BMAZ
Category-A 0 1654 1654 1650 4
Category-B 7 128 135 128 7
Category-C 262 15 277 15 262
Category-D 27 1 28 1 27
Category-E 0 0 0 0 0 --NIL--
BRAZ
Category-A 1 105 106 98 8
Category-B 0 1 1 1 0 --NIL--
Category-C 1 1 2 1 1
Date: 07-07-2013Time: 08:45 AM Respected Sir,
Please find the Efficiency of Helpline as below.
Opening Balance
Complaints Received
Total Complaints
Complaints Attended
Pending Complaints
a) S4-Gurappana Palya-No Power Supplyb) E7-Ramurthy nagar-No Power Supplyc) E3-Ulsoor-No Power Supplyd) E7- Kalkere-No Power Supply
a) N5 ,Malasandra:Apartment premisis transformer oil filtration and oil top upb) E7 Shanti lyt,Ramachandrappa garden,RM nagar FLUCTUATION IN VOLTAGEc) E7 Kalkere main road , Ramurthy nagar BENT POLEd) E7 Ramchandra Garden,R M Ngr,B'lore Low Volatgee)E7 Basavanapura: Wire Saggingf)E7,KR PURAM-FLUCTUATION IN VOLTAGEg)S9,BSK 2nd Stage-TREE BRANCH TOUCHING THE LINES
a) S6 J.P.Nagar 1st Phase Other-Overhead High Tension Wires passing above the parkb) N5 Peenya, Dasarahalli Other Shifting of RMU commissioned in front of sitec) E7 (254Complaints)d) C4, Ashwath Nagar: Other Than Above Categoriese) W1,Srinagar-OTHER THAN ABOVE CATEGORIESf)E4,Ramagondanahalli-BILLINGg)S6, Dollars colony-OTHER THAN ABOVE CATEGORIESh)C4,SANJAYNAGAR-Billingi) S6- Btm Layout 2nd stage-Billing.
a) W3,Complaint against AEE Basavannab) E7 Akshyanagar:Other-Power theftc) W4 Magadi road :Other Curruption From EE AN Murthyd) BMAZ -Other-Transfer of Meter Readerse) C7 Karlapura palya Illegal Power Connectionf) K1 kuvempu nagar ,kengeri hobli Other-illegal power supply taken from 2 pole g) C7 Sahakar Nagar -Illegal Activites Following Zones (Power theft)h) C5 Bhuvaneshwarinagar H.kempapur Other SP Vigilencei) W3 Cottenpete:Power theftj) W3 Cottenpete :Power theftk) E7 Pai l/o Allegation Against Staffl) S10 Kalena agrhara :Power theftm) C7 Yelahanka Old Town Allegation Against Staffn) S7 Basava nagar , HAL Power thefto) W1 BSK 1`st stage Power theftp) E9: Allegation Against Staffq) C8 Talacavery Layout, Allegation Against Staffr) C7 yelahanka new town Power thefts) W7 H.V HALLY KENGERI Allegation Against Stafft) S9 Bsk 3rd stage: Allegation Against Staffu) S10,Begur-Power Theftv)E9,kothanur-ALLEGATION AGAINST STAFFw)C5,RT NAGAR-ALLEGATION AGAINST STAFFx)E7,KR Puram,-ALLEGATION AGAINST STAFFy)E7,Kaggadasapura bangalore-POWER THEFTz)C5, Nagena halli-ALLEGATION AGAINST STAFFaa)C5, Kavalbyrasandra-ALLEGATION AGAINST STAFF
a) KU1-MAGADI-No Power Supplyb) RM1-RAMANAGAR-No Power Supplyc) KP2-KANAKAPURA-No Power Supplyd) DB1-Doddaballapura-No Power Supplye) MA1-RAMANAGAR-No Power Supply (3 Complaints)f) CP2-Channapatna-No Power Supply
a)DH1 Nagamangala,Hegganahalli post Devanahalli. (Requesting for Niranthara Jyothi for 3 houses, RR. No. - DVL597) Other Than Above Categories
BRAZ
Category-D 9 0 9 0 9
Category-E 0 1 1 1 0 --NIL--
CTAZ
Category-A 2 18 20 17 3
Category-B 5 1 6 2 4
Category-C 16 2 18 3 15
Category-D 11 0 11 0 11
Category-E 0 0 0 0 0 --NIL--
Total 341 1927 2268 1917 351
a) KL1 Kolar Other : Major works division KPTCL, Annual Increment issue.b) DH1 Vijayapura section office, Devanahalli -Time bond Increment not given to J.E(Elec.l)c) DH1 Avathi section office, Devanahalli -Time bond Increment not givend) KL1 vijayanagar Kolar Other regarding complaint against AE e) HK1 Hoskote Power theftf) KG1,Andrasond pet-Allegation Against Staffg) GB1 Pidichalahalli Village,Manchenahalli Hobli,Gowribidanur Taluk,Chikkaballapur Dist- Allegation Against Staffh) HK1 chikkagubbi hoskote Allegation Against Staffi)MA1,Magadi taluk-ALLEGATION AGAINST STAFF
a) KU1-HULLYDURGA-No Power Supplyb) MG1-Madugiri-No Power Supplyc) KU1-Kottipura-No Power Supply
a) CD1,Chitradurga:Pole Bentb)KR1,Kolala Hobli-FREQUENT POWER CUTSc)CD2,Baramasagara hobli-BENT POLEd)DV1,davangere taluk-BENT POLE
a) TU1 Other- requesting additional TCb) TU1 Turuvekere Other- Issue of new sanctioned Transformer & Re-conductoring work c) TU1 Other- Request for additional TCd) NT1 Kadaba hobli Other Required 63KV additional Transformere) TK4 Dayananad H r Alanaur @ Post Kasaba Hobli Tumkur Thaluk New Tc To Be Installed f) TU1 Abhalakatte honnitumkur post dhabbeghatta hobli Turuvekere over load of Transformerg) GU1 nadauvalapalya chikkonahalli gubbi taluk tumukar :Iinstallation of new tc h) NT1 Hoskere: Additional TCi) NT1 shivapura village agalawadi hobli gubbi taluk tumkur district Other Than Above Categoriesj) CD1 Chitradurga town, Other Than Above Categoriesk) TU1 Mughlur post and village:Other Than Above Categoriesl) TK1, Paradale Palya:Other Than Above Categoriesm) TU1, Ajjenahalli:Other Than Above Categoriesn)TK3,Urdigere-OTHER THAN ABOVE CATEGORIESo)TK3,kolala-OTHER THAN ABOVE CATEGORIES
a) TK1 Tumkur division Other- About Advance Incrementb) TP1 Tiptur Other-Power theftc) HD1 Hosadurga-Other-Power theft miss using the power from T.C. d) DV3 Davangere -Other- illegal powere) DV1 Arsikere Parapannahalli Taluk, Davangere Other Illegal Power Supply f) HL1 Chkkajajur village, Holalakere Taluk, Chitradurga Other-Installation of TCg) MG1 Maruth n kene, kodigenahalli sub division, madugiri division Power thefth) CD1 Chalkere taluk Allegation Against Staffi) CD2 kallalli thimappa badavane,raidurga rd molakalmur town TQ, chithradurga dist .Power theftj)HR1,Harihara-ALLEGATION AGAINST STAFFk)MK1,MOLAKALMUR TQ -ALLEGATION AGAINST STAFF
With Regards,On behalf of GM (CR)Ravi.K.AManager(Ele)9986873333BESCOM Helpline
Date:-07-07-2013
Email Id:[email protected]
Complaints Received:
Category
Category of Complaints
ZONESTotal
BMAZ BRAZ CTAZ
OB Total Disposed Pending OB Total Disposed Pending OB Total Disposed Pending OB Total Disposed Pending
A
SMS 0 36 36 36 0 0 10 10 10 0 0 0 0 0 0 0 46 46 46 0
Online 0 4 4 4 0 0 0 0 0 0 0 0 0 0 0 0 4 4 4 0
Helpline 0 1614 1614 1610 4 1 95 96 88 8 2 18 20 17 3 3 1727 1730 1715 15
Total 0 1654 1654 1650 4 1 105 106 98 8 2 18 20 17 3 3 1777 1780 1765 15
B
SMS 0 3 3 3 0 0 0 0 0 0 1 0 1 0 1 1 3 4 3 1
Online 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0
Helpline 7 124 131 124 7 0 1 1 1 0 4 1 5 2 3 11 126 137 127 10
Total 7 128 135 128 7 0 1 1 1 0 5 1 6 2 4 12 130 142 131 11
C
SMS 0 3 3 2 1 0 0 0 0 0 0 0 0 0 0 0 3 3 2 1
Online 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0
Helpline 262 11 273 12 261 1 1 2 1 1 16 2 18 3 15 279 14 293 16 277
Total 262 15 277 15 262 1 1 2 1 1 16 2 18 3 15 279 18 297 19 278
D
SMS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Online 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Helpline 27 1 28 1 27 9 0 9 0 9 11 0 11 0 11 47 1 48 1 47
Total 27 1 28 1 27 9 0 9 0 9 11 0 11 0 11 47 1 48 1 47
E Additional TC / Capex Works
SMS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Online 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Helpline 0 0 0 0 0 0 1 1 1 0 0 0 0 0 0 0 1 1 1 0
Total 0 0 0 0 0 0 1 1 1 0 0 0 0 0 0 0 1 1 1 0
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned by Government of Karnataka Undertaking)
Respected sir, Please find the Efficiency of Helpline dated 06-07-2013 (00:00hrs to 24:00hrs)
New Complaints on 06-07-2013
New Complaints on 06-07-2013
New Complaints on 06-07-2013
New Complaints on 06-07-2013
Any grievances regarding no power supply to the consumers.
Complaints where power supply is available but there are complaints regarding, Voltage fluctuations, Frequent power cuts, Tree branches touching the lines, Pole bend/broken, Sparkings, meter problems & Safety issues.
Billing issue & All other grievances which are not falling under Category (A) and (B).
Power theft & Allegation against staff
Grand Total 296 1798 2094 1794 300 11 108 119 101 18 34 21 55 22 33 341 1927 2268 1917 351
Note:- Category B & C Complaints before due dates are not included.
Major Power Supply Interruptions:
Scheduled Duration (in Hrs) Unscheduled Duration (in Hrs)
KPTCL - - 07:00
Total - - 1 07:00
BESCOM
- - a) 66/11KV NGEF Station F-3 Feeder Trip From 09:35hrs to 11:00hrs 01:25
- - 04:40
- - 01:55
- - 02:00
- - 03:05
Total 0 00:00 4 13:05
a) 66/11KV Soladevanahalli Station LC Taken for Errection of Tower and Re-Stringing of Conductore LILO Work From 10:00hrs to 17:00hrs)
b) 66/11KV VHF Station F-10 Feeder LT Cable Lying Work From 10:20hrs to 15:00hrs
c) 66/11KV ITI Station F-2 Feeder GOS Maintenance Work From 11:05hrs to 13:00hrs
d) 66/11KV HBR Station F-7 Feeder VL Kept open for HT Maintenance Work From 10:45hrs to 12:45hrs
e) 66/11KV Hebbal Station F-1,3 Feeder LC Taken for BBMP Work From 15:45hrs to 18:50hrs
Distribution Transformer Failure:
ZonesTotal
BMAZ BRAZ CHITRADURGA
- - - -Transformer details Location Reason for failure
- - -
Accidents: BMAZ BRAZ CHITRA DURGA TOTAL
- - -Departmental Non-Departmental Departmental Non-Departmental Departmental Non-Departmental Departmental Non-Departmental
Fatal Non- Fatal Fatal Non- Fatal Fatal Non- Fatal Fatal Fatal Fatal Non-Fatal Fatal Fatal
_ - - - - - - - - - - _ - - -
With regards GM (CR)
BESCOM HelplineOn behalf of GM(CR)
Ravi.K.A Manager(Ele)
9986873333BESCOM Helpline
Non-Fatal Non-Fatal Non-
FatalNon-Fatal
STATUS OF PENDING COMPLAINTS DATED 06-07-2013
Category-AConsumer Details Location Details Complaint Details
Zone Area Officer Responsible Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Malasha 8861625223 AKU10079 04-07-2013 10:00 CTAZ KU1 NO POWER 08-07-2013 4 Days
2 9535997447 AMA10108 05-07-2013 19:28 BRAZ KU1 08-07-2013 3 Days
3 Dayanadha 9611586547 AMG10022 05-07-2013 20:56 CTAZ MG1 NO POWER 07-07-2013 2 Days
4 Sathish 9845711212 A0S44980 06-07-2013 19:06 BMAZ S4 NO POWER 12-30-1899 14:54
5 Yamuna 8105540897 A0E711029 06-07-2013 19:12 BMAZ E7 NO POWER 12-30-1899 15:18
6 9844313201 A0E31537 06-07-2013 19:18 BMAZ E3 NO POWER 12-30-1899 15:42
7 Ramu 9741705609 A0E711041 06-07-2013 21:21 BMAZ E7 NO POWER 12-30-1899 13:09
8 Lingaraju 9449405653 ARM20034 06-07-2013 18:20 BRAZ RM2 12-30-1899 17:10
Sl No.
Name of Consumer
Consumer Contact No.
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub Division
Nature of complaint
Committed Time of
Attending
Committed Date of
Attending
No. of hours/minutes/days (Complaint
Received & Committed)
RBATTLEHALLI POST,HULLYDURGA
HOBILY,
AEEHANUMANTHAI
AH PN 9448279049
100 KVA IP Set Transformer failure, it will be attended on 08-07-2013.
ParamaShivya
#EXTENTION 73 PARAMASHIVYA MADVAL HOBLI
MAGADI TALUK(TC PROBLEM).V
OTHER EMERGENCY
CALLS
AEEY. PRABHAKAR
9448279078
100 KVA IP Set Transformer failure, it will be attended on 08-07-2013.
#Vodaphone Tower ,Beladha Madugu Village,Madugiri
(T)-,Madhugiri
AEEBASAVARAJAIAH B S 9448279053
25 KVA IP Set Transformer failure, it will be attended on 07-07-2013.
#56/1 panchamigaredn hotel new gurappana Plya Bg rd
Nps f/a Madivala
AEES R NAGARAJ
9449844664
Service Main UG Cable fault, it will be attended on 07-07-2013
#65,5th crs,Godenahalli,ramurthy
nagar,Kalkere mn rd,next to More super market,nps s/b,
rrno:7eeh48023
AEERAMESH
9449844677
Consumer has requested to attended on 07-07-2013.
Deepak Kumar
near ulsoor police station sv road #49&50 (E3 ulsoor nps
f/a)
AEESREENATH C K
9449844673
Service Main UG Cable fault, it will be attended on 07-07-2013
#230 4th crs kalkere mn rd bowe colony (nps s/b rr
no:dlg6285)
AEERAMESH
9449844677
Consumer has requested to attended on 07-07-2013.
GUNNER,KYLANCH HOBLI,RAMANAGAR
TALUK &DIST(NPS,TREE BRANCHES TOUCHING
LINE,).V
OTHER EMERGENCY
CALLS
AEELINGAPPA9448088763
Pole Broken, it will be attended on 07-07-2013.
9 Jayamudu 9902766103 AKP20048 06-07-2013 19:24 BRAZ KP2 NO POWER 12-30-1899 15:36
10 Manjunath 9845234811 ADB10154 06-07-2013 20:01 BRAZ DB1 NO POWER 12-30-1899 14:29
11 Jagadish 9632141877 AMA10110 06-07-2013 20:05 BRAZ MA1 NO POWER 12-30-1899 14:55
12 9731606463 AMA10111 06-07-2013 20:07 BRAZ MA1 NO POWER 12-30-1899 14:53
13 Prasad 9731605537 ANM10507 06-07-2013 20:10 BRAZ NM1 NO POWER 12-30-1899 14:50
14 8147332850 ACP20043 06-07-2013 20:31 BRAZ CP2 NO POWER 12-30-1899 14:29
15 Venkataiah 9972028962 AKU10083 06-07-2013 13:20 CTAZ KU1 NO POWER 12-30-1899 21:10
SMS STATUS OF PENDING COMPLAINTS DATED 06-07-2013
Category-A
Sl No.
