INDEX OF DRAWINGS C1.0 COVER SHEET C2.1-2.2 SITE LOCATION MAPS C2.3 GENERAL NOTES C3.1 FARIAS ELEMENTARY SCHOOL C3.2 SANTA MARIA ELEMENTARY SCHOOL C3.3 SANCHEZ-OCHOA ELEMENTARY SCHOOL C3.4 DOVALINA ELEMENTARY SCHOOL C3.5 KAWAS ELEMENTARY SCHOOL C3.6 ZACHARY ELEMENTARY SCHOOL C3.7 LIGARDE ELEMENTARY SCHOOL C3.8 MILTON ELEMENTARY SCHOOL C3.9 ALMA A. PIERCE ELEMENTARY SCHOOL C3.10 BRUNI ELEMENTARY SCHOOL C3.11 MACDONELL ELEMENTARY SCHOOL C3.12 TARVER ELEMENTARY SCHOOL C3.13 DAICHES ELEMENTARY SCHOOL C3.14 RYAN ELEMENTARY SCHOOL C3.15 DON JOSE GALLEGO ELEMENTARY SCHOOL C-3.16 HEIGHTS ELEMENTARY SCHOOL C3.17 LEYENDECKER ELEMENTARY SCHOOL C3.18 D.D. HACHAR ELEMENTARY SCHOOL C3.19 J.C. MARTIN ELEMENTARY SCHOOL C4.1 DETAILS LAREDO INDEPENDENT SCHOOL DISTRICT ELEMENTARY CAMPUS PARKING LOT PAVEMENT REHABILITATION IMPROVEMMENTS LAREDO INDEPENDENT SCHOOL DISTRICT LAREDO, TEXAS JUNE 20, 2016 BOARD OF TRUSTEES DR. A. MARCUS NELSON - SUPERINTENDENT S&B INFRASTRUCTURE, LTD. MR. RICADO GARZA - DISTRICT 4, TRUSTEE MR. HECTOR J. NOYOLA - DISTRICT 3, VICE PRESIDENT MR. JESUS MARTINEZ - DISTRICT 2, SECRETARY MR. HECTOR J. GARCIA - DISTRICT 6, TRUSTEE MR. JOSE A. VALDEZ - DISTRICT 1, TRUSTEE MR. JOSE R. PEREZ - DISTRICT 7, TRUSTEE DR. CECILIA MAY MORENO - DISTRICT 5, PRESIDENT A JORGE A. MARTINEZ G X E S P R O F E N 101173 C L S I I O N S E D L E N A S T T E O F T E N E E I R S A JULY 06, 2016

Transcript of X EOFTE ASTASR PNEI NSED CIL F E ORGLEN SI SEANO...mr. hector j. noyola - district 3, vice president...

  • INDEX OF DRAWINGS

    C1.0 COVER SHEET

    C2.1-2.2 SITE LOCATION MAPS

    C2.3 GENERAL NOTES

    C3.1 FARIAS ELEMENTARY SCHOOL

    C3.2 SANTA MARIA ELEMENTARY SCHOOL

    C3.3 SANCHEZ-OCHOA ELEMENTARY SCHOOL

    C3.4 DOVALINA ELEMENTARY SCHOOL

    C3.5 KAWAS ELEMENTARY SCHOOL

    C3.6 ZACHARY ELEMENTARY SCHOOL

    C3.7 LIGARDE ELEMENTARY SCHOOL

    C3.8 MILTON ELEMENTARY SCHOOL

    C3.9 ALMA A. PIERCE ELEMENTARY SCHOOL

    C3.10 BRUNI ELEMENTARY SCHOOL

    C3.11 MACDONELL ELEMENTARY SCHOOL

    C3.12 TARVER ELEMENTARY SCHOOL

    C3.13 DAICHES ELEMENTARY SCHOOL

    C3.14 RYAN ELEMENTARY SCHOOL

    C3.15 DON JOSE GALLEGO ELEMENTARY SCHOOL

    C-3.16 HEIGHTS ELEMENTARY SCHOOL

    C3.17 LEYENDECKER ELEMENTARY SCHOOL

    C3.18 D.D. HACHAR ELEMENTARY SCHOOL

    C3.19 J.C. MARTIN ELEMENTARY SCHOOL

    C4.1 DETAILS

    LAREDO INDEPENDENT SCHOOL DISTRICT

    ELEMENTARY CAMPUS PARKING LOT PAVEMENT REHABILITATION IMPROVEMMENTS

    LAREDO INDEPENDENT SCHOOL DISTRICT

    LAREDO, TEXAS

    JUNE 20, 2016

    BOARD OF TRUSTEES

    DR. A. MARCUS NELSON - SUPERINTENDENT

    S&B INFRASTRUCTURE, LTD.

    MR. RICADO GARZA - DISTRICT 4, TRUSTEE

    MR. HECTOR J. NOYOLA - DISTRICT 3, VICE PRESIDENT

    MR. JESUS MARTINEZ - DISTRICT 2, SECRETARY

    MR. HECTOR J. GARCIA - DISTRICT 6, TRUSTEE

    MR. JOSE A. VALDEZ - DISTRICT 1, TRUSTEE

    MR. JOSE R. PEREZ - DISTRICT 7, TRUSTEE

    DR. CECILIA MAY MORENO - DISTRICT 5, PRESIDENT

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

  • O

    L

    D

    S

    A

    N

    T

    A

    M

    A

    R

    IA

    R

    D

    .

    CHICAGO ST.

    FRANCISCO FARIAS ELEMENTARY SCHOOL1510 CHICAGO STREET, LAREDO, TEXAS

    MARKLEY ST.

    PROJECTSITE

    SANTA MARIA ELEMENTARY SCHOOL3817 SANTA MARIA STREET, LAREDO, TEXAS

    SANCHEZ-OCHOA ELEMENTARY SCHOOL211 E. ASH STREET, LAREDO, TEXAS

    ANITA T. DOVALINA ELEMENTARY SCHOOL1700 W. ANNA AVE., LAREDO, TEXAS

    FARIAS ST.

    ORTIZ ST.

    TACUBA ST.

    PACE ST.

    UGARTE ST.

    JU

    AR

    EZ

    A

    VE

    .

    SA

    NT

    A M

    AR

    IA

    A

    VE

    .

    SA

    LIN

    AS

    A

    VE

    .

    CO

    NV

    EN

    T A

    VE

    .

    FLO

    RE

    S A

    VE

    .

    VID

    AU

    RR

    I A

    VE

    .

    SA

    NT

    A IS

    AB

    EL A

    VE

    .

    TACUBA ST.

    ORTIZ ST.

    FARIAS ST.

    SA

    NT

    A R

    IT

    A A

    VE

    .

    CHICAGO ST.

    PIERCE ST.

    PROJECTSITE

    PHILADELPHIA ST.

    BOSTON ST.

    PACE ST.

    UGARTE ST.

    JU

    AR

    EZ

    A

    VE

    .

    SA

    NT

    A M

    AR

    IA

    A

    VE

    .

    SA

    LIN

    AS

    A

    VE

    .

    CO

    NV

    EN

    T A

    VE

    .

    FLO

    RE

    S A

    VE

    .

    VID

    AU

    RR

    I A

    VE

    .

    SA

    NT

    A C

    LE

    OT

    ILD

    E A

    VE

    .

    BALTIMORE ST.

    SA

    NT

    A R

    IT

    A A

    VE

    .

    DA

    VIS

    A

    VE

    .

    MA

    IN

    A

    VE

    .

    SAN JOSE ST.

    PLUM ST.

    PROJECTSITEELM ST.

    LOCUST ST.

    MONTGOMERY ST.

    ASH ST.

    MA

    RC

    ELLA

    A

    VE

    .

    SA

    ND

    ER

    S A

    VE

    .

    MA

    RY

    LA

    ND

    A

    VE

    .

    CE

    DA

    R A

    VE

    .

    SP

    RIN

    GF

    IE

    LD

    A

    VE

    .

    VA

    LE

    NC

    IA

    A

    VE

    .

    FROST ST.

    BA

    RC

    ELO

    NA

    A

    VE

    .

    MO

    NT

    ER

    RE

    Y A

    VE

    .

    MC

    DO

    NE

    LL A

    VE

    .

    LOCATIONSITE

    BRUNI ST.

    PARK ST.

    SANCHEZ ST.

    GARZA ST.

    CA

    MP

    A

    VE

    .

    E. A

    NN

    A A

    VE

    .

    PIN

    DE

    R A

    VE

    .

    SA

    N IG

    NA

    CIO

    A

    VE

    .

    RIV

    ER

    RIO

    G

    RA

    ND

    E

    CALLAGHAN ST.

    BENAVIDES ST.

    GARCIA ST.

    LE

    E A

    VE

    .

    W. A

    NN

    A A

    VE

    .

    MEXICO

    SALTILLO ST.

    PINE ST.

    PROJECTSITE

    CHESTNUT ST.

    VICENTE ST.

    SAN LUIS ST.

    LO

    US

    IA

    NA

    A

    VE

    .

    TE

    XA

    S A

    VE

    .

    AR

    KA

    NS

    AS

    A

    VE

    .

    NE

    W Y

    OR

    K A

    VE

    .

    CA

    NA

    DA

    A

    VE

    .

    ME

    AD

    OW

    A

    VE

    .

    Z

    A

    P

    A

    T

    A

    H

    W

    Y

    -

    8

    3

    JESUS A. KAWAS ELEMENTARY SCHOOL2100 S. MILMO AVE., LAREDO, TEXAS

    JA

    RV

    IS

    A

    VE

    .

    MA

    RT

    IN

    A

    VE

    .

    HENRY B. ZACHRY ELEMENTARY SCHOOL3200 CHACOTA STREET, LAREDO, TEXAS

    SALTILLO ST.

    THURMAN ST.

    PROJECTSITE

    TINAJA ST.

    PALO BLANCO ST.

    ZACATECAS ST.

    CHACOTA ST.

    EJID

    O A

    VE

    .

    SM

    IT

    H A

    VE

    .

    W

    O

    R

    M

    S

    E

    R

    R

    D

    .

    AR

    KA

    NS

    AS

    A

    VE

    .

    NORTON ST.

    LO

    UIS

    IA

    NA

    A

    VE

    .

    IN

    DIA

    A

    VE

    .

    CA

    NA

    DA

    A

    VE

    .

    POTOMAC LOOP

    NE

    W Y

    OR

    K A

    VE

    .

    HONORE LIGARDE ELEMENTARY SCHOOL2800 S. CANADA AVE., LAREDO, TEXAS

    500' 1000'

    SCALE: 1" = 500'

    SALTILLO ST.

    THURMAN ST.

    PROJECTSITE

    TINAJA ST.

    PALO BLANCO ST.

    ZACATECAS ST.

    CHACOTA ST.

    EJID

    O A

    VE

    .

    SM

    IT

    H A

    VE

    .

    W

    O

    R

    M

    S

    E

    R

    R

    D

    .

    AR

    KA

    NS

    AS

    A

    VE

    .

    NORTON ST.

    LO

    UIS

    IA

    NA

    A

    VE

    .

    0'

    IN

    DIA

    A

    VE

    .

    CA

    NA

    DA

    A

    VE

    .

    POTOMAC LOOP

    NE

    W Y

    OR

    K A

    VE

    .

    CLARENCE L. MILTON ELEMENTARY SCHOOL2500 E. ASH STREET, LAREDO, TEXAS

    SAUNDERS ST.

    ELM ST.

    PROJECTSITE

    MONTGOMERY ST.

    ASH ST.

    SAN JOSE ST.

    TE

    XA

    S A

    VE

    .

    MA

    RT

    IN

    A

    VE

    .

    LOCUST ST.

    LO

    UIS

    IA

    NA

    A

    VE

    .

    JA

    RV

    IS

    A

    VE

    .

    PLUM ST.

    BA

    RT

    LE

    TT

    A

    VE

    .

    AR

    KA

    NS

    AS

    A

    VE

    .

    NE

    W Y

    OR

    K A

    VE

    .

    MILM

    O A

    VE

    .

    SAN CARLOS ST.

    BUSTAMANTE ST.

    PROJECTSITE

    T

    A

    Y

    L

    O

    R

    S

    T

    .

    RYAN ST.

    EISTETTER ST.

    HE

    ND

    RIC

    KS

    A

    VE

    .

    LO

    GA

    N A

    VE

    .

    MC

    C

    LE

    LLA

    ND

    A

    VE

    .

    SP

    RIN

    GF

    IE

    LD

    A

    VE

    .

    ALMA A. PIERCE ELEMENTARY SCHOOL800 E. EISTETTER STREET, LAREDO, TEXAS

    MA

    RY

    LA

    ND

    A

    VE

    .

    CE

    DA

    R A

    VE

    .

    A

    L

    L

    E

    N

    D

    E

    S

    T

    .

    R

    Y

    A

    N

    S

    T

    .

    E

    I

    S

    T

    E

    T

    T

    E

    R

    S

    T

    .

    LO

    GA

    N A

    VE

    .

    SCOTT ST.

    COKE ST.

    PROJECTSITE

    GARCIA ST.

    BENAVIDES ST.

    SA

    N JO

    RG

    E A

    VE

    .

    SA

    N F

    RA

    NC

    IS

    CO

    A

    VE

    .

    SA

    N E

    NR

    IQ

    UE

    A

    VE

    .

    SA

    NT

    A U

    RS

    ULA

    A

    VE

    .

    ANTONIO M. BRUNI ELEMENTARY SCHOOL1508 SAN EDUARDO AVE., LAREDO, TEXAS

    SA

    N D

    AR

    IO

    A

    VE

    .

    SA

    N B

    ER

    NA

    RD

    O A

    VE

    .

    I-H

    WY

    -35

    SA

    N E

    DU

    AR

    DO

    A

    VE

    .

    CALLAGHAN ST.

    SA

    N A

    GU

    ST

    IN

    A

    VE

    .

    GARZA ST.

    SANCHEZ ST.

    WASHINGTON ST.

    SCOTT ST.

    PROJECTSITE BENAVIDES ST.

    COKE ST.

    JU

    AR

    EZ

    A

    VE

    .

    SA

    NT

    A M

    AR

    IA

    A

    VE

    .

    SA

    LIN

    AS

    A

    VE

    .

    SA

    NT

    A C

    LE

    OT

    ILD

    E A

    VE

    .

    CHRISTOPHER M. MACDONELL ELEMENTARY SCHOOL1606 BENAVIDES STREET, LAREDO, TEXAS

    MA

    IN

    A

    VE

    .

