8.3.2.2-63

8.3.2.2-63

8.3.2.2-72

8.3.2.2-72

8.3.2.2-72

8.3.2.2-72

8.3.2.2-73

8.3.2.2-73

8.3.2.2-75

8 .3.2.2-75

8.3.2.3-1

8.3.2.3-39

2 1

2 1

2 4*

2 2

2 1

2 10*

2 1

2 1

2 1

2 1

2 1

2 3

2 1

2 1

2 39*

2 4

8.3.2.2.7 Information Need 1.11.7: Referencepostclosure repository design . . . .

8.3.2.2.7.1 Design Activity 1.11.7.1: Refer-ence postclosure repositorydesign . . . . . . . . . . . . . .

8.3.2.2.7.2 Design Activity 1.11.7.2: Docu-mentation of compliance . . . . .

8.3.2.3 Issue resolution strategy for Issue 2.7:Have the characteristics and configura-tions of the repository been adequatelyestablished to (a) show compliance withthe preclosure design criteria of 10 CFR60.130 through 60.133 and (b) provideinformation for the resolution of theperformance issues? . . . . . . . .

8.3.2.3.1 Information Need 2.7.1: Determina-tion that the design criteria in 10CFR 60.131 through 60.133 and anyappropriate additional design objec-tives pertaining to radiologicalprotection have been met . . . . . . .

* Includes figures and tables

xvi

Page 64: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

8.3.2.3.1.1 Design Activity 2.7.1.1:Design evaluation for comp-liance with radiological safetydesign criteria and performancegoals . . . . . . . . . . . . . . 8.3.2.3-42

8.3.2.3.2 Information Needs 2.7.2 and 2.7.3:(1) Determination that the designcriteria in 10 CFR 60.131 through60.133 and any appropriate addi-tional design objectives pertainingto the design and protection ofstructures, systems, and componentsimportant to safety have been met,and (2) Determination that thedesign criteria in 10 CFR 60.131through 60.133 and any appropriateadditional design objectives per-taining to criticality control havebeen met . . . . . . . . . . . . . . . 8.3.2.3-42

8.3.2.4 Issue resolution strategy for Issue 4.2:Are the repository design and operatingprocedures developed to ensure nonradio-logical health and safety of workers ade-quately established for the resolution ofthe performance issues? . . . . . . . . . . 8.3.2.4-1

8.3.2.4.1 Information Need 4.2.1: Site andperformance assessment informationneeded for design . . . . . . . . . . 8.3.2.4-23

8.3.2.4.1.1 Design Activity to verify accessand drift usability . . . . . . . 8.3.2.4-27

8.3.2.4.1.2 Design activity to verify airquality and ventilation . . . . . 8.3.2.4-30

8.3.2.5 Issue resolution strategy for Issue 4.4:Are the technologies of repository con-struction, operation, closure, and decom-missioning adequately established for theresolution of the performance issues? . . 8.3.2.5-1

8.3.2.5.1 Information Need 4.4.1: Site andperformance assessment informationneeded for design . . . . . . . . . . 8.3.2.5-35

8.3.2.5.2 Information Need 4.4.2: Character-istics and quantities of waste andwaste packages needed for design . . . 8.3.2.5-38

2 1

2 3

2 23*

2 5

2 4

2 1

2 35*

2 4

2 5

* Includes figures and tables

xvii

Page 65: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.2.5.3 Information Need 4.4.3: Plan forrepository operations during con-struction, operation, closure, anddecommissioning . . . . . . . . . . .

8.3.2.5.3.1 Design Activity 4.4.3.1: Opera-tions plan to accompany theadvanced conceptual design . . . .

8.3.2.5.3.2 Design Activity 4.4.3.2: Opera-tions plan to accompany thelicense application design . . . .

8.3.2.5.4 Information Need 4.4.4: Repositorydesign requirements for construction,operation, closure, and decom-missioning . . . . . . . . . . . . . .

8.3.2.5.4.1 Design Activity 4.4.4.1: Reposi-tory design requirements (RDR)for license application design

8.3.2.5.5 Information Need 4.4.5: Referencepreclosure repository design . . . . .

8.3.2.5.6 Information Need 4.4.6: Developmentand demonstration of requiredequipment . . . . . . . . . . . . . .

8.3.2.5.7 Information Need 4.4.7: Designanalyses, including those addressingimpacts of surface conditions, rockcharacteristics, hydrology, and tec-tonic activity . . . . . . . . . . . .

8.3.2.5.8 Information Need 4.4.8: Identifica-tion of technologies for surfacefacility construction, operation,closure, and decommissioning . . . . .

8.3.2.5.9 Information Need 4.4.9: Identifica-tion of technologies for undergroundfacility construction, operation,closure, and decommissioning . . . . .

8.3.2.5.10 Information Need 4.4.10: Determina-tion that the seals for shafts,drifts, and boreholes can be placedwith reasonably availabletechnology . . . . . . . . . . . . .

8.3.3 Seal program . . . . . . . . . . . . . . . . .8.3.3.1 Overview of the seal program . . . . . . .

8.3.3.1.1 Seal environment . . . . . . . . . . .8.3.3.1.2 Seal components . . . . . . . . . . .8.3.3.1.3 Seal designs . . . . . . . . . . . . .8.3.3.1.4 Seal modeling . . . . . . . . . . . .

8.3.2.5-42

8.3.2.5-44

8.3.2.5-45

8.3.2.5-45

8.3 2.5-49

8.3.2.5-50

8.3.2.5-53

8.3.2.5-57

8.3.2.5-79

8.3.2.5-82

8.3.2.5-898.3.3-1

8.3.3.1-18.3.3.1-48 .3.3. 1-48.3.3.1-88.3.3.1-8

2 3

2 1

2 1

2 5*

2 1

2 4

2 5

2 23*

2 4

2 7

2222222

214 *1412

* Includes figures and tables

xviii

Page 66: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Paqe Rev. Pages

8.3.3.2 Issue resolution strategy for Issue 1.12:Have the characteristics and configura-tions of the shaft and borehole sealsbeen adequately established to (a) showcompliance with the postclosure designcriteria of 10 CFR 60.134 and (b) provideinformation for the resolution of theperformance issues? . . . . . . . . . .

8.3.3.2.1 Information Need 1.12.1: Site, wastepackage, and underground facilityinformation needed for design ofseals and their placement methods

8.3.3.2.2 Information Need 1.12.2: Materialsand characteristics of seals forshafts, drifts, and boreholes . . . .

8.3.3.2.2.1 Study 1.12.2.1: Seal materialproperties development . . . . . .

8.3.3.2.2.1.1 Activity 1.12.2.1.1: Detailedproperty determination ofcementitious-based and earthenmaterials . . . . . . . . . . .

8.3.3.2.2.1.2 Activity 1.12.2.1.2:Hydraulic conductivity andconsolidation testing ofcrushed tuff . . . . . . . . .

8.3.3.2.2.2 Design Activity 1.12.2.2: Adegradation model for cement-itious materials emplaced in atuffaceous environment . . . . . .

8.3.3.2.2.3 Study 1.12.2.3: In situ testingof seal components . . . . . . . .

8.3.3.2-1

8.3.3.2-31

8.3.3.2-36

8.3.3.2-39

8.3.3.2-39

8.3.3.2-39

8.3.3.2-40

8.3.3.2-40

8.3.3.2-62

8.3.3.2-64

8.3.3.2-65

8.3.3.2-65

8.3.3.2-66

2 31*

2 6

2 3*

2 1

2 1

2 2

2 1

2 23*

2 3

2 2

2 1

2 2

2 1

8.

8.

3.3.2.3 Information Need 1.12.3: Placementmethod for seals for shafts, drifts,and boreholes . . . . . . . . .

3.3.2.4 Information Need 1.12.4: Referencedesign of seals for shafts, drifts,and boreholes . . . . . . . . . . . .

8.3.3.2.4.1 Design Activity 1.12.4.1: Devel-opment of the advanced conceptualdesign (ACD) for sealing . . . . .

8.3.3.2.4.1.1 Design Subactivity 1.12.4.1.1:Define subsystem designrequirements . . . . . . . . .

8.3.3.2.4.1.2 Design Subactivity 1.12.4.1.2:Perform trade-off studies tosupport advanced conceptualdesign development . . . . . .

* Includes figures and tables

xix

Page 67: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

iaqe Lev. Pages

8.3.3.2.4.1.3 Design Subactivity 1.12.4.1.3:Develop advanced conceptualdesign for seals . . . . . . .

8.3.3.2.4.2 Design Activity 1.12.4.2: Devel-opment of the license applicationdesign for sealing . . . . . . . .

8.3.3.2.4.2.1 Design Subactivity 1.12.4.2.1:Define subsystem designrequirements . . . . . . . . .

8.3.3.2.4.2.2 Design Subactivity 1.12.4.2.2:Perform trade-off studies tosupport license applicationdesign development . . . . . .

8.3.3.2.4.2.3 Design Subactivity 1.12.4.2.3:Develop license applicationdesign for seals . . . . . . .

8.3.4 Waste package program . . . . . . . . . . . . .8.3.4.1 Overview . . . . . . i . . . . . . . . . .

8.3.4.1.1 Waste package environment . . . . . .8.3.4.1.2 Waste package components . . . . . . .8.3.4.1.3 Waste package designs . . . . . . . .8.3.4.1.4 Waste package modeling . . . . . . .

8.3.4.2 Issue resolution strategy for Issue 1.10:Have the characteristics and configura-tions of the waste packages been ade-quately established to (a) show compliancewith the postclosure design criteria of10 CFR 60.135 and (b) provide informationto support resolution of the performanceissues? . . . . . . . . . . . . . . I I I .

8.3.4.2.1 Information Need 1.10.1: Designinformation needed to comply withpostclosure criteria from 10 CFR60.135(a) for consideration of theinteractions between the waste pack-age and its environment . . . . . . .

8.3.4.2.1.1 Design Activity 1.10.1.1: Con-sideration of 10 CFR 60.135(a)factors . . . . . . . . . . . . .

8.3.4.2.2 Information Need 1.10.2: Referencewaste package designs . . . . . . . .

8.3.4.2.3 Information Need 1.10.3: Referencewaste package emplacement configura-tions . . . . . . . . . .

8.3.4.2.4 Information Need 1.10.4: Postem-placement near-field environment . . .

8.3.3.2-67

8.3.3.2-67

8.3.3.2-67

8 .3.3 .2-68

8.3.3.2-688.3.4-1

8.3.4.1-18.3.4. 1-48.3.4. 1-58.3.4. 1-58.3.4. 1-7

8.3.4.2-1

8.3.4.2-33

8.3.4.2-34

8.3.4.2-35

8.3.4.2-36

8.3.4.2-38

2 1

2 1

2 2

2 1

2222222

24*42121

2 33*

2 2

2 2

2 2

2 3

2 4

* Includes figures and tables

xx

Page 68: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.4.2.4.1 Study 1.10.4.1: Characterizechemical and mineralogicalchanges in the postemplacementenvironment . . . . . . . . . . .

8.3.4.2.4.1.1 Activity 1.10.4.1.1: Rock-water interactions at elevatedtemperatures . . . . . . . . .

8.3.4.2.4.1.2 Activity 1.10.4.1.2: Effectof grout, concrete, and otherrepository materials on watercomposition . . . . . . . . . .

8.3.4.2.4.1.3 Activity 1.10.4.1.3: Composi-tion of vadose water from thewaste package environment . . .

8.3.4.2.4.1.4 Activity 1.10.4.1.4: Dissolu-tion of phases in the wastepackage environment . . . . . .

8.3.4.2.4.1.5 Activity 1.10.4.1.5: Effectsof radiation on waterchemistry . . . . . . . . . . .

8.3.4.2.4.1.6 Activity 1.10.4.1.6: Effectsof container and boreholeliner corrosion products onwater chemistry . . . . . . . .

8.3.4.2.4.1.7 Activity 1.10.4.1.7: Numeri-cal analysis and modeling ofrock-water interaction . . . .

8.3.4.2.4.2 Study 1.10.4.2: Hydrologicproperties of waste packageenvironment . . . . . .

8.3.4.2.4.2.1 Activity 1.10.4.2.1: Single-phase fluid system properties

8.3.4.2.4.2.2 Activity 1.10.4.2.2: Two-phase fluid system properties

8.3.4.2.4.2.3 Activity 1.10.4.2.3: Numeri-cal analysis of flow andtransport in laboratorysystems . . . . . . . . . . . .

8.3.4.2.4.3 Study 1.10.4.3: Mechanicalattributes of the waste packageenvironment . . . . . . . . . . .

8.3.4.2.4.3.1 Activity 1.10.4.3.1: Wastepackage environment stressfield analysis . . . . . . . .

8.3.4.2.4.4 Study 1.10.4: Engineered barriersystem field tests . . . . . . . .

8.3.4.2-41

8.3.4.2-41

8.3.4.2-43

8 .3.4.2-43

8.3.4.2-44

8.3.4.2-45

8.3.4.2-46

8.3.4.2-46

8.3. 4.2-47

8.3. 4.2-48

8.3.4.2-49

8.3.4.2-50

8.3.4.2-51

8.3.4.2-51

8.3.4.2-52

2 1

2 3

2 1

2 2

2 2

2 1

2 1

2 2

2 2

2 2

2 2

2 1

2 1

2 1

2 1

* Includes figures and tables

xxi

Page 69: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Re. Pages

8.3.4.2.4.4.1

8.3.4.2.4.4.2

8.3.4.2.4.4.3

Activity 1.10.4.4.1: Reposi-tory horizon near-fieldhydrologic properties . . . .Activity 1.10.4.4.2: Reposi-tory horizon rock-water inter-action . . . . . . . . . . .Activity 1.10.4.4.3:Numerical analysis of fluidflow and transport in therepository horizon near-fieldenvironment . . . . . . . . .

8.3.4.3 Issue resolution strategy for Issue 2.6:Have the characteristics and configura-tions of the waste packages been ade-quately established to (a) show compliancewith the preclosure design criteria of 10CFR 60.135 and (b) provide information forthe resolution of the performance issues?

8.3.4.3.1 Information Need 2.6.1: Designinformation needed to comply withpreclosure criteria from 10 CFR60.135(b) for materials, handling,and identification of waste packages

8.3.4.3.2 Information Need 2.6.2: Designinformation needed to comply withpreclosure criteria from 10 CFR60.135(c) for waste forms . . . . .

8.3.4.3.3 Information Need 2.6.3: Wasteacceptance specifications . . . . .

8.3.4.4 Issue resolution strategy for Issue 4.3:Are the waste package production techno-logies adequately established for theresolution of the performance issues?

8.3.4.4.1 Information Need 4.3.1: Identifica-tion and evaluation of productiontechnologies for fabrication,closure, and inspection of the wastepackage . . . . . . . . . . . . . .

