Did you know ...
York Region's Yonge Subway
Could cost
JUST 750 MILLION DOLLARS?
![Page 2: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/2.jpg)
Correction...
That is ...
125 Million Dollars
York Region's ShareFor 7.4 Km's of Subway
WITH A BUILT IN 50% Contingency
The next slide declares LINE by LINE...York Region's share should only have been
113 Million Dollars on the Spadina Subway.WITH A 100% Built-in Contingency
![Page 3: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/3.jpg)
York Region Share:Should have been
Just 113 Million DollarsWith 100% Built-in Contingency
![Page 4: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/4.jpg)
Sharon Yetman Plan A: John Tory Plan
14.5 Kilometres 5.6 Km's
9 Stations Just1 Station
Zero Operating Costs 30 Million/Yr
1.2 Billion $ 3.56 Billion $
![Page 5: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/5.jpg)
“Smart Subways” FLOW PLAN:
10 – 3 Car Trains (adaptable)ZERO OPERATION COSTS
Train Every 4 Minutes either directionSTC to Kennedy – 6 Minutes
STC to Don Mills – 12 Minutes
9 Free “Smart Stations” And fully funded!
Sharon Yetman Innovation Plan A:
![Page 6: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/6.jpg)
Trains MEET with Computer Operated Precision
And By-Pass OR act as SHUTTLE SYSTEM
As Shuttle System: EASY TRANSFER only about 12 second lengthened dwell !
Built Underground
Prepped for Future FREE STATIONS
![Page 7: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/7.jpg)
NO 2 Trains can collide
Trains MEET with Precision
EASY 20 Second TransferWheelchairs always go first
Platform Ready forEASY future
Station Access from Above
![Page 8: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/8.jpg)
Yetman A Plan Cost:
14.5 Km's of TunnellingWith Free Operational System
= 800 Mllion Dollars (55 Million/Km)
9 Short Subways = 90 Million
9 Short Platforms = 90 Million
Innovation Fee = .5 Million
200 Million Contingency
Toronto Planning select precise station locations with drawings !
TOTAL = 1.2 Billion Dollars
![Page 9: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/9.jpg)
Sharon Yetman Plan B: John Tory Plan:
5 Stations 1 Station
2 Minute Service 6 to 9 Minute Service
Innovative Dome Disruption & Gridlock
Cost less than 500 Million Dollars Less the 325 Million Dollar Kennedy Station Savings
Project complete 1-2 Years Complete in 10 Years
Total Cost 175 Million Dollars 3.56 Billion $
![Page 10: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/10.jpg)
KENNEDY SRT STATION
While Train 1 is delivering to
KENNEDY STATION
![Page 11: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/11.jpg)
KENNEDY SRT STATION
While Train 1 is delivering to
KENNEDY STATION
2ND Train is delivering to SMART TRACK & Subway
![Page 12: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/12.jpg)
Thereby creating...
DOUBLE CAPACITY
“Subway Like Service”
5 Rapid Stations
and SAVING ...
3+ Billion Dollars
![Page 13: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/13.jpg)
With one tunnel system
A Train can arrive
EVERY 3 Minutes
6 Trains = 120 Million
“Smart Subways” = 550 Million Dollars
![Page 14: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/14.jpg)
YORK Planners
Choose exact Station Locations And do all drawings !
While ALL YOUR SUBWAYS ARE FREE using “Smart Stations”
YORK = 125 MILLIONTORONTO = 125 MILLION
Province = 250 Million Federal = 250 Million
Built-In Contingency = 250 Million @ 50%
![Page 15: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/15.jpg)
ZERO Operating Costs
PLUS6 FREE “Smart Stations”
Cost Just 55 Million per Km !
![Page 16: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/16.jpg)
“Smart Subways” is like a
“MINI SUBWAY SYSTEM”Innovatively built within a BROADER SUBWAY SYSTEM,
While uniquely creating FREE OPERATIONAL COSTS !
While uniquely creating FREE SUBWAY STATIONS !
![Page 17: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/17.jpg)
TTC's Expensive “NON” Innovative System
400 Million/Km
York RegionINNOVATIVE
SUBWAY SYSTEM80 Million in Total/Km
“6 Free Stations”&
“Tunnelling Cost HALF”Saves 320 Million/Km
![Page 18: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/18.jpg)
While Richmond Centre Subway Station
IS OPERATIONAL ATLEAST 4 YEARS EARLIER !
![Page 19: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/19.jpg)
SSE – New Cost – Under 1 Billion Dollars
3 to 5 Stations
Free Operational CostsWith 3 FREE “Smart Stations” Plan
![Page 20: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/20.jpg)
SSE – Or 9 to 10 FREE Subway StationsTo Don Mills Station
STILL UNDER 1 Billion Dollars,
“Smarter” to plan for complete subway plan system!
Innovators design bigger picture subway systems !
![Page 21: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/21.jpg)
YSE – 6 FREE Subway Stations,Under 1 Billion Dollars,
Completed 4 Years Faster to Richmond Heights Station
Free Operational Costs
![Page 22: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/22.jpg)
TTTTechnically ...
Revenue - 40% York Region
60% - TTC, (example)
York Region build YTC Subway System,
TTC retained to Maintain Track + Trains.
![Page 23: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/23.jpg)
A different Tunnel Machine does this section
Tunnel Innovation
ONLY Short Platforms required !LIKELY JUST 3 CAR Platforms
Boring Machines remain underground until Durham Region or Don Mills Station While Centre Platforms are constructed from Kennedy eastward.