    SA

    NT

    A R

    IT

    A A

    VE

    .

    DA

    VIS

    A

    VE

    .

    GARCIA ST.

    CALLAGHAN ST.

    GARZA ST.

    LAREDO INDEPENDENT SCHOOL DISTRICTPROPOSED PARKING LOT REHABILITATION

    DRAWN BY: J.J.S. SCALE: NTS

    CHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C2.1

    C2.1-2.2 SITE MAP.DWGFILE:

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    SITE PLANS

    LAREDO INDEPENDENT SCHOOL DISTRICT

    ELEMENTARY CAMPUS

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

    STATUS: FINAL

  • DRAWN BY: J.J.S. SCALE: NTS

    CHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C2.2

    C2.1-2.2 SITE MAP.DWGFILE:

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    TARVER ELEMENTARY SCHOOL3200 TILDEN AVE., LAREDO, TEXAS

    ASH ST.

    PROJECTSITE

    DAICHES ELEMENTARY SCHOOL1401 GREEN STREET, LAREDO, TEXAS

    RYAN ELEMENTARY SCHOOL2401 CLARK BLVD., LAREDO, TEXAS

    DON JOSE GALLEGO ELEMENTARY SCHOOL520 CLARK BLVD., LAREDO, TEXAS

    LOCUST ST.

    PLUM ST.

    FROST ST.

    PACE ST.

    UGARTE ST.

    LO

    GA

    N A

    VE

    .

    CE

    DA

    RA

    VE

    .

    TILD

    EN

    A

    VE

    .

    HE

    ND

    RIC

    KS

    A

    VE

    .

    Mc C

    LE

    LLA

    N A

    VE

    .

    MA

    RY

    LA

    ND

    A

    VE

    .

    LYON ST.

    ELM ST.

    LE

    XIN

    GT

    ON

    A

    VE

    .

    CHACON ST.

    WOOSTER ST.

    PROJECTSITE

    MERCER ST.

    MARION ST.

    PIEDRA CHINA ST.

    GRREN ST.

    SE

    YM

    OU

    R A

    VE

    .

    LO

    RIN

    G A

    VE

    .

    ME

    AD

    OW

    A

    VE

    .

    ME

    ND

    IO

    LA

    A

    VE

    .

    ST

    ON

    E A

    VE

    .

    GATES ST.

    REYNOLDS ST.

    FREMONT ST.

    PROJECTSITEGUSTAVUS ST.

    MUSSER ST.

    OKANE ST.

    CLARK BLVD.

    NE

    W Y

    OR

    K A

    VE

    .

    MILM

    O A

    VE

    .

    LO

    UIS

    IA

    NA

    A

    VE

    .

    AR

    KA

    NS

    AS

    A

    VE

    .

    TE

    XA

    S A

    VE

    .

    BA

    RT

    LE

    TT

    A

    VE

    .

    LANE ST.

    MA

    LIN

    CH

    E A

    VE

    .

    MA

    RT

    IN

    A

    VE

    .

    JA

    RV

    IS

    A

    VE

    .

    PROJECTSITE

    PRICE ST.

    STEWART ST.

    REYNOLDS ST.

    OKANE ST.

    SA

    ND

    ER

    S A

    VE

    .

    MA

    RC

    ELLA

    A

    VE

    .

    MA

    RY

    LA

    ND

    A

    VE

    .

    LE

    XIN

    GT

    ON

    A

    VE

    .

    CLARK BLVD.

    MUSSER ST.

    GUSTAVUS ST.

    SP

    RIN

    GF

    IE

    LD

    A

    VE

    .

    CORTEZ ST.

    GUADALUPE ST.

    PROJECTSITE

    CHIHUAHUA ST.

    ROSARIO ST.

    MARKET ST.

    ST

    ON

    E A

    VE

    .

    McP

    HE

    RS

    ON

    A

    VE

    .

    SE

    YM

    OU

    R A

    VE

    .

    ME

    AD

    OW

    A

    VE

    .

    ME

    ND

    IO

    LA

    A

    VE

    .

    TILD

    EN

    A

    VE

    .

    HEIGHTS ELEMENTARY SCHOOL1208 MARKET STREET, LAREDO, TEXAS

    HE

    ND

    RIC

    KS

    A

    VE

    .

    Mc C

    LE

    LLA

    N A

    VE

    .

    LEYENDECKER ELEMENTARY SCHOOL1311 GARDEN STREET, LAREDO, TEXAS

    JEFFERSON ST.

    THURMAN ST.

    PROJECTSITETINAJA ST.

    PALO BLANCO ST.

    CONSTANTINOPLE ST.

    GARDEN ST.

    IH

    H

    WY

    -35

    SA

    LIN

    AS

    A

    VE

    .

    MA

    IN

    A

    VE

    .

    NORTON ST.

    SA

    NT

    A C

    LE

    OT

    ILD

    E A

    VE

    .

    JU

    AR

    EZ

    A

    VE

    .

    SA

    NT

    A M

    AR

    IA

    A

    VE

    .

    PARK ST.

    DA

    VIS

    A

    VE

    .

    D.D. HACHAR ELEMENTARY SCHOOL3000 GUADALUPE STREET, LAREDO, TEXAS

    PROJECTSITE

    GUADALUPE ST.

    CHIHUAHUA ST.

    EJID

    O A

    VE

    .

    SM

    IT

    H A

    VE

    .

    AR

    KA

    NS

    AS

    A

    VE

    .

    LO

    UIS

    IA

    NA

    A

    VE

    .

    J. C. MARTIN ELEMENTARY SCHOOL1600 MONTERREY AVE., LAREDO, TEXAS

    500' 1000'

    SCALE: 1" = 500'

    GUERRERO ST.

    PROJECTSITE

    BENAVIDES ST.

    COKE ST.

    LANE ST.

    MO

    NT

    ER

    RE

    Y A

    VE

    .

    MA

    RT

    IN

    A

    VE

    .

    GALVESTON ST.

    0'

    SA

    ND

    ER

    S A

    VE

    .

    JA

    RV

    IS

    A

    VE

    .

    MIER ST.

    BA

    RT

    LE

    TT

    A

    VE

    .

    MA

    RC

    ELLA

    A

    VE

    .

    SP

    RIN

    GF

    IE

    LD

    A

    VE

    .

    McD

    ON

    ELL A

    VE

    .

    CE

    DA

    R A

    VE

    .

    LO

    GA

    N A

    VE

    .

    LO

    RIN

    G A

    VE

    .

    CO

    NV

    EN

    T A

    VE

    .

    FLO

    RE

    S A

    VE

    .

    ROSARIO ST.

    MARKET ST.

    CORTEZ ST.

    IN

    DIA

    A

    VE

    .

    CA

    NA

    DA

    A

    VE

    .

    NE

    W Y

    OR

    K A

    VE

    .

    ES

    PA

    NA

    A

    VE

    .

    LAREDO ST.

    CORPUS CHRISTI ST.

    GARFIELD ST.

    WASHINGTON ST.

    SCOTT ST.

    SITE PLANS

    LAREDO INDEPENDENT SCHOOL DISTRICT

    ELEMENTARY CAMPUS

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    LAREDO INDEPENDENT SCHOOL DISTRICTPROPOSED PARKING LOT REHABILITATION

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

    STATUS: FINAL

  • GENERAL NOTES

    LAREDO INDEPENDENT SCHOOL DISTRICT

    ELEMENTARY CAMPUS

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    GENERAL NOTES:

    THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE POSSIBLE PRESENCE OF UNDERGROUND UTILITIES ON THE RIGHT OF WAY ON THIS PROJECT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CALL LOCATION OF UTILITIES 48 HOURS INADVANCE OF CONSTRUCTION ACTIVITIES.

    APPLY ALL PAVEMENT MARKINGS IN ACCORDANCE WITH THE TEXAS MUTCD PLANS AND AS DIRECTED/APPROVED BY THE ENGINEER.

    REMOVE MATERIALS LARGER THAN 4 INCHES IN SIZE WITHIN THE CONSTRUCTION LIMITS AND NOT INCORPORATED IN THE PROJECT.

    RETAIN, STORE AND DELIVER ANY MATERIALS REMOVED AND NOT REUSED AND DETERMINED TO BE SALVAGABLE/STORAGE YARD AS DIRECTED BY THE ENGINEER OR DISTRICT.DELIVER UNDAMAGED ITEMS TO THE DISTRICT STORAGE YARD ASREQUIRED.

    REGULATE ALL CONSTRUCTION TRAFFIC AS TO CAUSE MINIMUM OF INCONVENIENCE TO THE PUBLIC OR DISTRICT EMPLOYEES. PROVIDE A SAFE AND CONVENIENT ACCESS TO THE CAMPUSES REQUIRED DURING CONSTRUCTION.

    UPON COMPLETION OF THE WORK ON EACH ROADWAY PROJECT, THOROUGHLY CLEAN ALL CONSTRUCTION MATERIALS, SWEEP ALL EXCESS ROCK AND RSETORE AL DELIVERY SITES TO NATURAL CONDITIONS OR SATISFACTORY OF THE ENGINEERPRIOR TO FINAL ACCEPTANCE OR REMOVAL OF THE BARRICADES.

    THE CONTRACTOR SHALL MAINTAIN EACH SITE FREE OF TRASH, CONSTRUCTION DEBRIS AND SURPLUS MATERIALS.

    REMOVE EXCESS AGGREGATE MATERIAL WITHIN THE CONSTRUCTION LIMITS AND NOT INCORPORATED INTO THE CONSTRUCTION FROM THE PROJECT AND DISPOSE OF IT IN A PROPER MANNER ACCEPTABLE TO THE ENGINEER. THIS WORK WILLNEED TO OCCUR PRIOR TO THE JOB BEING ACCEPTED AND WILL NOT BE PAID FOR DIRECTLY, BUT WILL BE SUBSIDIARY TO THE VARIOUS BID ITEMS.

    TXDOT ITEM 316 SURFACE TREATMENTS:

    DESCRIPTION: ONE COURSE PAVEMENT SEAL COATAREA: 118,486 SYASPH- TYPE AC 15-P OR AC-10-2TRASPH- RATE (GAL/SY)

    TY PB GR 4 SAC -B=0.3 GAL/SY = 35,685 GALTY PB GR5 SAC - B=0.2 GAL/SY = 23,790 GAL

    AGGR- - TYPES/GRTY PB, GR 4 SAC - BTY PB, GR 5 SAC - B

    AGGR- RATE (CY/SY)TY PB GR 4 SAC - B =1/110 = 1,081 CYTY PB GR5 SAC - B=1/120 = 991 CY

    DEPENDENT UPON WEATHER CONDITIONS AND OR SEASON OF APPLICATION THE ENGINEER WILL DIRECT THE ASPHALT TYPE TO UTILIZE.

    ASPHALT AND AGGREGATE RATES ARE FOR ESTIMATION PURPOSES ONLY AND MAY BE ADJUSTED BY THE ENGINEER DEPENDING ON THE MATERIAL USED. KEEP AGGREGATE RATE TO A MINIMUM AS DIRECTED BY THE ENGINEER. ALLOW AMINIMUM 24 HOUR CURING PERIOD IN THE EVENT EMULSIONS ARE USED BEFORE PLACING ANY SUBSEQUENT ASPHALT COURSES.

    TAKE PRECAUTIONARY MEASURES TO AVOID DRIFTING OF ASPHALT ON TO TRAFFIC AND ADJACENT PROPERTIES WHEN USING LATEX ASPHALT.

    THE ENGINEER WILL APPROVE THE LOCATION OF AGGREGATE STOCKPILES. PLACE THE AGGREGATE AT A LOCATION WHERE IT WILL BE FREE OF EXCESS SURFACE MOISTURE, AS DETERMINED BY THE ENGINEER BEFORE APPLICATION.

    FLUX OIL OR EMULSIONS MAY BE USED FOR PR-ECOATING LRA AND LRA TRAP ROCK BLENDS. DRY THE PRECOATED AGGREGATE TO THE SATISFACTION OF THE ENGINEER WHEN EMULSIONS ARE USED AS THE PRECOAT MATERIAL IT WILL BE THERESPONSIBILITY OF THE CONTRACTOR/PRODUCER TO PROVIDE ADEQUATE DRYING AND MINIMUM CURING PERIOD BEFORE DELIVERY OF THE AGGREGATE.

    THE ENGINEER RESERVES THE RIGHT TO REJECT ANY PRE-COATED AGGREGATE WHICH IS IMPROPERLY COATED OR OTHERWISE UNSATISFACTORY FOR USE. IF THE AGGREGATES TO BE PRECOATED ARE FOUND TO HAVE STRIPPINGCHARACTERISTICS, THE ENGINEER MAY REQUIRE THE ADDITION OF AN ANTI-STRIPPING AGENTS. ADD 1% HYDRATED LIME BY WEIGHT TO AGGREGATE WHEN CHOOSING LIME AS AN ANTI-STRIPPING AGENT. LIME NEEDS TO MEET DMS-6350REQUIREMENTS AND IS TO BE CONSIDERED SUBSIDIARY TO THIS ITEM.

    ENSURE THAT THE ASPHALT USED FOR PRE-COATING THE AGGREGATE AT THE PLANT AND THE ASPHALT USED FOR THE SURFACE TREATMENT AT THE PROJECT SITE WILL NOT RESULT IN A REACTION THAT MAY ADVERSELY AFFECT THE BONDINGOF THE AGGREGATE AND ASPHALT DURING THE SURFACE TREATMENT OPERATION.

    PRE-COATED AGGREGATED THAT DO NOT FLOW QUALITIES AND CAN NOT BE SATISFACTORY SPREAD BY APPROVED MECHANICAL SPREADING DEVICES ARE NOT ACCEPTABLE.

    STOCKPILES OF AGGREGATE PRE-COATED WITH AC MAY GENERATE EXCESSIVE HEAT BUILD-UP RESULTING IN DAMAGE TO THE ASPHALT AND/OR AGGREGATES IF ADEQUATE COOLING HAS NOT BEEN INITIALLY PROVIDED STOCKPILES SHOWINGEVIDENCE OF EXCESSIVE HEAT BUILD-UP CAN BE REJECTED BY ENGINEER

    EXECUTE ALL ROLLING IN ACCORDANCE WITH ITEM 210 ( MEDIUM, PNEUMATIC,TIRE) AT THE APPROXIMATE RATE OF 1 HR/3000 SY OR AS DIRECTED BY THE ENGINEER. THE LIGHT PNEUMATIC ROLLER WILL BE ACCEPTABLE AT THE APPROXIMATERATE OF 2 HR/2000 SY TIRE PRESSURE AND BALLAST OF ALL PNEUMATIC ROLLERS WILL BE CONTINUING INTEREST BY THE ENGINEER, AND WILL BE IN ACCORDANCE WITH ITEM 210.

