YRP Marine Unit Jackson’s Point, Georgina, ON Bi-Weekly Project … · 2020. 8. 16. · 1.1...

4
August 04,2020 YRP Marine Unit Jackson’s Point, Georgina, ON Bi-Weekly Project Update Period Covered Under Current Update: August 04 – August 16, 2020 Below pictures represent site activities at Jackson’s Point YRP Marine Unit between July 20 – August 02, 2020

Transcript of YRP Marine Unit Jackson’s Point, Georgina, ON Bi-Weekly Project … · 2020. 8. 16. · 1.1...

Page 1: YRP Marine Unit Jackson’s Point, Georgina, ON Bi-Weekly Project … · 2020. 8. 16. · 1.1 Building Envelope Completion 1.2 Final Painting Office 1.3 Permanent Power Supply Inspection

August 04,2020

YRP Marine Unit Jackson’s Point, Georgina, ON

Bi-Weekly Project Update

Period Covered Under Current Update: August 04 – August 16, 2020 Below pictures represent site activities at Jackson’s Point YRP Marine Unit between July 20 – August 02, 2020

Page 2: YRP Marine Unit Jackson’s Point, Georgina, ON Bi-Weekly Project … · 2020. 8. 16. · 1.1 Building Envelope Completion 1.2 Final Painting Office 1.3 Permanent Power Supply Inspection
Page 3: YRP Marine Unit Jackson’s Point, Georgina, ON Bi-Weekly Project … · 2020. 8. 16. · 1.1 Building Envelope Completion 1.2 Final Painting Office 1.3 Permanent Power Supply Inspection
Page 4: YRP Marine Unit Jackson’s Point, Georgina, ON Bi-Weekly Project … · 2020. 8. 16. · 1.1 Building Envelope Completion 1.2 Final Painting Office 1.3 Permanent Power Supply Inspection

Upcoming construction activities for the Jackson’s Point YRP Marine Unit for the duration between August 04 – August 16, 2020 will include, but are not limited to the following:

1.1 Building Envelope Completion 1.2 Final Painting Office 1.3 Permanent Power Supply Inspection 1.4 Plumbing Fixtures 1.5 Storm Culvert Replacement 1.6 Fixed Dock Installation 1.7 Door Hardware Installations 1.8 Site Services

Please be advised that all construction activities are subject to inclement weather or unforeseen site conditions. Streets and intersections adjacent to the construction site remain open to traffic. The health and safety of our workers is a top priority and we are adhering to the Ministry of Labour established standards and best practices to help protect everyone and limit the spread of the virus.

For more information on the York Regional Police Marine Facility, please visit http://www.dmccholdings.com/projects/york-regional-police-marine-project/ or contact [email protected] or by phone at 1-866-995-2929. Sincerely, DMCC Holdings Inc.