Consumer Details Location Details Complaint Details
Name of Consumer Zone Sub Division Area Nature of complaint Officer Responsible Remarks
1 2 3 4 5 6 7 8 9 1 11 12 13
~~~ Nil ~~~
JAYAMUDU SON OF APPAJI GOWDA S
KOTHNUR KASAVA HOBLI KANAKAPURA
THALUK
AEEPURUSHOTHAMA R. 9448279087
AEE informed that it will be attended on 07-07-2013
krishnegowda building near bus stand hosa halli village Doddaballapura taluk (Nps
F/a)
AEEB.T.GANGA
RAJU 9448279080
Service Line Wire Demage, it will be attended on 07-07-2013
MATTIKERE,MAGADI TALUK, RAMANAGAR
DIST (NPS FROM 6:00pm.V)
AEEY. PRABHAKAR
9448279078
Tree Fallen on 11KV Lin, it will be attended on 07-07-2013
Ramachandraiah.
Mathikere Village,Madubaluhobli,Maga
di Taluk,Ramanagara Dist.
AEEY. PRABHAKAR
9448279078
Tree Fallen on 11KV Lin, it will be attended on 07-07-2013
mathiketre @ post, magadi taluk ramanagara distric
AEEB.N JITENDRA
9448279077
Tree Fallen on 11KV Lin, it will be attended on 07-07-2013
Chandrashekar
siddarameshwara badavane bevoor village and post
channapatna taluk ramanagara(Nps F/a)
AEEL.S.
LAKSHMEESH 9448279091
Line Trouble, it will be attended on 07-07-2013
kottipura,herur post,kasaba hobli,kunigal tq,tumkur
district.(nps f/a-niranthara jhyothi)
AEEHANUMANTHAI
AH PN 9448279049
Service Main UG Cable fault, it will be attended on 07-07-2013
Consumer Contact No.
DocketNo.
Date of Complaint Received
Time of Complaint Received
Committed Time of
Attending
Committed Date of
Attending
No. of hours/minutes/days
(Complaint Received & Committed)
STATUS OF PENDING COMPLAINTS DATED 06-07-2013Category-B
Consumer Details Location Details Complaint Details
Zone Area Remarks
1 Nagendra.c 9342139989 248792 06-05-2013 18:46 BMAZ N5 Malasandra Date not confirmred Yes
2 Vijay Baskar 9739167620 B0E70925 26-06-2013 11:35 BMAZ E7 Date not confirmred No
3 ravindran 8147162088 B0E70950 27-06-2013 17:10 BMAZ E7 BENT POLE Date not confirmred No
4 Raghavendra 9741488960 B0E70938 27-06-2013 9:24 BMAZ E7 Low Volatge 10-07-2013 13 Days No
5 9342504389 B0E70982 28-06-2013 11:37 BMAZ E7 WIRE SAGGING 08-07-2013 9 Days No
6 Sreekanta S 9845058657 BKR10001 01-07-2013 13:31 CTAZ KR1 13-07-2013 12 Days No
7 A Martin Francis 9845083181 B0E71087 01-07-2013 10:58 BMAZ E7 KR PURAM 7/7/2013 6 Days No
8 Devaraju 9481039277 BCD20003 01-07-2013 9:21 CTAZ CD2 BENT POLE 09-07-2013 8 Days No
9 0 9448827317 B0S90312 03-07-2013 14:32 BMAZ S9 Date not confirmred No
Sl No. Name of
ConsumerConsumer
Contact No.Docket
No.
Date of Complaint Received
Time of Complaint Received
Sub-Divisio
n
Nature of complaint
Officer Responsible
Committed date of
Attending
No. of days (Complaint Received & Committed)
Reminders to AEE(s)
AEE's Email Reply
Other- Apartment premisis
transformer oil filtration and oil
top up
AEE(Ele)Ashok
9449844655
AEE(Ele) informed that oil top up is done and pending for oil filtration. AEE replied through mail this compalint will be attending with in one week
Informed, AEE(Ele) to send e mail reply
for confirmation.
#41,2nd crs,Shanti lyt,Ramachandrappa garden,RM
nagar.)
FLUCTUATION IN VOLTAGE
AEE(Ele) Ramesh 9449844677
Awaiting for AEE(Ele) detailed report
Informed, AEE(Ele) to send e mail reply
for confirmation.
8th crs, Kalkere main road, near Bekry, Ramurthy nagar
AEE RAMESH
9449844677
Awaiting for AEE(Ele) detailed report
Informed, AEE(Ele) to send e mail reply
for confirmation.
#39,2nd Crs,Shanthi l/o,Ramchandra Garden,R M
Ngr,B'lore
AEE RAMESH
9449844677
AEE(Ele) informed that Complaint will attended on 10-07-2013
Informed, AEE(Ele) to send e mail reply
for confirmation.
R Bharatesh Hathwar
(E-Mail)No.3, Sri Durgambika Nilaya, 3rd cross, Sri Satya Sai Baba Layout Kodigehalli Main road, Basavanapura, KR Puram, Bengaluru - 560036 (Regarding
main power line sagging )
AEE(Ele) Ramesh 9449844677
AEE(Ele) informed that Complaint will attended on 08-07-2013
Informed, AEE(Ele) to send e mail reply
for confirmation.
No 52, Bheema Sagara Road, Kolala Kolala Hobli,korategere Taluk Tumkur District - E-Mail
Complaint regarding NO POWER SUPPLY From 45
Days in our Road
FREQUENT POWER CUTS
AEENAGARAJ H P
9448279058
AEE(Ele) informed that Complaint will attended Within 12-07-2013
Informed, AEE(Ele) to send e mail reply
for confirmation.
FLUCTUATION IN VOLTAGE
AEERAMESH
9449844677
AEE(Ele) informed that Complaint will attended on 07-07-2013
Informed, AEE(Ele) to send e mail reply
for confirmation.
Bastihalli,Helagodu grama panchayath,Baramasagara
hobli,Chitradurga taluk(Consumer wants
Replacement for New pole)
AEESHANKARAMU
RTHY 9448279038
AEE(Ele) informed that Complaint will attended Within 09-07-2013
Informed, AEE(Ele) to send e mail reply
for confirmation.
698,9TH MAIN,22RD CRS,BASK 2ND
STAGR,MANJUNATH MEDICAL ,NEAR PARK
TREE BRANCH TOUCHING THE
LINES
AEECHITTAIHA 9449844669
Awaiting for AEE(Ele) detailed report
Informed, AEE(Ele) to send e mail reply
for confirmation.
Consumer Details Location Details Complaint Details
Zone Area Remarks
Sl No. Name of
ConsumerConsumer
Contact No.Docket
No.
Date of Complaint Received
Time of Complaint Received
Sub-Divisio
n
Nature of complaint
Officer Responsible
Committed date of
Attending
No. of days (Complaint Received & Committed)
Reminders to AEE(s)
AEE's Email Reply
10 Thippeswamy 9448566639 BDV10028 03-07-2013 12:54 CTAZ DV1 BENT POLE Date not confirmred No
STATUS OF SMS PENDING COMPLAINTS DATED 06-07-2013Category-B
Consumer Details Location Details Complaint Details
Zone Area Remarks
1 Mohd. Zabiulla 8762391163 S4833 29-06-2013 13:51 CTAZ CD1 Date not confirmred No
#6th kallu, branch name-tharallu balu ngr, davangere taluk,
davangere district.( pole fallown on rd)along with pole bent, dvg.
AEEKUMARA SWAMY
9448279028
Awaiting for AEE(Ele) detailed report
Informed, AEE(Ele) to send e mail reply
for confirmation.
Sl No. Name of
ConsumerConsumer
Contact No.Docket
No.
Date of Complaint Received
Time of Complaint Received
Sub-Divisio
n
Nature of complaint
Officer Responsible
Committed date of
Attending
No. of days (Complaint Received & Committed)
Reminders to AEE(s)
AEE's Email Reply
Masjid E Aqsa, near National service station and By-
Pass.chitradurga
Safety:Pole Bent
AEE MEGARAJ-9448279037
Awaiting for AEE(Ele) detailed report
Informed to AEE (Ele) to send mail
reply for confirmation
STATUS OF PENDING COMPLAINTS DATED 06-07-2013
Category-C
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 C.R.Badrinath 117053 20-03-2013 10:42 BMAZ S6 J.P.Nagar 1St Phase Date not confirmred Awaiting for AEE(Ele) detailed report Yes
2 9972076987 124078 25-03-2013 10:45 CTAZ TU-1 Turuvekere Date not confirmred No
3 Ramaiya 9481274996 180880 01-04-2013 15:37 CTAZ TU-1 Turuvekere 18-07-2013 106 Days No
4 Thontaraj 8762795806 192345 05-04-13 10:14 CTAZ TU-1 Ajjenahalli Date not confirmred AEE Informed that work will taken after Election No
5 N Kemparaju 9343228754 230025 25-04-2013 14:38 BMAZ N5 Peenya, Dasarahalli Date not confirmred Yes
6 Lokesh 9845588031 250238 07-05-2013 16:00 CTAZ NT1 Kadaba Hobli Date not confirmred Awaiting for AEE(Ele) detailed report No
7 Kumar Swamy 9844591859 CTK10001 21-05-2013 14:23 CTAZ TK4 Date not confirmred Awaiting for AEE(Ele) detailed report No
8 Gangadarayya - CTU10001 21-05-2013 11:04 CTAZ TU1 Date not confirmred Awaiting for AEE(Ele) detailed report No
9 Basavraju ; CGU10002 23-05-2013 17:15 CTAZ GU1 Date not confirmred Awaiting for AEE(Ele) detailed report No
10 Paul 9900175596 C0E70200 31-05-2013 11:52 BMAZ E7 Bill Issue Date not confirmred Yes
11 9880411933 C0E70199 31-05-2013 11:11 BMAZ E7 Bill Issue Date not confirmred Yes
12 Aswin 9742412403 C0E70198 31-05-2013 11:08 BMAZ E7 Bill Issue Date not confirmred Yes
Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
26651041
9448450604
Other-Overhead High Tension Wires passing
above the park
AEE(Ele)Lokesh Babu94498 44660
Informed, AEE(Ele) to send e mail reply for confirmation.
Rama chandrayya
OtherIssue of new
additional Transformer & Re-conductoring work
AEE(Ele)Gavirangaiah9448279052
AEE Confirmed that work order will be passed after election. Awaiting for AEE(Ele) detailed report.
Informed, AEE(Ele) to send e mail reply and Resolving
date.
Other-Request for additional
Transformer
AEE(Ele)Gavirangiah9448279052
AEE Informed that work will be taken after Election (18-07-2013)
Informed, AEE(Ele) to send e mail reply for confirmation.
Other-Additional Transformer requered
AEE(Ele)Gavirangiah9448279052
Informed, AEE(Ele) to send e mail reply for confirmation.
Other Shifting of RMU commissioned
in front of site
AEE-'Ashok
94498 44655
AEE infmd that the RMU in front of consmr site as instald undr DAS project,it ll com under GM DAS.mail has been forwarded.
Informed, AEE(Ele) to send e mail reply for confirmation.
Other Required 63KV additional
Transformer
AEE (Elel)Thippe swamy9448279048
Informed, AEE(Ele) to send e mail reply for confirmation.
#Dayananad H R Alanaur @ Post Kasaba Hobli Tumkur Thaluk ( New
Tc To Be Installed )
Other New Tc To Be Installed
AEE (Elel)Jagadish
9448279046
Informed, AEE(Ele) to send e mail reply for confirmation.
Abhalakatte Honnitumkur Post Dhabbeghatta Hobli Turuvekere
Nature Of Complaint: Over Load Of Transformer
Other over load of Transformer
AEE GAVI RANGAIAH 9448279052
Informed, AEE(Ele) to send e mail reply for confirmation.
Nadauvalapalya Chikkonahalli Gubbi Taluk Tumukar (Installation Of The
New Tc )
Other installation of the new
tc
AEE SYED
MOHAMED 9448279047
Informed, AEE(Ele) to send e mail reply for confirmation.
Ramaiah Compound Behind Vani Hotel Udayanagar 2Nd Main Road Dooravaninagar Post [ Excess Bill,
Rrno:7Ed7441]
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Rama Mohan Reddy
#25, 5Th Crs, Rm Ngr, Dv Ngr, Blore. (Rm Ngr, Excess Bill. Rr. No -
Ms7Eeh44985)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
3, Oblic 13Crs Akshyanagar Tc Palya Main Road [ Bill Not Recevid]
[Rrno:Ms7Eeh36323,Ms7Eeh3230]
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
13 SHIVANNA 9844587121 CNT10005 01-06-2013 20:33 CTAZ NT1 Date not confirmred No
14 9620604220 C0E70215 01-06-2013 10:35 BMAZ E7 Bill Issue Date not confirmred Yes
15 Pavithran 8095174531 C0E70233 02-06-2013 10:11 BMAZ E7 Bill Issue Date not confirmred Yes
16 Shirose 9740820087 C0E70246 03-06-2013 11:04 BMAZ E7 BILLING Date not confirmred Yes
17 Nagendra 9845206059 C0E70268 04-06-2013 9:41 BMAZ E7 BILLING Date not confirmred Yes
18 9886403609 C0E70285 04-06-2013 12:08 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
19 XXX 9945816864 C0E70287 04-06-2013 13:16 BMAZ E7 BILLING Date not confirmred Yes
20 9731333207 C0E70294 04-06-2013 17:49 BMAZ E7 BILLING Date not confirmred Yes
21 Kiran 7204681499 C0E70295 04-06-2013 18:04 BMAZ E7 BILLING Date not confirmred Yes
Hoskere, Gubbi Taluk, Tumkur .Nittur Divison ( Additional
Tc Required )
Other Additional TC
Required
AEE (Elel)Thippe swamy9448279048
AEE informed that the work will be completed within 28-06-2013
Informed, AEE(Ele) to send e mail reply for confirmation.
Sarathbabu munuswamy
K Rpuram (Excess Bill Showing In Online Rr No Ms7Eeh47892)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#6Th Crs Devasandra K R Puram [ Excess Bill]
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Indra Ngr, Ngf Krishnana Palya, 2Nd Mn, 2Nd Crs,(Excess Bill)--Rr
No:7Elgc4035, Mr Cd:64, Amt:347
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#35 1St Mn 3Rd Crs Kr Palya Indiranagar Post(Excess Billing
Amt:2929)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Hemlatha Nevetia
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
78,1St Floor, Kalkere Main Rd, Ramamaurt Nagar, Exess Of Bill
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
BALASUBRAMANYAM
No 2080 Lakshmi Tent Road Rashimhaya Layout Rama Murthy
Nagar B-16 Rr No Tlg 25511 Receipt No 6993(Kavitha)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#65/2B Muneshwar Circle Ayyappa Ngr K R Puram Blore:36
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
22 Pankaj chouhan 9986813632 C0E70296 04-06-2013 19:45 BMAZ E7 BILLING Date not confirmred Yes
23 XXX 9900695555 C0E70298 04-06-2013 23:07 BMAZ E7 BILLING Date not confirmred Yes
24 Shivaprasad 8039130974 C0E70302 05-06-2013 9:15 BMAZ E7 BILLING Date not confirmred Yes
25 CHAITHANYA 9632218294 C0E70305 05-06-2013 11:41 BMAZ E7 BILLING Date not confirmred Yes
26 k raj 9900077115 C0E70323 05-06-2013 16:09 BMAZ E7 BILLING Date not confirmred Yes
27 V.Harsha 9845303333 C0E70328 05-06-2013 18:11 BMAZ E7 BILLING Date not confirmred Yes
28 SURESH 9986234499 C0E70331 05-06-2013 18:44 BMAZ E7 BILLING Date not confirmred Yes
29 SHREEKANTH 9880174733 C0E70332 05-06-2013 18:54 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
Rr No: Ms7Eeh41317 Mr64 Bill Is Not Correct, Calculation Mistake Is
Ther In Bill(Consumed Units Is Wrong) Rs 1182
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No 17/1, 20Th Crs , Akshay Nagar ,Ramurthy Nagar (Excess Bill ,
Rr No : 7Elg27177)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#162/2 Nagavarapalya Cv Raman Ngr Rr No Ms7Eeh45230 Amt 1454
(Excess Bill)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Flat #101 Vinayaka Ville, 14 Th Cross 1 St Main Pai L/O
(Rr#7Eeh19289 . Amt:5122/- Excess Amt)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No 49 Vivekanada Street Udaya Nagar
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
223, Ngef L/O, Sadananda Nagar Kasturi Nagar, Blore-38(Excess Bill,
Rr No.7Eeh8086)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Star Laptop And System Manubai Complex Old Madras Road Near K.R
Pur Puram Bangalore Excises Amount In Bill Rr No 7Ecl4605
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
30 0 9686663624 C0E70337 05-06-2013 23:17 BMAZ E7 BILLING Date not confirmred Yes
31 venkatamma 9379559845 C0E70356 06-06-2013 14:00 BMAZ E7 BILLING Date not confirmred Yes
32 0 7204732791 C0E70362 06-06-2013 16:46 BMAZ E7 BILLING Date not confirmred Yes
33 TYAGARAJ 9620203537 C0E70363 06-06-2013 16:51 BMAZ E7 BILLING Date not confirmred Yes
34 SUSHILAMMA 9886250596 C0E70367 06-06-2013 18:45 BMAZ E7 BILLING Date not confirmred Yes
35 Chandrashekar 9739038616 C0E70370 06-06-2013 19:29 BMAZ E7 BILLING Date not confirmred Yes
36 Chandrashekar 9901306111 C0E70376 06-06-2013 21:28 BMAZ E7 Date not confirmred Awaiting for AEE(Ele) detailed report Yes
37 Godwin 9591684822 C0E70422 07-06-2013 22:44 BMAZ E7 BILLING Date not confirmred Yes
38 9986046649 C0E70421 07-06-2013 22:00 BMAZ E7 BILLING Date not confirmred Yes
#20, 2Nd Main, 4Th Cross, Sp Naidu L/O, Vijinapura, Rm Nagar, Rr No:-7Eeh26157, Rec No:-311703058667, Current Bill Amount Is Rs:-372 ( It Includes Rs 169/- For Previous Bill As A Due)Current Bill Shown As
Due.
