No.Start DateFinish DateEquipmentUnitDaysHargaremarkUse

124-Jun-1524-Jun-15Fork lift 7 ton111,925,000FixPengaturan Container22-Aug-153-Aug-15Fork lift 7 ton122,975,000FixG&A 6ton & Schroeder 6 ton36-Sep-156-Sep-15Fork lift 7 ton112,750,000AsumsiChemtech 3 ton418-Sep-1521-Sep-15Fork lift 10 ton2427,800,000AsumsiChemtech 12 ton51-Oct-151-Oct-15Fork lift 7 ton112,750,000AsumsiVotator 3 ton

38,200,000

Sheet1 (3)TERM OF REFERENCE

Gudang GBJ :

ADESIGN

1Peruntukan Gudang:2Luas Gudang ( L x W ):3Racking System:4Kapasitas Gudang:5Control Suhu / Temperatur:6Organisasi Ruang ::Flow System:Spesifikasi Forklift / Transporter:Jumlah Forklift / Transporter:Area Rack:Type Rack:Charger room:Jumlah Batery:Type Batery equipment:Total kebutuhan daya Listrik:Loading Dock:Jumlah Dock Leveler:Spesifikasi Dock Leveler:Spesifikasi Truck Loading Unloading:Jumlah Parking space / Loading Unloading area:Office:Jumlah Meja kerja:Pengadaan Furniture lainnya:Jumlah titik Stop Kontak:Jumlah titik Telpon:Jumlah titik Kabel Data:Toilet:Closet:Urinoir:Washtafel:Sanitair:Ruang Tunggu Supir:7Spesifikasi Bangunan:Lantai:Type Struktur Pondasi:Kapasitas daya dukung lantai /m2:Tingkat keratan lantai:Finishing lantai:Struktur Baja Bangunan:Struktur Baja Kolom:Struktur Baja Rafter:Struktur Baja lainnya:Spesifikasi Cat Struktur Baja:Dinding:Tinggi Dinding bata:Glass block (Y/N):Steel Louvered + Kassa nyamuk (Y/N):Spesifikasi Cat Dinding bata:Material Clading:Sky light (Y/N):Steel Louvered + Kassa nyamuk (Y/N):Atap:Material Atap:Insulation Atap (Y/N):Sky light (Y/N):Turbin Ventilator:Drainage System:8Kelengkapan Bangunan Gudang:Lampu Penerangan & instalasi Elektrikal:Cahaya minimum pada posisi lantai gudang = 150 Lux:Type Lampu yang digunakan:Jumlah Titik lampu:Jumlah Stop kontak 1 phase:Jumlah stop kontak 3 phase:Posisi Main Distribution Panel:Posisi Panel Data:Fire Protection System:Hydrant Box:Hydrant Pilar:Fire Srinkler System:Fire Alarm System:Audio System / Calling Truck:Pintu Baja:Ukuran Pintu:Jumlah Pintu:PVC Curtain:Rolling Door:Ukuran Rolling Door:Jumlah Rolling Door:Spesifikasi Rolling Door:PVC Curtain:

Sheet1 (4)TERM OF REFERENCE

Gudang GBJ :