8.3.4.4.1.1 Design Activity 4.3.1.1: Wastepackage fabrication processdevelopment . . . . . . . . . .

8.3.4.4.1.2 Design Activity 4.3.1.2: Wastepackage closure processdevelopment . . . . . . . . . .

8.3.4.2-52

8.3.4.2-53

8.3.4.2-53

8.3.4.3-1

8.3.4.3-5

8.3.4.3-7

8.3.4.3-8

8.3.4.4-1

8.3.4.4-3

8.3.4.4-3

8.3.4.4-4

2 2

2 1

2 3

2 5*

2 2

2 1

2 1

2 3*

2 1

2 2

2 2

* Includes figures and tables

xxii

Page 70: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.4.4.1.3 Design Activity 4.3.1.3: Wastepackage closure inspectionprocess development . . . . . . . 8.3.4.4-5

8.3.5 Performance Assessment Program . . . . . . . . 8.3.5-18.3.5.1 Strategy for preclosure performance

assessment . . . . . . . . . . . . . . . . 8.3.5.1-18.3.5.1.1 Overview of the PRAM program . . . . . 8.3.5.1-28.3.5.1.2 Identifying information needs . . . . 8.3.5.1-78.3.5.1.3 General analytical approach for

assessing radiological risks fromaccidents . . . . . . . . . . . . . . 8.3.5.1-7

8.3.5.1.4 General analytical approach forassessing radiological risks fromroutine operations . . . . . . . . . . 8.3.5.1-13

22

11

222

25*1

2 6*

2 9

* Includes figures and tables

xxiii

Page 71: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES

TotalNo. of

Rev. PagesFigure Title Page

8.3.1.14-1

8.3.1.14-2

8.3.1.14-3

8.3.1.14-4

8.3. 1. 14-5

8.3.1.14-6

8.3.1.14-7

8.3.1. 15-1

8.3. 1.15-2

8.3.1. 15-3

8.3.1.16-1

Logic diagram for Program 8.3.1.14,surface and subsurface accesscharacteristics . . . . . . . . . . .

Logic diagram for Investigation8.3.1.14.2, soil and rock properties

Location of surface test pits inalluvium . . . . . . . . . . . . . . .

Map of the surface geology and faultsin the vicinity of Exile Hill . . . .

Cross section of the geologic struc-ture through Exile Hill and thereference conceptual site based onsurface mapping and borehole data

Conceptual cross section of the geo-logic structure south of the refer-ence conceptual site for repositorysurface facilities . . . . . . . . . .

Summary of boreholes UE-25 RF#10, 11,9, 3b, and 3, showing major strati-graphic units and features . . . . . .

Relationship between data acquisitionfor rock properties and issuesrequiring the data . . . . . . . . . .

Logic diagram for Investigation8.3.1.15.1, spatial distribution ofthermal/mechanical rock properties

Logic diagram for Investigation8.3.1.15.2, spatial distribution ofambient stress and temperatureconditions . . . . . . . . . . . . . .

Relationship between the preclosurehydrology test program and itsinvestigations . .

8.3. 1. 14-2

8.3.1.14-17

8.3.1.14-34

8.3.1.14-35

8.3.1.14-36

8.3.1.14-37

8.3.1.14-38

8.3.1.15-15

8.3.1.15-16

8.3.1.15-17

8.3. 1. 16-5

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

xxiv

Page 72: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFigure Title Page

8.3.1.16-2

8.3.1.16-3

8 .3.1. 16-4

8 .3. 1. 16-5

8.3.1.17-1

8 .3.1. 17-2

8.3.1.17-3

8.3.1. 17-4

8.3.1.17-5

Logic diagram for Investigation8.3.1.16.1 (flood recurrenceintervals) . . . . . . . . . . . . .

Logic diagram for Investigation8.3.1.16.2 (water supplies) . . . .

Locations of wells J-12 and J-13relative to the surface facilitylocation . . . . . . . . . . . . . .

Logic diagram for Investigation8.3.1.16.3 (ground-water conditions)

Logic diagram for the preclosuretectonics site program . . . . . . .

Quaternary normal faults andpostulated detachment faults on ornear Yucca Mountain . . . . . . . .

Logic diagram for Investigation8.3.1.17.1 (preclosure volcanicactivity) . . . . . . . . . . . . .

Logic diagram for the Investigation8.3.1.17.2 (preclosure faultdisplacement) . . . . . . . . . . .

Logic diagram for the Investigation8.3.1.17.3 (preclosure vibratoryground motion) . . . . . . . . . . .

8.3.1.16-9

8.3.1.16-14

8.3.1.16-15

8.3.1.16-21

8.3.1.17-2

8.3.1.17-29

8.3.1.17-53

8.3.1.17-58

8.3.1.17-66

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

8.3.1. 17-6

8.3.1.17-7

8.3.1. 17-8

Conceptual approach for identifyingpotentially relevant earthquakesources . . . . . . . . . . . . . .

Index map showing published geologicmap coverage at scales of 1:63,630and larger . . . . . . . . . . . . .

General localities map showing areasof exposed bedrock . . . . . . . . .

8.3.1.17-70

8.3.1.17-94

8.3.1.17-95

2 1

2 1

2 1

xxv

Page 73: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFigure Title Page

8.3.1.17-9

8.3.1.17-10

8.3.1.17-11

8.3.1.17-12

8.3.1.17-13

8.3.2.1-1

8.3.2.1-2

8.3.2.2-la

8.3.2.2-lb

8 .3.2.2-2

Regional structure map, showinglocation of the repository area, mapareas of Figures 8.3.1.17-2 and8.3.1.17-11, and major Quaternarystructural features . . . . . . . . .

Idealized models of upper crustaldeformation involving right-lateralshear on through-going wrench faultand displacement on overlying detach-ment fault, as postulated for CedarMountain area by Molinari (1984) andsouthern Nevada Test Site byBurchfiel (1965) . . . . . . . . . . .

Generalized Quaternary fault map ofYucca Mountain and vicinity, showingtrench locations (CF1, 1, GA1A, etc.)and site area . . . . . . . . . . . .

Location of seismic refraction andmagnetotelluric sounding traverses

Map showing relation of proposedrepository area to Mine Mountain,Cane Spring, Rock Valley, and Stage-coach Road fault zones . . . . . . . .

Relationships between design andperformance related issues useddirectly in performance allocation

Schematic diagram of the input to andoutput from a design or performanceissue . . . . . . . . . . . . . . .

General approach for Issue 1.11(configuration of undergroundfacilities--postclosure) . . . . . . .

Legend for Figure 8.3.2.2-la . . . . .

Relationship between subsumedinformation needs and issue functionsand parameters for Issue 1.11,configuration of undergroundfacilities (postclosure) . . . . . . .

8.3.1.17-96

8.3.1.17-98

8.3.1.17-100

8.3.1.17-112

8.3.1.17-123

8.3.2.1-3

8.3.2.1-4

8.3.2.2-2

8.3.2.2-3

8.3.2.2-22

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

xxvi

Page 74: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

Fiqure

8.3.2.3-1

8.3.2.3-2a

8.3.2.3-2b

8.3.2.4-la

8.3.2.4-lb

8.3.2.5-la

8.3.2.5-lb

8.3.2.5-2

8.3.3.1-1

8.3.3.2-la

8.3.3.2-lb

8.3.3.2-2

8.3.3.2-3

8.3.3.2-4

Title

Relationship of Issue 2.7 (repositorydesign criteria for radiologicalsafety) to other issues and the sitecharacterization program . . . . . . .

Logic diagram for Issue 2.7(repository design criteria forradiological safety) . . . . . . . . .

Legend for Figure 8.3.2.3-2a . . . . .

Logic diagram for Issue 4.2(nonradiological health and safety)

Legend for Figure 8.3.2.4-la . . . . .

Logic diagram for Issue 4.4(preclosure design and technicalfeasibility) . . . . . . . . . . . . .

Legend for Figure 8.3.2.5-la . . . . .

Hierarchical relationships ofrequirements documents . . . . . . . .

Anticipated sequencing of sealingactivities . . . . . . . . . . . . . .

Logic diagram for Issue 1.12 (sealcharacteristics) . . ... . . . . . . .

Legend for Figure 8.3.3.2-la . . . . .

Sealing subsystems, seal locations,and seal components . . . . . . . . .

Schematic diagram of performancegoals and relationship to anticipatedand unanticipated episodic flows forsealing . . . . . . . . . . . . . . .

Comparison of borehole plug test withexperimental data for fracturedbasalt . . . . . . . . . . . . . . . .

P8a3e

8.3.2.3-2

8.3.2.3-13

8.3.2.3-14

8.3.2.4-2

8.3.2.4-3

8.3.2.5-2

8.3.2.5-3

8.3.2.5-46

8.3.3.1-2

8.3.3.2-4

8.3.3.2-5

8.3.3.2-8

8.3.3.2-23

8.3.3.2-59

TotalNo. of

Rev. Pages

2 1

2

2

2

2

2

2

I

1

1

1

1

1

2 1

2 1

2

2

I

1

2 1

2 1

2 1

xxvii

Page 75: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

Figure Title Page

TotalNo. of

Rev. Pages

2 18.3.4-1 Waste package postclosure compliance

strategy . . . . . . . . . . . . . . . 8.3.4-2

8.3.4.1-1

8.3.4.2-la

8.3.4.2-lb

8.3. 4.2-2

8.3.4.3-la

8.3.4.3-lb

8.3.4.4-1

8.3.5.1-1

8.3.5.1-2

8.3.5.1-3

Relationships between design- andperformance-related issues useddirectly in performance allocation

Logic diagram for the resolution ofIssue 1.10 (postclosure waste packagecharacteristics) . . . . . . . . . . .

Legend for Figure 8.3.4.2-la . . . . .

Model hierarchy for Issue 1.10(waste package characteristics--postclosure) . . . . . . . . . . . .

Logic diagram for the resolution ofIssue 2.6 (waste packagecharacteristics--preclosure) . . . . .

Legend for Figure 8.3.4.3-la . . . . .

Logic diagram for the resolution ofIssue 4.3 (waste package productiontechnologies) . . . . . . . . . . . .

Overview of the PRAM program for thehigh-level waste repository

The applications of risk categoriesto end uses . . . . . . . . . . . . .

Analytical steps for assessing radio-logical risks from accidents . . . . .

8.3.4.1-2

8.3.4.2-2

8.3.4.2-4

8.3.4.2-5

8.3.4.3-3

8.3.4.3-4

8.3. 4. 4-2

8.3.5.1-3

8.3.5.1-5

8.3.5.1-8

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

xxviii

Page 76: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES

TotalNo. of

Rev. PagesTable Title Paqe

8.3.1.14-

8.3.1.14-

8.3.1.14-

8.3.1. 15-

8.3. 1. 15-

8 .3.1. 15-

8.3.1. 15-

8 .3.1. 16-

8.3.1. 16-

8.3.1. 17-

1 Performance allocation for sitesurface and subsurface accesscharacterization parameters and thecorresponding performance or designparameters and issues they support

2 Investigations and information needsthat require parameters from thesurface and subsurface accesscharacteristics program . . . . . .

3 Investigations or information needssupplying data to the surface andsubsurface access characteristicsprogram . . . . . . . . . . . . . .

-1 Performance and design parameters,tentative goals, and characterizationparameters for thermal and mechanicalproperties program . . . . . . . . .

-2 Current representation and alterna-tive hypotheses for modeling for thethermal and mechanical rock proper-ties program . . . . . . ... . . . .

-3 Thermal and mechanical propertiesrequired by other issues . . . . . .

-4 Experiments required for eachlocation selected for characteriza-tion of spatial variability of rockproperties . . . . . . . . . . . . .

-1 Data requirements of the design andperformance issues satisfied by thepreclosure hydrology program forSystem Element 1.1.1 (surface) . . .

-2 Data requirements of the design andperformance issues satisfied by thepreclosure hydrology program forSystem Element 1.1.2 (subsurface)

-la Design and performance parametersrelated to surface facilities andpreclosure volcanic activity . . . .

8.3.1.14-3

8.3.1.14-19

8.3.1.14-24

8.3.1.15-2

8.3.1.15-19

8.3.1.15-24

8.3.1.15-32

8.3.1.16-3

8.3.1.16-4

8.3.1.17-3

2 12

2 5

2 1

2 12

2 3

2 1

2 1

2 1

2 1

2 1

xxix

Page 77: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.1.17-lb

8.3.1.17-2a

8.3.1.17-2b

8.3.1.17-3a

8.3.1.17-3b

8.3.1.17-4a

8.3.1.17-4b

8.3.1.17-5a

8.3.1.17-5b

Characterization parameters relatedto surface facilities and preclosurevolcanic activity . . . . . . . . . .

Design and performance parametersrelated to underground facilities andpreclosure volcanic activity . . . . .

Characterization parameters relatedto underground facilities and pre-closure volcanic activity . . . . . .

Design and performance parametersrelated to surface facilities andpreclosure fault displacement . . . .

Characterization parameters relatedto surface facilities and preclosurefault displacement . . . . . . . . . .

Design and performance parametersrelated to underground facilities andpreclosure fault displacement . . . .

Characterization parameters relatedto the underground facilities andpreclosure fault displacement . . . .

Design and performance parametersrelated to surface facilities andpreclosure vibratory ground motion

Characterization parameters relatedto surface facilities and preclosurevibratory ground motion . . . . . . .

8.3.1.17-4

8.3.1.17-5

8.3.1.17-6

8.3.1.17-7

8.3. 1. 17-9

8.3.1.17-10

8.3.1.17-12

8.3.1.17-13

8.3.1.17-16

2 1

2 1

2 1

2 1

2 1

2 2

2 1

2 3

2 3

8.3.1.17-6a Design andrelated topreclosure

performance parametersunderground facilities andvibratory ground motion . . 8.3.1.17-19 2 4

8.3.1.17-6b

8.3.1.17-7

Characterization parameters relatedto underground facilities and pre-closure vibratory ground motion . . .

Current representation and alterna-tive hypotheses for local model forthe preclosure tectonics program . . .

8.3.1.17-23

8.3.1.17-39

2 3

2 7

xxx

Page 78: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.1.17-8

8.3.1.17-9

8.3.1.17-10

8.3.2.1-1

8.3.2.1-2

8.3.2.2-1

8.3.2.2-2

8.3.2.2-3

8.3.2.2-4

8.3.2.2-5

Current representation and alterna-tive hypotheses for the regionalmodel for the preclosure tectonicsprogram . . . . . . . . . . . . . . . 8.3.1.17-46

Summary of geophysical studies inpreclosure and postclosure tectonics . 8.3.1.17-103

Summary of other geophysical studiescontributing to preclosure and post-closure tectonics . . . . . . . . . . 8.3.1.17-107

Studies or activities for coupledinteraction tests . . . . . . . . . . 8.3.2.1-15

Nevada Nuclear Waste Storage Investi-gations Project design tradeoffanalyses . . . . . . . . . . . . . . . 8.3.2.i-20

Performance measures, goals, andneeded confidence for selectingorientation, geometry, layout anddepth of underground facility(postclosure design function 1) . . . 8.3.2.2-8

Performance measures, goals, andneeded confidences for limiting waterusage and potential chemical changes(postclosure design function 2) . . . 8.3.2.2-13

Performance measures, goals, andneeded confidences for limitingpotential for excavation-inducedchanges in rock mass permeability(postclosure design function 3) . . . 8.3.2.2-15

Performance measures, goals, andneeded confidences for designingthermal loading taking into accountperformance objectives and thermo-mechanical response of host rock(postclosure design function 4) . . . 8.3.2.2-17

Performance parameters and tentativegoals for Issue 1.11, configurationof underground facilities(postclosure) . . . . . . . . . . . . 8.3.2.2-25

2 5

2 4

2 4

2 4

2 1

2 3

2 1

2 1

2 2

2 12

xxxi

Page 79: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.2.2-6

8.3.2.2-7

8.3.2.2-8

8.3.2.2-9

Relationship of Information Need1.11.3 products to the processesassociated with function 1 given inTable 8.3.2.2-1 . . . . . . . . . . .

Parameters and information requiredto satisfy Information Need 1.11.3

Relationship of Information Need1.11.4 products to the processesassociated with function 2 . . . . . .

Parameters and information itemsrequired to satisfy Information Need1.11.4 . . . . . . . . . . . . . . . .