    CONFIGURE THE ASPHALT DISTRIBUTOR SPRAY BAR SO THAT NOZZLES OVER THE WHEEL PATHS OF THE ROAD SPRAY 15% LESS THAN THE NOZZLES OVER THE AREAS OF THE ROADWAY, UNLESS OTHERWISE DIRECTED THE ENGINEER. PROVIDE THEVARIABLE SIZE NOZZLES AND PROVIDE THE ENGINEER WITH DOCUMENTATION CERTIFYING THE CALIBRATION OF THE NOZZLES. THE VARIABLE SIZE NOZZLES WILL NOT BE PAID FOR DIRECTLY, BUT IS SUBSIDIARY TO ITEM 316

    ALL CONCRETE CURBS AND/PR CONCRETE ISLANDS THAT GET COATED WITH OIL/MATERIAL DURING THE SURFACE TREATMENT OPERATION SHALL BE CLEANED AS DIRECTED/APPR9OVED BY THE ENGINEER PRIOR TO FINAL ACCEPTANCE OF THEPROJECT. REPAIR SURFACE FLUSHING AND BLEEDING LOCATIONS ON ALL SCHOOL SITES.

    PAVEMENT SEALER ALTERNATE BID

    AS AN ALTERNATE BID FOR EACH CAMPUS, THE CONTRACTOR PROVIDE AND INSTALL SEALMASTER COLD TAR CONCENTRATE PAVEMENT SEALER WITH PAVE GEL ADDITIVE OR APPROVED EQUAL. CONTRACTOR INSTALLATION PROCEDURES ANDMETHODS SHALL BE AS PER MANUFACTURERS RECOMMENDATIONS. CONTRACTOR SHALL PROVIDE AND INSTALL A MINIMUM OF 2 COATS OF PAVEGEL SEALER ADDITIVE AS PER MANUFACTURERS RECOMMENDATIONS. TEMPERATURE MUST BEA MINIMUM OF 50 DEGREES FAHRENHEIT AND RISING FOR A PERIOD OF NOT LESS THAN 24 HOURS. DO NOT APPLY WHEN TEMPERATURE IS EXPECTED TO DROP BELOW 50 DEGREES FAHRENHEIT IN A PERIOD. DO NOT APPLY IF RAIN ISFORECAST WITHIN 24 HOURS. ALLOW FINAL COAT OF PAVEMENT SEALER TO CURE FOR A MINIMUM OF 24 HOURS BEFORE OPENING TO TRAFFIC. SEE BID SCHEDULE FOR FURTHER INFORMATION.

    TXDOT ITEM 502 BARRICADES,SIGNS AND TRAFFIC HANDLING :

    STATE STANDARD SHETS(S) TRAFFIC CONTROL PLAN (TCP) REQUIRES THAT CERTAIN SIGNS ARE TO REMAIN IN PLACE UNTIL THE STANDARD PAVEMENT MARKINGS ARE PLACED. PLACE THE STANDARD MARKINGS NO LATER THAN 14 DAYS AFTERSURFACE TREATMENT OPERATIONS ARE COMPLETED.

    REFER TO THE TRAFFIC CONTROL PLAN FOR THIS PROJECT AS SHOWN IN THE PLANS, AS DETAILED ON THE BARRICADE AND CONSTRUCTION STANDARD SHEETS AND AS PROVIDED FOR IN THE CURRENT TEXAS MUTCD

    ASSURE THAT PREVIOUSLY USED TO TMA's MEET THE NCHRP 230 REQUIREMENTS AND ALL NEW TRUCK MOUNTED ATTENUATORS MEET NCHRP 350 REQUIREMENTS.

    THE TIME FRAME FOR THE CONTRACTOR TO PROVIDE PROPERLY MAINTAINED TRAFFIC CONTROL DEVICES BEFORE THEY ARE CONSIDERED TO BE IN NON-COMPLIANCE WITH THIS ITEM, IS 48 HOURS REGARDLESS OF THE DAYS OF THE WEEKINVOLVED AFTER NOTIFICATION IS DONE IN WRITING BY THE ENGINEER. IF THE CONTRACTOR DOESN'T TAKE THE NECESSARY STEPS APPROVED BY THE ENGINEER TO ELIMINATE THE NON-COMPLIANCE CONDITIONS WITHIN THE 48 HOURSESTABLISHED ABOVE PAYMENT FOR THIS ITEM FOR THE MONTH(S) IN NON-COMPLIANCE CAN BE WITHHELD AS COVERED IN SECTION 502.4(B)

    FURNISH ALL T4RAFFIC CONTROL AND COMPLY WITH THE CURRENT TEXAS MUTCD. TRAFFIC CONTROL PLAN (TCP) AND BARRICADES AND CONSTRUCTION STANDARDS (BC) PAVEMENT MARKER STANDARDS (PM) AND WORK ZONE STANDARD(WZ) CONDUCT CONSTRUCTION METHODS SO AS TO PROVIDE THE LEAST POSSIBLE INTERFERENCE TO TRAFFIC AND TO PERMIT THE CONTINUOUS MOVEMENT OF TRAFFIC IN ALL ALLOWABLE DIRECTIONS AT ALL TIMES. CLEAN UP AND REMOVEFROM THE WORK AREA ALL LOOSE MATERIAL RESULTING FROM CONTRACT OPERATIONS AT THE END OF EACH WORK DAY.

    THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE TRAFFIC CONTROL AND WILL BE RESPONSIBLE FOR FURNISHING ALL TRAFFIC CONTROL DEVICES AND FLAGGERS

    ALL PROPOSED STOP SIGNS SHALL BE R1-1 (30"X30") AND AHDERE TO THE TEXAS MUTCD REQUIREMENT.

    TXDOT ITEM 506 TEMPORARY EROSION, SEDIMENTATION , AND ENVIROMENTAL CONTROLS :

    THE SW3P FOR THIS CONTRACT CONSISTS OF TEMPORARY SEDIMENT CONTROL FENCE TO BE UTILIZED AS DEEMED NECESSARY BY THE ENGINEER.

    TXDOT ITEM 644 SMALL ROADSIDE SIGN SUPPORTS AND ASSEMBLIES:

    SALVAGE AND DELIVER ALL ALUMINUM SIGN FACES TO LISD AS DIRECTED.

    TXDOT ITEM 666 REFLECTORIZED PAVEMENT MARKINGS:

    ALL PAVEMENT MARKINGS INCLUDING PARKING STALLS, ADA MARKINGS, FIRE LANE MARKING, DIRECTIONAL ARROWS, ETC FOR ALL PAVEMENT AREAS SHALL BE PAINTED "WHITE". PROVIDE "YELLOW"PAINT FOR ALL CONCRETE AREAS.PROVIDE BLUE COLOR FOR ADA HANDICAP MARKING AND RED FOR FIRE LANES UNLESS OTHERWISE INDICATED. PAINT MATERIAL SHALL ADHERE TO THE REQUIREMENTS OF PPG ZONELINE 11-53 SERIES. CONTRACTOR SHALL INSTALLPAVEMENT MARKINGS AS PER MANUFACTURERS RECOMMENDATIONS.

    SWEEP AND CLEAN SURFACE WITH POWER BROOM SUPPLEMENTED BY HAND BROOMING AS REQUIRED TO REMOVE ALL LOOSE MATERIAL, DUST AND DEBRIS. REMOVE ALL GREASE AND OILS DEPOSITS WITH SOLVENTS AND DETERGENTS ASREQUIRED.

    STRIPING: APPLY PAINT WITH MECHANICAL EQUIPMENT TO PRODUCE STRIPES WITH UNIFORM STRAIGHT EDGES, MINIMUM 4" WIDE OR AS PER DETAIL. APPLY IN COATS AT MANUFACTURERS RECOMMENDED RATES TO PROVIDE A 15-MIL WETFILM THICKNESS.

    APPLY ALL MAKINGS IN ACCORDANCE WITH THE PLANS, TEXAS MUTCD AND AS DIRECTED/APPROVED BY THE ENGINEER AFTER THE SURFACE HAS CURED FOR (2) DAYS, BEEN CLEANED AND PREPARED ACCORDING TO THE SPECIFICATIONS AND ASDIRECTED/APPROVED BY THE ENGINEER. APPLY MARKINGS DIRECTLY OVER EXISTING PAINTED PAVEMENT MARKINGS ONLY WHERE APPLICABLE AND AS OUTLINED IN THE 2014 STANDARD SPECIFICATIONS FOR CONSTRUCTION ANDMAINTENANCE OF HIGHWAYS,STREETS AND BRIDGES.

    FOR SURFACE TREATMENT PROJECTS, LEAVE THE FINAL COURSE IN PLACE FOR TWO (2) DAYS AND BROOM THE ROADWAY DIRECTLY AHEAD OF THE STRIPING MACHINE PRIOR TO PLACING STANDARD PAVEMENT MARKINGS.

    TXDOT ITEM 672 RAISED PAVEMENT MARKERS:

    MOUNT ADHESIVE DISPENSING EQUIPMENT INTO TRUCK OR TRAILER. PLACE ALL ADHESIVE MATERIAL DIRECTLY FROM THE HEATED DISPENSER TO THE PAVEMENT. PORTABLE OR NOT-HEATED CONTAINERS WILL BE ALLOWED FOR THE PLACEMENTOF THE ADHESIVE MATERIAL.

    USE A CREW EXPERIENCED IN THE WORK OF RAISED PAVEMENT MARKER REPLACEMENT AND/OR INSTALLATION AND IN THE NECESSARY TRAFFIC CONTROL.

    PLACE THE PROPOSED REFLECTIVE PAVEMENT MARKERS IN ACCORDANCE WITH TxDOT STANDARDS.

    CLEAN THE PAVEMENT AT EACH LOCATION WHERE MARKERS ARE TO BE PLACED IN SUCH A MANNER AS TO REMOVE ALL DIRT AND LOOSE DEBRIS BEFORE APPLICATION. THIS CLEANING WILL NOT BE PAID FOR DIRECTLY, BUT WILL BE SUBSIDIARY TOITEM 672 RAISED PAVEM ENT MARKERS.

    PRIOR TO PLACEMENT OF ALL RAISED PAVEMENT MARKERS ON CONCRETE PAVEMENT. THE SURFACE WILL BE BLAST-CLEANED USING AN ABRASIVE BLASTING MEDIUM. THIS WORK WILL NOT BE PAVED FOR DIRECTLY BUT WILL BE

    SUBSIDIARY TO BID ITEM 672 RAISED PAVEMENT MARKERS.

    USE BITUMINOUS ADHESIVE ON BITUMINOUS PAVEMENTS. DO NOT USE EPOXY ADHESIVE ON PORTLAND CEMENT CONCRETE PAVEMENT.

    GENERAL INSTRUCTIONS:

    1) THE CONTRACTOR SHALL SUBMIT A PROPOSED SCHEDULE OF WORKAT THE PRE-CONSTRUCITON CONFERENCE. NO CONSTRUCTIONACTIVITIES SHALL COMMENCE UNTIL THE SCHEDULE IS APPROVED BYLISD AND THE ENGINEER.

    2) CONTRACTOR SHALL COORDINATE AND PERFORM ALL PROPOSEDWORK TO MINIMIZE DISRUPTION TO THE DISTRICT. CONTRACTOR SHALLCONTACT LISD THE SCHOOL WORKING DAY SCHEDULE AND PROVIDE ASCHEDULE TO MINIMIZE DISRUPTION.

    3) INSTALL ALL APPLICABLE BARRICADES, SIGNS, WORK ZONES MARKINGAS REQUIRED FOR THE SAFETY OF THE PUBLIC AND STAFF.

    4) ONCE WORK HAS BEGUN AT EACH SITE, THE ENTIRE SEQUENCE MUSTBE WORKED ON CONTINUOUSLY TO COMPLETION. ADJACENT SITELOCATIONS MAY BE COMBINED WITH ENGINEER OR LISD APPROVAL. NOWORK WILL BE ALLOWED NEXT CAMPUS UNTIL THE CURRENT WORK ISFINISHED AND READY TO OPEN TO TRAFFIC UNLESS OTHERWISEAPPROVED BY THE ENGINEER.

    5) CONTRACTOR IS REQUIRED TO OBTAIN AND PAY FOR ALL CITY OFLAREDO PERMITS REQUIRED FOR PROJECT. NO CONSTRUCTION SHALLCOMMENCE WITHOUT OBTAINING ALL PERMITS/ APPROVALS.

    6) EACH WORK AREA IS TO BE CLEARED BY BLOWING AND SWEEPINGALL VEGETATION, DIRT, AND LOOSE DEBRIS PRIOR TO SEAL COATOPERATIONS.

    7) CONTRACTOR SHALL PROVIDE FLAGGERS, SIGNS, WORK ZONEMARKINGS IN ACCORDANCE WITH THE PROJECT AS REQUIRED.

    8) CONTRACTOR SHALL REPAIR ALL POT HOLES AND BAD AREASIDENTIFIED ON THE PLAN SET.

    9) ALL PARKING AREAS WITHIN PROJECT LIMITS SHALL BE RE-STRIPED ASPER PLAN.

    10) AREAS UTILIZED FOR THE CONTRACTOR'S PARKING, STORAGE,STAGING, HAUL ROUTES, AND ALL OTHER IMPACTED AREAS DISTURBEDSHALL BE RESTORED TO THE ORIGINAL CONDITION OR AS ACCEPTED BYLISD AT THE COMPLETION OF THE PROJECT.

    11) CONTRACTOR WILL BE REQUIRED TO PROVIDE WARRANTY FOR THEWORK COMPLETED AS PER LISD REQUIREMENTS.

    BASIS OF ESTIMATE

    SEQUENCE OF WORK

    THE FOLLOWING WORK WILL BE PERFORMED AT EACH CAMPUS.SIMULTANEOUS WORK WILL NOT BE ALLOWED UNLESS OTHERWISEAPPROVED BY THE ENGINEER.

    1) PLACE ADVANCE WARNING SIGNS, FLAGGERS, WORK ZONE SIGNS,BARRICADES AND ALL TRAFFIC CONTROL MEASURES REQUIRED ON THESITE.

    2) PREPARE THE WORK AREA BY CLEARING, BLOWING AND SWEEPINGALL VEGETATION, DIRT, AND LOOSE DEBRIS PRIOR TO SEAL COATOPERATIONS.