![Page 24: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/24.jpg)
![Page 25: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/25.jpg)
“Smart Stations”Developers pay
for Access
![Page 26: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/26.jpg)
“Smart Subways”
![Page 27: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/27.jpg)
Spadina Subway Operating Costs
30 Million Annually for 6.8 Km's
![Page 28: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/28.jpg)
Suppose the SSE was...
TWICE as LONG
COST LESS TO BUILDHad 9 FREE “Smart Stations”, instead of just 1 expensive one...
And had... 60 Million Annuallized Average Operating Costs,
Becoming YOUR AMMORTIZED CAPITAL COSTS paid for.. meaning
NOW YOUR ...NOW YOUR ... Subway Cost is Almost Free
9 Free “Smart Stations”
+ Almost 3 times the Subway Length !
![Page 29: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/29.jpg)
![Page 30: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/30.jpg)
INNOVATON BUILDS
Subways 3 times as long
9 times the Stations,
AND FINDS A WAY TO PAY FOR BOTH !
![Page 31: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/31.jpg)
It's ALL ABOUT ...
“Finding the Efficiencies”That ONLY
Innovators do !
![Page 32: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/32.jpg)
... as recap
Every PlatformPlatform is “prepped” for
FUTURE FREE SUBWAY STATIONS
Each Station adds just 12 seconds to your commute
WHILE SAVING 3 Billion Dollars
![Page 33: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/33.jpg)
* MEET WITH PRECISION* have lots of extra WIDE DOORS
*Operate Driverless*Can Never Collide
Easy Passenger Flow -Traffic LightingSHORT 20 SECOND DWELLEasy Future Street Access
![Page 34: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/34.jpg)
NO 2 Trains can collide
Trains MEET with Precision
EASY 20 Second TransferWheelchairs always go first
Platform Ready forEASY future
Station Access from Above
![Page 35: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/35.jpg)
Trains MEET with Computer Operated Precision
And By-Pass OR act as SHUTTLE SYSTEM
As Shuttle System: EASY TRANSFER only about 12 second lengthened dwell !
Built Underground
Prepped for Future FREE STATIONS
![Page 36: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/36.jpg)
New Cost of SSE= 560 Million Dollars
FREE to operate
Old Cost 4.6 BillionPLUS Operation Costs
![Page 37: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/37.jpg)
New Cost of YSE= 750 Million Dollars
FREE to operate
Old Cost = 4 Billion+ Opertional Costs
1 Less Access Station
![Page 38: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/38.jpg)
Transit Innovation Plan
Creates...● Free Subway Stations● HALF COST Tunnelling● FREE OPERATIONAL COSTS● Operational Savings pays for Capital Costs !.
Subway Paid by Operational SAVINGS over 50 years.OLD SUBWAY Cost - 3.56 Billion Dollars
NEW INNOVATIVE SUBWAY Cost – 800 Million Dollars.
![Page 39: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/39.jpg)
Innovation Plan B
● Since Kennedy Reconstruction
has 325 Million Dollars in Savings
... Such Savings pays for
1. “Innovative Dome”
2. “Innovative Spur”
3. “The Innovator's Fee” (the same small fee TTC paid for a
13 Page Report to steal my Yonge/Bloor Solution)
![Page 40: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/40.jpg)
![Page 41: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/41.jpg)
Taxsavings is Innovation's best gift for the poor & struggling !
![Page 42: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/42.jpg)
The poor and marginalized sufferwhen politicians waste big $.
The poor and marginalized sufferWhen Politicians WASTE BIG $
![Page 43: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/43.jpg)
PPoPoPoverty COSTS Toronto
5 Billion Dollars Every Year
Gridlock COSTS Toronto
ANOTHER 6 Billion Every Year
![Page 44: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/44.jpg)
Getting TRANSIT RIGHT IS...
![Page 45: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/45.jpg)
IS GETTING COSTS SMARTER FROM THE BEGINNING
![Page 46: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/46.jpg)
INNOVATION is the “Better and ONLY WAY TO SAVINGS”Sharon Yetman of
Platform Technology Consultancy2 Times Dragon's Den Winning Contestant5 Registered Transit Inventions with CIPO
HOLDER of the 2009 Yonge/Bloor Solution – Gaining 50% Subway Capacity in 36 days !
![Page 47: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/47.jpg)
Because of TTC's Pride..
● I went on to invent
“Smart Track”
“Smart Subways”
“Smart Stations”
“Smart LRT”
“Smart Streetcars”
“Smart Flow Technology”
...for Union Station and the SSE.● (EACH saving multiple billions of dollars).
![Page 48: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/48.jpg)
Kindly contact me at [email protected] Yetman
If you care about the “Taxpayers Bottom Line”
And Getting Transit Built Faster
I have other more DESCRIPTIVE and DETAILED “Smart Stations” and “Smart Subways” Presentations
From 2011, when I was attempting to save 1 Billion Dollars on the York-Spadina Subway
![Page 49: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/49.jpg)
There is a reason why I have 1,600 Linkedin Followers,
70+ Metrolinx Followers, 60+ MTO Followers,
![Page 50: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/50.jpg)
Innovators have only 1 TOOL,
Timing ...
Let the professionals make their mistakes,
than in the 11th hour,
DECLARE YOUR INNOVATION SOLUTIONS !
![Page 51: York region smart subways and smart stations innovatiion by sharon yetman](https://reader036.fdocuments.us/reader036/viewer/2022070513/588485581a28ab6d1a8b4fd1/html5/thumbnails/51.jpg)
Thank you for listening.
Kindly take the next step and connect with me,
And help me SAVE TAXPAYERS BILLIONS !
Sharon [email protected]
Platform Technology Consultancy
Canada's ONLY Transit Innovation Firm
.