8.3.2.2-44

8.3.2 .2-45

2 2

2 4

2 1

2 1

8.3.2.2-55

8.3.2.2-55

8.3.2.2-10 Relationship of1.11.5 productsassociated with

Information Needto the processesfunction 3 . . . . . 8.3.2.2-60 2 1

8.3.2.2-11 Parameters and information requiredto Information Need 1.11.5 . . . . . . 8.3.2.2-61 2 1

8.3.2.2-12 Relationship of1.11.6 productsassociated with

Information Needto the processesfunction 4 . . . . . 8.3.2.2-64 2 1

8.3.2.2-13

8.3.2.2-14

8.3.2.3-1

8.3.2.3-2

8.3.2.3-3

Analyses and input items required toresolve Information Need 1.11.6 . . .

Parameters for thermal and thermo-mechanical analyses . . . . . . . . .

Design criteria for the geologicrepository operations area . . . . . .

Functions, performance measures, andperformance goals for Issue 2.7(repository design criteria forradiological safety) . . . . . . . . .

Parameters required for Issue 2.7(repository design criteria forradiological safety) . . . . . . . . .

8.3.2.2-66

8.3.2.2-67

8.3.2.3-4

8.3.2.3-17

2 1

2 2

2 8

2 13

2 68.3.2.3-30

xxxii

Page 80: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Paqe

8.3.2.4-1

8.3.2.4-2

8.3.2.4-3

8.3.2.4-4

8.3.2.4-5

8.3.2.4-6

8.3.2.4-7

8.3.2.4-8

Performance measures, goals, andneeded confidences for SystemElement 1.2.1.1 (access construction)pertinent to Issue 4.2, nonradio-logical health and safety . . . . . .

Performance measures, goals, andneeded confidences for System Element1.2.1.2 (drift construction)pertinent to Issue 4.2, nonradio-logical health and safety . . . . . .

Performance measures, goals, andneeded confidences for System Element1.2.1.3 (borehole construction)pertinent to Issue 4.2, nonradio-logical health and safety . . . . . .

Performance measures, goals, andneeded confidences for System Element1.2.1.6 (mining ventilation) perti-nent to Issue 4.2, nonradiologicalhealth and safety . . . . . . . . . .

Performance measures, goals, andneeded confidences for System Element1.2.2.5 (retrieval) pertinent toIssue 4.2, nonradiological healthand safety . . . . . . . . . . . . . .

Performance measures, goals, andneeded confidences for System Element1.2.2.7 (waste ventilation) pertinentto Issue 4.2, nonradiological healthand safety . . . . . . . . . . . . . .

Performance measures, goals, andneeded confidences for System Element1.2.4.1 (underground closure) perti-nent to Issue 4.2, nonradiologicalhealth and safety . . . . . . . . . .

Performance measures, goals, andneeded confidences for System Element1.2.5.6 (maintenance) pertinent toIssue 4.2, nonradiological health andsafety . . . . . . . . . . . . . . . .

8.3.2.4-8

8.3.2.4-12

8.3.2.4-15

8.3.2.4-16

8.3.2.4-17

8.3.2.4-19

8.3.2.4-20

8.3.2.4-21

2 4

2 3

2 1

2 1

2 2

2 1

2 1

2 1

xxxiii

Page 81: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.2.4-9

8.3.2.5-1

8.3.2.5-2

8.3.2.5-3

8.3.2.5-4

8.3.2.5-5

8.3.2.5-6

8.3.2.5-7

8.3.2.5-8

8.3.2.5-9

8.3.2.5-10

8.3.2.5-11

Performance measures, goals, andneeded confidences for System Element1.2.5.9.2 (nonradiological monitor-ing pertinent to Issue 4.2, nonradio-logical health and safety . . . . . .

Preliminary performance allocationfor System Element 1.1.1, surface

Preliminary performance allocationfor System Element 1.1.2, subsurface

Preliminary performance allocationfor System Element 1.2.1.1, accessconstruction . . . . . . . . . . . . .

Preliminary performance allocationfor System Element 1.2.1.2, driftconstruction . . . . . . . . . . . . .

Preliminary performance allocationfor System Element 1.2.1.3, boreholeconstruction . . . . . . . . . . . . .

Preliminary performance allocationfor System Element 1.2.1.4, rockhandling . . . . . . . . . . . . . . .

Preliminary performance allocationfor System Element 1.2.1.5, waterremoval . . . . . . . . . . . . . . .

Preliminary performance allocationfor System Element 1.2.1.6, miningventilation . . . . . . . . . . . . .

Preliminary performance allocationfor System Element 1.2.2.4,emplacement . . . . . . . . . . . . .

Preliminary performance allocationfor System Element 1.2.2.5,retrieval . . . . . . . . . . . . . .

Preliminary performance allocationfor System Element 1.2.2.7, wastehandling ventilation . . . . . . . . .

8.3.2.4-22

8.3.2.5-7

8.3.2.5-13

8.3.2.5-18

8.3.2.5-22

8.3.2.5-24

8.3.2.5-25

8.3.2.5-26

8.3.2.5-27

8.3.2.5-29

8.3.2.5-30

8.3.2.5-31

2 1

2 6

2 5

2 4

2 2

2 1

2 1

2 1

2 2

2 1

2 1

2 1

xxxiv

Page 82: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.2.5-12

8.3.2.5-13

8.3.2.5-14

8.3.2.5-15

8.3.2.5-16

8.3.3.2-1

8.3.3.2-2

8.3.3.2-3

8.3.3.2-4

8.3.3.2-5

8.3.3.2-6

8.3.3.2-7

8.3.3.2-8

Preliminary performance allocationfor System Element 1.2.4.1, under-ground closure . . . . . . . . . . . . 8.3.2.5-32

System elements for the Yucca Moun-tain mined geologic disposal systemaddressed by each information need . . 8.3.2.5-33

Organization of repository designrequirements . . . . . . . . . . . . . 8.3.2.5-48

Preclosure design analyses . . . . . . 8.3.2.5-58

List of planned analyses . . . . . . . 8.3.2.5-71

Sealing components and associatedfunctions, processes, materialproperties, performance measures,and goals . . . . . . . . . . . . . 8.3.3.2-9

General design constraints passed toIssue 1.11, configuration of under-ground facilities (postclosure), formajor repository features fromsealing program . . . . . . . . . . . 8.3.3.2-13

Hydrologic-related site parametersneeded to support resolution of Issue1.12 (seal characteristics) . . . . . 8.3.3.2-16

Miscellaneous information needed tosupport resolution of Issue 1.12 . . . 8.3.3.2-19

Design-basis performance goals forthe sealing subsystem . . . . . . . . 8.3.3.2-28

Potentially important materialproperties of concern for sealingcomponents . . . . . . . . . . . . . . 8.3.3.2-38

Site properties needed for Issue 1.12(seal characteristics) . . . . . . . . 8.3.3.2-43

Seal material and emplacementenvironment properties needed . . . . 8.3.3.2-46

2 1

2 2

2 2

2 1

2 6

2 4

2 3

2 3

2 4

2 1

2 1

2 3

2 1

xxxv

Page 83: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

Table

8.3.3.2-9a

8.3.3.2-9b

8.3.4.2-1

8.3.4.2-2

8.3.4.2-3

8.3.4.2-4

8.3.4.3-1

Title

Emplacement concerns for thepreferred sealing options . . . . . .

Emplacement concerns for thesecondary sealing options . . . . . .

Model hierarchy and model inputs forIssue 1.10 (waste packagecharacteristics--postclosure) . . . .

Performance measures and goals forIssue 1.10 (waste packagecharacteristics--postclosure) . . . .

Performance parameters and goals forIssue 1.10 (waste packagecharacteristics--postclosure) . . . .

Input parameters for characterizationmodels for Issue 1.10 (waste packagecharacteristics--postclosure) . . . .

Performance allocation for Issue 2.6(waste package characteristics--preclosure) . . . . . . . . . . . . .

Page

8.3.3.2-47

8.3.3.2-51

8.3.4.2-6

8.3.4.2-9

8.3.4.2-10

8.3.4.2-11

8.3.4.3-5

TotalNo. of

Rev. Pages

2 4

2 5

2 3

2 1

2 1

2 12

2 1

xxxvi

Page 84: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

U.S. DEPARTMENT OF ENERGY

O l YUCCA MI

R SITER \ CHARACTM PROJECT

Document No. XmP/CM-O 11

evision 4

INo. CI.11.OOOO/CI.13.0000

te 03/1 3/2 -

SNo. 1.2.3

Level Yes

I_ , . , . . . _ _

PROJECT BASELI YIGUMENT

YUCCA MOUNTAINSITE CHARACTERIZATION

PROGRAM BASELINE(SCPB)

VOLUME 4

CHANGES TO THIS DOCUMENT REQUIRE PREPARATIONAND APPROVAL OF A CHANGE REQUEST IN ACCORDANCEWITH PROJECTAP-3.3Q

UNITED STATES DEPARTMENT OF ENERGYYUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT OFFICE

Page 85: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS

TotalNo. of

Page Rev. Pages

8.3.5.2 Issue resolution strategy for Issue 2.4:Can the repository be designed, con-structed, operated, closed, and decom-missioned so that the option of wasteretrieval will be preserved as requiredby 10 CFR 60.111? . . . . . . . . . . . . .

8.3.5.2.1 Information Need 2.4.1: Site anddesign data required to supportretrieval . . . . . . . . . .

8.3.5.2.2 Information Need 2.4.2: Determina-tion that access to the wasteemplacement boreholes can be providedthroughout the retrievability periodfor normal and credible abnormalconditions . . . . . . . . . .

8.3.5.2.3 Information Need 2.4.3: Determina-tion that access to the wastepackages can be provided throughoutthe retrievability period for normaland credible abnormal conditions . . .

8.3.5.2.4 Information Need 2.4.4: Determina-tion that the waste can be removedfrom the emplacement boreholes fornormal and credible abnormalconditions . . . . . . . . . .

8.3.5.2.5 Information Need 2.4.5: Determina-tion that the waste can be trans-ported to the surface and deliveredto the waste-handling surfacefacilities for normal and abnormalconditions . . . . . . . . . . . . . .

8.3.5.2.6 Information Need 2.4.6: Determin-ation that the retrieval require-ments set forth in 10 CFR 60.111(b)are met using reasonably availabletechnology . . . . . . . . . . . . . .

8.3.5.3 Issue resolution strategy for Issue 2.1:During repository operation, closure, anddecommissioning (a) will the expectedaverage radiation dose received by membersof the public within any highly populatedarea be less than a small fraction of theallowable limits and (b) will the expectedradiation dose received by any member ofthe public in an unrestricted area be lessthan the allowable limits as required by10 CFR 60.111, 40 CFR 191 Subpart A, and10 CFR Part 20? . . . . . . . . . . . . . .

8.3.5.2-1

8.3.5.2-23

8.3.5.2-29

8 .3.5.2-34

8.3.5.2-38

8.3.5.2-41

8 .3.5.2-44

8.3.5.3-1

2 23*

2 7*

2 6*

2 5*

2 4*

2 4*

2 4*

2 19*

* Includes figures and tables

iii

Page 86: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.5.3.1 Information Need 2.1.1: Site anddesign information needed to assesspreclosure radiological safety . . . .

8.3.5.3.1.1 Performance Assessment Activity2.1.1.1: Refinement of sitedata parameters required forIssue 2.1 . . . . . . . . . . . .

8.3.5.3.1.2 Performance Assessment Activity2.1.1.2: Development of perform-ance assessment activitiesthrough the preclosure riskassessment methodology program

8.3.5.3.1.3 Performance Assessment Activity2.1.1.3: Advanced conceptualdesign assessment of the publicradiological safety during thenormal operations of the YuccaMountain repository . . . . . . .

8.3.5.4 Issue resolution strategy for Issue 2.2:Can the repository be designed,constructed, operated, closed, anddecommissioned in a manner that ensuresthe radiological safety of workers undernormal operations as required by 10 CFR60.111, and 10 CFR Part 20? . . . . . . . .

8.3.5.4.1 Information Need 2.2.1: Determina-tion of radiation environment insurface and subsurface facilitiesdue to natural and manmaderadioactivity . . . . . . . . . . . .

8.3.5.4.1.1 Activity 2.2.1.1: Refinement ofsite data parameters required forIssue 2.2 . . . . . . . . . . . .

8.3.5.4.1.2 Activity 2.2.1.2: Advanced con-ceptual design assessment of theworker radiological safety duringthe normal operations of theYucca Mountain repository . . . .

8.3.5.4.2 Information Need 2.2.2: Determina-tion that projected worker exposuresand exposure conditions under normalconditions meet applicable require-ments . . . . . . . . . . . . . . . .

8.3.5.4.2.1 Activity 2.2.2.1: Refinement ofsite data parameters required forIssue 2.2 . . . . . . . . . . . .

8.3.5.3-20

8.3.5.3-23

8 .3.5.3-24

8.3.5.3-24

8.3.5.4-1

8.3.5.4-18

8.3.5.4-20

8.3.5.4-20

8.3.5.4-21

8.3.5.4-23

2 4

2 1

2 1

2 2

2 18*

2 2

2 1

2 1

2 3

2 1

* Includes figures and tables

iv

Page 87: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPages

8.3.5.4.2.2 Activity 2.2.2.2: Development ofperformance assessment activitiesthrough the preclosure riskassessment methodology program

8.3.5.4.2.3 Activity 2.2.2.3: Advanced con-ceptual design assessment of theworker radiological safety duringthe normal operations of theYucca Mountain repository . . . .

8.3.5.5 Issue resolution strategy for Issue 2.3:Can the repository be designed,constructed, operated, closed, anddecommissioned in such a way that credibleaccidents do not result in projectedradiological exposures of the generalpublic at the nearest boundary of theunrestricted area, or workers in therestricted area, in excess of applicablelimiting values? . . . . . . . . . . . . .

8.3.5.5.1 Information Need 2.3.1: Determina-tion of credible accident sequencesand their respective frequenciesapplicable to the repository . . . . .

8.3.5.5.1.1 Performance Assessment Activity2.3.1.1: Refinement of sitedata parameters required forIssue 2.3 . . . . . . . . . . . .

8.3.5.5.1.2 Performance Assessment Activity2.3.1.2: Determination of cred-ible accident sequences and theirrespective frequencies applicableto the Yucca Mountain repository

8.3.5.5.1.3 Performance Assessment Activity2.3.1.3: Development of candi-date design-basis accidents forthe Yucca Mountain repository

8.3.5.5.2 Information Need 2.3.2: Determina-tion of the predicted releases ofradioactive material and projectedpublic and worker exposures underaccident conditions and that theseexposures meet applicablerequirements . . . . . . . . . . . . .

8.3.5.5.2.1 Performance Assessment Activity2.3.2.1: Refinement of sitedata parameters required forIssue 2.3 . . . . . . . . . . . .

8.3.5. 4-24

8.3.5. 4-24

8.3.5.5-1

8.3.5.5-19

8.3.5.5-22

8.3.5.5-22

8.3.5.5-23

8.3.5.5-23

8.3.5.5-26

2 1

2 2

2 19*

2 3

2 1

2 1

2 1

2 4

2 1

* Includes figures and tables

v

Page 88: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPaqe Rev.

8.3.5.5.2.2

8.3.5.5.2.3

8.3.5.5.2.4

Performance Assessment Activity2.3.2.2: Consequence analyses ofcredible accidents at the YuccaMountain repository . . . . . .Performance Assessment Activity2.3.2.3: Sensitivity andimportance analyses of credibleaccidents at the Yucca Mountainrepository . . . . . . . . . . .Performance Assessment Activity2.3.2.4: Documentation ofresults of safety analyses andcomparison to applicable"limiting" values . . . . . . .