    3) REPAIR ALL/ANY POT HOLES AND BAD AREAS IDENTIFIED ON THE PLANSET.

    4) COMPLETE ALL SEAL COAT OPERATIONS FOR THE PARKING AREAS.

    5) COMPLETE ALL STRIPING SIGNAGE AND PAVEMENT MARKINGS AS PERPLAN. ALL PAVEMENT MARKINGS SHALL BE INSTALLED NOT LESS THAN24 HOURS AFTER COMPLETION OF THE SEAL COAT OPERATIONS.

    6) CLEAN AND CLEAR ALL LOOSE DEBRIS FROM THE PROJECT LIMITS.CLEAN ALL AREAS DISTURBED TO THE ORIGINAL CONDITION OR ASACCEPTED BY LISD.

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016 DRAWN BY: J.J.S. SCALE: AS SHOWNCHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C2.3

    C2.3-GENERAL NOTES.DWG

    FILE: STATUS: FINAL

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

  • PROPOSED SEAL COATAREA= 52,950 SQ.FT.

    18

    .0

    '

    9.0'

    9.0'

    18

    .0

    '

    9.0'

    18.0'

    18

    .0

    '

    18.0'

    9.0'

    18.0'

    9.0'

    18.0'

    9.0'

    9.0'5.0'

    PR

    OP

    OS

    ED

    SE

    AL

    CO

    AT

    AR

    EA

    = 10

    ,700

    SQ

    .FT

    .18.0'

    PROPOSED SEAL COATAREA= 18,850 SQ.FT.

    PROPOSED SEAL COATAREA= 22,185 SQ.FT.

    20.0'

    9

    .

    0

    '

    11.0'

    18.0'

    9.0'

    18.0'

    20.0'

    9.0'

    18.0'

    5.0'

    9.0' 9.0' 8.0'9.0'

    22.0'

    18.0'

    9.0'

    22.8'

    DRAWN BY: J.J.S. SCALE: AS SHOWN

    CHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C3.1

    C-3.1-3.10 ELEMENTARY SCHOOLS.DWG

    LAREDO INDEPENDENT SCHOOL DISTRICT

    FARIAS ELEMENTARY SCHOOL

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    FILE: STATUS: FINAL

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    0

    30' 60'

    SCALE: 1" = 30'

    CALL BEFORE YOU DIG!

    TEXAS ONE CALL PARTICIPANTS REQUEST

    48 HOURS NOTICE BEFORE YOU DIG

    DRILL, OR BLAST - STOP, CALL!

    TEXAS ONE CALL SYSTEM

    811

    SOUTH SIDE PARKING AREASCALE 1" - 30'

    UTILITY DEPARTMENTS

    LAREDO, TEXAS

    WATER DISTRIBUTION AND SANITARY SEWER

    ROLANDO LOZANO

    LAREDO WATER UTILITIES DEPARTMENT

    (956) 794-1625

    ELECTRIC COMPANY

    A. E. P.

    (956) 721-3169

    TELEPHONE COMPANY

    ATT

    (956) 727-6749

    CABLE COMPANY

    TIME WARNER CABLE

    (956) 721-0600

    NORTH SIDE PARKING AREASCALE 1" - 20'

    WEST SIDE PARKING AREASCALE 1" - 30'

    28 PARKING SPACES

    ORTIZ STREET

    SA

    NT

    A M

    AR

    IA R

    OA

    D

    CHICAGO STREET

    RA

    IL R

    OA

    D T

    RA

    CK

    S

    FIRE LANESTRIPINGSEE DETAIL

    FIRE LANESTRIPING

    SEE DETAIL

    PAVEMENTSTRIPING

    26 PARKING SPACES 11 PARKING SPACES

    11 PARKING SPACES10 PARKING SPACES

    10 PARKING SPACES

    8 PARKING SPACES

    8 PARKING SPACES

    FIRE LANE STRIPINGSEE DETAIL

    RESTRIPEPAVEMENT

    MARKING

    PROPOSEDPAVEMENT

    STRIPINGPAVEMENTMARKINGS

    FIRE LANE STRIPINGSEE DETAIL

    PAVEMENTSTRIPING

    13 PARKING SPACES

    11 PARKING SPACES

    12 PARKING SPACES

    11 P

    AR

    KIN

    G S

    PA

    CE

    SFIRE LANESTRIPING

    SEE DETAIL

    FIRE LANESTRIPING

    SEE DETAIL

    EXISTINGCONCRETE

    EXISTING SIDEWALK

    PROPOSED 4"CENTERLINE STRIPING

    PAVEMENTMARKINGS

    LOCATIONSAS SHOWN

    PROPOSED 24"X6'PAVEMENT STRIPING

    SEE DETAIL

    PAVEMENTMARKINGS

    LOCATIONSAS SHOWN

    PROPOSED 24"X6'PAVEMENT MARKING

    SEE DETAIL

    EXISTINGCONCRETE PAVEMENT

    EXISTINGBUILDING

    EXISTING BUILDING

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    PAVEMENTMARKINGS

    LOCATIONSAS SHOWN

    PAVEMENT MARKINGSLOCATION AS SHOWN

    EXISTINGSIGN

    FIRE LANESTRIPINGSEE DETAIL

    NOTES:

    1. CONTRACTOR IS REQUIRED TO VISIT SITE AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO

    PLACING A BID. BID SHALL BE ALL INCLUSIVE OF WORK REQUIRED TO COMPLETE THE PROJECT.

    2. CONTRACTOR SHALL MATCH EXISTING GRADES NOTIFY ENGINEER OF ANY DISCREPANCIES.

    3. NO CONSTRUCTION SHALL COMMENCE UNTIL PROPER CLEARANCES FROM THE ENGINEER/DISTRICT

    HAS BEEN OBTAINED.

    4. CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING AS MAY BE REQUIRED FOR THE PROJECT.

    5. CONTRACTOR SHALL PROVIDE ADEQUATE PEDESTRIAN / TRAFFIC BARRICADES WHILE WORKING

    ONSITE TO ENSURE SAFETY FOR THE PUBLIC.

    6. CONTRACTOR SHALL INCLUDE IN HIS BID REMOVAL AND HAULING OF ANY EXCESS MATERIAL.

    7. CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE CONDITIONS DURING ALL CONSTRUCTION

    PHASES OF THE PROJECT UNTIL PROJECT IS COMPLETED. HANDLE ALL EXCAVATED, EXCESS AND

    STOCKPILED MATERIAL IN SUCH A WAY THAT IT WILL NOT BLOCK DRAINAGE OR DAMAGE EXISTING

    ENVIRONMENTAL ITEMS.

    8. ALL EXISTING ASPHALT PAVED SURFACES WILL BE SEAL COATED AS PER DETAIL UNLESS

    SPECIFICALLY SHOWN OTHERWISE.

    9. ALL EXISTING WHEEL STOPS AND SPEED HUMPS SHALL BE RELOCATED AND REINSTALLED AS

    REQUIRED WHEN WITHIN PROPOSED PROJECT LIMITS AND/OR PROPOSED PAVEMENT IMPROVEMENTS.

    10. ALL PAVEMENT STRIPING WITHIN PROJECT LIMITS SHALL BE RE-STRIPED UNLESS SPECIFICALLY

    SHOWN OTHERWISE.

    11. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL DUST CONTROL MEASURES AS MAY BE

    REQUIRED FOR PROJECT AT ALL TIMES.

    12. CONTRACTOR TO SUBMIT ALL MATERIAL SUBMITTALS FOR ENGINEER APPROVAL PRIOR TO

    CONSTRUCTION.

    11. CONTRACTOR SHALL ADJUST ALL UTILITIES WITHIN THE PROJECT AREA TO GRADE AS REQUIRED.

    12. DIMENSIONS SHOWN ARE TAKEN FROM THE BACK OF CURB OR EDGE OF SIDEWALK, UNLESS

    OTHERWISE PRESENTED ON THIS PLAN.

    13. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES

    THAT DIFFER FROM THIS DIMENSION PLAN.

    14. PAVEMENT MARKINGS/STRIPING SHALL BE AS PER THIS PLAN, UNLESS OTHERWISE ADVISED BY THE

    ENGINEER. COLORS SHALL BE AS DIRECTED BY LISD.

    15. THE CONTRACTOR SHALL ADHERE TO LOCAL DESIGN REQUIREMENTS FOR PARKING DIMENSIONS,

    SHOULD REVISIONS BE MADE.

    16. THE CONTRACTOR SHALL COORDINATE ANY ADDITIONAL DIMENSIONS NEEDED WITH THE ENGINEER

    PRIOR TO CONSTRUCTION ACTIVITIES.

    17. THE CONTRACTOR SHALL PROVIDE FOR FIRE LANE MARKING AS SHOWN ON THE UTILITY PLAN AND

    COORDINATE WITH THE CITY OF LAREDO FIRE DEPARTMENT FOR LOCATIONS AND COLORS.

    18. PAVEMENT MARKING SHALL BE PAINTED IN ACCORDANCE WITH THE MOST RECENT ARCHITECTURAL

    BARRIERS REQUIREMENTS AND AS PER CIVIL DIMENSIONAL PLAN. SIGNAGE SHALL BE PROVIDED BY

    THE CONTRACTOR AND COORDINATED WITH THE ARCHITECT AND THE LOCAL BUILDING DEPARTMENT.

    19. LOCATIONS OF UTILITIES SHOWN HEREIN WERE DERIVED FROM BEST AVAILABLE SOURCES AND

    FIELD SURVEYS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING EXACT LOCATION,

    DEPTH, AND SIZES OF ALL UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO CONSTRUCTION AND

    SHALL BE LIABLE FOR ANY DAMAGES OR DOWN TIME CAUSED BY FAILURE TO COMPLY WITH THESE

    INSTRUCTIONS.

    CONCRETE

    EXISTING PROPOSED

    PAVEMENT IMPROVEMENTS

    MANHOLES

    SIGN

    BUILDING

    CONCRETE CURB & GUTTER

    MONOLITHIC CURB/GUTTER

    SIGN

    PROPOSEDPAVEMENTSTRIPING

    EXISTING BUILDING

    WHEEL STOP

    PROPOSED 24"X6'PAVEMENT STRIPINGSEE DETAIL

    PROPOSED 24"X6'PAVEMENT STRIPING

    SEE DETAIL

    PROPOSEPAVEMENT

    STRIPING

    PROPOSEPAVEMENT

    STRIPINGPROPOSE

    PAVEMENTSTRIPING

    PROPOSED 24"X6'PAVEMENT STRIPINGSEE DETAIL

    PROPOSED 24"X6'PAVEMENT STRIPING

    SEE DETAIL

    PROPOSED 24"X6'PAVEMENT STRIPING

    SEE DETAIL

    PROPOSED 24"X6'PAVEMENT STRIPING

    SEE DETAIL

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

  • PROPOSED SEAL COATAREA= 17,842 SQ.FT.

    9.0'

    20

    .0

    '

    20

    .0

    '

    9.0'

    20.0'

    9.0'

    20.0'

    5.0'

    8.0'

    24.2'

    24.9'

    2.0'

    PR

    OP

    OS

    ED

    SE

    AL

    CO

    AT

    AR

    EA

    = 19

    ,803

    SQ

    .FT

    .

    20.0'

    9.0'

    20.0'

    9.0'

    9.0'

    20

    .0

    '

    5.0'

    8.0'

    8.0

    '6

    .0

    '1

    0.0

    '

    ONLY

    PR

    OP

    OS

    ED

    SE

    AL

    CO

    AT

    AR

    EA

    = 5,

    200

    SQ

    .FT

    .

    DRAWN BY: J.J.S. SCALE: AS SHOWN

    CHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C3.2

    C-3.1-3.10 ELEMENTARY SCHOOLS.DWG

    LAREDO INDEPENDENT SCHOOL DISTRICT

    SANTA MARIA ELEMENTARY SCHOOL

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    FILE: STATUS: FINAL

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    0

    30' 60'

    SCALE: 1" = 30'

    CALL BEFORE YOU DIG!

    TEXAS ONE CALL PARTICIPANTS REQUEST

    48 HOURS NOTICE BEFORE YOU DIG

    DRILL, OR BLAST - STOP, CALL!

    TEXAS ONE CALL SYSTEM

    811

    WEST SIDE PARKING AREASCALE 1" - 30'

    UTILITY DEPARTMENTS

    LAREDO, TEXAS

    WATER DISTRIBUTION AND SANITARY SEWER

    ROLANDO LOZANO

    LAREDO WATER UTILITIES DEPARTMENT

    (956) 794-1625

    ELECTRIC COMPANY

    A. E. P.

    (956) 721-3169

    TELEPHONE COMPANY

    ATT

    (956) 727-6749

    CABLE COMPANY

    TIME WARNER CABLE

    (956) 721-0600

    SOUTH SIDE PARKING AREASCALE 1" - 30'

    EAST SIDE PARKING AREASCALE 1" - 30'

    7 PARKINGSPACES

    SA

    NT

    A M

    AR

    IA A

    VE

    NU

    E

    SA

    NT

    A M

    AR

    IA A

    VE

    NU

    E

    BOSTON STREET

    JUA

    RE

    Z A

    VE

    NU

    E

    PAVEMENT MARKINGSEE DETAILS

    PROPOSED 24" x 6'PAVEMENT MARKING

    FIR

    E L

    AN

    ES

    TR

    IPIN

    GS

    EE

    DE

    TA

    IL

    12 PARKING SPACES

    15 PARKING SPACES

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    14 P

    AR

    KIN

    G S

    PA

    CE

    S

    5 P

    AR

    KIN

    G S

    PA

    CE

    S5

    PA

    RK

    ING

    SP

    AC

    ES

    11 P

    AR

    KIN

    G S

    PA

    CE

    S

    FIRE LANE STRIPINGSEE DETAILPAVEMENT MARKING

    LOCATIONSAS SHOWN

    4 P

    AR

    KIN

    G S

    PA

    CE

    S

    FIR

    E L

    AN

    E S

    TR

    IPIN

    GS

    EE

    DE

    TA

    IL

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    EXISTINGBUILDING

    EXISTINGBUILDING

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    SID

    EW

    ALK

    EX

    IST

    ING

    SID

    EW

    ALK

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EXISTINGCONCRETE

    EXISTING SIDEWALK

    EXISTING CONCRETE

    EXISTINGSIGN

    NOTES:

    1. CONTRACTOR IS REQUIRED TO VISIT SITE AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO

    PLACING A BID. BID SHALL BE ALL INCLUSIVE OF WORK REQUIRED TO COMPLETE THE PROJECT.

