X71 Preventive Maintenance

11
Scenario Overview BP Mining V1.600 X71: Preventive Maintenance

description

Preventive maintenance flowchart

Transcript of X71 Preventive Maintenance

  • Scenario Overview

    BP Mining V1.600

    X71: Preventive Maintenance

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 2

    X71 - PREVENTIVE_MAINTENANCE Overview (time-, usage-, & condition based)

    Highlights:

    The three preventive maintenance processes, time-, usage-, and condition

    based, are described

    Generating a cost report for time- and usage based preventive maintenance is

    shown

    Integration:

    Integration to the corrective maintenance process is shown

    Time- and usage based preventive maintenance plans are key inputs to the maintenance cost budgeting process

    Process Overview: Industry: Mining The preventive maintenance scenario demonstrates three preventive maintenance

    processes. It describes how to create and schedule a maintenance plan based on

    elapsed time and based on usage, and how to generate a planned cost report. It further

    describes how maintenance is trigged based on the condition of a unit. Maintenance based on elapsed time: Since time does not provide the optimal schedule for

    maintaining equipment that requires maintenance due to operational wear, it is usually used to

    schedule inspection activities and periodic testing (e.g. pressure vessel tests)

    Maintenance based on the usage of plant and equipment is a common and important maintenance strategy to enable the optimisation of the maintenance frequencies. Maintenance

    requirements are generated from equipment usage information, i.e. engine hours

    Condition based maintenance is the third method used to drive the creation of preventive maintenance work. Requests for maintenance are generated from condition readings entered

    into SAP

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 3

    Maintenance

    Management

    X71 - PREVENTIVE_MAINTENANCE Responsibility (time- & usage based)

    Business

    Benefits Maintenance Planning

    Engineering

    Management

    OEM and/or

    scientifically

    based

    maintenance

    program

    Legal

    compliance

    visible

    Maintenance

    and cost

    optimization

    possible

    Maintenance

    cost visibility

    and available as

    key budget

    input

    Controlled

    maintenance

    delivery

    Display

    Maintenance

    Strategy

    Display

    Functional

    Location

    Display

    Measurement

    Point

    Create

    Maintenance

    Item & Plan

    Schedule

    Maintenance

    Plan

    Approve

    Plan & Cost

    Run

    Deadline

    Monitoring

    Display

    Planned

    Cost

    Review &

    Adjust

    Notes: - In the above diagram the department responsible for the expense is generally allocated the responsibility for the tasks associated with the expense

    - Responsibility allocation is client specific and is influenced by several factors (e.g. skill level, organisation structure, governance, etc.)

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 4

    X71 - PREVENTIVE_MAINTENANCE Technical View (time based)

    Continues to P7

    Continues from P13

    Continues from P13

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 5

    X71 - PREVENTIVE_MAINTENANCE Technical View (usage based)

    Continues to P7

    Continues from P20

    Continues from P20

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 6

    X71 - PREVENTIVE_MAINTENANCE Technical View (approval)

    Continues to P10

    Continues from P6

    Continues from P19

    Continues to P4

    Continues to P6

    Continues to P19

    Continues to P18

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 7

    X71 - PREVENTIVE_MAINTENANCE Technical View (work order generation)

    Continues from P9

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 8

    X71 - PREVENTIVE_MAINTENANCE Transcation Process Flow (time- & usage based)

    IH01 Display Functional Location

    IK06 Display Measurement Points (if usage based)

    IP12 Display Maintenance Strategy

    IP04 Create Maintenance Item

    IA09 Display Maintenance Task List

    IP42 Create Maintenance Plan

    IP31 Display Planned Cost of Maintenance Plan

    IP02 Review & Adjust Maintenance Plan (if necessary)

    IA06 Review & Adjust Task List if required (if necessary)

    IP10 Schedule Maintenance Plan

    Manual Approve Maintenance Plan & Planned Cost

    IP30 Run Deadline Monitoring

    (call object generated Maintenance Order)

    Follow Corrective Maintenance Scenario

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 9

    X71 - PREVENTIVE_MAINTENANCE Responsibility (condition based)

    Business

    Benefits

    Maintenance

    Planning

    Maintenance

    and cost

    optimization

    possible

    (only perform

    maintenance

    when condition

    justifies it)

    Display

    Functional

    Location

    Display

    Measurement

    Point

    Create

    Measurement

    Document

    Select

    Valuation

    Code

    Notes: - In the above diagram the department responsible for the expense is generally allocated the responsibility for the tasks associated with the expense

    - Responsibility allocation is client specific and is influenced by several factors (e.g. skill level, organisation structure, governance, etc.)

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 10

    X71 - PREVENTIVE_MAINTENANCE Technical View (condition based)

    Continues to P24

    Continues from P23

  • SAP AG 2007, SAP Best Practices for Mining V1.600 X71 Preventive Maintenance, 11

    X71 - PREVENTIVE_MAINTENANCE Transcation Process Flow (condition based)

    IK03 Display Measurement Points

    IL03 Display Functional Location

    IK11 Select Valuation Code to Trigger Notification Creation

    (call object generated Notification)

    IK11 Create Measurement Document

    Follow Corrective Maintenance Scenario