8.3.5.6 Issue resolution strategy for Issue 2.5:Can the higher-level findings required by10 CFR Part 960 be made for the qualifyingcondition of the preclosure system guide-line and the qualifying and disqualifyingconditions of the technical guidelines forpopulation density and distribution, siteownership and control, meteorology, andoffsite installations and operations? . . .

8.3.5.7 Issue resolution strategy for Issue 4.1:Can the higher-level findings required by10 CFR Part 960 be made for the qualifyingcondition of the preclosure system guide-line and the disqualifying and qualifyingconditions of the technical guidelines forsurface characteristics, rock character-istics, hydrology, and tectonics? . . . . .

8.3.5.8 Strategy for postclosure performanceassessment . . . . . . . . . . . . . . .

8.3.5.9 Issue resolution strategy for Issue 1.4:Will the waste package meet the perform-ance objective for containment as requiredby 10 CFR 60.113? . . . . . . . . . . . . .

8.3.5.9.1 Information Need 1.4.1: Wastepackage design features that affectthe performance of the container . . .

8.3.5.9.1.1 Activity 1.4.1.1: Integratedesign and materials information(metal container) . . . . . . . .

8.3.5.5-26

8.3.5.5-27

8.3.5.5-27

8.3.5.6-1

8.3.5.7-1

8.3.5. 8-1

8.3.5.9-1

8.3.5. 9-47

8.3.5.9-51

2 2

2 1

2 2

2 13*

2 16*

2 9*

2 47*

2 4

2 1

* Includes figures and tables

vi

Page 89: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

EAje Rev. Pages

8.3.5.9.1.1.1 Subactivity 1.4.1.1.1:Mechanical properties . . . . .

8.3.5.9.1.1.2 Subactivity 1.4.1.1.2: Micro-structural properties . . . . .

8.3.5.9.1.1.3 Subactivity 1.4.1.1.3:Physical properties . . . . . .

8.3.5.9.1.1.4 Subactivity 1.4.1.1.4: Stateof stress in the container

8.3.5.9.1.1.5 Subactivity 1.4.1.1.5:Characterization and inspec-tion of weld integrity . . . .

8.3.5.9.1.1.6 Subactivity 1.4.1.1.6:Characterization of the con-tainer surface . . . . . . . .

8.3.5.9.1.2 Activity 1.4.1.2: Integratedesign and materials information(alternate barriers investi-gation) . . . . . . . . . . . . .

8.3.5.9.1.2.1 Subactivity 1.4.1.2.1:Survey of alternative barrierdesigns, materials, andprocesses to determine feasi-bility of fabricating a satis-factory waste package . . . . .

8.3.5.9.1.2.2 Subactivity 1.4.1.2.2:Mechanical properties . . . . .

8.3.5.9.1.2.3 Subactivity 1.4.1.2.3: Micro-structural properties . . . . .

8.3.5.9.1.2.4 Subactivity 1.4.1.2.4:Thermophysical properties

8.3.5.9.1.2.5 Subactivity 1.4.1.2.5:Nondestructive characteriza-tion of the alternate barrierinvestigations waste packagecontainer . . . . . . . . . . .

8.3.5.9.2 Information Need 1.4.2: Materialproperties of the container . . . . .

8.3.5.9.2.1 Activity 1.4.2.1: Selection ofthe container material for thelicense application design . . . .

8.3.5.9.2.1.1 Subactivity 1.4.2.1.1:Establishment of selectioncriteria and their weightingfactors . . . . . . . . . . . .

8.3.5.9.2.1.2 Subactivity 1.4.2.1.2:Material selection . . . . . .

8.3.5.9-51

8.3.5.9-52

8.3.5. 9-54

8 .3.5. 9-55

8.3.5.9-56

8.3.5. 9-58

8.3.5. 9-59

8.3.5. 9-60

8.3.5. 9-61

8.3.5.9-61

8. 3.5. 9-63

8.3.5.9-63

8.3.5.9-64

8.3.5.9-66

8.3.5. 9-67

8.3.5. 9-69

2 2

2 3

2 2

2 2

2 3

2 2

2 2

2 2

2 1

2 2

2 1

2 2

2 3

2 2

2 2

2 1

* Includes figures and tables

vii

Page 90: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.5.9.2.2 Activity 1.4.2.2: Degradationmodes affecting candidate copper-based container materials . . . .

8.3.5.9.2.2.1 Subactivity 1.4.2.2.1:Assessment of degradationmodes in copper-basedmaterials . . . . . . . . . . .

8.3.5.9.2.2.2 Subactivities 1.4.2.2.2through 1.4.2.2.8: Laboratorytest plan for copper-basedmaterials . . . . .

8.3.5.9.2.3 Activity 1.4.2.3: Degradationmodes affecting candidate austen-itic container materials . . . . .

8.3.5.9.2.3.1 Subactivity 1.4.2.3.1:Assessment of degradationmodes in austenitic materials

8.3.5.9.2.3.2 Subactivities 1.4.2.3.2through 1.4.2.3.9: Laboratorytest plan for austeniticmaterials . . . . . . .

8.3.5.9.2.4 Activity 1.4.2.4: Degradationmodes affecting ceramic-metal,bimetallic/single metal, orcoatings and filler systems . . .

8.3.5.9.2.4.1 Subactivity 1.4.2.4.1:Assessment of degradationmodes affecting ceramic-metalsystems . . . . . . . . . . . .

8.3.5.9.2.4.2 Subactivity 1.4.2.4.2:Laboratory test plan forceramic-metal systems of thealternate barriers investi-gations . . . . . . . . . . . .

8.3.5.9.2.4.3 Subactivity 1.4.2.4.3:Assessment of degradationmodes affecting bimetallic/single metal systems . . . . .

8.3.5.9.2.4.4 Subactivity 1.4.2.4.4:Laboratory test plan forbimetallic/single metalmaterial system . . . . . . . .

8.3.5.9.2.4.5 Subactivity 1.4.2.4.5:Assessment of degradationmodes in coatings and fillersystems . . . . . . . . . . . .

8.3.5. 9-69

8.3.5.9-69

8.3.5. 9-71

8.3.5. 9-73

8.3.5. 9-73

8'.3.5.9-75

8.3.5. 9-77

8.3.5. 9-77

8.3.5. 9-79

8.3.5. 9-80

8.3.5. 9-81

8.3.5. 9-83

2 1

2 3

2 3

2 1

2 3

2 3

2 1

2 3

2 1

2 2

2 3

2 1

* Includes figures and tables

viii

Page 91: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.5.9.2.4.6 Subactivity 1.4.2.4.6:Laboratory test plan for coat-ings and filler systems of thealternate barriers investi-gations . . . . . . . . . .

8.3.5.9.3 Information Need 1.4.3: Scenariosand models needed to predict the rateof degradation of the containermaterial . . . . . . . . . . .

8.3.5.9.3.1 Activity 1.4.3.1: Models forcopper and copper alloy

8.3.5.9.3.1.

8.3.5.9.3.1.

8.3.5.9.3.1.

8.3.5.9.3.1.

8.3.5.9.3.1.

degradation . . . . . . . . . ..1 Subactivity 1.4.3.1.1:

Metallurgical aging and phasestability . . . . . . . . ..

.2 Subactivity 1.4.3.1.2: Low-temperature oxidation . . . .

.3 Subactivity 1.4.3.1.3:General aqueous corrosion

.4 Subactivity 1.4.3.1.4:Hydrogen entry and embrittle-ment . . . . . . . . . . . .

.5 Subactivity 1.4.3.1.5:Pitting, crevice, and otherlocalized attack . . . . . .

.6 Subactivity 1.4.3.1.6: Stress8.3.5.9.3.1.

8.3.5.9-83

8.3.5.9-84

8.3.5. 9-87

8.3.5. 9-87

8.3.5.9-88

8.3.5. 9-89

8.3.5.9-91

8.3.5. 9-92

8.3.5.9-93

8.3.5.9-95

8.3.5. 9-95

8 .3.5. 9-96

8.3.5.9-97

8.3.5. 9-98

8.3.5.9-99

8.3.5.9-101

8.3.5.9-102

2 2

2 3

2 1

2 2

2 2

2 3

2 2

2 2

2 3

2 1

2 1

2 2

2 2

2 2

2 3

2 2

2 2

corrosion cracking . . . . .8.3.5.9.3.1.7 Subactivity 1.4.3.1.7: Other

potential degradation modes .8.3.5.9.3.2 Activity 1.4.3.2: Models for

austenitic material degradation8.3.5.9.3.2.1

8.3.5.9.3.2.2

8.3.5.9.3.2.3

8.3.5.9.3.2.4

8.3.5.9.3.2.5

8.3.5.9.3.2.6

Subactivity 1.4.3.2.1:Metallurgical aging and phasetransformations . . . . . . . .Subactivity 1.4.3.2.2: Low-temperature oxidation . . . . .Subactivity 1.4.3.2.3:General aqueous corrosion .

Subactivity 1.4.3.2.4: Inter-granular attack and inter-granular stress corrosioncracking . . . . . . . . . . .Subactivity 1.4.3.2.5:Hydrogen entry and embrittle-ment . . . . . . . . . . . . .Subactivity 1.4.3.2.6:Pitting, crevice, and otherlocalized attack . . . . . . .

* Includes figures and tables

ix

Page 92: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.5.9.3.2.7 Subactivity 1.4.3.2.7: Trans-granular stress corrosioncracking . . . . . . . . . . .

8.3.5.9.3.2.8 Subactivity 1.4.3.2.8: Otherpotential degradation modes

8.3.5.9.3.3 Activity 1.4.3.3: Models fordegradation of ceramic-metal,bimetallic/single metal, andcoatings and filler alternativesystems . . . . . . . . . . . . .

8.

8.3.5.9.3.3.1 Subactivity 1.4.3.3.1: Modelsfor degradation of ceramic-metal systems . . . . . . . . .

8.3.5.9.3.3.2 Subactivity 1.4.3.3.2: Modelsfor degradation of bimetallic/single metal systems . . . . .

8.3.5.9.3.3.3 Subactivity 1.4.3.3.3: Modelsfor degradation of coatingsand filler systems . . . . . .

3.5.9.4 Information Need 1.4.4: Estimates ofthe rates and mechanisms of containerdegradation in the repositoryenvironment for anticipated and un-anticipated processes and events,and calculation of the failure rateof the container as a function oftime . . . . . . . . . . . . . . . . .

8.3.5.9.4.1 Activity 1.4.4.1: Estimate ofthe rates and mechanisms ofcontainer degradation in therepository environment foranticipated and unanticipatedprocesses and events, andcalculation of container failurerate as a function of time . . . .

8.3.5.9.4.1.1 Subactivity 1.4.4.1.1:Deterministic calculation ofrates of container degradationin the repository environmentfor anticipated and unantici-pated processes and events,and calculation of containerfailure rate as a function oftime . . . . . . . . . . . . .

8.3.5.9-103

8.3.5.9-104

8.3.5.9-104

8.3.5.9-105

8.3.5.9-105

8.3.5.9-106

8.3.5.9-107

8.3.5.9-108

8.3.5.9-108

2 2

2 1

2 2

2 1

2 2

2 1

2 2

2 1

2 2

* Includes figures and tables

x

Page 93: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

8.3.5.9.4.1.2 Subactivity 1.4.4.1.2:Probabilistic calculation ofrates of container degradationand distribution of time toinitiation of release ofradionuclides from the wastepackages . . . . . . . . . . .

8.3.5.9.5 Information Need 1.4.5: Determina-tion of whether the set of wastepackages meets the performanceobjective for substantially completecontainment for anticipated processesand events . . . . . . . . . . .

8.3.5.9.5.1 Activity 1.4.5.1: Determinationof whether the substantiallycomplete containment requirementis satisfied . . . . . . . . . . .

8.3.5.10 Issue resolution strategy for Issue 1.5:Will the waste package and repositoryengineered barrier systems meet theperformance objective for radionucliderelease rates as required by 10 CFR60.113? . . . . . . . . . . . . . . . . .

8.3.5.10.1 Information Need 1.5.1: Wastepackage design features that affectthe rate of radionuclide release

8.3.5.10.1.1 Activity 1.5.1.1: Integratewaste form data and wastepackage design data . . . . . . .

8.3.5.10.1.1.1 Subactivity 1.5.1.1.1:Integrate spent fuelinformation . . . . . . . . .

8.3.5.10.1.1.2 Subactivity 1.5.1.1.2:Integrate glass waste forminformation . . . . . . . . .

8.3.5.10.1.1.3 Subactivity 1.5.1.1.3:Integrate waste package andrepository designinformation . . . . . . . . .

8.3.5.10.2 Information Need 1.5.2: Materialproperties of the waste form . . . .

8.3.5.10.2.1 Activity 1.5.2.1: Characteriza-tion of the spent fuel wasteform . . . . . . . . . . . . . .

8.3.5.9-109

8.3.5.9-110

8.3.5.9-111

8.3.5.10-1

8.3.5.10-39

8.3.5.10-42

8.3.5.10-42

8.3.5.10-42

8.3.5.10-42

8.3.5.10-42

8.3.5.10-44

2 2

2 2

2 1

2 39*

2 3

2 1

2 1

2 1

2 1

2 3

2 1

* Includes figures and tables

xi

Page 94: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

8.3.5.10.2.1.1

8.3.5.10.2.1.2

8.3.5.10.2.1.3

8.3.5.10.2.1.4

8.3.5.10.2.1.5

8.3.5.10.2.1.6

Subactivity 1.5.2.1.1:Dissolution and leaching ofspent fuel . . . . . . . . . .Subactivity 1.5.2.1.2:Oxidation of spent fuel . . .Subactivity 1.5.2.1.3:Corrosion of Zircaloy . . . .Subactivity 1.5.2.1.4:Corrosion of and radionucliderelease from other materialsin the spent fuel waste formSubactivity 1.5.2.1.5:Evaluation of the inventoryand release of carbon-14from Zircaloy cladding .

Subactivity 1.5.2.1.6: Otherexperiments on the spent fuelwaste form . . . . . . . . . .

8.3.5.10.2.2 Activity 1.5.2.2: Characteriza-tion of the glass waste form . .

8.3.5.10.2.2.1 Subactivity 1.5.2.2.1: Leachtesting of glass . . . . .

8.3.5.10.2.2.2 Subactivity 1.5.2.2.2:Materials interactionsaffecting glass leaching . . .

8.3.5.10.2.2.3 Subactivity 1.5.2.2.3:Cooperative testing withwaste producers . . . . . . .

8.3.5.10.3 Information Need 1.5.3: Scenariosand models needed to predict therate of radionuclide release fromthe waste package and engineeredbarrier system . . . . .

8.3.5.10.3.1 Activity 1.5.3.1: Integratescenarios for release from wastepackage . . . . . . . . . . . . .

8.3.5.10.3.1.1 Subactivity 1.5.3.1.1:Develop scenario identifica-tions . . . . . . . . . . . .

8.3.5.10.3.1.2 Subactivity 1.5.3.1.2:Separate scenarios intoanticipated and unanticipatedcategories . . . . . . . . . .

8.3.5.10.3.1.3 Subactivity 1.5.3.1.3:Development of parametersdescribing the scenarios . . .

8.3.5.10-44

8.3.5.10-46

8.3.5.10-46

8.3.5.10-48

8.3.5.10-49

8.3.5.10-50

8.3.5.10-51

8.3.5.10-51

8.3.5.10-52

8.3.5.10-53

8.3.5.10-54

8.3.5.10-58

8.3.5.10-58

8.3.5.10-59

8.3.5.10-60

2 2

2 1

2 3

2 2

2 2

2 1

2 1

2 2

2 2

2 2

2 5

2 1

2 1

2 1

2 2

* Includes figures and tables

xii

Page 95: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.5.10.3.1.4 Subactivity 1.5.3.1.4:Determine adequacy of designenvelope of waste package . .