    2. CONTRACTOR SHALL MATCH EXISTING GRADES NOTIFY ENGINEER OF ANY DISCREPANCIES.

    3. NO CONSTRUCTION SHALL COMMENCE UNTIL PROPER CLEARANCES FROM THE ENGINEER/DISTRICT

    HAS BEEN OBTAINED.

    4. CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING AS MAY BE REQUIRED FOR THE PROJECT.

    5. CONTRACTOR SHALL PROVIDE ADEQUATE PEDESTRIAN / TRAFFIC BARRICADES WHILE WORKING

    ONSITE TO ENSURE SAFETY FOR THE PUBLIC.

    6. CONTRACTOR SHALL INCLUDE IN HIS BID REMOVAL AND HAULING OF ANY EXCESS MATERIAL.

    7. CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE CONDITIONS DURING ALL CONSTRUCTION

    PHASES OF THE PROJECT UNTIL PROJECT IS COMPLETED. HANDLE ALL EXCAVATED, EXCESS AND

    STOCKPILED MATERIAL IN SUCH A WAY THAT IT WILL NOT BLOCK DRAINAGE OR DAMAGE EXISTING

    ENVIRONMENTAL ITEMS.

    8. ALL EXISTING ASPHALT PAVED SURFACES WILL BE SEAL COATED AS PER DETAIL UNLESS

    SPECIFICALLY SHOWN OTHERWISE.

    9. ALL EXISTING WHEEL STOPS AND SPEED HUMPS SHALL BE RELOCATED AND REINSTALLED AS

    REQUIRED WHEN WITHIN PROPOSED PROJECT LIMITS AND/OR PROPOSED PAVEMENT IMPROVEMENTS.

    10. ALL PAVEMENT STRIPING WITHIN PROJECT LIMITS SHALL BE RE-STRIPED UNLESS SPECIFICALLY

    SHOWN OTHERWISE.

    11. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL DUST CONTROL MEASURES AS MAY BE

    REQUIRED FOR PROJECT AT ALL TIMES.

    12. CONTRACTOR TO SUBMIT ALL MATERIAL SUBMITTALS FOR ENGINEER APPROVAL PRIOR TO

    CONSTRUCTION.

    11. CONTRACTOR SHALL ADJUST ALL UTILITIES WITHIN THE PROJECT AREA TO GRADE AS REQUIRED.

    12. DIMENSIONS SHOWN ARE TAKEN FROM THE BACK OF CURB OR EDGE OF SIDEWALK, UNLESS

    OTHERWISE PRESENTED ON THIS PLAN.

    13. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES

    THAT DIFFER FROM THIS DIMENSION PLAN.

    14. PAVEMENT MARKINGS/STRIPING SHALL BE AS PER THIS PLAN, UNLESS OTHERWISE ADVISED BY THE

    ENGINEER. COLORS SHALL BE AS DIRECTED BY LISD.

    15. THE CONTRACTOR SHALL ADHERE TO LOCAL DESIGN REQUIREMENTS FOR PARKING DIMENSIONS,

    SHOULD REVISIONS BE MADE.

    16. THE CONTRACTOR SHALL COORDINATE ANY ADDITIONAL DIMENSIONS NEEDED WITH THE ENGINEER

    PRIOR TO CONSTRUCTION ACTIVITIES.

    17. THE CONTRACTOR SHALL PROVIDE FOR FIRE LANE MARKING AS SHOWN ON THE UTILITY PLAN AND

    COORDINATE WITH THE CITY OF LAREDO FIRE DEPARTMENT FOR LOCATIONS AND COLORS.

    18. PAVEMENT MARKING SHALL BE PAINTED IN ACCORDANCE WITH THE MOST RECENT ARCHITECTURAL

    BARRIERS REQUIREMENTS AND AS PER CIVIL DIMENSIONAL PLAN. SIGNAGE SHALL BE PROVIDED BY

    THE CONTRACTOR AND COORDINATED WITH THE ARCHITECT AND THE LOCAL BUILDING DEPARTMENT.

    19. LOCATIONS OF UTILITIES SHOWN HEREIN WERE DERIVED FROM BEST AVAILABLE SOURCES AND

    FIELD SURVEYS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING EXACT LOCATION,

    DEPTH, AND SIZES OF ALL UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO CONSTRUCTION AND

    SHALL BE LIABLE FOR ANY DAMAGES OR DOWN TIME CAUSED BY FAILURE TO COMPLY WITH THESE

    INSTRUCTIONS.

    CONCRETE

    EXISTING PROPOSED

    PAVEMENT IMPROVEMENTS

    MANHOLES

    SIGN

    BUILDING

    CONCRETE CURB & GUTTER

    MONOLITHIC CURB/GUTTER

    SIGN

    WHEEL STOP

    6 P

    AR

    KIN

    G S

    PA

    CE

    S

    PROPOSED 24"x6'PAVEMENT

    MARKING

    PROPOSED 24" x 6'PAVEMENT MARKING

    PAVEMENT MARKINGSEE DETAILS

    PROPOSED 24" x 6'PAVEMENTMARKING

    PROPOSED24" x 6'PAVEMENTMARKING

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSED 2'STOP BAR

    LOCATIONSAS SHOWN

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    ADJUSTEXISTINGSIGN

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

  • PR

    OP

    OS

    ED

    SE

    AL

    CO

    AT

    AR

    EA

    = 10

    ,850

    SQ

    .FT

    .

    ON

    LY

    9.0'

    9.0'

    8.0'

    PR

    OP

    OS

    ED

    SE

    AL

    CO

    AT

    AR

    EA

    = 21

    ,150

    SQ

    .FT

    .

    9.0

    '

    9.0

    '

    9.0

    '

    18.0'

    18.0'

    8.0'

    9.0'

    9.0'

    9.0'

    20.0'

    18.0'

    8.0

    '5

    .0

    '

    10.0'

    9.0

    '9

    .0

    '

    PROPOSED SEAL COATAREA= 32,550 SQ.FT.

    9.0

    '

    9

    .

    0

    '

    18

    .5

    '

    20.0'

    BUS PARKING BUS PARKING

    8.0'

    11.6'

    9.0'

    20.0'

    DRAWN BY: J.J.S. SCALE: AS SHOWN

    CHECKED BY: M.E.E. PROJECT NO: U2405

    APPROVED BY: J.A.M. C3.3

    C-3.1-3.10 ELEMENTARY SCHOOLS.DWG

    LAREDO INDEPENDENT SCHOOL DISTRICT

    SANCHEZ OCHOA ELEMENTARY SCHOOL

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    FILE: STATUS: FINAL

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    0

    30' 60'

    SCALE: 1" = 30'

    CALL BEFORE YOU DIG!

    TEXAS ONE CALL PARTICIPANTS REQUEST

    48 HOURS NOTICE BEFORE YOU DIG

    DRILL, OR BLAST - STOP, CALL!

    TEXAS ONE CALL SYSTEM

    811

    UTILITY DEPARTMENTS

    LAREDO, TEXAS

    WATER DISTRIBUTION AND SANITARY SEWER

    ROLANDO LOZANO

    LAREDO WATER UTILITIES DEPARTMENT

    (956) 794-1625

    ELECTRIC COMPANY

    A. E. P.

    (956) 721-3169

    TELEPHONE COMPANY

    ATT

    (956) 727-6749

    CABLE COMPANY

    TIME WARNER CABLE

    (956) 721-0600

    WEST SIDE PARKING AREASCALE 1" - 20'

    NORTH SIDE PARKING AREASCALE 1" - 30'

    EAST SIDE PARKING AREASCALE 1" - 30'

    ASH STREET

    PROPOSEDPAVEMENT

    MARKINGFI

    RE

    LA

    NE

    ST

    RIP

    ING

    SE

    E D

    ET

    AIL

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    7 PARKING SPACES

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    PAVEMENTMARKINGS

    LOCATIONSAS SHOWN

    EXISTINGBUILDING

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EXISTING CONCRETE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    7 PARKING SPACES

    6 P

    AR

    KIN

    G S

    PA

    CE

    S4

    PA

    RK

    ING

    SP

    AC

    ES

    11 P

    AR

    KIN

    G S

    PA

    CE

    S

    4 P

    AR

    KIN

    GS

    PA

    CE

    S

    13 P

    AR

    KIN

    G S

    PA

    CE

    S2

    PA

    RK

    ING

    SP

    AC

    ES

    10 P

    AR

    KIN

    G S

    PA

    CE

    S

    PROPOSED24" X 6'

    PAVEMENTMARKING

    SEE DETAIL

    PROPOSED24" X 6'

    PAVEMENTMARKING

    PROPOSED 24" X 6'PAVEMENTSTRIPINGSEE DETAIL

    PROPOSED24" X 6'PAVEMENTSTRIPING

    FIRE LANE STRIPINGSEE DETAIL

    36 PARKING SPACES

    19 PARKING SPACES

    EXISTINGBUILDINGM

    ON

    TE

    RR

    EY

    AV

    EN

    UE

    PROPOSED 24"X6'PAVEMENTMARKINGSEE DETAIL

    PROPOSED 24" X 8'PAVEMENTMARKINGSEE DETAIL

    FIRE LANESTRIPING

    SEE DETAIL

    PROPOSEDWHEELSTOPS (4)

    PROPOSEDWHEELSTOPS (2)

    PROPOSEDWHEEL

    STOPS (2)

    EXISTINGBUILDING

    PROPOSED PAVEMENTMARKINGSLOCATIONSAS SHOWN

    PROPOSED 4" SOLIDCENTERLINE

    STRIPING

    RE-STRIPEPAVEMENTMARKINGS

    NOTES:

    1. CONTRACTOR IS REQUIRED TO VISIT SITE AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO

    PLACING A BID. BID SHALL BE ALL INCLUSIVE OF WORK REQUIRED TO COMPLETE THE PROJECT.

    2. CONTRACTOR SHALL MATCH EXISTING GRADES NOTIFY ENGINEER OF ANY DISCREPANCIES.

    3. NO CONSTRUCTION SHALL COMMENCE UNTIL PROPER CLEARANCES FROM THE ENGINEER/DISTRICT

    HAS BEEN OBTAINED.

    4. CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING AS MAY BE REQUIRED FOR THE PROJECT.

    5. CONTRACTOR SHALL PROVIDE ADEQUATE PEDESTRIAN / TRAFFIC BARRICADES WHILE WORKING

    ONSITE TO ENSURE SAFETY FOR THE PUBLIC.

    6. CONTRACTOR SHALL INCLUDE IN HIS BID REMOVAL AND HAULING OF ANY EXCESS MATERIAL.

    7. CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE CONDITIONS DURING ALL CONSTRUCTION

    PHASES OF THE PROJECT UNTIL PROJECT IS COMPLETED. HANDLE ALL EXCAVATED, EXCESS AND

    STOCKPILED MATERIAL IN SUCH A WAY THAT IT WILL NOT BLOCK DRAINAGE OR DAMAGE EXISTING

    ENVIRONMENTAL ITEMS.

    8. ALL EXISTING ASPHALT PAVED SURFACES WILL BE SEAL COATED AS PER DETAIL UNLESS

    SPECIFICALLY SHOWN OTHERWISE.

    9. ALL EXISTING WHEEL STOPS AND SPEED HUMPS SHALL BE RELOCATED AND REINSTALLED AS

    REQUIRED WHEN WITHIN PROPOSED PROJECT LIMITS AND/OR PROPOSED PAVEMENT IMPROVEMENTS.

    10. ALL PAVEMENT STRIPING WITHIN PROJECT LIMITS SHALL BE RE-STRIPED UNLESS SPECIFICALLY

    SHOWN OTHERWISE.

    11. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL DUST CONTROL MEASURES AS MAY BE

    REQUIRED FOR PROJECT AT ALL TIMES.

    12. CONTRACTOR TO SUBMIT ALL MATERIAL SUBMITTALS FOR ENGINEER APPROVAL PRIOR TO

    CONSTRUCTION.

    11. CONTRACTOR SHALL ADJUST ALL UTILITIES WITHIN THE PROJECT AREA TO GRADE AS REQUIRED.

    12. DIMENSIONS SHOWN ARE TAKEN FROM THE BACK OF CURB OR EDGE OF SIDEWALK, UNLESS

    OTHERWISE PRESENTED ON THIS PLAN.

    13. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES

    THAT DIFFER FROM THIS DIMENSION PLAN.

    14. PAVEMENT MARKINGS/STRIPING SHALL BE AS PER THIS PLAN, UNLESS OTHERWISE ADVISED BY THE

    ENGINEER. COLORS SHALL BE AS DIRECTED BY LISD.

    15. THE CONTRACTOR SHALL ADHERE TO LOCAL DESIGN REQUIREMENTS FOR PARKING DIMENSIONS,

    SHOULD REVISIONS BE MADE.

    16. THE CONTRACTOR SHALL COORDINATE ANY ADDITIONAL DIMENSIONS NEEDED WITH THE ENGINEER

    PRIOR TO CONSTRUCTION ACTIVITIES.

    17. THE CONTRACTOR SHALL PROVIDE FOR FIRE LANE MARKING AS SHOWN ON THE UTILITY PLAN AND

    COORDINATE WITH THE CITY OF LAREDO FIRE DEPARTMENT FOR LOCATIONS AND COLORS.

    18. PAVEMENT MARKING SHALL BE PAINTED IN ACCORDANCE WITH THE MOST RECENT ARCHITECTURAL

    BARRIERS REQUIREMENTS AND AS PER CIVIL DIMENSIONAL PLAN. SIGNAGE SHALL BE PROVIDED BY

    THE CONTRACTOR AND COORDINATED WITH THE ARCHITECT AND THE LOCAL BUILDING DEPARTMENT.

    19. LOCATIONS OF UTILITIES SHOWN HEREIN WERE DERIVED FROM BEST AVAILABLE SOURCES AND

    FIELD SURVEYS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING EXACT LOCATION,

    DEPTH, AND SIZES OF ALL UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO CONSTRUCTION AND

    SHALL BE LIABLE FOR ANY DAMAGES OR DOWN TIME CAUSED BY FAILURE TO COMPLY WITH THESE

    INSTRUCTIONS.