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
A.Narayan Pura Main Road , Duravai Ngr , Bang ..Rr No 4Ecl1876(Excess
In Bill)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#D1,Shakthi Highlines, Wing2,K.R.Puram,Online Bill Not
Generated Rr:Ms7Eeh54580
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No.66, 4Th Cross, Vijaya Bank Colony, Basavanpur, Kr Puram,
Blore. Billing (Vinutha)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No.203, Zion Block, 8Th Cross, Nagawara Palya Blore-93.
Billing(Vinutha)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#35, J.K Halli, Ananthpura, Ramamurthy Ngar(Arrears Added To Bill, Rr No-7Elg54954, Mr-46, Last Two Month Bill Amount-2498 Rs)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
# 71 1St Cross Kanakavinayaka Temple Road Shanthi L/O R M Nagar 11 Kv Wire Have To Be
Shifted
OTHER THAN ABOVE
CATEGORIES
AEE(Ele)Ramesh
9449844677
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#75/1, Suddaguntepalya, Cv Raman Nagara, Blore. (Benagana Halli,
Excess Bill, Account Id. 8985255000, Consumer Requesting For Meter
Check)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Anantha Ramakrishnan
#110 Sri Sappher Park Vijina Pura Dooravani Nagar Rr No-
Ms7Eeh29671
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
39 Manjunath 9480129952 C0E70415 07-06-2013 18:14 BMAZ E7 BILLING Date not confirmred Yes
40 subash 8025340238 C0E70414 07-06-2013 18:13 BMAZ E7 BILLING Date not confirmred Yes
41 VINOD 9845234642 C0E70413 07-06-2013 18:04 BMAZ E7 BILLING Date not confirmred Yes
42 Murali 8105710553 C0E70412 07-06-2013 17:59 BMAZ E7 BILLING Date not confirmred Yes
43 SINGH 8884033055 C0E70411 07-06-2013 17:07 BMAZ E7 BILLING Date not confirmred Yes
44 rajeev 9886491630 C0E70409 07-06-2013 16:33 BMAZ E7 BILLING Date not confirmred Yes
45 Jacob Cherian C0E70408 07-06-2013 16:02 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
46 SAI KRISHNA 9900152415 C0E70404 07-06-2013 14:38 BMAZ E7 BILLING Date not confirmred Yes
#300,3Rd Main, 3Rd C Cross,Ht Road, Anandpura, Tc Palya Main
Road, K.R. Puram(Bill Not Recieved Of May Month Rr No 7Elg23984 )
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Plat No 006,B Blk,Srimitraya Estate,Sanjeevappa L/O(Rr
No:Ms7Eeh48928 Billing Amt Is Too Much More)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
C3 Shakti High Line ,Wing 2 ,Kodige Halli Main Rd Banglore 36,Kr Puram
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
K.R.Puram, Railway Station Behind, Bangalore - If Power Off Meter Is
Running Contunously,Rr No. Dlg2854
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No.202, Geetanjali High Con, Nagawara Palya Main Road, Cv
Raman, Blore. Billing
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#127 1St Main 3E Cross Kasturi Nagar B
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No.11, 2Nd 1St Block, Akshaya Nagar, Ramamurthy Nagar, Blore-16.
Billing
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
47 abhijith 8970051124 C0E70403 07-06-2013 14:36 BMAZ E7 BILLING Date not confirmred Yes
48 kamal kumar 9916213030 C0E70401 07-06-2013 14:06 BMAZ E7 BILLING Date not confirmred Yes
49 Amarnath 9845696786 C0E70399 07-06-2013 14:01 BMAZ E7 BILLING Date not confirmred Yes
50 gurudath 8023474874 C0E70396 07-06-2013 13:39 BMAZ E7 BILLING Date not confirmred Yes
51 Shailesh Kumar 7259035634 C0E70395 07-06-2013 13:23 BMAZ E7 BILLING Date not confirmred Yes
52 SUNDAR RAO 9481810345 C0E70382 07-06-2013 9:42 BMAZ E7 BILLING Date not confirmred Yes
53 dhanunjaya 9632031191 CGU10004 07-06-2013 11:23 CTAZ NT1 Date not confirmred Awaiting for AEE(Ele) detailed report No
54 Sarath Kumar 9620211472 C0E70457 08-06-2013 23:33 BMAZ E7 BILLING Date not confirmred Yes
55 - 9845083181 C0E70456 08-06-2013 22:50 BMAZ E7 Kr Puram Date not confirmred Yes
T C Palya Lake Town Ship Flat#T07 3Rd Flr ,(Rr No:7Eeh25142 Excess
Bill,Requested To Send Meter Reader To His Home )
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
5Th Crss,Gangappa L/O,Nr Pai L/O ,Bng 16 Bill Not Issued Rr
No:17Eeh54300
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#23/A Kodigehalli Nr To Milk Factory Excess Billing Rr
No:7Eeh58525 Amt:1638 Dt:7/6
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No 459 , 1 St Flr,Old Madras Rd , Kr Puram Rr No:4Eh1244(Excess Bill)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
(E-Mail)Flat No # J002, Keerthi Harmony Apartments, Ramamurthy
Nagar (Excess Billing Rr.No:Ms7Eeh43756)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#11, Green Woods Layout, Jinke Thimana Halli Road, Varnasi Village,
Near Kannada School, Ramurthy Nagar, Bangalore. (Rr#7Eeh39240,
Excess Amt# 4240.00,). ( Exess Amt Of Rs.4240.00 Rcvd Than Normal)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Shivapura Village Agalawadi Hobli Gubbi Taluk Tumkur District
OTHER THAN ABOVE
CATEGORIES
AEE(Ele) Thippe swamy9448279048
Informed, AEE(Ele) to send e mail reply for confirmation.
2Nd Floor Sujatha Rediency 6Th Cross Nisgra L/O Basavanpura Main Road Kr Puram Blore 560036(Online
Payment Issue Rrno 7Eeh54785)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
BILLING-7EEH53893
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
56 VINAYAKA 9164992870 C0E70449 08-06-2013 18:10 BMAZ E7 Nagawara Palya Putanna Garden BILLING Date not confirmred Yes
57 meenu 9632894535 C0E70470 09-06-2013 17:22 BMAZ E7 BILLING Date not confirmred Yes
58 Preetham dutta 9739986665 C0E70465 09-06-2013 14:12 BMAZ E7 BILLING Date not confirmred Yes
59 Chendra Sekar 9008348869 C0E70464 09-06-2013 13:54 BMAZ E7 BILLING Date not confirmred Yes
60 NARENDRA 9686937600 C0E70463 09-06-2013 13:07 BMAZ E7 BILLING Date not confirmred Yes
61 9886683248 C0E70512 10-06-2013 17:26 BMAZ E7 BILLING Date not confirmred Yes
62 raj 42063155 C0E70510 10-06-2013 16:53 BMAZ E7 BILLING Date not confirmred Yes
63 7795012225 C0E70503 10-06-2013 13:40 BMAZ E7 BILLING Date not confirmred Yes
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#217 , 1 St Ab Cross , East Of Ngs , Kasturi Nagr Banglore , Rr Num -
7Eeh20345 , Amount - 740 , Wrong Calculation In The Bill
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Flat No.105, Geetanjali, Paradise, Rahat Bagh, Cv Raman Nagar Blore-93 Near Big Bazzar(Excess Bill, Rr
No.7Eeh16154)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
18, 21St Cross, 2Nd Block, Akshi Nagar, Rm Nagar-16( Bill Not
Printed Properly It Happened Every Month.)
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#224, 2 C Cross 2Nd A Main Kasthuri Nagar (7Eh10142 Mtr-61
Amt:4013/- Excess Amt
AEE(Ele)Ramesh
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
S JAGANNADHA
N
12, Udaya Ngr(Not Able To Check Wether The Amt Paid Is Received Ti
Bescom)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#343/63, Koudenahalli, Rm Nagara, High Bill Of 7Ecl4853 - 203 For 17 Units, 7Ecl4854 - 544 For 68 Units
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Diwaker Sudesh Bansal
K.R Puram, Bangalore - E-Mail Complaint Regarding Excess Bill - Rr
No. 7Eeh14059)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
64 9686579468 C0E70500 10-06-2013 13:22 BMAZ E7 BILLING Date not confirmred Yes
65 vanalaxmi 7204517070 C0E70498 10-06-2013 12:51 BMAZ E7 BILLING Date not confirmred Yes
66 Dinu 9945244476 C0E70497 10-06-2013 12:36 BMAZ E7 BILLING Date not confirmred Yes
67 SAVITRAMMA 9448834400 C0E70495 10-06-2013 12:03 BMAZ E7 BILLING Date not confirmred Yes
68 Lakshmi 9980137327 C0E70489 10-06-2013 10:59 BMAZ E7 BILLING Date not confirmred Yes
69 priyanka 9739297218 C0E70487 10-06-2013 10:50 BMAZ E7 BILLING Date not confirmred Yes
70 PREETA 9845436357 C0E70486 10-06-2013 10:42 BMAZ E7 BILLING Date not confirmred Yes
71 PANKAJ 8792313060 C0E70485 10-06-2013 10:22 BMAZ E7 BILLING Date not confirmred Yes
Keerthi Armony Horamavu Rammurthynagar Bangalore....Excess
Amount Rr-Ms7Eeh45379
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
32, Gowdan Halli,R M Nagar, ( Excess Bill Rr No-7Elg55115 )
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#50/1,Lake Vihar Part-2,F0-004,, Lake City Rd,T.C.Palya,
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#16,2Nd Cross, Marappa Layout , Byrasandra, C.V Raman Post.(Issue
Of Payment Of Bill)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#8, 8H Cross, Shanti L/O, B'Lore16(Rr No 7Eh20590, Ecs Is
Not Deducting From Previous Month)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#3011, Samhita Regioncy 1St Msin Pai L/O Rrno-7Eeh4212
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#73,Krishnakrupa 29Th Crs Balaji Layout Kaggeadasapura(Didnot Get
Bill From 1 Month)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#304,Padmavathi Nilaya,Sapthagiri Morsi Residency,No 26 Nagavara
Palya ,Cv Raman Nagar ,Bangalore(Increase In The
Bill Since 2 Months)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
72 9880772187 C0E70484 10-06-2013 10:22 BMAZ E7 BILLING Date not confirmred Yes
73 radha krishna 9845710790 C0E70483 10-06-2013 9:37 BMAZ E7 BILLING Date not confirmred Yes
74 Sudeep 9663913978 C0E70482 10-06-2013 9:22 BMAZ E7 BILLING Date not confirmred Yes
75 9035477558 C0E70479 10-06-2013 8:53 BMAZ E7 BILLING Date not confirmred Yes
76 9900070982 C0E70478 10-06-2013 8:36 BMAZ E7 BILLING Date not confirmred Yes
77 biju 9482534404 C0E70477 10-06-2013 8:01 BMAZ E7 BILLING Date not confirmred Yes
78 priya 9902137322 C0E70562 11-06-2013 22:41 BMAZ E7 BILLING Date not confirmred Yes
79 Vayagudan 9900613203 C0E70561 11-06-2013 22:17 BMAZ E7 BILLING Date not confirmred Yes
#203, Larden View Apt, 1C;C' Cross Kagadasapura B-93 (M No-1120104,
Ecess Amount-1218, Pls Chech Through This Excess Of Bill)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#113 2Nd C Cross East Of Ngef Kasthuri Nagar Meter Reader Not Came From Last 2 Months..Bill
Came High Rr No: 7Eeh14089,7Eeh12714,7Eeh12715
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#304,M.G Halli,R M Nagar,Bill Does Not Has Proper Details And Amount
Also (Rr No-7Eeh58124)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
202 Vevek Pardise 1A Blk Behind Birasandra Cv Raman
Nagara(Received 2Months Bill At A Time)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#15 5Thb Main Road Nril/O Ramamurthy Nagara(From 2Months
Dint Receive Bill )
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#B1, Nigam Residency 1St Cross Kagadasapura B-93( Meter
No:Lt2A1-N Excess Amount-2659)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
R Sunil Kumar , Kh No200\A , Nagaravarapalay Cv Raman Nagar
Banglore 93
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#33, 11Th Crs, Akshay Nagar R.M Nagar Blre Rrms7Eeh36703 Ba 2045
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
80 9886138101 C0E70557 11-06-2013 20:24 BMAZ E7 BILLING Date not confirmred Yes
81 9880962284 C0E70555 11-06-2013 19:24 BMAZ E7 BILLING Date not confirmred Yes
82 9740803634 C0E70554 11-06-2013 19:06 BMAZ E7 BILLING Date not confirmred Yes
83 Ramanathan 9036078799 C0E70553 11-06-2013 18:52 BMAZ E7 BILLING Date not confirmred Yes
84 M srinivas 9880253061 C0E70552 11-06-2013 18:38 BMAZ E7 BILLING Date not confirmred Yes
85 Praveen 9886596355 C0E70551 11-06-2013 17:34 BMAZ E7 BILLING Date not confirmred Yes
86 sibithomas 9900518175 C0E70547 11-06-2013 16:09 BMAZ E7 BILLING Date not confirmred Yes
87 Thyagasundar 9980524680 C0E70543 11-06-2013 13:55 BMAZ E7 BILLING Date not confirmred Yes
ashwini kumar supar
C401 5Mithra Medals 1St A Cross Kagadaspura Main Cv Ramanagar
Blore (Excessbill95 Ms7Eeh44260)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
C.G. SUBBA REDDY
4Th A Crs, Kaggadasapura(Total Reading 1016, Bill Amt Rs 8144,Old 4 Kw, New 5.2Kw- Consumer Wants
To Know Why It Happened)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
TULASI RAM MUNAGANTI
Flat No. G5, Sai Residency K R Puram To Hoodi Main Road
Ayappanagar, K R Puram Bangalore - 560036, Query ; Confirming That
The Amount Of Rs. 633.03 Is Credited To My Account (Bescom
Account )€ �
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#8 17Th Crs Akshya Nagar Block 2 Ramamurthy Ext T.C Palya Main
Road Behind Sbi Bank (Bill Was Not Generated 3/5/2013 &Got Bill On
3/6/2013 But Excess In Bill Amount Rs 2078 For Two Months )
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#38, Green Paradise L/O, 1St Mn 4Th Crs, Blore. E7-Kr Puram Excess Billing Rrno-7Elg53784 Amt-13431
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#21, Sri Venkateshwara Nilaya 6Th A Crs Kaggadasapura Mn Rd Cv
Raman Ngr (7Eeh18026)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
K2 Shakti Castle 1St A Cross Kaggadasapura Mn Rd Near August
Park C.V Raman Nagar
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#A-1,Pavitra Paradise,1St Flr,6Th F Crs,Kaggadasapur-93(Rr
No:7Eeh15093-Consumer Requesting For Name & Address Changing)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
88 suresh kumar 8197509007 C0E70541 11-06-2013 12:48 BMAZ E7 BILLING Date not confirmred Yes
89 patel 9538009911 C0E70540 11-06-2013 12:47 BMAZ E7 BILLING Date not confirmred Yes
90 ashok 9731449997 C0E70538 11-06-2013 11:58 BMAZ E7 BILLING Date not confirmred Yes
91 balraj 9900923733 C0E70535 11-06-2013 11:31 BMAZ E7 BILLING Date not confirmred Yes
92 sangamithra 8971867422 C0E70534 11-06-2013 11:28 BMAZ E7 BILLING Date not confirmred Yes
93 pankaj srivastav 9742139542 C0E70533 11-06-2013 11:28 BMAZ E7 BILLING Date not confirmred Yes
94 Rajesh 8892948085 C0E70531 11-06-2013 11:05 BMAZ E7 BILLING Date not confirmred Yes
95 Srinivas 8553026400 C0E70526 11-06-2013 10:13 BMAZ E7 BILLING Date not confirmred Yes
#203,1St B Main,Kasturinagar,Benganhalli(Got
Excess Amt)7Eeh8084
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No.65/96.Sir M B Nagar 2Nd Blk 2Nd Crs,Ramurthy Nagar,Rr
No.7Eh384,Excess Amount-993.Mr-6993,6524.Bill Not Received,
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
P Naeen Kumar No.56/2,1St Stage,T C Pallya,Kr Puram . Billing
Problem.Excess Amt -2031 Rr No-7Elg48869.