8.3.5.10.3.2 Activity 1.5.3.2: Develop geo-chemical speciation and reactionmodel . . . . . . . . . . . . . .

8.3.5.10.3.2.1 Subactivity 1.5.3.2.1:Develop data base for geo-chemical modeling . . . .

8.3.5.10.3.2.2 Subactivity 1.5.3.2.2:Develop geochemical modelingcode . . . . . . . . .

8.3.5.10.3.3 Activity 1.5.3.3: Generatemodels for release from spentfuel . . . . . . . . . . . . . .

8.3.5.10.3.3.1 Subactivity 1.5.3.3.1:Generate release for spentfuel models

8.3.5.10.3.4 Activity 1.5.3.4: Generatemodels for release from glasswaste forms . . . . . . . . . . .

8.3.5.10.3.4.1 Subactivity 1.5.3.4.1:Generate release models forglass waste forms . . . . . .

8.3.5.10.3.5 Activity 1.5.3.5: Waste packageperformance assessment modeldevelopment . . . . . . . . . . .

8.3.5.10.3.5.1 Subactivity 1.5.3.5.1:Development of system model

8.3.5.10.3.5.2 Subactivity 1.5.3.5.2:Development of uncertaintymethodology . . . . . . . . .

8.3.5.10.3.5.3 Subactivity 1.5.3.5.3: Waterflow into and out of abreached container . . . . . .

8.3.5.10.4 Information Need 1.5.4: Determina-tion of the release rates of radio-nuclides from the waste package andengineered barrier system foranticipated and unanticipatedevents . . . . . . . . . . . . . . .

8.3.5.10.4.1 Activity 1.5.4.1: Deterministiccalculation of releases from thewaste package . . .

8.3.5.10.4.2 Activity 1.5.4.2: Probabilisticcalculation of releases from thewaste package . . . . . . . . . .

8.3.5.10-61

8.3.5.10-62

8.3.5.10-62

8.3.5.10-64

8.3.5.10-66

8.3.5.10-66

8.3.5.10-68

8.3.5.10-68

8.3.5.10-70

8.3.5.10-70

8.3.5.10-72

8.3.5.10-74

8.3.5.10-75

8.3.5.10-76

8.3.5.10-76

2 2

2 1

2 3

2 3

2 1

2 3

2 1

2 2

2 1

2 3

2 2

2 1

2 1

2 1

2 2

* Includes figures and tables

xiii

Page 96: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.5.10.5 Information Need 1.5.5: Determina-tion of the amount of radionuclidesleaving the near-field environmentof the waste package . . . . . . . .

8.3.5.10.5.1 Activity 1.5.5.1: Determineradionuclide transport para-meters . . . . . . . . . . . . .

8.3.5.10.5.1.1 Subactivity 1.5.5.1.1:Radionuclide distribution intuff wafers . . . . . . . . .

8.3.5.10.5.1.2 Subactivity 1.5.5.1.2: Radio-nuclide distribution in tuffcores . . . . . . . . . . . . . .

8.3.5.10.5.2 Activity 1.5.5.2: Radionuclidetransport modeling in the near-field waste package environment

8.3.5.10.5.2.1 Subactivity 1.5.5.2.1:Validation of near-fieldtransport model usinglaboratory and field experi-mental data . . . . . . . . .

8.3.5.10.5.2.2 Subactivity 1.5.5.2.2:Application of near-fieldtransport model to wastepackage releases . . . . . . .

8.3.5.11 Plans for assessing seal systemperformance . . . . . . . . . . . . . . .

8.3.5.12 Issue resolution strategy for Issue 1.6:Will the site meet the performanceobjective for pre-waste-emplacementground-water travel time as required by10 CFR 60.113? . . . . . . . . . . . . . .

8.3.5.12.1 Information Need 1.6.1: Siteinformation and design conceptsneeded to identify the fastest pathof likely radionuclide travel and tocalculate the ground-water traveltime along that path . . . . . . . .

8.3.5.12.2 Information Need 1.6.2: Calculation-al models to predict ground-watertravel times between the disturbedzone and the accessible environment

8.3.5.12.2.1 Activity 1.6.2.1: Modeldevelopment . . . . . . . . . . .

8.3.5.10-77

8.3.5.10-79

8.3.5.10-79

8.3.5.10-79

8.3.5.10-80

8.3.5.10-80

8.3.5.10-80

8.3.5.11-1

8.3.5.12-1

8.3.5.12-25

8.3.5.12-40

8.3.5.12-44

2 3

2 1

2 1

2 2

2 1

2 1

2 1

2 5*

2 25*

2 15*

2 5

2 1

* Includes figures and tables

xiv

Page 97: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

8.3.5.12.2.1.1 Subactivity 1.6.2.1.1:Development of a theoreticalframework for calculationalmodels . . . . . . . . . . . .

8.3.5.12.2.1.2 Subactivity 1.6.2.1.2:Development of calculationalmodels . . . . . . . . . . . .

8.3.5.12.2.2 Activity 1.6.2.2: Verificationand validation . . . . . . . . .

8.3.5.12.2.2.1 Subactivity 1.6.2.2.1:Verification of codes . . . .

8.3.5.12.2.2.2 Subactivity 1.6.2.2.2:Validation of models . . . . .

8.3.5.12.3 Information Need 1.6.3: Identifica-tion of the paths of likely radio-nuclide travel from the disturbedzone to the accessible environmentand identification of the fastestpath . . . . . . . . . . i . . . . .

8.3.5.12.3.1 Activity 1.6.3.1: Analysis ofunsaturated flow system . . . . .

8.3.5.12.3.1.1 Subactivity 1.6.3.1.1:Unsaturated zone flowanalysis . . . . . . . . . . .

8.3.5.12.3.1.2 Subactivity 1.6.3.1.2:Saturated zone flow analysis

8.3.5.12.4 Information Need 1.6.4: Determina-tion of the pre-waste-emplacementground-water travel time along thefastest path of likely radionuclidetravel from the disturbed zone tothe accessible environment

8.3.5.12.4.1 Activity 1.6.4.1: Calculationof pre-waste-emplacement ground-water travel time . . . . . . . .

8.3.5.12-45

8.3.5.12-45

8.3.5.12-45

8.3.5.12-46

8.3.5.12-46

8.3;-5.12-48

8.3.5.12-50

8.3.5.12-50

8.3.5.12-50

8.3.5.12-51

8.3.5.12-52

8.3.5.12-52

8.3.5.12-53

8.3.5.12-53

2 1

2 1

2 1

2 1

2 3

2 3

2 1

2 1

2 2

2 2

2 1

2 1

2 1

2 1

8 .3 .5. 12 .4.1 .1

8.3.5.12.4.1.2

8 .3 .5.12 .4 .1 .3

Subactivity 1.6.4.1.1:Performance allocation forIssue 1.6 . . . . . . . . .Subactivity 1.6.4.1.2:Sensitivity and uncertaintyanalyses of ground-watertravel time . . . . . . . .Subactivity 1.6.4.1.3:Determination of the pre-waste-emplacement ground-water travel time . . . . .

* Includes figures and tables

xv

Page 98: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Eaqe Rev. Pages

8.3.5.12.5 Information Need 1.6.5: Boundary ofthe disturbed zone . . . . . . . . .

8.3.5.12.5.1 Activity 1.6.5.1: Ground-watertravel time after repositoryconstruction and waste emplace-ment . . . . . . . . . . . . . .

8.3.5.12.5.2 Activity 1.6.5.2: Definition ofthe disturbed zone . . . . . . .

8.3.5.13 Issue resolution strategy for Issue 1.1:Will the mined geologic disposal systemmeet the system performance objective forlimiting radionuclide releases to theaccessible environment as required by 10CFR 60.112 and 40 CFR 191.13? . . . . . .

8.3.5.13.1 Information Need 1.1.1: Siteinformation needed to calculatereleases to the accessible environ-ment . . . . . . . . . . . . . . . .

8.3.5.13.2 Information Need 1.1.2: A set ofpotentially significant releasescenario classes that address allevents and processes that may affectthe geologic repository . . . . . . .

8.3.5.13.2.1 Performance Assessment Activity1.1.2.1: Preliminary identi-fication of potentially signif-icant release scenario classes

8.3.5.13.2.1.1 Subactivity 1.1.2.1.1:Preliminary identificationof potentially significantsequences of events andprocesses at the YuccaMountain repository site .

8.3.5.13.2.1.2 Subactivity 1.1.2.1.2:Preliminary identification ofpotentially significantrelease scenario classes . . .

8.3.5.13.2.2 Performance Assessment Activity1.1.2.2: Final selection ofsignificant release scenarioclasses to be used in licensingassessments . . . . . . . . . . .

8.3.5.12-53

8.3.5.12-61

8.3.5.12-61

8.3.5.13-1

8.3.5.13-124

8.3.5.13-124

8.3.5.13-126

8.3.5.13-126

8.3.5.13-127

8.3.5.13-127

2 9*

2 1

2 2

2 123*

2 1

2 3

2 1

2 2

2 1

2 2

* Includes figures and tables

xvi

Page 99: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Paqe Rev. Pages

8.3.5.13.3 Information Need 1.1.3: Calcula-tional models for predictingreleases to the accessible environ-ment attending realizations of thepotentially significant release-scenario classes . . . . . . . . . .

8.3.5.13.3.1 Performance Assessment Activity1.1.3.1: Development of math-ematical models of the scenarioclasses . . . . . . . . . . . . .

8.3.5.13.3.1.1

8.3.5.13.3.1.2

8.3.5.13.3.1.3

8.3.5.13.3.1.4

Subactivity 1.1.3.1.1:Development of models forreleases along the waterpathways . . . . . . . . .Subactivity 1.1.3.1.2:Development of a model forgas-phase releases . . . .Subactivity 1.1.3.1.3:Development of a model ofreleases through basalticvolcanism . . . . . . . .Subactivity 1.1.3.1.4:Development of a model ofreleases through humanintrusion . . . . . . . .

8.3.5.13-128

8.3.5.13-132

8.3.5.13-132

8.3.5.13-133

8.3.5.13-133

8.3.5.13-134

8.3.5.13-134

8.3.5.13-136

8.3.5.13-136

8.3.5.13-136

2 5

2 1

2 2

2 1

2 2

2 1

2 3

2 1

2 1

2 2

8.3.5.13.4 Information Need 1.1.4: Determina-tion of the radionuclide releasesto the accessible environmentassociated with realizations ofpotentially significant releasescenario classes . . . . . . . . . .

8.3.5.13.4.1 Performance Assessment Activity1.1.4.1: The screening ofpotentially significant scenarioclasses against the criterion ofrelative consequences . . . . . .

8.3.5.13.4.1.1 Subactivity 1.1.4.1.1: Thescreening of the preliminaryscenario classes . . . . . . .

8.3.5.13.4.1.2 Subactivity 1.1.4.1.2: Afinal screening of scenarioclasses . . . . . . . . . . .

* Includes figures and tables

xvii

Page 100: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. ofPagesPage Rev.

8.3.5.13.4.2

8.3.5.13.4.2.

8.3.5.13.4.2.

Pi1S.er

erformance Assessment Activity.1.4.2: The provision ofimplified, computationallyfficient models of the final

scenario classes representingthe significant processes andevents mentioned in proposed10 CFR 60.112 and 60.115 . . .1 Subactivity 1.1.4.2.1:

Preliminary development ofsimplified, computationallyefficient scenario-classmodels . . . . . . . . . . .

2 Subactivity 1.1.4.2.2:Development of the final,computationally efficientmodels of the scenarioclasses that will be usedto represent all significantprocesses and events in thesimulation of the total

8.3.5. 13.5system . . . . . . . . . . .

Information Need 1.1.5: Probabilis-tic estimates of the radionuclidereleases to the accessible environ-ment considering all significant

8.3.5.13-137

8.3.5.13-137

8.3.5.13-138

8.3.5.13-138

8.3.5.13-139

8.3.5.13-139

8.3.5.13-140

8.3.5.13-140

2 1

2 1

2 1

2 2

2 1

2 2

2 1

2 2

release scenarios . . . . . . . . . .8.3.5.13.5.1 Performance Assessment Activity

1.1.5.1: Calculation of anempirical complementary cumula-tive distribution function . . .

8.3.5.13.5.1.1 Subactivity 1.1.5.1.1:Construction of the total-system simulator . . . . . . .

8.3.5.13.5.1.2 Subactivity 1.1.5.1.2:Construction of the jointprobability distribution to

8.3.5.13.5.1.3

be used in the licensing-assessment calculations . . .Subactivity 1.1.5.1.3:Construction of an empiricalcomplementary cumulativedistribution function for thelicensing action . . . . . . .

* Includes figures and tables

xviii

Page 101: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Paqe Rev. Pages

8.3.5.14 Issue resolution strategy for Issue 1.2:Will the mined geologic disposal systemmeet the requirements for limitingindividual doses in the accessibleenvironment as required by 40 CFR191.15? . . . . . . . . . . . . . . . . .

8.3.5.14.1 Information Need 1.2.1: Determina-tion of doses to the public in theaccessible environment throughground-water transport . . . . . . .

8.3.5.14.1.1 Activity 1.2.1.1: Calculationof doses through the ground-water pathway . . . . . . . . . .

8.3.5.14.2 Information Need 1.2.2: Determina-tion of doses to the public in theaccessible environment through thegaseous pathway . . . . . . . . . . .

8.3.5.14.2.1 Activity 1.2.2.1: Calculationof transport of gaseouscarbon-14 dioxide through theoverburden . . . . . . . . . . .

8.3.5.14.2.2 Activity 1.2.2.2: Calculationof land-surface dose and dose tothe public in the accessibleenvironment through the gaseouspathway of carbon-14 . . . . . .

8.3.5.15 Issue resolution strategy for Issue 1.3:Will the mined geologic disposal systemmeet the requirements for the protectionof special sources of ground water asrequired by 40 CFR 191.16? . . . . . . . .

8.3.5.15.1 Information Need 1.3.1: Determina-tion whether any Class I or specialsources of ground water exist atYucca Mountain, within the con-trolled area, or within 5 km of thecontrolled area boundary . . . . . .

8.3.5.15.1.1 Analysis 1.3.1:1: Determinewhether any aquifers near thesite meet the Class I or specialsource criteria . . . . . . . . .

8.3.5. 14-1

8.3.5. 14-9

8.3.5.14-10

8.3.5.14-10

8.3.5.14-12

8.3.5.14-12

8.3.5.15-1

8.3.5. 15-4

8.3.5. 15-7

2 8*

2 1

2 1

2 2

2 1

2 1

2 4*

2 4*

2 1

* Includes figures and tables

xix

Page 102: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.3.5.15.1.1.1 Activity 1.3.1.1.1:Synthesis and evaluation ofhydrologic and environmentalinformation needed to deter-mine whether aquifers at thesite meet the special sourcecriteria . . . . . . . . . . .

8.3.5.15.1.1.2 Activity 1.3.1.1.2:Synthesis and evaluation ofdemographic and economic dataneeded to determine whetherClass I or special sources ofground water exist . . . . . .

8.3.5.15.2 Information Need 1.3.2: Determinefor all special sources whetherconcentrations of waste products inthe ground water during the first1,000 yr after disposal couldexceed the limits established in40 CFR 191.16 . . . . . . . . . . . .

8.3.5.15.2.1 Analysis 1.3.2.1: Determine theconcentrations of waste productsin any special source of groundwater during the first 1,000 yrafter disposal . . . . . . . . .