    CONCRETE

    EXISTING PROPOSED

    PAVEMENT IMPROVEMENTS

    MANHOLES

    SIGN

    BUILDING

    CONCRETE CURB & GUTTER

    MONOLITHIC CURB/GUTTER

    SIGN

    WHEEL STOP

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSED2' STOP BARLOCATIONSAS SHOWN

    PROPOSEDWHEELSTOPS (1)

    RESTRIPEPAVEMENT MARKINGS

    AS REQUIRED

    PROPOSED 4"SOLID STRIPINGLOCATIONSAS SHOWN

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    N

    S

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

    EXISTINGCONCRETEPAVEMENT

    EXISTINGCONCRETEPAVEMENT

    EXISTINGCONCRETEPAVEMENT

    DATE: 6.21.2016

    DATE: 7.06.2016

  • DRAWN BY: J.J.S. SCALE: AS SHOWN

    CHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C3.4

    C-3.1-3.10 ELEMENTARY SCHOOLS.DWG

    LAREDO INDEPENDENT SCHOOL DISTRICT

    DOVALINA ELEMENTARY SCHOOL

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    FILE: STATUS: FINAL

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    0

    20' 40'

    SCALE: 1" = 20'

    CALL BEFORE YOU DIG!

    TEXAS ONE CALL PARTICIPANTS REQUEST

    48 HOURS NOTICE BEFORE YOU DIG

    DRILL, OR BLAST - STOP, CALL!

    TEXAS ONE CALL SYSTEM

    811

    UTILITY DEPARTMENTS

    LAREDO, TEXAS

    WATER DISTRIBUTION AND SANITARY SEWER

    ROLANDO LOZANO

    LAREDO WATER UTILITIES DEPARTMENT

    (956) 794-1625

    ELECTRIC COMPANY

    A. E. P.

    (956) 721-3169

    TELEPHONE COMPANY

    ATT

    (956) 727-6749

    CABLE COMPANY

    TIME WARNER CABLE

    (956) 721-0600

    WEST SIDE PARKING AREASACALE 1" - 30'

    NORTH SIDE PARKING AREASACALE 1" - 20'

    18 PARKING SPACES

    FIRE LANE STRIPINGSEE DETAIL

    PROPOSED24" X 8'PAVEMENTMARKINGS

    FIRE LANESTRIPINGSEE DETAIL

    FIRE LANESTRIPING

    SEE DETAIL

    FIRE LANESTRIPINGSEE DETAIL

    FIRE LANESTRIPINGSEE DETAIL

    FIR

    E L

    AN

    E S

    TR

    IPIN

    GS

    EE

    DE

    TA

    IL

    PROPOSEDPAVEMENTMARKINGS

    PROPOSEDPAVEMENTMARKINGS

    PROPOSEDPAVEMENTSTRIPING

    PROPOSEDPAVEMENTSTRIPING

    7 PARKING SPACES

    7 PARKING SPACES

    7 PARKING SPACES

    7 PARKING SPACES

    10 P

    AR

    KIN

    G S

    PA

    CE

    S

    11 P

    AR

    KIN

    G S

    PA

    CE

    S

    9 P

    AR

    KIN

    G S

    PA

    CE

    S

    9 P

    AR

    KIN

    G S

    PA

    CE

    S4

    PA

    RK

    ING

    SP

    AC

    ES

    2 P

    AR

    KIN

    GS

    PA

    CE

    S

    AN

    NA

    AV

    ENU

    E

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    PROPOSED24" X 6'PAVEMENTMARKINGSEE DETAIL

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EXISTING CONCRETE

    EXISTINGBUILDING

    PAVEMENTMARKINGLOCATIONSAS SHOWN

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    PROPOSEDPAVEMENTMARKINGSLOCATIONSAS SHOWN

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    PART OF NORTHSIDE PARKING LOT

    PROPOSEDPAVEMENTMARKINGSLOCATIONSAS SHOWN

    RESTRIPEPAVEMENTMARKINGAS REQUIRED

    EXISTINGBUILDING

    RESTRIPEPAVEMENT

    MARKINGAS REQUIRED

    NOTES:

    1. CONTRACTOR IS REQUIRED TO VISIT SITE AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO

    PLACING A BID. BID SHALL BE ALL INCLUSIVE OF WORK REQUIRED TO COMPLETE THE PROJECT.

    2. CONTRACTOR SHALL MATCH EXISTING GRADES NOTIFY ENGINEER OF ANY DISCREPANCIES.

    3. NO CONSTRUCTION SHALL COMMENCE UNTIL PROPER CLEARANCES FROM THE ENGINEER/DISTRICT

    HAS BEEN OBTAINED.

    4. CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING AS MAY BE REQUIRED FOR THE PROJECT.

    5. CONTRACTOR SHALL PROVIDE ADEQUATE PEDESTRIAN / TRAFFIC BARRICADES WHILE WORKING

    ONSITE TO ENSURE SAFETY FOR THE PUBLIC.

    6. CONTRACTOR SHALL INCLUDE IN HIS BID REMOVAL AND HAULING OF ANY EXCESS MATERIAL.

    7. CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE CONDITIONS DURING ALL CONSTRUCTION

    PHASES OF THE PROJECT UNTIL PROJECT IS COMPLETED. HANDLE ALL EXCAVATED, EXCESS AND

    STOCKPILED MATERIAL IN SUCH A WAY THAT IT WILL NOT BLOCK DRAINAGE OR DAMAGE EXISTING

    ENVIRONMENTAL ITEMS.

    8. ALL EXISTING ASPHALT PAVED SURFACES WILL BE SEAL COATED AS PER DETAIL UNLESS

    SPECIFICALLY SHOWN OTHERWISE.

    9. ALL EXISTING WHEEL STOPS AND SPEED HUMPS SHALL BE RELOCATED AND REINSTALLED AS

    REQUIRED WHEN WITHIN PROPOSED PROJECT LIMITS AND/OR PROPOSED PAVEMENT IMPROVEMENTS.

    10. ALL PAVEMENT STRIPING WITHIN PROJECT LIMITS SHALL BE RE-STRIPED UNLESS SPECIFICALLY

    SHOWN OTHERWISE.

    11. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL DUST CONTROL MEASURES AS MAY BE

    REQUIRED FOR PROJECT AT ALL TIMES.

    12. CONTRACTOR TO SUBMIT ALL MATERIAL SUBMITTALS FOR ENGINEER APPROVAL PRIOR TO

    CONSTRUCTION.

    11. CONTRACTOR SHALL ADJUST ALL UTILITIES WITHIN THE PROJECT AREA TO GRADE AS REQUIRED.

    12. DIMENSIONS SHOWN ARE TAKEN FROM THE BACK OF CURB OR EDGE OF SIDEWALK, UNLESS

    OTHERWISE PRESENTED ON THIS PLAN.

    13. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES

    THAT DIFFER FROM THIS DIMENSION PLAN.

    14. PAVEMENT MARKINGS/STRIPING SHALL BE AS PER THIS PLAN, UNLESS OTHERWISE ADVISED BY THE

    ENGINEER. COLORS SHALL BE AS DIRECTED BY LISD.

    15. THE CONTRACTOR SHALL ADHERE TO LOCAL DESIGN REQUIREMENTS FOR PARKING DIMENSIONS,

    SHOULD REVISIONS BE MADE.

    16. THE CONTRACTOR SHALL COORDINATE ANY ADDITIONAL DIMENSIONS NEEDED WITH THE ENGINEER

    PRIOR TO CONSTRUCTION ACTIVITIES.

    17. THE CONTRACTOR SHALL PROVIDE FOR FIRE LANE MARKING AS SHOWN ON THE UTILITY PLAN AND

    COORDINATE WITH THE CITY OF LAREDO FIRE DEPARTMENT FOR LOCATIONS AND COLORS.

    18. PAVEMENT MARKING SHALL BE PAINTED IN ACCORDANCE WITH THE MOST RECENT ARCHITECTURAL

    BARRIERS REQUIREMENTS AND AS PER CIVIL DIMENSIONAL PLAN. SIGNAGE SHALL BE PROVIDED BY

    THE CONTRACTOR AND COORDINATED WITH THE ARCHITECT AND THE LOCAL BUILDING DEPARTMENT.

    19. LOCATIONS OF UTILITIES SHOWN HEREIN WERE DERIVED FROM BEST AVAILABLE SOURCES AND

    FIELD SURVEYS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING EXACT LOCATION,

    DEPTH, AND SIZES OF ALL UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO CONSTRUCTION AND

    SHALL BE LIABLE FOR ANY DAMAGES OR DOWN TIME CAUSED BY FAILURE TO COMPLY WITH THESE

    INSTRUCTIONS.

    CONCRETE

    EXISTING PROPOSED

    PAVEMENT IMPROVEMENTS

    MANHOLES

    SIGN

    BUILDING

    CONCRETE CURB & GUTTER

    MONOLITHIC CURB/GUTTER

    SIGN

    WHEEL STOP

    PROPOSEDPAVEMENTSTRIPING

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

  • PROPOSED SEAL COATAREA= 33,988 SQ.FT.

    9.0'

    40

    .0

    '

    20

    .0

    '

    9.0'9.0'9.0' 9.0' 9.0'

    9.0'

    24

    .0

    '

    PROPOSED SEAL COATAREA= 24,962 SQ.FT.

    9.0'

    40

    .0

    '

    20

    .0

    '

    DRAWN BY: J.J.S. SCALE: AS SHOWN

    CHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C3.5

    C-3.1-3.10 ELEMENTARY SCHOOLS.DWG

    LAREDO INDEPENDENT SCHOOL DISTRICT

    KAWAS ELEMENTARY SCHOOL

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    FILE: STATUS: FINAL

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    0

    20' 40'

    SCALE: 1" = 20'

    CALL BEFORE YOU DIG!

    TEXAS ONE CALL PARTICIPANTS REQUEST

    48 HOURS NOTICE BEFORE YOU DIG

    DRILL, OR BLAST - STOP, CALL!

    TEXAS ONE CALL SYSTEM

    811

    UTILITY DEPARTMENTS

    LAREDO, TEXAS

    WATER DISTRIBUTION AND SANITARY SEWER

    ROLANDO LOZANO

    LAREDO WATER UTILITIES DEPARTMENT

    (956) 794-1625

    ELECTRIC COMPANY

    A. E. P.

    (956) 721-3169

    TELEPHONE COMPANY

    ATT

    (956) 727-6749

    CABLE COMPANY

    TIME WARNER CABLE

    (956) 721-0600

    SOUTH SIDE PARKING AREASCALE 1" - 20'

    NORTH SIDE PARKING AREASCALE 1" - 20'

    15 PARKING SPACES

    CHESTNUT STREET

    FIRE LANESTRIPING

    SEE DETAIL

    PAVEMENTSTRIPING

    LOCATIONSAS SHOWN

    TE

    XA

    S A

    VE

    NU

    E

    JAR

    VIS

    AV

    EN

    UE

    SAN LUIS AVENUE

    11 PARKING SPACES

    11 PARKING SPACES

    8 PARKING SPACES

    3 PARKING SPACES

    FIRE LANESTRIPING

    SEE DETAIL

    EXISTINGTRANSFORMER

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EXISTING SIDEWALK

    22 PARKING SPACES

    19 PARKING SPACES

    19 PARKING SPACES

    25 PARKING SPACES

    2 PARKINGSPACES

    EXISTINGRAMP

    EXISTINGBUILDING

    FIRE LANESTRIPING

    SEE DETAIL

    FIRE LANESTRIPING

    SEE DETAIL

    PROPOSED24" X 6'PAVEMENTMARKINGSSEE DETAIL

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    EXISTING CONCRETE

    EXISTING SIDEWALK

    PROPOSED24" X 6'

    PAVEMENTMARKING

    SEE DETAIL

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    PAVEMENTMARKINGS

    LOCATIONSAS SHOWN

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    RESTRIPE ASREQUIRED

    EXISTINGCONCRETE

    EXISTINGCONCRETE

    NOTES:

    1. CONTRACTOR IS REQUIRED TO VISIT SITE AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO

    PLACING A BID. BID SHALL BE ALL INCLUSIVE OF WORK REQUIRED TO COMPLETE THE PROJECT.

    2. CONTRACTOR SHALL MATCH EXISTING GRADES NOTIFY ENGINEER OF ANY DISCREPANCIES.

    3. NO CONSTRUCTION SHALL COMMENCE UNTIL PROPER CLEARANCES FROM THE ENGINEER/DISTRICT

    HAS BEEN OBTAINED.

    4. CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING AS MAY BE REQUIRED FOR THE PROJECT.

    5. CONTRACTOR SHALL PROVIDE ADEQUATE PEDESTRIAN / TRAFFIC BARRICADES WHILE WORKING

    ONSITE TO ENSURE SAFETY FOR THE PUBLIC.

    6. CONTRACTOR SHALL INCLUDE IN HIS BID REMOVAL AND HAULING OF ANY EXCESS MATERIAL.

    7. CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE CONDITIONS DURING ALL CONSTRUCTION

    PHASES OF THE PROJECT UNTIL PROJECT IS COMPLETED. HANDLE ALL EXCAVATED, EXCESS AND

    STOCKPILED MATERIAL IN SUCH A WAY THAT IT WILL NOT BLOCK DRAINAGE OR DAMAGE EXISTING

    ENVIRONMENTAL ITEMS.

    8. ALL EXISTING ASPHALT PAVED SURFACES WILL BE SEAL COATED AS PER DETAIL UNLESS

    SPECIFICALLY SHOWN OTHERWISE.

    9. ALL EXISTING WHEEL STOPS AND SPEED HUMPS SHALL BE RELOCATED AND REINSTALLED AS

    REQUIRED WHEN WITHIN PROPOSED PROJECT LIMITS AND/OR PROPOSED PAVEMENT IMPROVEMENTS.

    10. ALL PAVEMENT STRIPING WITHIN PROJECT LIMITS SHALL BE RE-STRIPED UNLESS SPECIFICALLY

    SHOWN OTHERWISE.

    11. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL DUST CONTROL MEASURES AS MAY BE

    REQUIRED FOR PROJECT AT ALL TIMES.

    12. CONTRACTOR TO SUBMIT ALL MATERIAL SUBMITTALS FOR ENGINEER APPROVAL PRIOR TO

    CONSTRUCTION.

    11. CONTRACTOR SHALL ADJUST ALL UTILITIES WITHIN THE PROJECT AREA TO GRADE AS REQUIRED.

    12. DIMENSIONS SHOWN ARE TAKEN FROM THE BACK OF CURB OR EDGE OF SIDEWALK, UNLESS

    OTHERWISE PRESENTED ON THIS PLAN.

    13. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES

    THAT DIFFER FROM THIS DIMENSION PLAN.

