Your Trusted Adviser Minimizing Risk Maximizing Your Value Scheduling Agreement with Summarized JIT...

6
Your Trusted Adviser • Minimizing Risk • Maximizing Your Value Scheduling Agreement with Summarized JIT Call

Transcript of Your Trusted Adviser Minimizing Risk Maximizing Your Value Scheduling Agreement with Summarized JIT...

Page 1: Your Trusted Adviser Minimizing Risk Maximizing Your Value Scheduling Agreement with Summarized JIT Call.

Your Trusted Adviser • Minimizing Risk • Maximizing Your Value

Scheduling Agreement with Summarized JIT Call

Page 2: Your Trusted Adviser Minimizing Risk Maximizing Your Value Scheduling Agreement with Summarized JIT Call.

PAGE2©2010 Sparta Consulting

Purpose & Benefi ts

Purpose

Summarized JIT calls are used for the receipt of required

materials which do not have any reference to the finished

product and are not delivered in sequence.

The delivery to a summarized JIT call can take place using

exact times and also several times a day.

Benefits Long term material requirement information is

communicated between OEM and supplier via forecast delivery schedule in IDoc.

Summarized JIT call is generated based on the real production situation on OEM side.

You have the possibility of grouping several material requirements to a JIT call.

Page 3: Your Trusted Adviser Minimizing Risk Maximizing Your Value Scheduling Agreement with Summarized JIT Call.

PAGE3©2010 Sparta Consulting

Overview

SAP Application

SAP enhacement package 4 for SAP ERP 6.0

Company Stake Holders Involved

Strategic Planner

Production Planner

Purchaser

IT Administrator (Professional User)

Production Planner (AUTO)

Logistics Execution JIT (AUTO)

Page 4: Your Trusted Adviser Minimizing Risk Maximizing Your Value Scheduling Agreement with Summarized JIT Call.

PAGE4©2010 Sparta Consulting

Detail Process Description

Scheduling Agreement with Summarized JIT Call

The OEM creates planned independent requirements and

generates an MRP run. The OEM sends the forecast

delivery schedules to the supplier. For material staging,

the OEM creates a summarized JIT call and sends it to

the supplier. The supplier creates a delivery based on the

incoming summarized JIT call. The supplier posts the

goods issue, and carries out the billing.

The OEM posts the goods receipt for the summarized JIT

call. The OEM completes and reorganizes summarized

JIT call.

Page 5: Your Trusted Adviser Minimizing Risk Maximizing Your Value Scheduling Agreement with Summarized JIT Call.

PAGE5©2010 Sparta Consulting

Supplier Client / Plant 1000OEM Client / Plant 1000

DELFOR

SEQJIT

Planned Independent Requirement

Material Requirement Planning Run

Forecast Delivery Schedule in Scheduling Agreement

Summarized JIT Call (Manual)

Send Outbound Summarized JIT Call

GR for outbound JIT call

Complete/Delete Outbound JIT call

Forecast Delivery Schedule in Scheduling Agreement

Summarized JIT Call

Delivery for Summarized JIT Call

Goods Issue for Delivery

Billing

Process Flow Diagram

Page 6: Your Trusted Adviser Minimizing Risk Maximizing Your Value Scheduling Agreement with Summarized JIT Call.

Your Trusted Adviser • Minimizing Risk • Maximizing Your Value

Question