8.3.5.15.2.2 Activity 1.3.2.1.1: Synthesisand evaluation of releases ofwaste products to specialsources of ground water duringthe first 1,000 yr afterdisposal . . . . . . . . . . . .

8.3.5.16 Issue resolution strategy for Issue 1.7:Will the performance-confirmation programmeet the requirements of 10 CFR 60.137?

8.3.5.15-8

8.3.5. 15-8

8.3.5. 15-9

8.3.5.15-9

8.3.5.15-10

8.3.5. 16-1

2 1

2 2

2 1

2 1

2 1

2 10*

* Includes figures and tables

xx

Page 103: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES

TotalNo. of

Rev. PagesFigure Title Page

8.3.5.2-la.

8.3.5.2-lb

8.3.5.2-2

8.3.5.2-3

8.3.5.3-1

8.3.5.3-2a

8.3.5.3-2b

8.3.5.4-1

8.3.5.4-2a

8.3.5.4-2b

8.3.5.5-1

8.3.5.5-2a

8.3.5.5-2b

Logic diagram for Issue 2.4 (wasteretrievability) . . . . . . . . . . .

Legend for Figure 8.3.5.2-la . . . . .

Information exchanged between wasteretrievability issue and preclosuredesign and technical feasibilityissue . . . . . . . . . . . . . . . .

Retrieval time frame for designpurposes . . . . . . . . . . . . . . .

Relationship of Issue 2.1 (publicradiological exposures-normalconditions) to other issues and thesite characterization program . . . .

Logic diagram for Issue 2.1 (publicradiological exposures-normalconditions) . . . . . . . . . . . . .

Legend for Figure 8.3.5.3-2a . . . . .

Relationship of Issue 2.2 (workerradiological safety-normal condi-tions) and site characterizationprograms . . . . . . . . . . . . . . .

Logic diagram for Issue 2.2 (workerradiological safety-normalconditions) . . . . . . . . . . . . .

Legend for Figure 8.3.5.4-2a . . . . .

Relationship of Issue 2.3 (accidentalradiological releases) to otherissues and the site characterizationprograms . . . . . . . . . . . . . . .

Logic diagram for Issue 2.3(accidental radiological releases)

Legend for Figure 8.3.5.5-2a . . . . .

8.3.5.2-4

8.3.5.2-5

8.3.5.2-6

8.3.5.2-13

8.3.5.3-2

8.3.5.3-6

8.3.5.3-7

8.3.5. 4-2

8.3.5.4-6

8.3.5. 4-7

8.3.5.5-2

8.3.5.5-5

8.3.5. 5-6

2 1

2 .1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

xxi

Page 104: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFigure Title Page

8.3.5.5-3

8.3.5.6-1

8.3.5.7-1

8.3.5.8-1

8.3.5.8-2

8.3.5.9-1

8.3.5. 9-2

8.3.5. 9-3

8.3.5. 9-4

8.3.5.10-1

8 .3.5. 10-2

8.3.5. 10-3

8 .3.5. 11-1

Analytical steps for assessing radio-logical risks from accidents . . . . .

Issue resolution strategy for Issue2.5 (higher level findings-preclosureradiological safety) . . . . . . . . .

Issue resolution strategy for Issue4.1 (higher level findings--ease andcost of construction) . . . . . . . .

Simplified information flow amongpostclosure performance issues andtheir interaction with design issues

Steps in performance assessment forpostclosure performance issues . . . .

Spent fuel and high-level waste glasscontainers . . . . . . . . . . . . . .

Design configurations for verticaland horizontal emplacement . . . . . .

Model hierarchy for Issue 1.4(containment by waste package) . . . .

Reference approach for Issue 1.4(containment by waste package) . . . .

Model hierarchy for Issue 1.5(engineered barrier system releaserates) . . . . . . . . . . . . . . . .

Reference approach to resolvingIssue 1.5 (engineered barrier systemperformance) . . . . . . . . . . . . .

Alternative approaches to resolvingIssue 1.5 (engineered barrier systemperformance), assuming case ofmaximum water flux per package (20liters per year) . . . . . . . . . . .

Flowchart illustrating the approachfor answering the performance-relatedquestions . . . . . . . . . . . . . .

8.3.5.5-7

8.3.5.6-5

8.3.5.7-5

8.3.5.8-3

8.3.5.8-5

8.3.5.9-2

8 .3.5. 9-3

8.3.5. 9-7

8. 3.5. 9-8

8.3.5.10-3

8.3.5.10-12

8.3.5.10-13

8.3.5.11-2

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

xxii

Page 105: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFigure Title Page

8.3.5.11-2

8.3.5.12-1

8.3.5.12-2

8.3.5.12-3

8.3.5.12-4

8.3.5.12-5

8.3.5.12-6

8.3.5.12-7

8.3.5.12-8

8.3.5.13-la

Logic to select preferred performancegoals for seal program . . . . . . . .

Preliminary definition of theboundary of the accessible environ-ment (Rautman et al., 1987) and thelocation of section B-B', Figure8.3.5.12-2 . . . . . . . . . . . . . .

Conceptual hydrogeologic section fromSolitario Canyon to well J-13 . . . .

Schematic logic for resolution ofIssue 1.6 (current alternative modelsof flow system acknowledge matrix andfracture dominated flow in unsatu-rated zone, seepage velocity, disper-sion and diffusion) . . . . . . . . .

Isopach contour maps of hydrogeo-logic units used for performanceallocation . . . . . . . . . . . . . .

Travel-time plots . . . . . . . . . .

Cross section at Yucca Mountainshowing pinch-outs of unsaturatedhydrogeologic units . . . . . . . . .

Examples of ground-water travel-timedistributions . . . . . . . . . . . .

Schematic flow of site information onsystem geometry, material properties,initial and boundary conditions, andmodel validation through data reduc-tion modeling (Programs 8.3.1.2 and8.3.1.4) to definition of perform-ance assessment parameters (Table8.3.5.12-2) for use in ground-watertravel time calculations and modelvalidation (Information Needs 1.6.2,1.6.3, and 1.6.4) . . . . . . . . . .

Graphic representation of Environ-mental Protection Agency (EPA)containment requirements . . . . . . .

8.3.5. 11-3

8.3.5.12-2

8.3.5.12-4

8.3.5.12-7

8.3.5.12-12

8.3.5.12-14

8.3.5.12-15

8.3.5.12-18

8.3.5.12-26

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 18.3.5. 13-6

xxiii

Page 106: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFigure Title Page

8.3.5.13-lb

8.3.5.13-2

Example of an empirical complementarycumulative distribution function . . .

An illustration of the expansion of acomplementary cumulative distributionfunction in independent scenarioclasses. Two types of events areassumed . . . . . . . . . . . . . . .

8.3.5.13-6

8.3.5.13-14

2 1

2 1

8.3.5.13-3

8.3.5.13-4

8.3.5.13-5

8.3.5.13-6A

8.3.5.13-6B

8.3.5.13-6C

8.3.5.13-6D

8.3.5.13-6E

8.3.5.13-6F

An illustration of the expansion of acomplementary cumulative distributionfunction in independent scenarioclasses. Two types of events and oneundetected feature are assumed . . . .

Representation of a time-dependentstate variable . . . . . . . . . . . .

General hydrogeologic cross sectionat Yucca Mountain . . . . . . . . . .

Idealized scenario classification andscreening (logic diagram for Issue1.1, total system performance) . . . .

Subtree 1--Idealized preliminaryperformance allocation (logic diagramfor Issue 1.1, total systemperformance) . . . . . . . . . . . . .

Idealized probabilistic calculationsand evaluations (logic diagram forIssue 1.1, total system performance)

Subtree 2--Idealized scenario class-ification (logic diagram for Issue1.1, total system performance) . . . .

Subtree 3--Idealized sequence forconstructing a mathematical model ofa scenario class (logic diagram forIssue 1.1, total system performance)

Subtree 4--Idealized scenarioscreening (logic diagram for Issue1.1, total system performance) . . . .

8.3.5.13-15

8.3.5.13-22

8.3.5.13-57

8.3.5.13-117

8.3.5.13-118

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

8.3.5.13-119

8.3.5.13-120

8.3.5.13-121

8.3.5.13-122 2 1

xxiv

Page 107: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

TotalNo. of

Rev. PagesFiqure Title Page

8.3.5.13-6G

8.3.5.14-1

8.3.5.15-1

8.3.5.16-1

Subtree 5--Decision to includescenario in complementary cumulativedistribution function calculation(logic diagram for Issue 1.1, totalsystem performance) . . . . . . . . .

Logic diagram for Issue 1.2(individual protection) . . . . . . .

Logic diagram for Issue 1.3 (ground-water protection) . . . . . . . . . .

Correlation between the phases andobjectives of the DOE's performanceconfirmation program, phases of therepository program, and the NRCrequirements driving the objectives

8.3.5.13-123 2

8.3.5.14-3 2

8.3.5.15-3 2

8.3.5.16-3 2

1

1

1

1

xxv

Page 108: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES

TotalNo. of

Rev. PagesTable Title Page

8.3.5.2-1

8 .3.5.2-2

8.3.5.2-3

8.3.5.2-4

8.3.5.2-5

8.3.5.2-6

8.3.5.2-7

8.3.5.2-8

8.3.5.2-9

8.3.5.2-10

Directory of discussions related toretrieval . . . . . . . . . . . . . . .

Performance measures, goals, andneeded confidence for processes oractivities involved in providingaccess to the emplacement borehole forretrieval (retrieval function 1) . . .

Performance measures, goals, andneeded confidence for processes oractivities involved in providingaccess to the waste packages forretrieval (retrieval function 2)

Performance measures, goals, andneeded confidence for processes oractivities involved in removing wastepackages from emplacement boreholes(retrieval function 3) . . . . . . . .

Performance measures, goals, andneeded confidence for processes oractivities involved in transportingand delivering the waste to thesurface facilities (retrievalfunction 4) . . . . . . . . . . . . . .

Retrieval-related input items (to beprovided by Issue 4.4) . . . . . . . .

Retrieval-related design or perform-ance goals (design criteria) . . . . .

Potential abnormal conditions forretrieval . . . . . . . . . . . . . . .

Input items to be provided by Issue4.4 for Information Need 2.4.2 (accessto emplacement boreholes) . . . . . . .

Input items to be provided by Issue4.4 for Information Need 2.4.3 (accessto waste packages) . . . . . . . . . .

8.3.5.2-8

8.3.5.2-11

8.3.5.2-15

8.3.5.2-18

8.3.5.2-21

8.3.5.2-24

8.3.5.2-26

8.3.5.2-27

8.3.5.2-31

8.3.5.2-36

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 3

2 2

2 1

xxvi

Page 109: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.5.2-11

8.3.5.2-12

8.3.5.2-13

Input items to be provided by Issue4.4 for Information Need 2.4.4(removal of waste from boreholes) . . .

Input items to be provided by Issue4.4 for Information Need 2.4.5(delivery of waste to surfacefacilities) . . . . . . . . . . . . . .

Input items to be provided by Issue4.4 for Information Need 2.4.6 (comp-liance with retrieval requirements) . .

8.3.5.2-40 2 1

2 1

2 1

8.3.5.2-43

8.3.5.2-46

8.3.5.3-1

8.3.5.3-2

8.3.5.4-1

8.3.5.4-2

8.3.5.5-1

8.3.5.5-2

8.3.5. 6-1

8.3.5.6-2

Functions, performance measures, andperformance goals for Issue 2.1(public radiological exposures--normalconditions) . . . . . . . . . . . . . .

Parameters required for Issue 2.1(public radiological exposures--normalconditions) . . . . . . . . . . . . . .

Functions, performance measures, andperformance goals for Issue 2.2(worker radiological safety--normalconditions) . . . . . . . . . . . . . .

Parameters required for Issue 2.2(worker radiological safety--normalconditions) . . . . . . . . . . . . . .

Functions, performance measures, andperformance goals for Issue 2.3(accidental radiological releases)

Parameters required for Issue 2.3(accidental radiological releases)

Findings for qualifying and disqual-ifying conditions . . . . . . . . . . .

Preliminary findings for the qualify-ing and disqualifying conditionconcerned with preclosure radiologicalsafety . . . . . . . . . . . . . . . .

8.3.5.3-10

8.3.5.3-11

8.3.5. 4-10

8.3.5.4-12

8.3.5.5-9

8.3.5.5-12

8.3.5. 6-2

8.3.5.6-3

2 1

2 4

2 2

2 2

2 2

2 5

2 1

2 1

xxvii

Page 110: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Paqe

8 .3.5. 6-3

8.3.5.6-4

8.3.5.7-1

8.3.5.7-2

8.3.5.7-3

8.3.5.7-4

8.3.5.7-5

8.3.5.7-6

Preclosure performance issues thataddress the concerns of the preclosureradiological safety qualifying anddisqualifying conditions covered byIssue 2.5 . . . . . . . . . . . . . . .

Information used in the resolution ofIssue 2.1 (adapted from Table8.3.5.3-2) . . . . . . . . . . . . . .

Findings for qualifying and disqual-ifying conditions . . . . . . . . . . .

Preliminary findings for the qualify-ing and disqualifying conditionsconcerned with ease and cost ofconstruction . . . . . . . . . . . . .

Preclosure design issues that addressthe concerns of the qualifying anddisqualifying conditions of the pre-closure guidelines on ease and costof siting, constructing, operating,and closing a repository . . . . . . .

Surface characteristics informationconsidered in making the higher-levelfinding for the qualifying conditionof the surface characteristicsguideline, and issues for which theinformation will be obtained . . . . .

Rock characteristics informationconsidered in making the higher-levelfinding for the qualifying conditionof the rock characteristics guideline,and issues for which the informationwill be obtained . . . . . . . . . . .

Hydrologic information considered inmaking the higher-level finding forthe qualifying condition of thehydrology guideline, and issues forwhich the information will beobtained . . . . . . . . . . . . . . .

8.3.5.6-6

8.3.5.6-10

8.3.5.7-2

8.3.5.7-4

8.3.5.7-7

8.3.5.7-10

8.3.5.7-12

8.3.5.7-14

2 1

2 2

2 1

2 1

2 1

2 1

2 1

2 1

xxviii

Page 111: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

Title

TotalNo. of

Rev. PagesTable Page

8.3.5.7-7 Tectonics information considered inmaking the higher-level finding forthe qualifying condition of thetectonics guideline, and issues forwhich the information will beobtained . . . . . . . . . . . . . . 8.3.5.7-15 2 2

8.3.5. 9-1 Performance measures and goals forIssue 1.4 (containment by wastepackage) . . . . . . . . . . . . . . 8.3.5.9-9 2 2

8.3.5. 9-2

8.3.5. 9-3

8.3.5. 9-4

8.3.5.9-5

8.3.5.10-1

8.3.5. 10-2

8.3.5.10-3a

8.3.5.10-3b

Water quality performance parametersand goals for Issue 1.4 (containmentby waste package) . . . . . . . . . . . 8.3.5.9-13

Waste form performance parameters andgoals for Issue 1.4 (containment bywaste package) . . . . . . . . . . . . 8.3.5.g-20

Performance parameters and goals forcontainers subdivided by alloy familyand degradation mode . . . . . . . . . 8.3.5.9-37

Container degradation model inputs . . 8.3.5.9-41

Input to predictive models for Issue1.5, engineered barrier system releaserates . . . . . . . . . . . . . . . . . 8.3.5.10-4

Performance measures and goals forIssue 1.5 (engineered barrier systemrelease rates) . . . . . . . . . . . . 8.3.5.10-17

Performance parameters and goals forwater composition for Issue 1.5(engineered barrier system releaserates) . . . . . . . . . . . . . . . . 8.3.5.10-19

Performance parameters and goals forspent fuel and glass waste forms forIssue 1.5 (engineered barrier systemrelease rates) . . . . . . . . . . . . 8.3.5.10-20

2 2

2 3

2 4

2 4

2 7

2 2

2 1

2 8

xxix

Page 112: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.5.10-3c

8.3.5.10-4

8.3.5.10-5

8.3.5. 12-1

8.3.5.12-2

8.3.5. 12-3

8.3.5.12-4

8 .3.5. 12-5

8.3.5. 13-1

8.3.5. 13-2

8.3.5. 13-3

8.3.5. 13-4

8.3.5.13-5

Performance parameters and goals forcomponents of spent fuel waste formfor Issue 1.5 (engineered barriersystem release rates) . . . . . . . . .