    14. PAVEMENT MARKINGS/STRIPING SHALL BE AS PER THIS PLAN, UNLESS OTHERWISE ADVISED BY THE

    ENGINEER. COLORS SHALL BE AS DIRECTED BY LISD.

    15. THE CONTRACTOR SHALL ADHERE TO LOCAL DESIGN REQUIREMENTS FOR PARKING DIMENSIONS,

    SHOULD REVISIONS BE MADE.

    16. THE CONTRACTOR SHALL COORDINATE ANY ADDITIONAL DIMENSIONS NEEDED WITH THE ENGINEER

    PRIOR TO CONSTRUCTION ACTIVITIES.

    17. THE CONTRACTOR SHALL PROVIDE FOR FIRE LANE MARKING AS SHOWN ON THE UTILITY PLAN AND

    COORDINATE WITH THE CITY OF LAREDO FIRE DEPARTMENT FOR LOCATIONS AND COLORS.

    18. PAVEMENT MARKING SHALL BE PAINTED IN ACCORDANCE WITH THE MOST RECENT ARCHITECTURAL

    BARRIERS REQUIREMENTS AND AS PER CIVIL DIMENSIONAL PLAN. SIGNAGE SHALL BE PROVIDED BY

    THE CONTRACTOR AND COORDINATED WITH THE ARCHITECT AND THE LOCAL BUILDING DEPARTMENT.

    19. LOCATIONS OF UTILITIES SHOWN HEREIN WERE DERIVED FROM BEST AVAILABLE SOURCES AND

    FIELD SURVEYS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING EXACT LOCATION,

    DEPTH, AND SIZES OF ALL UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO CONSTRUCTION AND

    SHALL BE LIABLE FOR ANY DAMAGES OR DOWN TIME CAUSED BY FAILURE TO COMPLY WITH THESE

    INSTRUCTIONS.

    CONCRETE

    EXISTING PROPOSED

    PAVEMENT IMPROVEMENTS

    MANHOLES

    SIGN

    BUILDING

    CONCRETE CURB & GUTTER

    MONOLITHIC CURB/GUTTER

    SIGN

    WHEEL STOP

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSEDPOTHOLEREPAIR (15 SY)

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    N

    S

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

  • PROPOSED SEAL COATAREA= 45,850 SQ.FT.

    9.0

    '

    20.0'

    9.0

    '

    40.0' 24.0'

    40.0' 24.0'

    24.0'

    9.0'

    DRAWN BY: J.J.S. SCALE: AS SHOWN

    CHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C3.6

    C-3.1-3.10 ELEMENTARY SCHOOLS.DWG

    LAREDO INDEPENDENT SCHOOL DISTRICT

    ZACHARY ELEMENTARY SCHOOL

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    FILE: STATUS: FINAL

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    0

    20' 40'

    SCALE: 1" = 20'

    CALL BEFORE YOU DIG!

    TEXAS ONE CALL PARTICIPANTS REQUEST

    48 HOURS NOTICE BEFORE YOU DIG

    DRILL, OR BLAST - STOP, CALL!

    TEXAS ONE CALL SYSTEM

    811

    UTILITY DEPARTMENTS

    LAREDO, TEXAS

    WATER DISTRIBUTION AND SANITARY SEWER

    ROLANDO LOZANO

    LAREDO WATER UTILITIES DEPARTMENT

    (956) 794-1625

    ELECTRIC COMPANY

    A. E. P.

    (956) 721-3169

    TELEPHONE COMPANY

    ATT

    (956) 727-6749

    CABLE COMPANY

    TIME WARNER CABLE

    (956) 721-0600

    SOUTH SIDE PARKING AREASCALE 1" - 20'

    10 P

    AR

    KIN

    G S

    PA

    CE

    S

    OR

    TIZ

    ST

    RE

    ET

    FIRE LANE STRIPINGSEE DETAIL

    12 P

    AR

    KIN

    G S

    PA

    CE

    S

    19 P

    AR

    KIN

    G S

    PA

    CE

    S

    19 P

    AR

    KIN

    G S

    PA

    CE

    S

    10 P

    AR

    KIN

    G S

    PA

    CE

    S

    9 PARKING SPACES

    9 PARKING SPACES

    RE-STRIPEPAVEMENT

    STRIPING

    PAVEMENTMARKINGSLOCATIONSAS SHOWN

    PROPOSED 24" X 6'PAVEMENTMARKINGSEE DETAIL

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    EXISTINGCONCRETE

    PROJECT LIMITS

    19 P

    AR

    KIN

    G S

    PA

    CE

    S

    EXISTINGCONCRETE

    NOTES:

    1. CONTRACTOR IS REQUIRED TO VISIT SITE AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO

    PLACING A BID. BID SHALL BE ALL INCLUSIVE OF WORK REQUIRED TO COMPLETE THE PROJECT.

    2. CONTRACTOR SHALL MATCH EXISTING GRADES NOTIFY ENGINEER OF ANY DISCREPANCIES.

    3. NO CONSTRUCTION SHALL COMMENCE UNTIL PROPER CLEARANCES FROM THE ENGINEER/DISTRICT

    HAS BEEN OBTAINED.

    4. CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING AS MAY BE REQUIRED FOR THE PROJECT.

    5. CONTRACTOR SHALL PROVIDE ADEQUATE PEDESTRIAN / TRAFFIC BARRICADES WHILE WORKING

    ONSITE TO ENSURE SAFETY FOR THE PUBLIC.

    6. CONTRACTOR SHALL INCLUDE IN HIS BID REMOVAL AND HAULING OF ANY EXCESS MATERIAL.

    7. CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE CONDITIONS DURING ALL CONSTRUCTION

    PHASES OF THE PROJECT UNTIL PROJECT IS COMPLETED. HANDLE ALL EXCAVATED, EXCESS AND

    STOCKPILED MATERIAL IN SUCH A WAY THAT IT WILL NOT BLOCK DRAINAGE OR DAMAGE EXISTING

    ENVIRONMENTAL ITEMS.

    8. ALL EXISTING ASPHALT PAVED SURFACES WILL BE SEAL COATED AS PER DETAIL UNLESS

    SPECIFICALLY SHOWN OTHERWISE.

    9. ALL EXISTING WHEEL STOPS AND SPEED HUMPS SHALL BE RELOCATED AND REINSTALLED AS

    REQUIRED WHEN WITHIN PROPOSED PROJECT LIMITS AND/OR PROPOSED PAVEMENT IMPROVEMENTS.

    10. ALL PAVEMENT STRIPING WITHIN PROJECT LIMITS SHALL BE RE-STRIPED UNLESS SPECIFICALLY

    SHOWN OTHERWISE.

    11. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL DUST CONTROL MEASURES AS MAY BE

    REQUIRED FOR PROJECT AT ALL TIMES.

    12. CONTRACTOR TO SUBMIT ALL MATERIAL SUBMITTALS FOR ENGINEER APPROVAL PRIOR TO

    CONSTRUCTION.

    11. CONTRACTOR SHALL ADJUST ALL UTILITIES WITHIN THE PROJECT AREA TO GRADE AS REQUIRED.

    12. DIMENSIONS SHOWN ARE TAKEN FROM THE BACK OF CURB OR EDGE OF SIDEWALK, UNLESS

    OTHERWISE PRESENTED ON THIS PLAN.

    13. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES

    THAT DIFFER FROM THIS DIMENSION PLAN.

    14. PAVEMENT MARKINGS/STRIPING SHALL BE AS PER THIS PLAN, UNLESS OTHERWISE ADVISED BY THE

    ENGINEER. COLORS SHALL BE AS DIRECTED BY LISD.

    15. THE CONTRACTOR SHALL ADHERE TO LOCAL DESIGN REQUIREMENTS FOR PARKING DIMENSIONS,

    SHOULD REVISIONS BE MADE.

    16. THE CONTRACTOR SHALL COORDINATE ANY ADDITIONAL DIMENSIONS NEEDED WITH THE ENGINEER

    PRIOR TO CONSTRUCTION ACTIVITIES.

    17. THE CONTRACTOR SHALL PROVIDE FOR FIRE LANE MARKING AS SHOWN ON THE UTILITY PLAN AND

    COORDINATE WITH THE CITY OF LAREDO FIRE DEPARTMENT FOR LOCATIONS AND COLORS.

    18. PAVEMENT MARKING SHALL BE PAINTED IN ACCORDANCE WITH THE MOST RECENT ARCHITECTURAL

    BARRIERS REQUIREMENTS AND AS PER CIVIL DIMENSIONAL PLAN. SIGNAGE SHALL BE PROVIDED BY

    THE CONTRACTOR AND COORDINATED WITH THE ARCHITECT AND THE LOCAL BUILDING DEPARTMENT.

    19. LOCATIONS OF UTILITIES SHOWN HEREIN WERE DERIVED FROM BEST AVAILABLE SOURCES AND

    FIELD SURVEYS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING EXACT LOCATION,

    DEPTH, AND SIZES OF ALL UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO CONSTRUCTION AND

    SHALL BE LIABLE FOR ANY DAMAGES OR DOWN TIME CAUSED BY FAILURE TO COMPLY WITH THESE

    INSTRUCTIONS.

    CONCRETE

    EXISTING PROPOSED

    PAVEMENT IMPROVEMENTS

    MANHOLES

    SIGN

    BUILDING

    CONCRETE CURB & GUTTER

    MONOLITHIC CURB/GUTTER

    SIGN

    WHEEL STOP

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSED 24" X 6'PAVEMENTMARKINGSEE DETAIL

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSED 24" X 8'PAVEMENTMARKINGS

    SEE DETAIL

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

  • PR

    OP

    OS

    ED

    SE

    AL

    CO

    AT

    AR

    EA

    = 42

    ,533

    SQ

    . FT

    .

    20.0'

    9.0

    '

    9.0

    '

    36.0'

    36.0'

    9.0

    '

    18.0'

    9.0

    '

    24.0'

    8.0

    '9

    .0

    '

    5.0

    '

    9.0

    '

    5.0

    '

    9.0

    '

    PARKING LOTTOTAL AREA= 6,412 SQ.FT.

    D

    Y

    H

    19

    .5

    '

    9.0'

    9.0'

    19

    .5

    '

    23

    .6

    '

    DRAWN BY: J.J.S. SCALE: AS SHOWN

    CHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C3.7

    C-3.1-3.10 ELEMENTARY SCHOOLS.DWG

    LAREDO INDEPENDENT SCHOOL DISTRICT

    LIGARDE ELEMENTARY SCHOOL

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    FILE: STATUS: FINAL

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    0

    20' 40'

    SCALE: 1" = 20'

    CALL BEFORE YOU DIG!

    TEXAS ONE CALL PARTICIPANTS REQUEST

    48 HOURS NOTICE BEFORE YOU DIG

    DRILL, OR BLAST - STOP, CALL!

    TEXAS ONE CALL SYSTEM

    811

    UTILITY DEPARTMENTS

    LAREDO, TEXAS

    WATER DISTRIBUTION AND SANITARY SEWER

    ROLANDO LOZANO

    LAREDO WATER UTILITIES DEPARTMENT

    (956) 794-1625

    ELECTRIC COMPANY

    A. E. P.

    (956) 721-3169

    TELEPHONE COMPANY

    ATT

    (956) 727-6749

    CABLE COMPANY

    TIME WARNER CABLE

    (956) 721-0600

    WEST SIDE PARKING AREASCALE 1" - 30'

    SOUTH SIDE PARKING AREASCALE 1" - 20'

    10 PARKING SPACES

    FIR

    E L

    AN

    E S

    TR

    IPIN

    GS

    EE

    DE

    TA

    IL

    RESTRIPEPAVEMENTMARKINGSAS REQUIRED

    PALO BLANCO STREET

    THURMAN STREET

    CA

    NA

    DA

    AV

    EN

    UE

    CA

    NA

    DA

    AV

    EN

    UE

    CA

    NA

    DA

    AV

    EN

    UE

    8 PARKING SPACES

    PAVEMENTSTRIPING

    30 P

    AR

    KIN

    G S

    PA

    CE

    S

    24 P

    AR

    KIN

    G S

    PA

    CE

    S

    24 P

    AR

    KIN

    G S

    PA

    CE

    S

    14 P

    AR

    KIN

    G S

    PA

    CE

    S

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    PROPOSED 24" X 6'PAVEMENT MARKING

    SEE DETAIL

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    NOTES:

    1. CONTRACTOR IS REQUIRED TO VISIT SITE AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO

    PLACING A BID. BID SHALL BE ALL INCLUSIVE OF WORK REQUIRED TO COMPLETE THE PROJECT.

    2. CONTRACTOR SHALL MATCH EXISTING GRADES NOTIFY ENGINEER OF ANY DISCREPANCIES.

    3. NO CONSTRUCTION SHALL COMMENCE UNTIL PROPER CLEARANCES FROM THE ENGINEER/DISTRICT

    HAS BEEN OBTAINED.

    4. CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING AS MAY BE REQUIRED FOR THE PROJECT.

    5. CONTRACTOR SHALL PROVIDE ADEQUATE PEDESTRIAN / TRAFFIC BARRICADES WHILE WORKING

    ONSITE TO ENSURE SAFETY FOR THE PUBLIC.

    6. CONTRACTOR SHALL INCLUDE IN HIS BID REMOVAL AND HAULING OF ANY EXCESS MATERIAL.

    7. CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE CONDITIONS DURING ALL CONSTRUCTION

    PHASES OF THE PROJECT UNTIL PROJECT IS COMPLETED. HANDLE ALL EXCAVATED, EXCESS AND

    STOCKPILED MATERIAL IN SUCH A WAY THAT IT WILL NOT BLOCK DRAINAGE OR DAMAGE EXISTING

    ENVIRONMENTAL ITEMS.

    8. ALL EXISTING ASPHALT PAVED SURFACES WILL BE SEAL COATED AS PER DETAIL UNLESS

    SPECIFICALLY SHOWN OTHERWISE.

    9. ALL EXISTING WHEEL STOPS AND SPEED HUMPS SHALL BE RELOCATED AND REINSTALLED AS

    REQUIRED WHEN WITHIN PROPOSED PROJECT LIMITS AND/OR PROPOSED PAVEMENT IMPROVEMENTS.

    10. ALL PAVEMENT STRIPING WITHIN PROJECT LIMITS SHALL BE RE-STRIPED UNLESS SPECIFICALLY

    SHOWN OTHERWISE.

    11. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL DUST CONTROL MEASURES AS MAY BE

    REQUIRED FOR PROJECT AT ALL TIMES.

    12. CONTRACTOR TO SUBMIT ALL MATERIAL SUBMITTALS FOR ENGINEER APPROVAL PRIOR TO

    CONSTRUCTION.