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Byappanahalli Police Qts,Near Metro Station,Old Madras Road(Rr
No:Ms7Eeh44195 Bil Amt Is More Than Usuall Amt ,So Consumer
Wants Clarification)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#343/1D,1St Flr ,2Nd Crs 5Th Main Ngef L/O Sadanandanagar
Benaganahalli
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#25, Rm Nagr, Blore, Rr No-7Elg24306, (Excess Bill), Another Ph
No-9538928001
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No-16,7Th A Crs,C.V. Raman Nagar (Kaggadaspura), Rrn-7Elg40489,Excess Bill
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No-Flt-117,1St D Crs,Ngef L/O,Kasthuri Nagar, ,Rrn-
7Eeh50018,7Eeh50019,Excess Bill
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
96 9900344664 C0E70525 11-06-2013 10:10 BMAZ E7 BILLING Date not confirmred Yes
97 srinivas murthy 9886997672 C0E70523 11-06-2013 9:43 BMAZ E7 BILLING Date not confirmred Yes
98 xxx 9880577577 C0E70522 11-06-2013 9:34 BMAZ E7 BILLING Date not confirmred Yes
99 nataraj 9448294676 C0E70518 11-06-2013 7:01 BMAZ E7 BILLING Date not confirmred Yes
100 Harish 8861636336 C0E70615 12-06-2013 21:58 BMAZ E7 BILLING Date not confirmred Yes
101 Shivaprasad 8904408270 C0E70614 12-06-2013 21:41 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
102 Stenthil 9740528307 C0E70611 12-06-2013 20:41 BMAZ E7 BILLING Date not confirmred Yes
103 Miss Jayapalan 9880793077 C0E70608 12-06-2013 17:00 BMAZ E7 BILLING Date not confirmred Yes
K. RAMA PRASAD
Kaggadapura, 4Th A Cross, Two Months Amt Total-2765- Excess Bill
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Ss Sales Corporation,10Th Cross,Akshaya Nagar,T.C Palya
Main Road,Blr-16(Rr No:Ms7Ecl9030 Current Amt:23043 Amt In Bill Large Amt Than Usuall Bill Amt By Consumer Intimated)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No 58, 1St Mn, Sadananda Nagar, Ngef L/A, Rr No.7Eeh1216, Receipt
No.799 (Excess Amt )
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#30, Kanakavinayak 3Rd Cross Rm Nagar(Rrn-7Elg38299)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#107/2, Sg Palya, Cv Raman Ngr, 7Th Crs Poojappa 3Rd Blk, Blore.
Rrno-Ms7Eeh51825 Amt-1310 Excess Bill E7-Benganahalli
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#161/4,8Th Main,4Th Crs,Rnr Colony,Venkateshwara L/O,Horamavu Main
Road,Ramamurthy Nagar,Excess Bill(Bill Issue)
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#32,Navinitha Nivasa, 3Rd Cross,Behind Joythi Gase,(Meter
Reading Wrong And Excess Bill-Rr-7Elg22742,Amount-12828/-)-
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
104 Eshwarai 9036798979 C0E70599 12-06-2013 14:30 BMAZ E7 BILLING Date not confirmred Yes
105 Sudha 9916355469 C0E70597 12-06-2013 14:19 BMAZ E7 BILLING Date not confirmred Yes
106 9886426326 9886426326 C0E70595 12-06-2013 14:09 BMAZ E7 BILLING Date not confirmred Yes
107 9394073317 C0E70587 12-06-2013 13:02 BMAZ E7 BILLING Date not confirmred Yes
108 Nagendra Ks 9241450014 C0E70584 12-06-2013 12:40 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
109 9964999625 C0E70583 12-06-2013 12:12 BMAZ E7 BILLING Date not confirmred Yes
110 Vanitha 8028474466 C0E70580 12-06-2013 11:01 BMAZ E7 BILLING Date not confirmred Yes
111 Uday 9886497094 C0E70579 12-06-2013 11:00 BMAZ E7 BILLING Date not confirmred Yes
#6Th Cross, Tc Palya,(Excess Bill-A/C No 0360265000-Rr-
Ms7Ecl5787,)
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#73,10Th Crss,Tc Palya,Kr Puram (Excess Bill Rr No: 4Ed21054) E7 Kr
Puram
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#Flat No:E51,Bars Regency,Kaggadasa Pura Main
Rd,Banglore 93 Cv Raman Nagar {{{ Excess Bill Rr No:7Eeh57
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No 329 Mapel A Prestige Gren Wood Nagawarapalya C.V Raman Nagar
Blr M.R Code:14000462,Bill Amt:3534(Addition Of Bill Amount
Is Not Correct. Total Amt Is Not Correct After Adding Manually)
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No.2 Ground Floor 16Th Crs Mv Nagar Rammurthy Nagar,(Account
No:860174500 Exess Bill:1200/-,)Last Month He Paid
650/- By Online
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Gnarayan Reddy #123,Margondanahalli,Rammurthy(B
illing Prb) Nagar
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#31, 3Rd Crs , Byrasandra Main Road , C.V Raman Nagar (Excess Bil
Rr-7Eeh35335, Amount-1676)
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
112 Salman 8050819273 C0E70578 12-06-2013 10:53 BMAZ E7 BILLING Date not confirmred Yes
113 Pandurangarao 9880305050 C0E70575 12-06-2013 10:22 BMAZ E7 BILLING Date not confirmred Yes
114 9448672626 C0E70572 12-06-2013 9:58 BMAZ E7 BILLING Date not confirmred Yes
115 Ramnath 9448672626 C0E70571 12-06-2013 9:52 BMAZ E7 BILLING Date not confirmred Yes
116 Ravindran 9986036357 C0E70566 12-06-2013 9:09 BMAZ E7 BILLING Date not confirmred Yes
117 Subbaraju 9341250330 C0E70565 12-06-2013 7:47 BMAZ E7 BILLING Date not confirmred Yes
118 Sayed(babu) 7899978619 CCD10006 13-6-213 1:11 CTAZ CD1 Date not confirmred Awaiting for AEE(Ele) detailed report No
119 Shekar 8025657221 C0E70618 13-06-2013 8:40 BMAZ E7 BILLING Date not confirmred Yes
120 Jay ram 9886769392 C0E70619 13-06-2013 8:51 BMAZ E7 BILLING Date not confirmred Yes
#149 Behind Tin Fat 1St Mn 1St Crs Udayanagar Bazar St[Bill Not
Issuing]
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
30. 8Th B A Crs, Sir Mv Nagar, R M Nagar ( Excess Bill, Rr No-7Ed51)
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Venkattesh Reddy
#40 , 8Th Cross , Rr Nagar , Rr Num -7Ekg18979 , Excess Amount-573
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Basama Jorge,Kalkera Main Road , Rr Nagar , 7Ecl4264 , Excess
Amount 800/,
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Rammurthynagar (Amtpaid-838)But No Power In Single House
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
# 115, 1St A Mn, Kasthuri Nagar, Eat Of Ngef, B-43 (Rr-7Eeh987,
Received Excess Bill)
AEE RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Jogimatti Rd, Near Maruthi Bar,Chitradurga Town,(Change Of
Tc (Tc Damage))
OTHER THAN ABOVE
CATEGORIES
AEE(Ele)K.P.BASAVARA
JU 944827937
Informed, AEE(Ele) to send e mail reply for confirmation.
Vijinapura , 1St Crs , Jubli School Road (Excess Bill Rr-Deh10980,
Amount-1553)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#203,6Th E Cross Kaggadaspura Blore (Rr No:7Eeh10195 ,Mr
Code:14000447 ,Excess Amount: 2154)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
121 Gowri shankar 8043432929 C0E70621 13-06-2013 10:14 BMAZ E7 BILLING Date not confirmred Yes
122 Rijith 8884519777 C0E70622 13-06-2013 10:35 BMAZ E7 BILLING Date not confirmred Yes
123 Manikumari 9535501766 C0E70623 13-06-2013 10:37 BMAZ E7 BILLING Date not confirmred Yes
124 9008794227 C0E70624 13-06-2013 10:50 BMAZ E7 BILLING Date not confirmred Yes
125 9901292683 C0E70626 13-06-2013 10:57 BMAZ E7 BILLING Date not confirmred Yes
126 jagdish 9986528343 C0E70627 13-06-2013 11:23 BMAZ E7 BILLING Date not confirmred Yes
127 9972455445 C0E70628 13-06-2013 11:31 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
128 jagaadeesh 9945878821 C0E70629 13-06-2013 11:51 BMAZ E7 BILLING Date not confirmred Yes
# 25, 2Nd Crs, Opp Gangamma Temple, Vb Layout Kr Puram. (Rr-7Eeh17015, Bill Not Printed Proper
And Consumer Demanding For Clarification)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#Sowperniga Apt North Blok 302 Hoodi K.R Puram B-48 (M.No-
14000412, Exces Amount-1646( Consumer Had Cleared Last Month Bill Bt They Added In This
Month Bill Pls Chk This)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No-17,Anandpura Tc Palya Main Road,Ramamurthy Nagar Rrn-
7Eeh50085,Excess Bill
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
NILAY SHREEVASTA
V
#19, 1St Floor, 5Th E Cross, Akshaya Nager, Ramamurthy
Nager,Banglore(Increase In Bill)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
8Th Main Ragavendra Nagar Rm Nagar Bangalore....Rr-
7Eeh50053...Bill Is Not Proper.....
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Flower Garden Street , Devasandra Main Road , K.R Puram (Excess Bill
Rr-7Eeh11527,Amount-1449)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Selvy Sundar Rajan
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#130/2,Seethappa Garden, T C Palya Mn Rd, R M Ngr, Blr-16, Billing
Issues (Excess)Rr-7Ecl2153
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
129 Malyadri 9448911746 C0E70630 13-06-2013 11:53 BMAZ E7 BILLING Date not confirmred Yes
130 Yaman 9620128010 C0E70631 13-06-2013 12:08 BMAZ E7 BILLING Date not confirmred Yes
131 Jaipal reddy 9986047933 C0E70632 13-06-2013 12:16 BMAZ E7 BILLING Date not confirmred Yes
132 9035280317 C0E70633 13-06-2013 12:17 BMAZ E7 BILLING Date not confirmred Yes
133 9731188600 C0E70634 13-06-2013 12:27 BMAZ E7 Kaggadaspura BILLING Date not confirmred Yes
134 Mune gowda 9738823779 C0E70635 13-06-2013 14:07 BMAZ E7 BILLING Date not confirmred Yes
135 D T Thyagarajan 9880284669 C0E70637 13-06-2013 14:41 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
136 Akilesh 9740931257 C0E70640 13-06-2013 15:41 BMAZ E7 BILLING Date not confirmred Yes
Maarthru Sri L/O, Maragondanahalli , Rr:7Eclp11912
(Excess Bill For One Motor 45,000 )
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
# 14 19Th B Cross Muneshwaranagar T C Palya R M Nagar Rr No :
7Eeh22345 Excess Of Bill Amt : 1240
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#26, 8Th Cross, Shanti L/O, Rammurthy Nagar, B'Lore16(Excess Bill Of May Month 2592Rs, Rr No
7Eeh48466)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#203,Charitha Residency, 6Th G Cross, Kagdaspura, Cv Raman Nagar Bill Issue Excess Bill Rr:7Eeh12254,
Amt:4,016/-,Units:556 Units,
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#41/42, 49/50, Battarahalli(Excess Bill Of May Month 1800Rs, Rr No
7Eeh10618)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
AEE(Ele)
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#201, Jyothi Residency, 1St Crs, Kaggadasa Pura Main, Cvraman
Nagar. (Rr No:7Eh1833)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
137 9342917274 C0E70643 13-06-2013 16:34 BMAZ E7 BILLING Date not confirmred Yes
138 srinivas 9663803006 C0E70645 13-06-2013 18:14 BMAZ E7 BILLING Date not confirmred Yes
139 Karthik 9620900014 C0E70648 13-06-2013 23:32 BMAZ E7 BILLING Date not confirmred Yes
140 777845000 9844049695 C0E70684 14-06-2013 22:42 BMAZ E7 BILLING Date not confirmred Yes
141 hemanth 8105852045 C0E70661 14-06-2013 10:31 BMAZ E7 BILLING Date not confirmred Yes
142 krishnan 9343651175 C0E70660 14-06-2013 10:27 BMAZ E7 BILLING Date not confirmred Yes
143 9663396155 C0E70665 14-06-2013 11:13 BMAZ E7 BILLING Date not confirmred Yes
144 SK shastri 9739999087 C0E70651 14-06-2013 8:34 BMAZ E7 BILLING Date not confirmred Yes
PRASHANTH SIGHN
# 10 Narayanappa Bld 10Th Cs Kagadasa Pura Mn Rd C V Raman
Ng
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Flat No 30, Megacity Anathapura Circle, Tc Palya Main
Road ,Bangalore. (Change Of Name)Rr No-7Eeh14256-Submit -
Documents To Aao
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
(E-Mail) No 4/1,6Th D Crs,Kaggadasapura, C.V Raman Ngr
(Online Payment Issue Rr No : Ms7Eeh31244)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Cv Ramanagar Kaggadasapura
Bangalore
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Ashok Residency, Near Ganesh Temple Sg Palya Cv Raman Nagar
(Rrno-7Eeh16892 Mr-53
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
E-11 Var Regency Kaggadaspura Main Road Cv Raman Nagar,
Rrno:7Eeh53,Amt:4364 Excess 2Mnths Bill ,Normal 1Mnth Bill
1400
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Nagaraj Bilamkar
Cv Ramanagar Kaggadasapura
Bangalore
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#F12,107,Pearl Cornet,, S G Palya,C V Raman Ngr,B-93 (Excess Bill Rr-
Ms7Eeh30403, Amount-1313)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
145 SRIDAR 8971088222 C0E70667 14-06-2013 11:40 BMAZ E7 BILLING Date not confirmred Yes
146 Suresh 9535560061 C0E70669 14-06-2013 12:19 BMAZ E7 BILLING Date not confirmred Yes
147 V GOPAL 9986422353 C0E70664 14-06-2013 11:05 BMAZ E7 BILLING Date not confirmred Yes
148 Varijan Nair 9731989177 C0E70678 14-06-2013 17:24 BMAZ E7 Rrno:7Eeh2152,153 BILLING Date not confirmred Yes
149 Vatches pathi 9886357000 C0E70676 14-06-2013 16:15 BMAZ E7 BILLING Date not confirmred Yes
150 Ramanna 9880444509 CDH10004 15-6-213 18:39 BRAZ DH1 Date not confirmred Awaiting for AEE(Ele) detailed report No
151 Vidyasagar 9886166063 C0E40124 15-06-2013 15:56 BMAZ E7 BILLING Date not confirmred Yes
152 Karthikeyan 8971388388 C0E70727 15-06-2013 23:00 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
153 Mehul 9663366690 C0E70720 15-06-2013 19:26 BMAZ E7 BILLING Date not confirmred Yes
1St Floor Renukappa Building 2Nd Cross Gangotri L/O ,Extension K
Rpuram Rrno:Deh10290
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#10/1, 4Th , 1St Main , Bhuvaneshwari Nagar (Excell Bill
Rr-7Eeh2270, Amount-1142)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Excess Bill, 7Ecl6868), Byrasandra, Gopalappa Building, 4Th Cross,
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
C,Blk , Kirti Raivera 6Th G Cross Kaggadasoura C V Raman ;High Bill
Issue
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Nagamangala,Hegganahalli Post Devanahalli. (Requesting For
Niranthara Jyothi For 3 Houses, Rr. No. - Dvl597)
OTHER THAN ABOVE
CATEGORIES
AEEDAKYA NAYAK
944827982
Informed, AEE(Ele) to send e mail reply for confirmation.