Performance allocation for radio-nuclide migration in near-field hostrock . . . . . . . . . . . . . . . . .

Performance measures, parameters, andparameter goals for calculating radio-nuclide source term for near-fieldhost rock . . . . . . . . . . . . . . .

Summary of performance allocation forIssue 1.6 . . . . . . . . . . . . . . .

Performance parameters needed forresolving Issue 1.6 . . . . . . . . . .

Supporting performance parametersused by Issue 1.6 . . . . . . . . . . .

Summary of performance allocation fordefining the boundary of the disturbedzone . . . . . . . . . . . . . . . . .

Parameter needs for defining thedisturbed zone . . . . . . . . . . . .

Potentially significant scenarios . . .

Disruptive scenario classes for thesite characterization program . . . . .

Categories of scenarios delineatedaccording to potential impacts onbarriers of the geologic repository(scenario classes) . . . . . . . . . .

Typical distribution coefficients andapproximate retardation factors forwelded and nonwelded Yucca Mountainhydrogeologic units . . . . . . . . . .

Estimates of ground-water travel time,predominately matrix flow . . . . . . .

8.3.5.10-29

8.3.5.10-31

8.3.5.10-32

8.3.5.12-9

8.3.5.-12-21

8.3.5.12-28

8.3.5.12-58

8.3.5.12-59

8.3.5.13-27

8.3.5.13-49

8.3.5.13-55

2 1

2 1

2 2

2 2

2 2

2 6

2 1

2 2

2 1

2 2

2 1

2 1

2 1

8.3.5.13-61

8.3.5.13-63

xxx

Page 113: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Paqe

8.3.5.13-6

8.3.5. 13-7

8.3.5.13-8

8 .3.5. 13-9

8.3.5.13-10

8.3.5.13-11

8.3.5.13-12

8.3.5.13-13

8.3.5.13-14

8.3.5.13-15

8.3.5.13-16

Reference inventory used in system-level models . . . . . . . . . . . . .

Maximum radioactivity (in curies)released in a single exploratorydrilling at the Yucca Mountain site

Preliminary performance allocation forIssue 1.1 . . . . . . . . . . . . . . .

Performance parameters for scenarioclass E (the nominal case) . . . . . .

Performance parameters for scenarioclass A-1 (extrusive magmatic events)

Performance parameters for scenarioclass A-2 (exploratory drilling) . . .

Performance parameters for scenarioclass C-1 (local or extensiveincreases in percolation flux throughunsaturated zone) . . . . . . . . . . .

Performance parameters for scenarioclass C-2 (foreshortening of theunsaturated zone) . . . . . . . . . . .

Performance parameters for scenarioclass C-3 (changes in rock, hydrol-ogic, and geochemical properties inthe unsaturated zone) . . . . . . . . .

Performance parameters for scenarioclass D-1 (appearance of surficialdischarge points within the C-area;foreshortening of the saturated zone)

Performance parameters for scenarioclass D-2 (increased head gradientsor changed rock, hydrologic, or geo-chemical properties in the saturatedzone) . . . . . . . . . . . . . . . . .

8.3.5.13-68 2

8.3.5.13-85 2

8.3.5.13-90 2

8.3.5.13-93 2

8.3.5.13-96 2

8.3.5.13-97 2

8.3.5.13-98 2

8.3.5.13-100 2

8.3.5.13-102 2

8.3.5.13-104 2

8.3.5.13-106 2

2

1

2

3

1

1

2

2

2

2

2

xxxi

Page 114: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.5.13-17

8.3.5.13-18

8.3.5.14-1

8.3.5.14-2

8.3.5.15-1

8.3.5. 16-1

8.3.5.16-2

Supporting parameters needed toevaluate the nominal case and as base-line data for the disturbed cases . . .

Licensing strategy for resolvingIssue 1.11 (total system performance)

Performance allocation for Issue 1.2(individual protection) . . . . . . . .

Performance parameters for Issue 1.2(individual protection) the disturbedcases . . . . . . . . . . . . . . . . .

Performance allocation for Issue 1.3(ground-water protection) . . . . . . .

Monitoring activities initiatedduring site characterization andplanned to be continued as performanceconfirmation . . . . . . . . . . . . .

Testing activities initiated duringsite characterization planned to becontinued as performance confirmation

8.3.5.13-108

8.3.5.13-114

8.3.5.14-7

8.3.5.14-8

8.3.5.15-5

8.3.5.16-7

8.3.5.16-8

2 6

2 3

2 1

2 1

2 1

2 1

2 1

xxxii

Page 115: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

Yuc rx &1-'B DocuimentNo. YMP/CMO001L

a | . YU~iX b y Revision 4C SITE THISISA Cl No.C1l 11.OOOO/CI. 13.0000

R EES UA N Date 0V131192W CHA N WBS No. 1 2* 3

M PROJ CALevel Yes

PROJECT BASELINE DOCUMENT

YUCCA MOUNTAINSITE CHARACTERIZATION

PROGRAM BASELINE(SCPB)

VOLUME 5

CHANGES TO THIS DOCUMENT REQUIRE PREPARATIONAND APPROVAL OFA CHANGE REQUEST IN ACCORDANCEWITH PROJECT AP3.30I

UNITED STATES DEPARTMENT OF ENERGYYUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT OFFICE

Page 116: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS

TotalNo. of

Page Rev. Pages

8.3.5.17 Issue resolution strategy for Issue 1.8:Can the demonstrations for favorable andpotentially adverse conditions be madeas required by 10 CFR 60.122? . . . . . .

8.3.5.18 Issue resolution strategy for Issue 1.9:(a) Can the higher-level findingsrequired by 10 CFR Part 960 be made forthe qualifying condition of the post-closure system guideline and the dis-qualifying and qualifying conditions ofthe technical guidelines for geohydrol-ogy, geochemistry, rock characteristics,climatic changes, erosion, dissolution,tectonics and human interference; and(b) can the comparative evaluationsrequired by 10 CFR Part 960.3-1-5 bemade? . . i . . . . . . . i . . i . . . .

8.3.5.19 Substantially completed analyticaltechniques . . . . . . . . . . . . . . . .

8.3.5.19.1 Postclosure performance-assessmentanalytical techniques . . . . . . . .

8.3.5.19.2 Preclosure performance-assessmentanalytical techniques . . . . . . . .

8.3.5.20 Analytical techniques requiringsignificant development . . . . . . . . .

8.3.5.20.1 Analytical techniques . . . . . . . .8.3.5.20.2 Plans for verification and

validation . . . . i . . i . . . . . .8.3.5.20.3 Verification of analytical

techniques . . . . . . . . . . . . . .8.3.5.20.4 Model validation . . . . . . . . . . .8.3.5.20.5 Validation program . . . . . . . . . .

8.4 Planned site characterization activities andpotential performance impacts . . . . . . . . . . .

8.4.1 Introduction . . . . . . . . . . . . . . . . .8.4.1.1 Phased approach to implementing site

characterization activities . . . . . . . .8.4.1.2 Incorporation of 10 CFR Part 60 in the

development of the site characterizationprogram . . . . . . . . . . . . . . . . . .

8.4.1.3 Concepts of unsaturated-zone flow andtheir application to Yucca Mountain . . . .

8.4.2 Description and location of characterizationoperations . . . . . . . . . . . . . . . . . .

8.4.2.1 Rationale for planned testing . . . . . . .

8.3.5.17-1 2 98*

8.3.5. 18-1

8.3.5.19-1

8.3.5.19-1

8.3.5;19-3

8.3.5.20-18.3.5.20-1

8.3.5.20-2

8.3.5.20-38.3.5.20-6

8.3.5.20-11

2 27*

2 1

2 3*

2 9*

22

12

2 1

222

4*53

8.4-1 28.4.1-1 2

21

8.4.1-1 2 2

8.4.1-3 2 10*

8.4.1-12 2 10*

8.4.2-1 28.4.2-1 2

13

* Includes figures and tables

iii

Page 117: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Paqe Rev. Pages

8.4.2.1.1 Principal data needed for postclosureperformance evaluations . . . i . . . .

8.4.2.1.2 Principal data needed for preclosureperformance evaluations and design

8.4.2.1.3 Methods for obtaining needed sitedata . . . . . . . . . . . . . . . . .

8.4.2.1.3.1 Characterization methods forobtaining surface data . . . . . .

8.4.2.1.3.2 Characterization methods forobtaining subsurface data . . . .

8.4.2.1.4 Relationship of planned testing todata needs . . . . . . . . . . . . . .

8.4.2.1.4.1 Addressing principal postclosureinformation needs . . . . . . . .

8.4.2.1.4.2 Addressing principal preclosureinformation needs . . . . . . . .

8.4.2.1.4.3 Summary of how information needsare addressed . . . . . . . . . .

8.4.2.1.5 Representativeness of planned testing8.4.2.1.5.1 Relation between surface-based

testing and testing in theexploratory studies facility . . .

8.4.2.1.5.2 Representativeness of theexploratory studies facility(ESF) location . . . . . . . . . .

8.4.2.1.5.3 Statistical representativeness . .8.4.2.1.5.4 Volcanic stratigraphy . . . . . .8.4.2.1.5.5 Drifting to the southern part of

the repository block . . . . . . .8.4.2.1.6 Characterization of the Calico Hills

nonwelded unit . . . . . . . . . . . .8.4.2.1.7 Conditionally planned activities . . .

8.4.2.2 Surface-based activities . . . . . . . . .8.4.2.2.1 General description of location and

extent of testing and construction(existing and planned) . . . . . . . .

8.4.2.2.2 Description of locations, operations,and construction controls for surface-based activities . . . . . . . . . . .

8.4.2.2.2.1 Site preparation and surface-related activities . . . . . . . .

8.4.2.2.2.2 Drilling-related activities . . .8.4.2.2.2.3 Basis for surface-based testing

construction controls . . . . . .8.4.2.2.3 Surface-based test interference . . . .

8.4.2.3 Subsurface-based activities . . . . . . . .

8.4.2-3 2 7*

8.4.2-9 2 7*

8.4.2-15 2 1

8.4.2-15 2 2

8.4.2-16 2 3

8.4.2-18 2 1

8.4.2-18 2 3

8.4.2-20 2 2

8.-4.2-21 28.4.2-21 2

13

8.4.2-23 2 2

8.4.2-248.4.2-268.4.2-28

222

334*

8.4.2-31 2 1

8.4.2-318.4.2-348.4.2-35

222

424*

8.4.2-38 2 4*

8.4.2-41 2 8*

8.4.2-49 28.4.2-63 2

14*17*

8.4.2-798.4.2-868.4.2-89

232

8*46*

* Includes figures and tables

iv

Page 118: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

Page Rev. Pages

8.4.2.3.1 Exploratory studies facility testingoperations, layout constraints, andzones of influence . . . . . . . . .

8.4.2.3.2 Exploratory studies facility inte-grated data system . . . . . . .

8.4.2.3.2.1 Purpose and Scope of the inte-grated data system . . . . . . .

8.4.2.3.2.2 Integrated Data SystemDescription . . . . . . . . . .

8.4.2.3.3 Description of exploratory studiesfacility . . . . . . . . . . . . . .

8.4.2.3.3.1 Introduction . . . . . . . . . .8.4.2.3.3.2 General arrangement of surface

facilities . . . . . . . . . . .8.4.2.3.3.3 General arrangement of ramps and

shaft . . . . . . . . . . . . .8.4.2.3.3.4 General arrangement of the

exploratory drifts in the TopopahSpring and Calico Hills levels

8.4.2.3.4 Description of exploratory studiesfacility construction operations

8.4.2.3.4.1 Site pads . . . . .8.4.2.3.4.2 Exploratory studies facility

surface facilities and utilities8.4.2.3.4.3 Ramp portal and shaft collar

construction . . . . . . . .8.4.2.3.4.4 Exploratory studies facility

underground construction andoperations . . . . . . . . . . .

8.4.2.3.5 General description of undergroundsupport systems . . . . . . . . . . .

8.4.2.3.6 Evaluation of exploratory studiesfacility layout and operations .

8.4.2.3.6.1 Potential for interferencebetween tests . . . . . . . . .

8.4.2.3.6.2 Potential for construction andoperations interference withtesting . . . . . . . . . . . .

8.4.2.3.6.3 Integration of the exploratorystudies facility with therepository design . . . . . . .

8.4.2.3.6.4 Design flexibility . . . . . . .8.4.2.3.6.5 Design and operational safety

8.4.3 Potential impacts of site characterizationactivities on postclosure performanceobjectives . . . . . . . . . . . . . . . . .

8.4.2-95 2 47*

8.4.2-141

8.4.2-141

8.4.2-142

8.4.2-1438.4.2-143

8.4.2-149

8.4.2-155

8.4.2-156

8.4.2-1578.4.2-158

8.4.2-158

8.4.2-158

8.4.2-159

8.4.2-159

8.4.2-163

8.4.2-164

8.4.2-174

8.4.2-1798.4.2-1818.4.2-182

2 1

2 2

2 2

22

17 *

2 6*

2 2

2 2

22

11

2 1

2 1

2 1

2 5

2 2

2 11*

2 6*

222

323

8.4.3-1 2 1

* Includes figures and tables

v

Page 119: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

TotalNo. of

faqe Rev. Pages

8.4.3.1 Introduction to postclosure performanceobjectives and approach to performanceassessment . . . . . . . . . . . . . .

8.4.3.1.1 General approach to performanceassessment . . . . . . . . . . . . . .

8.4.3.1.2 Approach to assess the potentialimpacts of site characterizationactivities on the performance of therepository system . . . . . . . . . . .

8.4.3.2 Supporting technical analyses and data8.4.3.2.1 Hydrologic analyses and data

8.4.3.2.1.1 Water infiltration from thesurface . . . . . . . . . . .

8.4.3.2.1.2 Ground-water flow in matrix andfractures . . . . . . . . . . . .

8.4.3.2.1.3 Redistribution of water retainedin the unsaturated zone . . . . .

8.4.3.2.1.4 Movement of water vapor and air8.4.3.2.2 Geochemical analyses and data . . . . .8.4.3.2.3 Thermal/mechanical analyses and data

8.4.3.2.3.1 Analyses of shafts and drifts8.4.3.2.3.2 Analysis of in situ experiments

8.4.3.2.4 Design features that may contribute toperformance . . . . . . . . . . . . . .

8.4.3.2.5 Potential impacts to current siteconditions from site characterizationactivities . . . . . . . . . . . . . .

8.4.3-1 2 4

8.4.3-4 2 3

8.4.3-68.4.3-88.4.3-8

222

312

8.4.3-9 2 4

8.4.3-12 2 6

8.4. 3-178.4.3-198.4.3-238.4.3-258.4.3-268.4.3-31

222222

35*

3164

8.4.3.2.5.1

8.4.3.2.5.2

8.4.3.2.5.3

8.4.3.2.5.4

8.4.3.2.5.5

Potential impacts to the sitefrom surface-related activitiesPotential impacts to the sitefrom drilling activities . . . . .Potential impacts to the sitefrom construction of the explora-tory shafts . . . . . . . . . . .Potential impacts to the sitefrom underground construction ofexploratory studies facilitydrifts and testing alcoves . . . .Potential impacts to the sitefrom exploratory studies facilityactivities . . . . . . . . . . . .