ADESIGN

1Peruntukan Gudang:2Luas Gudang ( L x W ):3Racking System:4Kapasitas Gudang:5Control Suhu / Temperatur:6Organisasi Ruang ::Flow System:Spesifikasi Forklift / Transporter:Jumlah Forklift / Transporter:Area Rack:Type Rack:Charger room:Jumlah Batery:Type Batery equipment:Total kebutuhan daya Listrik:Loading Dock:Jumlah Dock Leveler:Spesifikasi Dock Leveler:Spesifikasi Truck Loading Unloading:Jumlah Parking space / Loading Unloading area:Office:Jumlah Meja kerja:Pengadaan Furniture lainnya:Jumlah titik Stop Kontak:Jumlah titik Telpon:Jumlah titik Kabel Data:Toilet:Closet:Urinoir:Washtafel:Sanitair:Ruang Tunggu Supir:7Spesifikasi Bangunan:Lantai:Type Struktur Pondasi:Kapasitas daya dukung lantai /m2:Tingkat keratan lantai:Finishing lantai:Struktur Baja Bangunan:Struktur Baja Kolom:Struktur Baja Rafter:Struktur Baja lainnya:Spesifikasi Cat Struktur Baja:Dinding:Tinggi Dinding bata:Glass block (Y/N):Steel Louvered + Kassa nyamuk (Y/N):Spesifikasi Cat Dinding bata:Material Clading:Sky light (Y/N):Steel Louvered + Kassa nyamuk (Y/N):Atap:Material Atap:Insulation Atap (Y/N):Sky light (Y/N):Turbin Ventilator:Drainage System:8Kelengkapan Bangunan Gudang:Lampu Penerangan & instalasi Elektrikal:Cahaya minimum pada posisi lantai gudang = 150 Lux:Type Lampu yang digunakan:Jumlah Titik lampu:Jumlah Stop kontak 1 phase:Jumlah stop kontak 3 phase:Posisi Main Distribution Panel:Posisi Panel Data:Fire Protection System:Hydrant Box:Hydrant Pilar:Fire Srinkler System:Fire Alarm System:Audio System / Calling Truck:Pintu Baja:Ukuran Pintu:Jumlah Pintu:PVC Curtain:Rolling Door:Ukuran Rolling Door:Jumlah Rolling Door:Spesifikasi Rolling Door:PVC Curtain:

Sheet2 (3)

No.Start DateFinish DateEquipmentUnitDaysHargaremarkUse

124-Jun-1524-Jun-15Fork lift 7 ton111,925,000FixPengaturan Container22-Aug-153-Aug-15Fork lift 7 ton122,975,000FixG&A 6ton & Schroeder 6 ton36-Sep-156-Sep-15Fork lift 7 ton112,750,000AsumsiChemtech 3 ton418-Sep-1521-Sep-15Fork lift 10 ton2427,800,000AsumsiChemtech 12 ton51-Oct-151-Oct-15Fork lift 7 ton112,750,000AsumsiVotator 3 ton

38,200,000

Sheet2 (4)

No.Start DateFinish DateEquipmentUnitDaysHargaremarkUse

124-Jun-1524-Jun-15Fork lift 7 ton111,925,000FixPengaturan Container22-Aug-153-Aug-15Fork lift 7 ton122,975,000FixG&A 6ton & Schroeder 6 ton36-Sep-156-Sep-15Fork lift 7 ton112,750,000AsumsiChemtech 3 ton418-Sep-1521-Sep-15Fork lift 10 ton2427,800,000AsumsiChemtech 12 ton51-Oct-151-Oct-15Fork lift 7 ton112,750,000AsumsiVotator 3 ton

38,200,000

Sheet1 (2)TERM OF REFERENCE

Gudang GBJ :

ADESIGN

1Peruntukan Gudang:2Luas Gudang ( L x W ):3Racking System:4Kapasitas Gudang:5Control Suhu / Temperatur:6Organisasi Ruang ::Flow System:Spesifikasi Forklift / Transporter:Jumlah Forklift / Transporter:Area Rack:Type Rack:Charger room:Jumlah Batery:Type Batery equipment:Total kebutuhan daya Listrik:Loading Dock:Jumlah Dock Leveler:Spesifikasi Dock Leveler:Spesifikasi Truck Loading Unloading:Jumlah Parking space / Loading Unloading area:Office:Jumlah Meja kerja:Pengadaan Furniture lainnya:Jumlah titik Stop Kontak:Jumlah titik Telpon:Jumlah titik Kabel Data:Toilet:Closet:Urinoir:Washtafel:Sanitair:Ruang Tunggu Supir:7Spesifikasi Bangunan:Lantai:Type Struktur Pondasi:Kapasitas daya dukung lantai /m2:Tingkat keratan lantai:Finishing lantai:Struktur Baja Bangunan:Struktur Baja Kolom:Struktur Baja Rafter:Struktur Baja lainnya:Spesifikasi Cat Struktur Baja:Dinding:Tinggi Dinding bata:Glass block (Y/N):Steel Louvered + Kassa nyamuk (Y/N):Spesifikasi Cat Dinding bata:Material Clading:Sky light (Y/N):Steel Louvered + Kassa nyamuk (Y/N):Atap:Material Atap:Insulation Atap (Y/N):Sky light (Y/N):Turbin Ventilator:Drainage System:8Kelengkapan Bangunan Gudang:Lampu Penerangan & instalasi Elektrikal:Cahaya minimum pada posisi lantai gudang = 150 Lux:Type Lampu yang digunakan:Jumlah Titik lampu:Jumlah Stop kontak 1 phase:Jumlah stop kontak 3 phase:Posisi Main Distribution Panel:Posisi Panel Data:Fire Protection System:Hydrant Box:Hydrant Pilar:Fire Srinkler System:Fire Alarm System:Audio System / Calling Truck:Pintu Baja:Ukuran Pintu:Jumlah Pintu:PVC Curtain:Rolling Door:Ukuran Rolling Door:Jumlah Rolling Door:Spesifikasi Rolling Door:PVC Curtain:

Sheet1TERM OF REFERENCE

Gudang GBJ :

ADESIGN

1Peruntukan Gudang:2Luas Gudang ( L x W ):3Racking System:4Kapasitas Gudang:5Control Suhu / Temperatur:6Organisasi Ruang ::Flow System:Spesifikasi Forklift / Transporter:Jumlah Forklift / Transporter:Area Rack:Type Rack:Charger room:Jumlah Batery:Type Batery equipment:Total kebutuhan daya Listrik:Loading Dock:Jumlah Dock Leveler:Spesifikasi Dock Leveler:Spesifikasi Truck Loading Unloading:Jumlah Parking space / Loading Unloading area:Office:Jumlah Meja kerja:Pengadaan Furniture lainnya:Jumlah titik Stop Kontak:Jumlah titik Telpon:Jumlah titik Kabel Data:Toilet:Closet:Urinoir:Washtafel:Sanitair:Ruang Tunggu Supir:7Spesifikasi Bangunan:Lantai:Type Struktur Pondasi:Kapasitas daya dukung lantai /m2:Tingkat keratan lantai:Finishing lantai:Struktur Baja Bangunan:Struktur Baja Kolom:Struktur Baja Rafter:Struktur Baja lainnya:Spesifikasi Cat Struktur Baja:Dinding:Tinggi Dinding bata:Glass block (Y/N):Steel Louvered + Kassa nyamuk (Y/N):Spesifikasi Cat Dinding bata:Material Clading:Sky light (Y/N):Steel Louvered + Kassa nyamuk (Y/N):Atap:Material Atap:Insulation Atap (Y/N):Sky light (Y/N):Turbin Ventilator:Drainage System:8Kelengkapan Bangunan Gudang:Lampu Penerangan & instalasi Elektrikal:Cahaya minimum pada posisi lantai gudang = 150 Lux:Type Lampu yang digunakan:Jumlah Titik lampu:Jumlah Stop kontak 1 phase:Jumlah stop kontak 3 phase:Posisi Main Distribution Panel:Posisi Panel Data:Fire Protection System:Hydrant Box:Hydrant Pilar:Fire Srinkler System:Fire Alarm System:Audio System / Calling Truck:Pintu Baja:Ukuran Pintu:Jumlah Pintu:PVC Curtain:Rolling Door:Ukuran Rolling Door:Jumlah Rolling Door:Spesifikasi Rolling Door:PVC Curtain:

Sheet2

No.Start DateFinish DateEquipmentUnitDaysHargaremarkUse

124-Jun-1524-Jun-15Fork lift 7 ton111,925,000FixPengaturan Container22-Aug-153-Aug-15Fork lift 7 ton122,975,000FixG&A 6ton & Schroeder 6 ton36-Sep-156-Sep-15Fork lift 7 ton112,750,000AsumsiChemtech 3 ton418-Sep-1521-Sep-15Fork lift 10 ton2427,800,000AsumsiChemtech 12 ton51-Oct-151-Oct-15Fork lift 7 ton112,750,000AsumsiVotator 3 ton

38,200,000

Sheet2 (2)

No.Start DateFinish DateEquipmentUnitDaysHargaremarkUse

124-Jun-1524-Jun-15Fork lift 7 ton111,925,000FixPengaturan Container22-Aug-153-Aug-15Fork lift 7 ton122,975,000FixG&A 6ton & Schroeder 6 ton36-Sep-156-Sep-15Fork lift 7 ton112,750,000AsumsiChemtech 3 ton418-Sep-1521-Sep-15Fork lift 10 ton2427,800,000AsumsiChemtech 12 ton51-Oct-151-Oct-15Fork lift 7 ton112,750,000AsumsiVotator 3 ton

38,200,000