No.36,Ameeri Shrma Building,Hoodi Village,Shanthinagara,Beside
Srinivasreddi,Gopalreddi Building,Wrong Bill,Rr No.7Elg23967,Amount 433,Duedate:12:06:13.
Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#302,Mathrushree Silver Home,4Th Crs,Abhayareddy L/O,Kagdas Pura,Rr-7Eeh7427, Excess Bill
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
154 Jayashree 9880789898 C0E70713 15-06-2013 15:33 BMAZ E7 BILLING Date not confirmred Yes
155 8050530442 C0E70707 15-06-2013 13:28 BMAZ E7 BILLING Date not confirmred Yes
156 Raghvendra 9886897784 C0E70705 15-06-2013 12:58 BMAZ E7 BILLING Date not confirmred Yes
157 Jorge 9980062862 C0E70703 15-06-2013 12:41 BMAZ E7 BILLING Date not confirmred Yes
158 Kv Girija 9900701625 C0E70702 15-06-2013 12:22 BMAZ E7 BILLING Date not confirmred Yes
159 Bhamini 9845206125 C0E70697 15-06-2013 11:24 BMAZ E7 BILLING Date not confirmred Yes
160 Ram 9731308844 C0E70696 15-06-2013 11:16 BMAZ E7 BILLING Date not confirmred Yes
161 Shivadas 9980097727 C0E70694 15-06-2013 10:55 BMAZ E7 BILLING Date not confirmred Yes
#208 Vv Grand Regency Appatrment Abbahy Reddy Layout 6Th Cross Kagdaspura Main Road (Billing)
Different Bill Amnt Manual(Printed) Bill:2262/- Online Amnt:2276/- Rr
No:Ms7Eeh31918 Different Pincode On Bill
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#11, Balaji Nilayam, 12Th Cross, R.M Nagar, Excell Bill Rr:Dlg34130,
Amt:1,716/-
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#30,2Nd Main,6Th Cross,P And T L/O,Tc Palya Main Road Bglr-
560036.(Bills Not Received,Please Send Bills)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#30 2Nd Cross Abbay Reddy L/O Kaggadasapura C.V Ramanagar{Bill
Not Recived}Rr:-7Eeh8906
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
No-14,1St Crs,2Nd Main,New Manjunath L/O,Shanthi
L/O,Ramurthy Nagar,B-16Rrn-Tow 7Eeh33662 & 7Eeh33660,Excess Bill
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Bill Excess, Rr No: 7Eeh43260)). #4, Ganga Street, Ajith L/O,
Basavanapura Main Rd, Virgo Nagar
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
# 06, Parvathamma Residency, Devasandra Mn Rd, Kr Puram, B-36.(Rr-Ms7Eeh37528, Bill Not Provided
To Bank, Hence Amount Not Deducted)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#451,Jalavayu Tower,Near Ngf L/O,Sadananda Nagar-Rr
No:Ms7Eeh30511-1012/-Rs Excess Bill(Old Docket No:A0E76195)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
162 Radha 8197315920 C0E70692 15-06-2013 10:29 BMAZ E7 BILLING Date not confirmred Yes
163 Summith 9008032185 C0E70691 15-06-2013 10:25 BMAZ E7 BILLING Date not confirmred Yes
164 Tara 9844411982 C0E70690 15-06-2013 10:13 BMAZ E7 BILLING Date not confirmred Yes
165 Deva 802524825 C0E70685 15-06-2013 9:37 BMAZ E7 BILLING Date not confirmred Yes
166 Umashankar 9008718136 CTU10009 15-06-2013 21:49 CTAZ TU1 10-07-2013 Days No
167 Umesh 9141654419 CTK10011 16-06-2013 20:33 CTAZ TK1 Date not confirmred Awaiting for AEE(Ele) detailed report No
168 A KRISHNAN 9449082109 C0E70741 16-06-2013 20:25 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
169 Sridevi 8197921234 C0E70740 16-06-2013 15:57 BMAZ E7 BILLING Date not confirmred Yes
170 Birendar 9611838288 C0E70736 16-06-2013 14:08 BMAZ E7 BILLING Date not confirmred Yes
#39/A Happy Garden Kalkere Mn Ramurthynagar [Rr.No 14192][1551/Re Mr.No 7Elg14192]
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Excess Of Billing,Rr-Ms7Eeh28430,#743,Jalavyu
Towers,Sadanand Nagar
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#203,Narayana Reddy L/O,8Th Crs, Ramurthy Nagar Clore-17(Excess
Bill, Rr No.Deh5858)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#66, 1St Floor , 9Th Cross, Opposite May Floor Appartment, Nagavar
Palya Main Road, Cv Ram Nager ,Banglore( Increase In Bill)Rr
No:7Ecl3639
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Mughlur Post And Village,Maysandra Hobli,Turvekare
Taluk,Tumkur
OTHER THAN ABOVE
CATEGORIES
AEEGAVI
RANGAIAH 9448279052
AEE(Ele) informed that the complaint will be attended within 10-07-2013
Informed, AEE(Ele) to send e mail reply for confirmation.
Umeah S/0 Rudrappa Paradale Palya, Huliyar Hobli, Chikkanayakanahalli
Taluk, Tumkur Dist. To Shift Tc
OTHER THAN ABOVE
CATEGORIES
AEEPRASHANTH
KUDLUGI 9448279045
Informed, AEE(Ele) to send e mail reply for confirmation.
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
R.R No 7Elg28164, Address: No-34, Sri Durga Parameshwari Nilaya, 1St Floor, Kuvempu Road Udaya Nagarn Excess Bill Received On April And
May
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
29Th Cross Kaggadasa Pura Near Narayan School {Bill Not
Updated}Rr:-7Ed9954
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
171 gajapathi 9448831757 C0E70731 16-06-2013 11:25 BMAZ E7 BILLING Date not confirmred Yes
172 Muniyya 9916495114 C0C40127 16-06-2013 10:50 BMAZ C4 Date not confirmred Awaiting for AEE(Ele) detailed report No
173 VIJAY 9886845000 C0E70730 16-06-2013 10:46 BMAZ E7 BILLING Date not confirmred Yes
174 Nair D 9036850820 C0E70729 16-06-2013 9:44 BMAZ E7 BILLING Date not confirmred Yes
175 poornima 9980492660 C0E70743 17-06-2013 9:55 BMAZ E7 BILLING Date not confirmred Yes
176 8762072466 C0E70744 17-06-2013 9:57 BMAZ E7 BILLING Date not confirmred Yes
177 Somasundharam 9448206256 C0E70746 17-06-2013 10:05 BMAZ E7 BILLING Date not confirmred Yes
178 Sapna 9686185136 C0E70749 17-06-2013 10:35 BMAZ E7 BILLING Date not confirmred Yes
#1753 Vijinapura Opp Gayatri High School[Deh10216 Excess Amt 2279/Re 500/Re Amt Excess ]
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#239, 1St Mn, 2Nd Crs, Keb L/O, Ashwath Ngr, Sanjay Ngr, Hebbal , ((Services Main Ug Cable Failed,
Building More Than 8 Months Due To Reason Not Known. Bescom People Came Override Service
Temporarly, Till Date No Body From Bescom Taken An Any Action
OTHER THAN ABOVE
CATEGORIES
AEESURESH M 9449844644
Informed, AEE(Ele) to send e mail reply for confirmation.
Bill Excess, Rr No: Ms7Eeh 32785))G6, Fort House Aprtmt, 21St Course, Sir Mv Nagar, Tc Palya Main
Rd, Ramurthy Nagar
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Liily Block,#208, Kaggadas Pura, 5Th Cross(Excess Bill Of May
Month Of Rs 2573, Rr No Ms7Eeh36349)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
flat no:101, harsha praid, a block, 6th cross, kagdaspura(rr no:7eeh21386,
excess bill)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
m puttaraju, #10&11, buttar haali, ( exess bill)(RR#7elg53655, normal
amt rcvd 600.00, exess amt 800.00rs, Mr code not available)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#2 4th cross Abhaya reddy layout kaggadaspura (Excess bill)
Benaganahalli-1 rr no:7EEH24264 amnt recevied:3001/-
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#29th cross, balaji l/o, C.V. Raman Nagar Kaggadaspura, (rr
no.MS7EEH41348, Excess bill)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
179 thontaraju 9845932071 CTU10010 17-06-2013 11:01 CTAZ TU1 22-07-2013 35 Days Awaiting for AEE(Ele) detailed report No
180 Hitesh 8884100765 C0E70751 17-06-2013 11:04 BMAZ E7 BILLING Date not confirmred Yes
181 Prashant Sahoo 9916394900 C0E70752 17-06-2013 11:07 BMAZ E7 Kr Puram Date not confirmred Yes
182 Aniruddha Nath 9632277227 C0E70754 17-06-2013 11:23 BMAZ E7 BILLING Date not confirmred Yes
183 Mani 8025423542 C0E70760 17-06-2013 12:26 BMAZ E7 BILLING Date not confirmred Yes
184 j h nath 9620319991 C0E70759 17-06-2013 12:26 BMAZ E7 BILLING Date not confirmred Yes
185 mala 8197154061 C0E70763 17-06-2013 13:17 BMAZ E7 BILLING Date not confirmred Yes
ajjenahalli kolagatta kaval turuvekere taluk tumkur district (Turuvekere
additional tc )
OTHER THAN ABOVE
CATEGORIES
AEEGAVI
RANGAIAH 9448279052
Informed, AEE(Ele) to send e mail reply for confirmation.
Flat 201,Santhosh &SR residency ,10th E crss,Sanjeevappa lyt,Nagawara palya m rd,C.V raman
nagar[Excess bill complaint RR #MS7EEH35153 ]
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
OTHER THAN ABOVE
CATEGORIES
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
C-O SHILPITHA CRYSTAL, 6TH CRS BALAJI L/O
K.G.PURA(Benaganahalli,Change of pin and Arrears shown online)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
no 8,3rd D cross,kasthurinagar ,wellfare
association.(RRNo:7ECL5619,MR 82854,previous MR 79239 ,Excess
bill:28454) but total amount is 17,661(totalling is made wrong)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
no 426, 427, 1st mn, 14th b cs, fly l/o, bang-16. loc code: 1120104094162
RR no: 7eeh19224223
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#143, 1st floor, uday nagar, Benagana Halli -1, b'lore.(Excess bill).
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
186 MANIKANTAN 9900570129 C0E70765 17-06-2013 13:40 BMAZ E7 BILLING Date not confirmred Yes
187 I. Srinivas 9449832654 C0E70766 17-06-2013 15:03 BMAZ E7 Kr Puram Date not confirmred Awaiting for AEE(Ele) detailed report Yes
188 Amit Kumar Das 9740117378 C0E70767 17-06-2013 15:17 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
189 YOGESH 9916732075 C0E70768 17-06-2013 15:39 BMAZ E7 BILLING Date not confirmred Yes
190 P.Natarajan 9449009091 C0E70770 17-06-2013 16:09 BMAZ E7 BILLING Date not confirmred Yes
191 Ramesh 9341248984 C0E70771 17-06-2013 16:12 BMAZ E7 BILLING Date not confirmred Yes
192 Rajashri 9845563476 C0E70774 17-06-2013 17:42 BMAZ E7 BILLING Date not confirmred Yes
193 Vishnu 9686100220 C0E70773 17-06-2013 17:42 BMAZ E7 BILLING Date not confirmred Yes
#23 SRI KRUPA 10TH CRS NAGAPPA REDDY L.O AKASH
NAGAR A.NARAYAN PURA NPS F.A RR NO:7EEH38231 EXCESS
BILL
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
OTHER THAN ABOVE
CATEGORIES
AEERAMESH
9449844677
Informed, AEE(Ele) to send e mail reply for confirmation.
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#102, CHANNAMMA RESIDENCY 25TH CRS,
Kaggadaspura(DIFFERENT BILLING FORMAT PROBLEM)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
(E-Mail)Akshayanagar 2nd block 21st cross,Ramamurhynagar.
(Regarding Bill RR.No7BBH60671)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#25,26 akash nagar pwd mn rd b narayan pura ( bill did not came)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#204,V V Grand reginency,Kagadapura main road,5th
crs,Abayreddy lyt,Bang RR NO:MS7EEH31914
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#02, 7th cross, 2nd block, Akash Nagar, Ramamurthy Nagar, blore
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
194 9591974914 C0E70776 17-06-2013 17:51 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
195 SUDAKAR 9900533331 C0E70781 17-06-2013 19:38 BMAZ E7 BILLING Date not confirmred Yes
196 9742647799 C0E70783 17-06-2013 20:24 BMAZ E7 BILLING Date not confirmred Yes
197 shiva kumar 7259546386 C0E70784 17-06-2013 20:52 BMAZ E7 BILLING Date not confirmred Yes
198 Nidhin 9742544180 C0E70785 17-06-2013 21:32 BMAZ E7 Kr Puram BILLING Date not confirmred Yes
199 Skariah M S 9535245925 C0E70786 17-06-2013 21:44 BMAZ E7 BILLING Date not confirmred Yes
200 Karthik 9535112334 C0E70790 18-06-2013 8:44 BMAZ E7 BILLING Date not confirmred Yes
201 swaminathan 9591844378 C0E70791 18-06-2013 10:03 BMAZ E7 BILLING Date not confirmred Yes
Manikandan Narayanan
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
#167, 5TH CRS 1ST MN RISCO SHANTHINIKETHEN L/O VIRGO
NAGAR BLORE 49 (MR NO MRC37A, AMT 340, EXCESS AMT
680, 1188)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
Narayanswamy. R
(E-Mail) K.R Puram. (Irregular Meter Reading RR.No:7EEH20534)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
plot no:87 8th crs, sir MV ngr, RM ngr blore---(excess bill)-rr
no:7ed5756 , mr cd:42
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
(Facebook Complaint)D-3, R.K Resedency, 1st Main, Abbaiah Reddy L/O, Kaggadasapura. (Excess Billing-
RR.No:7EEH9985)
AEERAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply after
confirmation with the consumer as per GM(CR)
instruction.