8.4.3-34 2 3

8.4.3-36 2 2

8.4.3-37 2 3

8.4.3-39 2 6

8.4.3-44 2 3

8.4.3-47 2 2

8.4.3-49 2 2

8.4.3-50 2 28.4.3-51 2 1

8.4.3-51 2 2

8.4.3.3 Potential impacts of site characterizationactivities on postclosure performance . . .

8.4.3.3.1 Impacts on total system releases . .8.4.3.3.1.1 Summary of issue resolution

strategy . . . . . . . . . . . . .

* Includes figures and tables

vi

Page 120: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

TABLE OF CONTENTS (continued)

' I TotalNo. of

Page Rev. Pages

8.4.3.3.1.2 Evaluation of impacts on totalsystem releases . . . . . . . . .

8.4.3.3.2 Impacts on waste package containment8.4.3.3.2.1 Issue resolution strategy . . . .8.4.3.3.2.2 Impacts on waste package

containment . . . . . . . . . . .8.4.3.3.2.3 Impacts of site characterization

activities on waste packagedesign features . . . . . . . . .

8.4.3.3.3 Impacts on engineered barriersystem release . . . . . . . . . . . .

8.4.3.3.3.1 Issue resolution strategy . . . .8.4.3.3.3.2 Impacts on engineered barrier

system release . . . . . . . . . .8.4.3.3.4 Impacts on ground-water travel time . .

8.4.3.3.4.1 Issue resolution strategy . . . .8.4.3.3.4.2 Impacts on ground-water travel

time . . . . . . . . . . . . . . .8.5 THIS SECTION INTENTIONALLY EXCLUDED8.6 THIS SECTION INTENTIONALLY EXCLUDED8.7 Decontamination and decommissioning . . . . . . . .

8.7.1 Decontamination . . . . . . . . . . . . . . . .8.7.2 Decommissioning . . . . . . . . . . . . . . . .

8.7.2.1 Decommissioning for surface-basedactivities . . . . . . . . . . . . . . . .

8.7.2.2 Decommissioning of the exploratory studiesfacility . . . . . . . . . . . . . . . . .

8.7.3 Plans for mitigation of any significantadverse impacts caused by site characteriza-tion activities ................

8.7.4 Summary ...................REFERENCES . . . . . . . . . . . . . . . . . . . . . . .GLOSSARY . . . . . . . . . . . . . . . . . . . . . . . .

8.4.3-528.4.3-748.4.3-74

222

23*13

8.4.3-76 2 5

8.4.3-81 2 2

8.4.3-82 28.4.3-83 2

12

312

8.4.3-848.4.3-868.4.3-86

222

8.4.3-87 2 3

8.7-18.7-28.7-2

222

212

8.7-3 2 2

8.7-4 2 3

8.7-68.7-6R-1G-1

2222

1160115

* Includes figures and tables

vii

Page 121: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES

TotalNo. of

Rev. PagesFigure Title Paqe

8 .3.5. 17-1

8.3.5.17-2

8.3.5.18-1

8. 3. 5. 18-2

Logic diagram for resolving Issue1.8 for potentially adverseconditions (PACs) . . . . . . . . . .

Logic diagram for resolving Issue 1.8for favorable conditions (FCs) . . . .

Issue resolution strategy for Issue1.9(a) (postclosure higher-levelfindings) . . . . . . . . . . . . . .

Resolution strategy for Issue 1.9(b) .

8.3.5.17-10

8.3.5.17-16

8.3.5.18-6

8.3.5.18-23

2 1

2 1

2 1

2 1

8.4.1-1

8.4.1-2

8.4.2-la

8.4.2-lb

8.4.2-2a

8.4.2-2b

Hypothetical matric potential versussaturation for fractures and rockmatrix; ? indicates uncertainty . . . 8.4.1-17

Hypothetical hydraulic conductivityversus matric potential curve forfracture and rock matrix; ? indicatesuncertainty . . . . . . . . . . . . . 8.4.1-19

Existing surface-based activities . . 8.4.2-36-

Legend for Figure 8.4.2-la . . . . . . 8.4.2-37

Proposed surface-based fieldactivities . . . . . . . . . . . . . . 8.4.2-39

Legend for Figure 8.4.2-2a . . . . . . 8.4.2-40

2 1

2 1

2 1

2 1

2 1

2 1

8.4.2-3 Reference design concept forcommencing study . . . . . . . . . 8.4.2-90 2 1

8.4.2-4

8.4.2-5

8.4.2-6

8.4.2-7

Measurement details of the shaftconvergence test . . . . . . . . . . .

Conceptualized elevation view ofheater experiment in TSwl (litho-physal Topopah Spring unit) . . . . .

Canister scale heater test . . . . . .

Design of the Yucca Mountain heatedblock experiment . . . . . . . . . . .

8.4.2-111

8.4.2-114

8.4.2-116

8.4.2-118

2 1

2 1

2 1

2 1

viii

Page 122: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF FIGURES (continued)

Figure

8.4.2-8

8.4.2-9

8.4.2-10

8.4.2-11

8.4.2-12

8.4.2-13

8.4.2-14

8.4.2-15

8.4.2-16

8.4.2-17

8.4.3-1

8.4.3-2

8.4.3-3

Title

Conceptual design for thermal stressmeasurements . . . . . . . . . . . .

Conceptual layout for heated roomexperiment . . . . . . . . . . . . .

Design of the plate loading test . .

Repository horizon near-field hydro-logic properties (waste packageenvironment) typical testarrangement . . . . . . . . . . . .

Portions of the Yucca MountainProject Document Hierarchy . . . . .

General arrangement of surfacefacilities . . . . . . . . . . . . .

Thermal analysis of canister scaleheater test planar model . . . . . .

Analysis of demonstration breakoutroom--percentage change from in situvertical stress . . . . . . . . . .

Zones of influence from main testlevel experiments on dedicated testarea layout . . . . . . . . . . . .

Hydrologic and mechanical zones ofinfluence of exploratory shafts 1and 2 . . . . . . . . . . . . . . .

Effect of radius of area containingretained construction water orchange in saturation . . . . . . . .

Sealing concepts for the exploratoryshafts . . . . . . . . . . . . . . .

Topographic cross sections in thevicinity of exploratory shafts 1 and2 locations . . . . . . . . . . . .

Page

8.4.2-120

8.4.2-122

8.4.2-125

8.4.2-137

8.4.2-144

8.4.2-150

8.4.2-168

8.4.2-169

8.4.2-172

8.4.2-178

8.4.3-20

8.4.3-69

8.4.3-70

TotalNo. of

Rev. Pages

2 1

2

2

1

1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

ix

Page 123: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES

TotalNo. of

Rev. PagesTable Title Page

8.3.5.17-1

8.3.5.17-2

8.3.5.17-3

8.3.5. 17-4

8.3.5.17-5

8.3.5. 17-6

8.3.5. 17-7

8.3.5. 17-8

8.3.5. 17-9

8.3.5.17-10

8.3.5.17-11

Favorable conditions, PerformanceIssue 1.8 (Nuclear RegulatoryCommission siting criteria) . . . .

Potentially adverse conditions,Performance Issue 1.8 (NuclearRegulatory Commission sitingcriteria) . . . . . . . . . . . . .

Scenario classes and parametersassociated with potentially adversecondition 2 . . . . . . . . . . . .

Scenario classes and parametersassociated with potentially adversecondition 3 . . . . . . . . . . . .

Scenario classes and parametersassociated with potentially adversecondition 4 . . . . . . . . . . . .

Scenario classes and parametersassociated with potentially adversecondition 5 . . . . . . . . . . . .

Scenario classes and parametersassociated with potentially adversecondition 6 . . . . . . . . . . . .

Scenario classes and parametersassociated with potentially adversecondition 7 . . . . . . . . . . . .

Scenario classes and parametersassociated with potentially adversecondition 8 . . . . . . . . . . . .

Scenario classes and parametersassociated with potentially adversecondition 9 . . . . . . . . . . . .

Scenario classes and parametersassociated with potentially adversecondition 11 . . . . . . . . . . .

8.3.5.17-2

8.3.5.17-4

8.3.5.17-23

8.3.5.17-28

8.3.5.17-31

8.3.5.17-36

8.3.5.17-49

8.3.5.17-53

8.3.5.17-56

8.3.5.17-60

8.3.5.17-63

2 2

2 4

2 5

2 2

2 4

2 12

2 3

2 2

2 3

2 2

2 7

x

Page 124: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.5.17-12

8.3.5.17-13

8.3.5.17-14

8.3.5.17-15

8.3.5.17-16

8.3.5.18-1

8.3.5.18-2

8.3.5.18-3

8.3.5.18-4

8 .3.5. 18-5

Scenario classes and parametersassociated with potentially adversecondition 15 . . . . . . . . . . . . . 8.3.5.17-72

Scenario classes and parametersassociated with potentially adversecondition 17 . . . . . . . . . . . . . 8.3.5.17-79

Scenario classes and parametersassociated with potentially adversecondition 22 . . . . . . . . . . . . . 8.3.5.17-82

Scenario classes and parametersassociated with potentially adversecondition 23 . . . . . . . . . . . . . 8.3.5.17-88

Scenario classes and parametersassociated with potentially adversecondition 24 . . . . . . . . . . . . . 8.3.5.17-90

Findings for qualifying and disqual-ifying conditions . . . . . . . . . . . 8.3.5.18-3

Preliminary findings on postclosuresystem and technical guidelines . . . . 8.3.5.18-4

Geohydrologic characteristicsconsidered in making a higher-levelfinding for the qualifying conditionof the geohydrology technical guide-line, and issues for which theinformation will be obtained . . . . . 8.3.5.18-10

Geochemical characteristics consideredin making a higher-level finding forthe qualifying condition of the geo-chemistry technical guideline, andissues for which the information willbe obtained . . . . . . . . . . . . . . 8.3.5.18-12

Rock characteristics considered inmaking a higher-level finding for thequalifying condition of the rockcharacteristics technical guideline,and issues for which the informationwill be obtained . . . . . . . . . . . 8.3.5.18-13

2 5

2 1

2 5

2 2

2 1

2 1

2 1

2 1

2 1

2 2

xi

Page 125: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.3.5.18-6

8.3.5.18-7

8.3.5.18-8

8.3.5.18-9

8.3.5.19-1

8.3.5. 19-2

8.3.5. 19-3

8.3.5. 19-4

8.3.5.20-1

8.3.5.20-2

8.3.5.20-3

Effects of future climatic conditionsconsidered in making a higher-levelfinding for the qualifying conditionof the climatic change technicalguideline and in the resolution ofIssue 1.1 . . . . . . . . . . . . . . .

Effects of future tectonic activityconsidered in making a higher-levelfinding for the qualifying conditionof the tectonics technical guidelineand in the resolution of Issue 1.1

Effects of human activities consideredin making a higher-level finding forthe qualifying condition of the humaninterference technical guideline andin the resolution of Issue 1.1 . . . .

Scenarios and parameters associatedwith the 10,000-yr disturbed-performance scenario class that needto be added to the 100,000-yr nominal-performance scenario class . . . . . .

Computer codes for use in performanceassessment . . . . . . . . . . . . . .

Brief description of codes from Table8.3.5.19-1 . . . . . . . . . . . . . .

Examples of computer codes for use inpreclosure safety assessment . . . . .

Brief description of codes from Table8.3.5.19-3 . . . . . . . . . . . . . .

Participants and codes used in theCOVE 1 benchmarking exercise . . . . .

Participants and codes used in theCOVE 2 benchmarking exercise . . . . .

Participants and codes used in theCOVE 3 benchmarking exercise . . . . .

8.3.5.18-16

8.3.5.18-19

8.3.5.18-21

8.3.5.18-26

8.3.5.19-2

8.3.5.19-4

8.3.5.19-9

8.3.5.19-10

8.3.5.20-5

8.3.5.20-5

8.3.5.20-5

2 1

2 1

2 1

2 2

2 1

2 5

2 1

2 1

2 1

2 1

2 1

xii

Page 126: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

TotalNo. of

Rev. PagesTable Title Page

8.4.1-1 Principal requirements of 10 CFR Part60 affecting site characterizationplanning and performance impact eval-uation related to discussions inSection 8.4 . . . . . . . . . . . . . 8.4.1-4 2 2

8.4.1-2 Postclosurefrom 10 CFRdiscussions

performance objectivesPart 60 related toin Section 8.4 . . . . . 8.4.1-7 2 2

8.4.1-3

8.4.2-1

8.4.2-2

8.4.2-3

8.4.2-4

8.4.2-5

8.4.2-6

8.4.2-7

Technical criteria from 10 CFRPart 60 related to discussions inSection 8.4 . . . . . . . . . . . . . . 8.4.1-9

Principal site data needed for post-closure performance evaluation relatedto the information needs from theissues hierarchy requiring that data . 8.4.2-4

Principal site data needed for pre-closure performance evaluation relatedto the information needs from theissues hierarchy requiring that data . 8.4.2-10

Scale of variation of geologic-unitproperties . . . . . . . . . . . . . . 8.4.2-31

Existing and planned surface-relatedand drilling-related field activities . 8.4.2-42

Extent of existing surface disturbanceassociated with pre-site-characterization testing . . . . . . . 8.4.2-45

Estimates of minimal or potentiallysignificant disturbance (as discussedin Section 8.4.2.2.2.1) associatedwith planned surface-based testingfor site characterization . . . . . . . 8.4.2-47

Summary of planned surface-relatedcharacterization activities in thevicinity of Yucca Mountain--minimalor no disturbance is produced . . . . . 8.4.2-50

2 3

2 4

2 4

2 1

2 3

2 2

2 2

2 3

xiii

Page 127: YUCCA MOUNTAIN SITE CHARACTERIZATION PROGRAM … · YMP-035-RO YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT 4/22/91 DOCUMENT CHANGE NOTICE (DCN) RECORD Page 2 of 2 Document Title:

YMP/CM-0011, Rev. 4 YMP/CM-0011, Rev. 4

LIST OF TABLES (continued)

Table

8.4.2-8

Title

Summary of planned surface-relatedcharacterization activities thatcould produce potentially significantdisturbance in the vicinity of YuccaMountain . . . . . . . . . . . . . . .

Page

8.4.2-54

TotalNo. of

Rev. Pages

2 4

8.4.2-9

8.4.2-10

8.4 .2-11

8 .4 .2-12

8.4.2-13

8.4.2-14

8.4.3-1

Summary of planned subsurfacedrilling-related characterizationactivities . . . . . . . . . . . . .

Water-use estimates (in gallons) forplanned surface-based activities--drilling and testing . . . . . . . .

Water-use estimates for plannedsurface-based pumping tests . . . . .

Exploratory studies facility tests

Principal constraints imposed on theexploratory studies facility layoutby test requirements, listed bygeneral category of constraint . . .

Categories of effects considered inevaluating the zone of influence foreach site characterization test . . .

Comparative flood peak discharges inYucca Mountain area . . . . . . . . .

8.4.2-64

8.4.2-81

8.4.2-84

8.4.2-§6

8.4.2-100

8.4.2-103

8.4.3-71

2 8

2 3

2 1

2 3

2 3

2 3

2 1

xiv