F-1, Sheety classal Kaggasapura (Bengana halli O&M) Bill No. is not
there on the bill
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
k swaminathan,narayan pura MEG layout(MTR Code-5123055000)ecs -amt has to be paid-1618)Bill recept
NUM-not given (RR num-7eeh5193&7eeh32696)b
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
202 Suresh 9945226624 C0E70794 18-06-2013 11:55 BMAZ E7 BILLING Date not confirmred Yes
203 9980811666 C0E70796 18-06-2013 12:27 BMAZ E7 Date not confirmred Awaiting for AEE(Ele) detailed report Yes
204 9845384841 C0E70797 18-06-2013 12:40 BMAZ E7 - BILLING Date not confirmred Yes
205 Ravi Sunkoji 9740877001 C0E70798 18-06-2013 13:33 BMAZ E7 Date not confirmred Awaiting for AEE(Ele) detailed report Yes
206 G Kulandairaj 9590227627 C0E70800 18-06-2013 14:00 BMAZ E7 - BILLING Date not confirmred Yes
207 Anil Mankad 9845015530 C0E70801 18-06-2013 14:25 BMAZ E7 - BILLING Date not confirmred Yes
208 I.SRINIVAS 9449832654 C0E70802 18-06-2013 14:41 BMAZ E7 BILLING Date not confirmred Yes
209 Vikash Nag 8123835746 C0E70803 18-06-2013 15:10 BMAZ E7 BILLING Date not confirmred Yes
#402, sai sadan, 1st mn rd, 1st crs, pai l/o, Kr Puram, Blore. RRno-7eeh3868
amt-4930 Excess bill
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Vigneshwaran Gopalan
Vigneshwaran residing at 2C 303 East of NGEF Layout, Vijinapura
BDA Layout, Kasturinagar Extn(Permanent Connection)
OTHER THAN ABOVE
CATEGORIES
AEE(Ele)RAMESH
9449844677
Informed, AEE(Ele) to send e mail reply for confirmation.
Wikesh Kumar, Ranjeeta Verma
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sri Sai Palace, 8th Cross, 3rd Main, Hoysala Nagar, Ramamurthy Nagar,
Bangalore -16(Apartment Transformer issue)
OTHER THAN ABOVE
CATEGORIES
AEE(Ele)RAMESH
9449844677
Informed, AEE(Ele) to send e mail reply for confirmation.
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
(E-Mail)No.29A, ShreeVaishnavi, 9th Cross, Kalpataru Layout,
b/h:Christ the King School - via High Tension Wire Lane
Ramamurthynagar. ( Billing Issue and Solar Water Heter Concession)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
(E-Mail) K.R Puram. (Payment Not Up Dated RR.No:DEH15537)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
210 Krishnappa 9880163416 CTK30007 18-06-2013 15:13 CTAZ TK3 Date not confirmred Awaiting for AEE(Ele) detailed report No
211 Sunitha 9845104280 C0E70804 18-06-2013 15:15 BMAZ E7 BILLING Date not confirmred Yes
212 Minash 8105964210 C0E70805 18-06-2013 15:39 BMAZ E7 BILLING Date not confirmred Yes
213 P Mohan 9845048521 C0E70807 18-06-2013 17:13 BMAZ E7 - BILLING Date not confirmred Yes
214 mohan 7829921428 C0E70808 18-06-2013 17:16 BMAZ E7 BILLING Date not confirmred Yes
215 durga mohan 9663911555 C0E70809 18-06-2013 17:40 BMAZ E7 BILLING Date not confirmred Yes
216 *** 9741182940 C0E70812 18-06-2013 19:16 BMAZ E7 BILLING Date not confirmred Yes
217 Saurav Ghosh 9591581000 C0E70813 18-06-2013 20:04 BMAZ E7 - BILLING Date not confirmred Yes
Ajjibyranahalli, Bytha post, Urdigere, Hobli, Tumkur Taluk,(New TC not
fixed)
OTHER THAN ABOVE
CATEGORIES
AEE CHIKKANNA.C
9448088760
Informed, AEE(Ele) to send e mail reply for confirmation.
NO-29/30,Park viwe clasic Apts,9th cross,Kaggadasapura (Excess Bill)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#105.ARISTOCRAT, EAST OF NGEF.BL-38. Account ID:
6544945000, Amunt:1800/- (Excess Bill).
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#795 , jalavayu towers , kr puram bang (excess of bill) amt : 3460
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
no 78/6,2nd crs,ashirvad layt,varanasi( bill not recvd ,rrno -7eeh48437,7eeh60275,7eeh60276)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#flat no-22,trinity enclave,[n]Big Bazar,old madras rd,RR NO-DEH12081[Wrong reading]
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
218 Vishna murthi 9945528040 C0E70815 18-06-2013 20:16 BMAZ E7 BILLING Date not confirmred Yes
219 musthafa 8025349797 C0E70817 18-06-2013 21:39 BMAZ E7 BILLING Date not confirmred Yes
220 Gopal 9686687822 C0E70818 19-06-2013 7:07 BMAZ E7 BILLING Date not confirmred Yes
221 K.S. RAVI 9243222138 C0E70820 19-06-2013 8:01 BMAZ E7 BILLING Date not confirmred Yes
222 sumith mahajan 9980070051 C0E70821 19-06-2013 8:38 BMAZ E7 BILLING Date not confirmred Yes
223 Smith 9739498303 C0E70822 19-06-2013 8:58 BMAZ E7 BILLING Date not confirmred Yes
224 Radhika 9663299337 C0E70823 19-06-2013 9:42 BMAZ E7 BILLING Date not confirmred Yes
225 Hariharan 9739950640 C0E70824 19-06-2013 10:18 BMAZ E7 BILLING Date not confirmred Yes
2nd mn, gokula extension, k.r pura (Excess bill RR NO:7ELG15631)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
NO 46 29 TH CROSS BALAJILAYOUT
KAGGADASPURA RR NO:7ECL7830 MR:65 EXCESS AMOUNT;2538 EXCESS BILL
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
# 39, 1st floor, Garden street, RMnagar, RR no:7EEH15328.
(Excess bill)
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
d605 gopallan celestial green apartments old madras road
nagawarpalya ( E7 benaganahalli-1 rr no:ms7eeh14387 excess billing
3500/-)
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#106,Ewneal, 2 nd crs, Naggapppa ready lyt, A narayana pura, Bnagl-16 ( They got bill three month once and
excesses of billing)
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
B-309, anusha grunch, 29th crs, balaji l/o, kaggadasapura, blore. RRno-7eeh21691 amt-2530 Excess bill
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#C0 block 1 samhipa castle Rahadh bagh CV Raman nagar (Excess Bill
issue) rr no:ms7eeh37326 amnt recevied:1699/- CV RamanNagar
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
226 Nagaraju BM 9901433268 C0E70825 19-06-2013 10:37 BMAZ E7 BILLING Date not confirmred Yes
227 Liji 8553023688 C0E70826 19-06-2013 10:44 BMAZ E7 BILLING Date not confirmred Yes
228 Vasudev Murthy 9945537905 C0W10053 19-06-2013 11:23 BMAZ W1 Date not confirmred Awaiting for AEE(Ele) detailed report No
229 8095623611 C0E70828 19-06-2013 11:53 BMAZ E7 BILLING Date not confirmred Yes
230 BIJU 9731539286 C0E40147 19-06-2013 13:01 BMAZ E4 BILLING Date not confirmred Awaiting for AEE(Ele) detailed report No
231 vineeth tripati 9731600334 C0E70832 19-06-2013 13:15 BMAZ E7 BILLING Date not confirmred Yes
232 Adarsh Thampan 9845755127 C0E70833 19-06-2013 13:40 BMAZ E7 - BILLING Date not confirmred Yes
233 9980023986 C0E70834 19-06-2013 14:19 BMAZ E7 BILLING Date not confirmred Yes
#164/2, Maruthi nilaya , 1 st crs, Byrasandra, Benaganahalli,
Bng( Excess of bill rr no -7EH50005)
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#22,26th c crs,balaji l/o,cv raman ngr,blore -93,
(RR:7eeh15493,7eeh15492,7eeh15491 )excess bill
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#804 5th main 1st floor Ragavendra Block Srinagara (Requetion for
shifting of transformer which will be installed now ) Nagendra Block
OTHER THAN ABOVE
CATEGORIES
AEE Anandappa 9449844681
Informed, AEE(Ele) to send e mail reply for confirmation.
bibhuranjan panda
R Krishna Murthy, #21 A Hemavati street Ramamurthy nagar, Bangalore-(paid amount is showing arrears on
current bill)
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#21a, water wood apt,ramagondana halli,white field main,near sigma tech
park RR-MS4EEH26318,EXCESS BILL
AEE Narayan Swamy
9449844674
Informed, AEE(Ele) to send e mail reply for confirmation.
neeraja krishna #322,JALAVAYU TOWERS, ngefl/0 indra ngr,B-38
(rr:MS7EEH30684 mr:64 trn id:6764110) excess bill
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#102, SR enclave Sadananda nagar NGEF L/o RR-MS7EEH397 present
amount-1453, Excess Bill
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
234 satyavathi 9632218585 C0E70836 19-06-2013 16:04 BMAZ E7 BILLING Date not confirmred Yes
235 Swaminathan 8039993201 C0E70837 19-06-2013 16:55 BMAZ E7 BILLING Date not confirmred Yes
236 Balasundram 9342581173 C0E70839 19-06-2013 18:45 BMAZ E7 BILLING Date not confirmred Yes
237 rakesh 9845148797 C0E70840 19-06-2013 19:53 BMAZ E7 BILLING Date not confirmred Yes
238 Rajshekar 9980933800 C0E70841 19-06-2013 20:04 BMAZ E7 BILLING Date not confirmred Yes
239 zaheer R N 9742383174 C0E70842 19-06-2013 20:56 BMAZ E7 BILLING Date not confirmred Yes
240 Deepa I Bedsur 9008027006 C0E70868 20-06-2013 22:03 BMAZ E7 - BILLING Date not confirmred Yes
241 Venu gopal 9731533655 C0E70867 20-06-2013 20:31 BMAZ E7 BILLING Date not confirmred Yes
rr no :7eeh22218 , no :14 /1, kagadas pura mn rd , cv ramnagar(excess in
bill)
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Srwja srwvaru apartments,#304/a-blk,6th maibn,6th
crs,Kagadaspura,Near by Top town super market,Bang RR NO:
MS7EEH24782
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#24,vally villa,6th crs,kt muni reddy l/o,akash nagar post,b'lore(bill not
issued )RR NO:7ELG60584,
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
g10 , shiva giri enclve , timmareddy l/o , kagadas pura, c v ram nagar ,rr
no:7eeh7700(excess in bill)
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#20,1st flr,2nd main,1st b crs,Nagappa reddy
lyt,Kaggadaspura,Bang EXCESS BILLING RR NO: 7EEH5426
AEE Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
NO 24,RAMESH BUILDING,RISHITH PARADISE,12TH A
CROSS,KAGGADASAPURA CV RAMAN NAGAR BNG 93(FROM 2
MONTHS THEY ARE NOT GETTING BILL)
Ramesh 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#250/a kaggadaspura 1st mn, c.v raman nagar blre rre71120104 Bill
not issued
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
242 kiran kumar 9886782487 C0E70865 20-06-2013 19:52 BMAZ E7 BILLING Date not confirmred Yes
243 VENKATESH 9886258639 C0E70862 20-06-2013 17:35 BMAZ E7 BILLING Date not confirmred Yes
244 Ramesh 9611207855 C0E70861 20-06-2013 16:44 BMAZ E7 BILLING Date not confirmred Yes
245 chandrashekar 9880020711 C0E70858 20-06-2013 15:24 BMAZ E7 BILLING Date not confirmred Yes
246 JAGADISH K 9845642154 C0E70856 20-06-2013 14:35 BMAZ E7 - BILLING Date not confirmred Yes
247 sajith 9741955775 C0E70855 20-06-2013 14:19 BMAZ E7 BILLING Date not confirmred Yes
248 Pankaj 9742139542 C0E70854 20-06-2013 13:25 BMAZ E7 BILLING Date not confirmred Yes
249 radha prasad 9902029747 C0E70853 20-06-2013 12:47 BMAZ E7 BILLING Date not confirmred Yes
#6, chandini building 4th main, 5th crs, nagappa reddy l/o,
A.narayanapura (excess bill)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
7EH17799 NO B2 SAMHITHA RESENT APARTMENT
KAGGADASAPURA MAIN ROAD OPP SBI BANK CV RAMAN
NAGAR [BILLING PROBLEM THEY ALREADY REGISTERED COMPLAINT BUT NOT SOLVE
THEIRY BILL PROBLEM]
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#3,opp uk food point,pwd mn rd,akash ngr,b.narayanapura-Bill is nt
issued from past 2 months,RR no:7eeh22315,Mr:54
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
no 205 /a . 13 crs , kagadas pura rr no:deh15816(excess in bill)bill
no:1327673
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#207, C blk, harshapride apt, 6th G crs, kaggadasapura (excess billing
RS, 8979)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
# 25 Kalkere mn rd MV Nagar Rm Nagar 6th crs rd RRNO 7elg24306
[Excess bill]
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#145/2,komarla solid tyre company,old madras road,k.r puram
rr-e7ht253, bill not recived from 2mnths
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
250 nagaratna 9535704442 C0E70852 20-06-2013 12:36 BMAZ E7 BILLING Date not confirmred Yes
251 narayanareddy 9986486685 C0E70851 20-06-2013 12:22 BMAZ E7 BILLING Date not confirmred Yes
252 satish 8884142333 C0E70850 20-06-2013 12:15 BMAZ E7 BILLING Date not confirmred Yes
253 A Chevin 8025950541 C0E70849 20-06-2013 11:16 BMAZ E7 BILLING Date not confirmred Yes
254 VADVANI 9845014072 C0E70848 20-06-2013 11:07 BMAZ E7 BILLING Date not confirmred Yes
255 shobha 9945022001 C0E70846 20-06-2013 9:29 BMAZ E7 BILLING Date not confirmred Yes
256 Naranppa 9738277687 C0E70845 20-06-2013 8:47 BMAZ E7 BILLING Date not confirmred Yes
257 sachin 9980893676 C0E70844 20-06-2013 8:15 BMAZ E7 BILLING Date not confirmred Yes
#13/16, lakshmi nilaya, indira gandi street, 1st main, udaynagar poost,(Benagana Halli -1rr no:7ecl6558)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#183, sri guru krupa 8TH CRS,, sen't ans college road , R.M NGR, [ bill is
not generated last 2 months]
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
GF3,cjn temple view, 80/82 iti l/o,b.narayanapuya, kr puram (Excess
bill RR no:ms7eeh32572 AMT:2203)E7 Benaganahalli
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
App. 541 Jalvayu Towers NGEF Layout B-38, (R.R No ms7eeh30475 (Benagana Halli -1 E7 O&M Excess
of Bill)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
# 6, 2ND MAIN, 2ND CROSS, ABBAYYA RADDY L/O, KAGADASPURA, RR NO
7EEH36309,10,11 [EX BILL] O&M BENAGANAHALLI
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#125 opp LVS excellence apt K.Vl/o Anadapura T.C palaya mn K.Rpuram
[RR.NO 7ELG58724 MR.no not assured excess amt 1568/re due to
power flutuation ]
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#165 venkateshappa building behind mecca masid Annaiayppa layout
masidh road KR Puram (Excess bill Arears included) rr no:7ELG41183
Amnt recevied:945/-
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#24 Flat no d1 shafi paradise 1st crs abbaiyya reddy l/o kaggadasapura mn rd (RR No: MS7EEH31872 Wrong Meter reading )O&M Benaganahalli
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
258 Jarz 9980062862 C0E70843 20-06-2013 8:13 BMAZ E7 BILLING Date not confirmred Yes
259 GM(QS) 9845788331 C0S60175 20-06-2013 0:05 BMAZ S6 Date not confirmred Awaiting for AEE(Ele) detailed report No
260 gopi 9945684989 C0C40144 21-06-2013 17:48 BMAZ C4 BILLING
261 Atul 9901684460 C0E70890 21-06-2013 22:03 BMAZ E7 BILLING Date not confirmred Yes
262 9880593576 C0E70889 21-06-2013 21:08 BMAZ E7 BILLING Date not confirmred Yes
263 Rajesh 9741197650 C0E70888 21-06-2013 20:58 BMAZ E7 BILLING Date not confirmred Yes
264 prshanth 9164199225 C0E70884 21-06-2013 17:22 BMAZ E7 BILLING Date not confirmred Yes
265 9742847217 C0E70883 21-06-2013 16:43 BMAZ E7 BILLING Date not confirmred Yes
no 30, 2nd cs, kaggarasapura, c.v raman nagar. RR NO: 7weh53858 mr
no: 55 (no bill received from past 2months)
AEE(Ele)RAMESH
9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Maple Bear school and Kalyani Magnum in Dollars colony, JP Nagar
(3rd main)
OTHER THAN ABOVE
CATEGORIES
AEE(Ele) Manjunath
9449844660
Informed, AEE(Ele) to send e mail reply for confirmation.
NO 56/3, GEDDALAHALLI VILLAGE, SANJAYNAGAR,
BANGALORE 560106 location code not updated in bill
AEE SURESH M 9449844644
inform to aao to send main regarding the billing issue There is some connectivity problem for s/d to resolve this billing issue c/b [email protected]
Informed, AEE(Ele) to send e mail reply for confirmation.
(Facebook Complaint)Kaggadasapura (Excess Billing) RR.7EEH11377
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
RAMACHANDRAN
D-402, PEDESTRIAL GREENS NO:6, OLD MADRAS RD. CV
RAMAN NAGAR ----RR NO:MS7EEH14370--BILLS ARE
NOT UPDATED IN ONLINE PAYUMENT WEBSITE
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
SaiMithra Medos, CH1, Kagdaspura main road,C.V Raman Nagar, (New
RR NO:MS7eeh44265)( Old RR No:ws7eeh43206)( Excess Bill)
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
shop no 2 ,shama reddy building morgan halli main rd,tc palya(mr
code:47a,bill paid:129rs)
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
rama subramanya
f0 shakthi cattle,1st a crs,kagdaspur b'lor 93(mr 14000459,bill paid
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
266 ****** 9731456156 C0E70882 21-06-2013 15:29 BMAZ E7 BILLING Date not confirmred Yes
267 Ravi mehrotra 9449655838 C0E70881 21-06-2013 14:55 BMAZ E7 BILLING Date not confirmred Yes
268 Paresh 8880539949 C0E70879 21-06-2013 14:51 BMAZ E7 BILLING Date not confirmred Yes
269 Ramakrishnan 9342936708 C0E70878 21-06-2013 14:25 BMAZ E7 BILLING Date not confirmred Yes
270 JAYANTHI 9448479505 C0E70877 21-06-2013 13:04 BMAZ E7 BILLING Date not confirmred Yes
271 Chinni raj 9844183838 C0E70876 21-06-2013 12:17 BMAZ E7 BILLING Date not confirmred Yes
272 8880490629 C0E70875 21-06-2013 11:35 BMAZ E7 BILLING Date not confirmred Yes
273 9342562154 C0E70873 21-06-2013 10:09 BMAZ E7 BILLING Date not confirmred Yes
#01, 17th cross gayithri l/o basavapura main rd (7ecl10590, amt/-
5702 (excess amt)
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
(E-Mail) #50, 4th Cross, Abbaiah Reddy L/O, Kaggadasapura. (Online Payment Issue RR:MS7EEH57325)
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
112, 4th cross, varanasi 10th cross, TC Palya Road, RM Nagar( RR
No:7eeh49530) Excess Bill Amount)
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#203,4th crs,Abhaireddy l/o,RR:7EEH7413,amt:1613,Excess
bill
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
no 9 nishanth nivas 7th crss abbaya reddy layout kaggasadpura (sct
college near by)-Excess Bill
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
# 322 [n] Lake city Town Ship Appart 2nd crs T.C Palya [Exx Bill}
KR Puram RRNO:4eeh10889
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#40, nandanum nilaya 2nd floor, 4th b cross, kushal l/o, kagdaspura ( E7
benaganhalli rrno-7EEH48489 excess bill)
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Umesh(K.gopalan)
no 62,2nd main,evergreen street,udayanagar post doorvani nagar post,Bangalore 16 (RRNo:DEH7438
MR 54)Excess of bill:1454)
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
274 S.k modaliyaR 9900555336 C0E70871 21-06-2013 9:28 BMAZ E7 BILLING Date not confirmred Yes
275 Yogesh 9632423858 C0E70870 21-06-2013 9:12 BMAZ E7 BILLING Date not confirmred Yes
276 Rajesh V 9538920634 C0E70869 21-06-2013 3:39 BMAZ E7 BILLING Date not confirmred Yes
277 manjunath 9902259022 CTK30008 21-06-2013 11:52 CTAZ TK3 24-07-2013 33 Days
#298m, 1st crs, behind dasappa l/o, 3rd blk, ramurthy nagar, bangalore-
16 (exess bill amt normal amt 100.00, error exess amt #400.00. Mtr rdng
code:-(mr43)
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#405,jyoti clique,4th b cross,abbaya reddy l/o,kaggadapura,c.v raman
halli(Excess Bill RR no:ms7eeh33441,Benaganahalli)
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
"Munikrishan Neralu",No 84,1st Main Road,Bajaj Extn,Devsandra,KR Puram ,Bangalore - 36(April month
bill amount is not yet credited Rs.1583)RR no's:DP3579,RR
Number - 4EEH15871
AEE RAMESH 9449844677
As per EE (Ele) email reply, Due to switchover from zygox to infosys software, many bills couldn't be generated in the month of May.June almost all the bills served. the consumer complaints will be settled in the next billing cycle. Hence it is requested that there complaints may kindly be arranged to be closed early.
Informed, AEE(Ele) to send e mail reply for confirmation.
#dodda sagere kortagere tq section kolala tumkur dist(requesting for new
tc,nps frm last 12 days)
OTHER THAN ABOVE
CATEGORIES
AEE CHIKKANNA.C
9448088760
AEE(Ele) informed that the complaint will be attended within 24-07-2013
Informed, AEE(Ele) to send e mail reply for confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Date of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
SMS STATUS OF PENDING COMPLAINTS DATED 06-07-2013
Category-C
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Remarks Reminders to AEE(s)
1 Imthiyaz 919886888255 S4127 20-06-2013 13:55 BMAZ S6 08-07-2013 17 Days No
Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Officer Responsible
Committed Time of
Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
#29 2nd floor 1st D Main, 1st cross, NS Palya, Btm L/o 2nd stage
Bill Issue:Excess Billing and
meter to be tested. RR No. 6SH63030, Bill
amt: Rs.1100/-, Billing date: 8th june
AEE Lokesh babu. M94498 44660
Consumer is not Receiving call, complaint Reminded to Shobha- 26531877 informed that she will once again check with consumer on Monday 6/7, 17.27 Suresh shetty
Informed to AEE (Ele) to send mail reply for
confirmation
STATUS OF PENDING COMPLAINTS DATED 06-07-2013
Category-D
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Officer Responsible Remarks Reminders to
Shekar - 182822 02-04-2013 10:21 BMAZ W3 Magadi road sub division SP Vigilance Date Not confirmed Yes
2 Prakashbabu - 200987 08-04-2013 22:23 BRAZ - Date Not confirmed No
3 Shobha 8971790393 203162 10-04-2013 6:46 BMAZ E-7 Ramamurthynagar Other-power theft SP Vigilence Date Not confirmed Yes
4 Prathibha M Gowda - 203674 10-04-2013 13:11 CTAZ TK1 Tumkur division GM Admin Date Not confirmed No
5 Parthasarathy - 205806 11-04-2013 20:22 BMAZ W4 Magadi road SP Vigenlence Date Not confirmed Yes
6 9535738600 207143 12-04-2013 19:34 BRAZ DH1 Date Not confirmed No
7 N Shivaji Rao 8970997595 207157 12-04-2013 19:46 BRAZ DH1 Avathi section office,devanahalli Date Not confirmed No
8 Mr exposer - EMC1701 17-04-2013 15:59 BMAZ - E-Mail Date Not confirmed No
9 Siddaling Kumar 9964567289 216926 18-04-2013 21:10 CTAZ TP1 Tiptur SP Vigilance, Date Not confirmed No
10 Dahrata 7259352264 217631 19-04-2013 11:10 CTAZ HD1 Hosadurga SP Vigilance, Date Not confirmed No
11 MB Thippesh 9900862325 217746 19-04-2013 13:01 CTAZ DV3 Davangere RSD Other- illegal power SP Vigilance, Date Not confirmed No
12 Ashwatha - 231071 26-04-2013 10:51 BMAZ C7 Karlapura palya SP Vigilence Date Not confirmed Yes
13 Gopal.M - 231637 26-04-2013 15:09 BRAZ KL1 SE & EE Date Not confirmed Yes
14 P. Kottra Basappa 9844277148 232956 27-04-2013 13:02 CTAZ DV1 SP Vigilence Date Not confirmed Yes
Name of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Committed Date of Attending
No. of days (Complaint Received & Committed) Email Reply
Other-Complaint against AEE Basavanna
SP Vigilance replied the mail on 30-04-2013 due to the Karnataka Assembly Election on 05/05/2013, the Vigilance Officers & Staff are in Election Duties, as soon as they are relived from Election Duty, the pending petitions, complaints received by us will be attended & enquiry report will be submitted.
Mail send to SP vigiliance. Waiting for confirmation.
major works division, KPTCL, kolar
Other-Annual Increment issue
GM (Admin) and SE (BRC)
This complaint has been forwarded to GM Admin, SE (BRC) through mail, awaiting for reply
Mail send to GM (Admin) and SE (BRC). Waiting for
confirmation.
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Other-"About Advance Increment"
Email has been forwarded to GM Administration,waiting for GM reply.
Mail send to GM (Admin) and SE (BRC). Waiting for
confirmation.
Other Complaint against EE A.N
Murthy (Vidhana Soudha Division)
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Ramanujam. J.E(Elec.L)
Vijayapura section office,devanahalli
Other-Time bond Increment not given
to J.E(Elec.l)
SE (BRC),and GM (Admin)
This complaint has been forwarded to GM Admin, SE (BRC) through mail, awaiting for reply
Mail send to GM (Admin) and SE (BRC). Waiting for
confirmation.
Other-Time bond Increment not given
SE (BRC),and GM (Admin)
This complaint has been forwarded to GM Admin, SE (BRC) through mail, awaiting for reply
Mail send to GM (Admin) and SE (BRC). Waiting for
confirmation.
Other-Transfer of Meter Readers
SP Vigilance,and GM (Admin)
E-Mail has been forwarded to SP Vigilance, & GM Administration, awaiting for reply.
Informed, Sp Vigilance & GM Admin to send e mail
reply for confirmation.
Other-Power Theft,actual using Residencial power
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Other-power Theft miss using the power
from T.C
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Illegal Power Connection
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Sri Balanagamma Electronics vijayanagar Kolar.
Other regarding complaint against
AE MunirajE-Mail has been forwarded to SE & EE, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
Arsikere Parapannahalli Taluk, Davangere
Other Illegal Power Supply
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Officer Responsible Remarks Reminders toName of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Committed Date of Attending
No. of days (Complaint Received & Committed) Email Reply
15 _ 9008154417 234876 29-04-2013 8:00 BMAZ K1 SP Vigilence Date Not confirmed Yes
16 Shanmugappa - 235759 29-04-2013 17:55 CTAZ HL1 Date Not confirmed Awaiting for AEE(Ele) detailed report No
17 Maruthi 9448933748 249734 07-05-2013 11:50 CTAZ MG1 Power Theft SP Vigilence Date Not confirmed No
18 Ashok 7259782123 250226 07-05-2013 15:48 BMAZ C7 SP Vigilence Date Not confirmed No
19 - 9449325355 254341 09-05-2013 18:37 BMAZ C5 Other SP Vigilence Date Not confirmed Yes
20 Siva kumar - D0W30001 14-05-2013 19:39 BMAZ W3 POWER THEFT SP Vigilence Date Not confirmed Yes
21 Sivakumar - D0W30002 14-05-2013 19:44 BMAZ W3 POWER THEFT SP Vigilence Date Not confirmed Yes
22 XXX 9663293456 0E70001 14-05-2013 23:01 BMAZ E7 SE & EE Date Not confirmed No
23 Dr.Sriram shetty 9448180680 DS100001 16-5-2013 14:29 BMAZ S10 POWER THEFT SP Vigilence Date Not confirmed Yes
24 Panchakshri 9945749896 CD10001 16-5-2013 13:41 CTAZ CD1 SE & EE Date Not confirmed No
25 Singh 9731835650 0C70001 20-05-2013 22:09 BMAZ C7 SE & EE Date Not confirmed No
26 Mruthyunjaya K 9886047298 DHK10001 22-5-213 23:04 BRAZ HK1 POWER THEFT SP Vigilence Date Not confirmed Yes
27 - - D0S70001 23-5-213 15:17 BMAZ S7 POWER THEFT SP Vigilence Date Not confirmed Yes
kuvempu nagar ,kengeri hobli ,doddi palya main road
Other-illegal power supply taken from
pole 2
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Chkkajajur village,B.durga hobli, Holalakere Taluk, Chitradurga
Other- Installation of additional new TC
AEE-Thippeswamy-9448279040
Informed, AEE(Ele) to send e mail reply for
confirmation.
maruth n kene, bescom byalya, kodigenahalli sub division,
madugire division , tumkur dt
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Hoysala Jodidhar's Enclave I11,840 Sq ft Sahakar Nagar
Other-Illegal Activites Following
Zones (Power Theft)
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
#82 20th C x near st.john school bhuvaneshwarinagar H.kempapur.B.24.
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
ZEENATHUNNISSA,12/1,PS LANE,POLICE ROAD,OPPO
OPPOSITE COTTONPET POLICE STATION, NEXT TO
OLD GOODMORNING MEDICAL SHOP & TWO
CURRENT BOXES COTTONPET, BANGALORE
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
NARAYAN LAL, 17, POLICE MAIN ROAD NEAR CORNER
BUILDING FROM POLICE ROAD CROSS TO MILL ROAD
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Pai L/o,( irresponsible at rudely answer consumer)by AE
Manjunath, AEE Ramesh & EE Narsimhan Pandit.
ALLEGATION AGAINST STAFF E-Mail has been forwarded to SE & EE, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
site no.125,MLA l/o,Kalena agrhara ,gotigere
s10l65799 illigal metre service,pls kindly dissconnect
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
nayakanahatti chalkere taluk chitradurga district.[taken bribe of
amt Rs 25,000 from villagers Murgesh( jaglur) and Mohan
(thuravanoor)]
ALLEGATION AGAINST STAFF E-Mail has been forwarded to SE & EE, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
#yelahankaka old town (due seviour Power cut Problem )
ALLEGATION AGAINST STAFF E-Mail has been forwarded to SE & EE, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
jinnagara village,jadigenahalli , hoskote(E-Mail Complaint:Illegal
connection)
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
4th crs, 3rd mn, kallappa l/o basava nagar , HAL -34
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Officer Responsible Remarks Reminders toName of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Committed Date of Attending
No. of days (Complaint Received & Committed) Email Reply
28 - 9845066988 D0W10001 23-5-213 21:17 BMAZ W1 POWER THEFT SP Vigilence Date Not confirmed Yes
29 Nagarathnam - KG10001 24-5-213 13:27 BRAZ KG1 Date Not confirmed No
30 - DCD20001 25-5-213 2:21 CTAZ CD2 POWER THEFT SP Vigilence Date Not confirmed No
31 Anil Kumar Das 9019445739 D0E90001 26-5-213 15:08 BMAZ E9 __ SE & EE Date Not confirmed No
32 Shiva Prakash THM - D0C80001 27-5-213 1:46 BMAZ C8 SE & EE Date Not confirmed No
33 xxxxx 8970050228 D0C70003 27-5-213 9:41 BMAZ C7 POWER THEFT SP Vigilence Date Not confirmed No
34 Sudhakar 9845313440 DGB10001 28-5-213 23:13 BRAZ GB1 SE & EE Date Not confirmed No
35 Praful Roogi 9480194515 D0W70002 28-5-213 23:03 BMAZ W7 SE & EE Date Not confirmed No
36 feroz khan 9164078700 DHK10003 29-5-213 13:17 BRAZ HK1 SE & EE Date Not confirmed No
(neibhour to the mentioned address) #24a/1, 21st main 4th crs bsk 1`st stage opposite water tank
near kr hospital behind PES college
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
Sri.p.Nagarathnam,Junior Engineer (Ele) BESCOM Andrasonpet Unit-
1 KGF Subdivision -Letter Complaint - To Increase 75% DA
ALLEGATION AGAINST STAFF
SE BRC and Administration
E-Mail has been forwarded to Administration, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
kallalli thimappa badavane,raidurga rd molakalmur
town TQ, chithradurga dist . (2 houses using the power from taken
direct connection night only )
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Informed, Sp Vigilance to send e mail reply for
confirmation.
ALLEGATION AGAINST STAFF
E-Mail has been forwarded to Administration, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
Saptagiri, 2nd Floor, 1st Main, Talacavery Layout, Opp: Shiva
Prakruti Apartments, Amruthahalli-5692(complaint
against Bescom staff)
ALLEGATION AGAINST STAFF
E-Mail has been forwarded to Administration, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
yelahanka new town 5m wide rd near last bus stop (Power theft )
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Pidichalahalli Village,Manchenahalli Hobli,Gowribidanur
Taluk,Chikkaballapur Dist-(RR No:MP16)-Consumer Complaints
against AAO Chandra Nayak
ALLEGATION AGAINST STAFF E-Mail has been forwarded to SE & EE, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
#251 H.V HALLY KENGERI BANGALORE. Complaint on
Mr.Lingraj - K1 Kengeri - Rude Behavior
ALLEGATION AGAINST STAFF E-Mail has been forwarded to SE & EE, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
chikkagubbi hoskote (complaint against AE sathya narayan )
ALLEGATION AGAINST STAFF E-Mail has been forwarded to SE & EE, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Officer Responsible Remarks Reminders toName of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Committed Date of Attending
No. of days (Complaint Received & Committed) Email Reply
37 Vishwas 9900992345 D0S90001 29-5-213 1:57 BMAZ S9 SE & EE Date Not confirmed No
38 Srinivas 9742932367 DS100002 30-5-213 11:39 BMAZ S10 POWER THEFT Date Not confirmed No
39 Subramanyam 8050091684 D0E90004 1-6-213 11:29 BMAZ E9 Date Not confirmed No
40 xyz - D0C50002 2-6-213 17:12 BMAZ C5 Date Not confirmed No
41 shekar 7676723999 D0E70003 2-6-213 12:54 BMAZ E7 Date Not confirmed No
42 Salvoder 9740522639 D0E70005 4-6-213 21:06 BMAZ E7 POWER THEFT Date Not confirmed No
43 Sudhir 9482581418 D0C50003 5/6/213 15:31 BMAZ C5 Date Not confirmed No
44 MUZAMMIL KHAN - D0C50004 5/6/213 19:18 BMAZ C5 Date Not confirmed No
45 Kumar 9535738471 DMA10001 5/6/213 12:26 BRAZ MA1 Date Not confirmed No
44 Anoop Bongle / 9886 9916997748 DHR10001 6-6-213 9:39 CTAZ HR1 GM (Admin) Date Not confirmed E-Mail has been forwarded to Admin Awaiting for reply No
Bsk 3rd stage (complaint against AAo Girish)
ALLEGATION AGAINST STAFF E-Mail has been forwarded to SE & EE, Awaiting for reply
Informed,Administration to send e mail reply for
confirmation.
Vittasandra palya, near begur, opp vibgyor school, Blore. (Power
theft)
AEE(Ele)Rajanna B S944984467
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Mail fwd to SP Vigilance to send e mail reply for
confirmation.
#32 1 cross evergreen l/o kothanur bangalore (Complaint against JE
Manjunath for not reporting updates in central complaints)
ALLEGATION AGAINST STAFF
AEE(Ele)Lokesh
9449877171E-Mail has been forwarded to SE & EE, Awaiting for reply
Mail fwd to GM(Admin) to send e mail reply for
confirmation.
BHUVANESHWARNAGAR, 5TH CROSS, RT NAGAR,(E-
MAIL complaint:complaint against Staff)
ALLEGATION AGAINST STAFF
AEE(Ele)G.NAGRAJ9449844645
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Mail fwd to SP Vigilance to send e mail reply for
confirmation.
#69,netravathi l/o,kr puram,blr-36(JE anadaiah:8453568573 & JE
murulidhar 98894744 )
ALLEGATION AGAINST STAFF
AEE(Ele)Ramesh
9449844677
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Mail fwd to SP Vigilance to send e mail reply for
confirmation.
#4 rk complex kaggadasapura bangalore....Power theft
AEE(Ele)Ramesh
9449844677
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Mail fwd to SP Vigilance to send e mail reply for
confirmation.
#15/1,V.Nagenahalli,1st main,patel muniyappa l/o,kaval byrasandra-RR No:C5EH19221-Consumer
Complaint Against Meter Reader
ALLEGATION AGAINST STAFF
AEE(Ele)G.NAGRAJ9449844645
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Mail fwd to SP Vigilance to send e mail reply for
confirmation.
E mail complaint regarding Complaint against BESCOM Staff
in kavalabyarasandra C5 sub division. no 23. 1st Cross
Ramatent .G.Halli Bangalore
ALLEGATION AGAINST STAFF
AEE(Ele)G.NAGRAJ9449844645
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Mail fwd to SP Vigilance to send e mail reply for
confirmation.
Kariyanna palya magadi tq Rama ngr .. (stn incharge Nagarju
cheated consumer by taking bribe to change TC)
ALLEGATION AGAINST STAFF
Brabhakar.Y 944827978
E-Mail has been forwarded to SP Vigilance, Awaiting for reply
Mail fwd to SP Vigilance to send e mail reply for
confirmation.
6ft road, near govt hospital, Vidyanagar, harihara, Section Officer KARIBASAVAYYA-
9448567157 rejected the consumer's vehicle omni as he
wanted to give it to Bescom O&M 3 Office. Consumer has already
talked to the section officer about this matter b
ALLEGATION AGAINST STAFF
Mail fwd to GM(Admin) to send e mail reply for
confirmation.
Sl No.
Consumer Details Location Details Complaint Details
Consumer Contact No. Zone Area Nature of complaint Officer Responsible Remarks Reminders toName of Consumer
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Committed Date of Attending
No. of days (Complaint Received & Committed) Email Reply
45 JAGADISH 9686807729 DMK10001 6-6-213 21:29 CTAZ MK1 GM (Admin) Date Not confirmed E-Mail has been forwarded to Admin Awaiting for reply No
STATUS OF SMS PENDING COMPLAINTS DATED 06-07-2013
Category-D
Sl No.
Consumer Details Location Details Complaint Details
Name of Consumer Consumer Contact No. Zone Area Nature of complaint Officer Responsible Remarks Reminders to AEE(s)
~~~ Nil~~~
HANGAL GRAM PANCHAYTHI MOLAKALMUR TQ
CHITRADURGA ,,, jayanna AE (ae not responding whenever nps ,ae is not inspecting the lines,not behaving prperly)
ALLEGATION AGAINST STAFF
Mail fwd to GM(Admin) to send e mail reply for
confirmation.
DocketNo.
Date of Complaint Received
Time of Complaint Received
Sub-Division
Committed date of Attending
No. of days (Complaint Received & Committed)
AEE's Email Reply
Complaints Received Towards - Other Emergency Calls on 06-07-2013
Date /Time Address Contact Number Nature of the Complaint Information sent to Call Attended
~~~NIL~~~
Respected Sir,
Please find the complaints Received Towards- Other Emergency Calls on 06-07-2013
Sl no
Name of the Person
With Regards, Ravi.K.AManager(Ele) 9986873333 BESCOM Helpline
Circle Wise/ Division Wise- Complaint Details (Category-"A") Dated:- 06-07-2013
Sl No
Circle South North East West
Division HSR Peenya Hebbal Kengeri
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 48 98 78 224 43 3 94 140 252 32 36 320 31 57 23 111 795
3 0 0 0 0 0 0 0 0 0 0 0 0 13 2 0 15 15
4 Load restriction 0 0 0 0 9 7 18 34 0 12 0 12 0 0 0 0 46
5 Others 108 61 72 241 28 29 54 111 151 120 39 310 63 52 21 136 798
6 Divisional Total 156 159 150 465 80 39 166 285 403 164 75 642 107 111 44 262 1654
Zone TotalJaya
nagarKora
mangala Circle Total
Malleshwaram
Circle Total
Indira nagar
Shivaji nagar
Vidhana Soudha
Circle Total
Rajajinagar
R.R. Nagar
Circle Total
Scheduled maintenance
Unscheduled maintenance/ Feeder faults
Feeder Faults due to tree fallen/ accidents/ rain
No. of Complaints Received on 06-07-2013
ZONE CIRCLE DIVISION Total Complaints Sub Division Code Total Complaints
BM
AZ
South 565
Jayanagar 191
S1 81S2 36S5 19S6 35S9 20
Kormangala 188S3 37S4 83S7 68
HSR 186
S8 34S10 68S11 63S12 21
East 739
Indiranagar 472
E3 38
E4 78
E6 113
E7 243
Shivajinagar 187
E1 51
E2 29
E5 33
E8 48
E9 26
Vidhanasoudha 80W3 35
W4 24
W5 21
North 321
Peenya 92N4 29
N5 52
N7 11
Malleswaram 50
C1 18
C2 6
C3 9
C6 17
Hebbal 179
C4 77
C5 19
C7 40
C8 43
West 298
Rajajajinagar 127
N1 27
N2 30
N3 25
N6 19
N8 26
R.R. Nagar 119
W1 47
W2 40
W6 15
W7 17
Kengeri 52K1 26
K2 19
K3 7Total 1923 * 1923 1923
* Inculding Category B & C Complaints dated 06-07-2013
Total Complaints
No. of Complaints Received on 06-07-2013
ZONE CIRCLE DIVISION Total Complaints Sub Division Code Total ComplaintsB
RA
Z
BR
C
110
17
DB1 2KD1 0MA1 3NM1 10TV1 2
23DH1 6HK1 16NG1 1
37
BD1 16CP1 1CP2 2KP1 1KP2 2RM1 12RM2 2SA1 1
33AN1 17CH1 8AT1 8
Kol
ar C
ircl
e
5
Kolar division 0KL1 0KL2 0SP1 0
Chikkaballapura 2
BP1 0CB1 1CB2 0GB1 1GD1 0
KGF Division 3
BG1 0KG1 3ML1 0MB1 0
0
CM1 0CM2 0SG1 0SG2 0
Total 115 * 115 115
* Inculding Category B & C Complaints dated 06-07-2013
Total Complaints
Nelamanagala Division
Yelahanka Division
Ramanagar Division
Chandapura Division
Chinthamani Division
No. of Complaints Received on 06-07-2013
ZONE CIRCLE Total Complaints DIVISION Total Complaints Sub Division Code Total Complaints
CT
AZ
TU
MK
UR
8
TUMKUR 5
TK1 3TK2 0TK3 0TK4 0GU1 0NT1 0KU1 2
TIPTUR 0TP1 0TU1 0CN1 0
MADHUGIRI 3
MG1 1SR1 0SR2 1KR1 0PG1 1KH1 0
DA
VA
NG
ER
E
20
DAVANGERE 12
DV1 5DV2 0DV3 2AG1 0JL1 5CG1 0SB1 0
HARIHARA 0HR1 0HN1 0HH1 0
CHITRADURGA 6
CD1 2CD2 0HL1 1HD1 3
HIRIYURU 2HY1 1CK1 1MK1 0
Total 28 * 28 28
* Inculding Category B & C Complaints dated 06-07-2013
SOUTH CIRCLE (565) SUB DIVISION S4 (83) SUB DIVISION S1 (81)SUBDIVISION COMP REC INTERRUPTION COMP REC INTERRUPTION COMP REC
S4 83 NGV MUSS INCOMING SUPPLY FAILURE 22 JAYADEVA MUSS F8 FEEDER HT JUMP CUT 23S1 81 ADUGODI MUSS F6 FEEDER FAULT 11 TC MCB TRIPPED 18S7 68 MAIN LEAD BLOWN OUT 8 HT/LT/POLE FUSE BLOWN OUT 9
S10 68 ST JOHN WOOD MUSS F7 FEEDER FAULT 8 TC LT LEAD CUT 6S11 63 OTHER 6 BILLING 6S3 37 HT/LT/POLE FUSE BLOWN OUT 5 NIMHANS MUSS F10 FEEDER TRIP 5S2 36 HSR MUSS F13 FEEDER HT JUMP CUT 4 ADUGODI MUSS F10 FEEDER HT JUMP CUT 4S6 35 RECONNECTION PROVIDED 4 OTHER 4S8 34 NGV MUSS F11 FEEDER TRIP 4 INTERNAL FAULT 2
S12 21 TREE BRANCHES TOUCHING LINE 3 VL TRIPPED 2S9 20 TC REPLACEMENT WORK 2 RECONNECTION 2S5 19 BILLING 2 GRAND TOTAL 81
Grand Total 565 INTERNAL FAULT 2VL TRIP 2
GRAND TOTAL 83
EAST CIRCLE (739) SUB DIVISION E7 (243) SUB DIVISION E6 (113)SUBDIVISION COMP REC INTERRUPTION COMP REC INTERRUPTION COMP REC
E7 243 ITI MUSS F1 & F2 FEEDERS GOS MAINTENANCE WORK 72 NGEF MUSS F3 AND F4 FEEDERS RMU FLASH OVER 80E6 113 HT/LT/POLE FUSE BLOWN OUT 42 LIGHT FOUND OK 10E4 78 LIGHT FOUND OK 24 HT/LT/POLE FUSE BLOWN OUT 8E1 51 ITI MUSS F2 FEEDER TRIP 22 OTHER 6E8 48 BILLING 20 LOOSE CONNECTION AT POLE 4E3 38 LOOSE CONNECTION AT POLE 10 BILLING 3W3 35 ITI MUSS F1 FEEDER HT JUMP CUT 10 RECONNECTION 1E5 33 LT JUMP CUT 10 MCB TRIP 1E2 29 POWER SUPPLY NORMAL 8 GRAND TOTAL 113E9 26 OTHER 8
W4 24 TC MAINTENANCE WORK 6
W5 21 ITI MUSS F11 FEEDER MAINTENANCE WORK 3Grand Total 739 TC MCB TRIPPED 2
NGEF MUSS F2 FEEDER PHASE REVERSAL 2TREE TRIMMING WORK 2INTERNAL FAULT 2
NO. OF COMPLAINTS RECEIVED ON 06-07-2013
GRAND TOTAL 243
NORTH CIRCLE (321) SUB DIVISION C4 (77) SUB DIVISION N5 (52)SUBDIVISION COMP REC INTERRUPTION COMP REC INTERRUPTION COMP REC
C4 77 HEBBAL MUSS F2,F3 & F8 LC TAKEN FOR BBMP WORK 25 SOLADEVANAHALLI MUSS F5 FEEDER 11KV JUMP CUT 42N5 52 RAIL POLE RELEASING WORK 10 LIGHT FOUND OK 3C8 43 HT/LT/POLE FUSE BLOWN OUT 9 TC FUSE BLOWN OUT 2C7 40 ADDITIONAL TRANSFORMER WORK 8 TC SINGLE PHASE 2N4 29 LOOSE CONNECTION AT POLE 5 OTHER 2C5 19 OTHER 5 LOOSE CONNECTION AT POLE 1C1 18 POLE REPLACEMENT WORK 4 GRAND TOTAL 52C6 17 BILLING 3N7 11 MATHIKERE MUSS F4 FEEDER LOAD RESTRICTION 3C3 9 RECONDUCTORING WORK 3C2 6 HEBBAL MUSS F2 FEEDER HT JUMP CUT 2
Grand Total 321 GRAND TOTAL 77
WEST CIRCLE (298) SUB DIVISION W1 (47) SUB DIVISION W2 (40)SUBDIVISION COMP REC INTERRUPTION COMP REC INTERRUPTION COMP REC
W1 47 DAS PROJECT WORK 10 VICTORIA MUSS F3 & F6 FEEDER TRIP 12W2 40 POLE FUSE BLOWN OUT 8 VL TRIPPED 8N2 30 LIGHT FOUND OK 6 HT/LT/POLE FUSE BLOWN OUT 4N1 27 BSK MUSS F3 FEEDER GOS MAINTENANCE WORK 4 OTHER 4K1 26 OTHER 4 NIMHANS MUSS F10 FEEDER TRIP 3N8 26 POWER SUPPLY NORMAL 3 LIGHT FOUND OK 3N3 25 TC HT FUSE BLOWN OUT 3 LOOSE CONNECTION AT POLE 3K2 19 TREE BRANCHES FELL ON LINE 2 INTERNAL FAULT 3N6 19 LOOSE CONNECTION AT POLE 2 GRAND TOTAL 40W7 17 LT WIRE CUT 2W6 15 BILLING 2K3 7 GROUNDING 1
Grand Total 298 GRAND TOTAL 47