    11. CONTRACTOR SHALL ADJUST ALL UTILITIES WITHIN THE PROJECT AREA TO GRADE AS REQUIRED.

    12. DIMENSIONS SHOWN ARE TAKEN FROM THE BACK OF CURB OR EDGE OF SIDEWALK, UNLESS

    OTHERWISE PRESENTED ON THIS PLAN.

    13. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES

    THAT DIFFER FROM THIS DIMENSION PLAN.

    14. PAVEMENT MARKINGS/STRIPING SHALL BE AS PER THIS PLAN, UNLESS OTHERWISE ADVISED BY THE

    ENGINEER. COLORS SHALL BE AS DIRECTED BY LISD.

    15. THE CONTRACTOR SHALL ADHERE TO LOCAL DESIGN REQUIREMENTS FOR PARKING DIMENSIONS,

    SHOULD REVISIONS BE MADE.

    16. THE CONTRACTOR SHALL COORDINATE ANY ADDITIONAL DIMENSIONS NEEDED WITH THE ENGINEER

    PRIOR TO CONSTRUCTION ACTIVITIES.

    17. THE CONTRACTOR SHALL PROVIDE FOR FIRE LANE MARKING AS SHOWN ON THE UTILITY PLAN AND

    COORDINATE WITH THE CITY OF LAREDO FIRE DEPARTMENT FOR LOCATIONS AND COLORS.

    18. PAVEMENT MARKING SHALL BE PAINTED IN ACCORDANCE WITH THE MOST RECENT ARCHITECTURAL

    BARRIERS REQUIREMENTS AND AS PER CIVIL DIMENSIONAL PLAN. SIGNAGE SHALL BE PROVIDED BY

    THE CONTRACTOR AND COORDINATED WITH THE ARCHITECT AND THE LOCAL BUILDING DEPARTMENT.

    19. LOCATIONS OF UTILITIES SHOWN HEREIN WERE DERIVED FROM BEST AVAILABLE SOURCES AND

    FIELD SURVEYS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING EXACT LOCATION,

    DEPTH, AND SIZES OF ALL UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO CONSTRUCTION AND

    SHALL BE LIABLE FOR ANY DAMAGES OR DOWN TIME CAUSED BY FAILURE TO COMPLY WITH THESE

    INSTRUCTIONS.

    CONCRETE

    EXISTING PROPOSED

    PAVEMENT IMPROVEMENTS

    MANHOLES

    SIGN

    BUILDING

    CONCRETE CURB & GUTTER

    MONOLITHIC CURB/GUTTER

    SIGN

    WHEEL STOP

    PROPOSED 2' STOP BARLOCATIONS AS SHOWN

    PROPOSED 24" X 6'PAVEMENT MARKINGSEE DETAIL

    PROPOSED2' STOP BARLOCATIONSAS SHOWN

    PROPOSED 24" X 6'PAVEMENT MARKING

    SEE DETAIL

    PROPOSED2' STOP BARLOCATIONSAS SHOWN

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

    PROPOSED 24" X 6'PAVEMENT MARKING

    SEE DETAIL

  • PROPOSED SEAL COATAREA= 19,590 SQ.FT.

    12.0'

    19.0'

    9

    .

    0

    '

    12.0'

    12

    .0

    '

    PROPOSED SEAL COATAREA= 45,763 SQ.FT.

    40.0'24.0'

    9.0'

    40.0'

    20.0'

    40.0'

    24.0'

    40.0'

    9.0'

    9.0

    '

    9.0'

    9.0'

    24

    .9

    '

    20.0'

    PR

    OP

    OS

    ED

    SE

    AL

    CO

    AT

    AR

    EA

    = 17

    ,727

    SQ

    .FT

    .

    S

    S

    9

    .

    0

    '

    31.1'

    DRAWN BY: J.J.S. SCALE: AS SHOWN

    CHECKED BY: M.E.E. DATE: 6.21.2016 PROJECT NO: U2405

    APPROVED BY: J.A.M. DATE: 7.06.2016 C3.8

    C-3.1-3.10 ELEMENTARY SCHOOLS.DWG

    LAREDO INDEPENDENT SCHOOL DISTRICT

    MILTON ELEMENTARY SCHOOL

    PARKING LOT REHABILITATION

    CITY OF LAREDO, TEXAS

    FILE: STATUS: FINAL

    DATE: 6.21.2016

    No. DATE REVISION APP.

    - - -

    0

    20' 40'

    SCALE: 1" = 20'

    CALL BEFORE YOU DIG!

    TEXAS ONE CALL PARTICIPANTS REQUEST

    48 HOURS NOTICE BEFORE YOU DIG

    DRILL, OR BLAST - STOP, CALL!

    TEXAS ONE CALL SYSTEM

    811

    UTILITY DEPARTMENTS

    LAREDO, TEXAS

    WATER DISTRIBUTION AND SANITARY SEWER

    ROLANDO LOZANO

    LAREDO WATER UTILITIES DEPARTMENT

    (956) 794-1625

    ELECTRIC COMPANY

    A. E. P.

    (956) 721-3169

    TELEPHONE COMPANY

    ATT

    (956) 727-6749

    CABLE COMPANY

    TIME WARNER CABLE

    (956) 721-0600

    WEST SIDE PARKING AREASCALE 1" - 30'

    14 PARKING SPACES

    MONTGOMERY STREET

    RE-STRIPEPAVEMENTMARKING ASREQUIRED

    NORTH SIDE PARKING AREASCALE 1" - 20'

    5 P

    AR

    KIN

    G S

    PA

    CE

    S8

    PA

    RK

    ING

    SP

    AC

    ES

    3 P

    AR

    KIN

    GS

    PA

    CE

    S

    10 P

    AR

    KIN

    G S

    PA

    CE

    S

    10 P

    AR

    KIN

    G S

    PA

    CE

    S

    10 P

    AR

    KIN

    G S

    PA

    CE

    S

    10 P

    AR

    KIN

    G S

    PA

    CE

    S

    13 P

    AR

    KIN

    G S

    PA

    CE

    S

    6 P

    AR

    KIN

    G S

    PA

    CE

    S

    6 P

    AR

    KIN

    G S

    PA

    CE

    S

    6 P

    AR

    KIN

    G S

    PA

    CE

    S

    6 P

    AR

    KIN

    G S

    PA

    CE

    S

    7 P

    AR

    KIN

    G S

    PA

    CE

    S

    PROPOSED18" X 8'

    PAVEMENTMARKINGS

    PROPOSEDPAVEMENT

    STRIPING

    TE

    XA

    S A

    VE

    NU

    E

    13 PARKING SPACES

    PROPOSEDPAVEMENTMARKINGS

    PROPOSED 4"SOLID CENTERLINESTRIPING

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    EXISTING SIDEWALK

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EX

    IST

    ING

    CO

    NC

    RE

    TE

    EXIS

    TIN

    G C

    ON

    CR

    ETE

    EXIS

    TIN

    G C

    ON

    CR

    ETE

    PROPOSED 4" SOLIDCENTER LINESTRIPING

    PROPOSEDPAVEMENTMARKINGS

    LOCATIONSSEE DETAIL

    PAVEMENT MARKINGSLOCATIONS SEE DETAIL

    PAVEMENT MARKINGSLOCATIONS AS SHOWN

    SOUTH SIDE PARKING AREASCALE 1" - 20'

    MA

    RT

    IN A

    VE

    NU

    E

    MONTGOMERY STREET

    ELM STREET

    PAVEMENT MARKINGLOCATION SEE DETAIL PAVEMENT MARKINGS

    LOCATIONS AS SHOWN

    FIRE LANE STRIPINGSEE DETAIL

    FIRE LANE STRIPINGSEE DETAIL

    FIRE LANE STRIPINGSEE DETAIL

    FIRE LANESTRIPING

    SEE DETAIL

    FIRE LANESTRIPING

    SEE DETAIL

    FIRE LANE STRIPINGSEE DETAIL

    PROPOSED 4" SOLIDCENTER LINE

    STRIPING

    NOTES:

    1. CONTRACTOR IS REQUIRED TO VISIT SITE AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO

    PLACING A BID. BID SHALL BE ALL INCLUSIVE OF WORK REQUIRED TO COMPLETE THE PROJECT.

    2. CONTRACTOR SHALL MATCH EXISTING GRADES NOTIFY ENGINEER OF ANY DISCREPANCIES.

    3. NO CONSTRUCTION SHALL COMMENCE UNTIL PROPER CLEARANCES FROM THE ENGINEER/DISTRICT

    HAS BEEN OBTAINED.

    4. CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING AS MAY BE REQUIRED FOR THE PROJECT.

    5. CONTRACTOR SHALL PROVIDE ADEQUATE PEDESTRIAN / TRAFFIC BARRICADES WHILE WORKING

    ONSITE TO ENSURE SAFETY FOR THE PUBLIC.

    6. CONTRACTOR SHALL INCLUDE IN HIS BID REMOVAL AND HAULING OF ANY EXCESS MATERIAL.

    7. CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE CONDITIONS DURING ALL CONSTRUCTION

    PHASES OF THE PROJECT UNTIL PROJECT IS COMPLETED. HANDLE ALL EXCAVATED, EXCESS AND

    STOCKPILED MATERIAL IN SUCH A WAY THAT IT WILL NOT BLOCK DRAINAGE OR DAMAGE EXISTING

    ENVIRONMENTAL ITEMS.

    8. ALL EXISTING ASPHALT PAVED SURFACES WILL BE SEAL COATED AS PER DETAIL UNLESS

    SPECIFICALLY SHOWN OTHERWISE.

    9. ALL EXISTING WHEEL STOPS AND SPEED HUMPS SHALL BE RELOCATED AND REINSTALLED AS

    REQUIRED WHEN WITHIN PROPOSED PROJECT LIMITS AND/OR PROPOSED PAVEMENT IMPROVEMENTS.

    10. ALL PAVEMENT STRIPING WITHIN PROJECT LIMITS SHALL BE RE-STRIPED UNLESS SPECIFICALLY

    SHOWN OTHERWISE.

    11. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL DUST CONTROL MEASURES AS MAY BE

    REQUIRED FOR PROJECT AT ALL TIMES.

    12. CONTRACTOR TO SUBMIT ALL MATERIAL SUBMITTALS FOR ENGINEER APPROVAL PRIOR TO

    CONSTRUCTION.

    11. CONTRACTOR SHALL ADJUST ALL UTILITIES WITHIN THE PROJECT AREA TO GRADE AS REQUIRED.

    12. DIMENSIONS SHOWN ARE TAKEN FROM THE BACK OF CURB OR EDGE OF SIDEWALK, UNLESS

    OTHERWISE PRESENTED ON THIS PLAN.

    13. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING ANY FIELD CHANGES

    THAT DIFFER FROM THIS DIMENSION PLAN.

    14. PAVEMENT MARKINGS/STRIPING SHALL BE AS PER THIS PLAN, UNLESS OTHERWISE ADVISED BY THE

    ENGINEER. COLORS SHALL BE AS DIRECTED BY LISD.

    15. THE CONTRACTOR SHALL ADHERE TO LOCAL DESIGN REQUIREMENTS FOR PARKING DIMENSIONS,

    SHOULD REVISIONS BE MADE.

    16. THE CONTRACTOR SHALL COORDINATE ANY ADDITIONAL DIMENSIONS NEEDED WITH THE ENGINEER

    PRIOR TO CONSTRUCTION ACTIVITIES.

    17. THE CONTRACTOR SHALL PROVIDE FOR FIRE LANE MARKING AS SHOWN ON THE UTILITY PLAN AND

    COORDINATE WITH THE CITY OF LAREDO FIRE DEPARTMENT FOR LOCATIONS AND COLORS.

    18. PAVEMENT MARKING SHALL BE PAINTED IN ACCORDANCE WITH THE MOST RECENT ARCHITECTURAL

    BARRIERS REQUIREMENTS AND AS PER CIVIL DIMENSIONAL PLAN. SIGNAGE SHALL BE PROVIDED BY

    THE CONTRACTOR AND COORDINATED WITH THE ARCHITECT AND THE LOCAL BUILDING DEPARTMENT.

    19. LOCATIONS OF UTILITIES SHOWN HEREIN WERE DERIVED FROM BEST AVAILABLE SOURCES AND

    FIELD SURVEYS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING EXACT LOCATION,

    DEPTH, AND SIZES OF ALL UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO CONSTRUCTION AND

    SHALL BE LIABLE FOR ANY DAMAGES OR DOWN TIME CAUSED BY FAILURE TO COMPLY WITH THESE

    INSTRUCTIONS.

    CONCRETE

    EXISTING PROPOSED

    PAVEMENT IMPROVEMENTS

    MANHOLES

    SIGN

    BUILDING

    CONCRETE CURB & GUTTER

    MONOLITHIC CURB/GUTTER

    SIGN

    WHEEL STOP

    7 P

    AR

    KIN

    G S

    PA

    CE

    S

    PROPOSED 24" X 6'PAVEMENT MARKINGSEE DETAIL

    PROPOSED2' STOP BARLOCATIONSAS SHOWN

    PROPOSED 24" X 6'PAVEMENT MARKINGSEE DETAIL

    PROPOSED 24" X 8'PAVEMENT MARKINGSEE DETAIL

    PROPOSED24" X 6'

    PAVEMENTMARKING

    SEE DETAIL

    PROPOSED2' STOP BAR LOCATIONS

    AS SHOWN

    PROPOSED24" X 6'

    PAVEMENTMARKINGS

    SEE DETAIL

    PROPOSED 24" X 6'PAVEMENT MARKING

    SEE DETAIL

    PROPOSED 24" X 6'PAVEMENT MARKINGSEE DETAIL

    PROPOSED2' STOP BARLOCATIONSAS SHOWN

    PROPOSED2' STOP BARLOCATIONSAS SHOWN

    A

    JORGE A. MARTINEZ

    G

    X

    E

    S

    P

    R

    O

    F

    E

    N

    101173

    C

    L

    S

    I

    I

    O

    NS

    E

    D

    L

    E

    N

    A

    S

    T

    T

    E

    OF

    T

    E

    N

    E

    E

    I

    R

    S

    A

    JULY 06, 2016

  • PROPO

    SED SEAL COAT

    AREA= 6,382 SQ.FT.20

    .

    0

    '

    9

    .

    0

    '

    2

    0

    .

    0

    '

    9

    .

    0

    '

    PROPOSED SEAL COATAREA= 27,336 SQ.FT.

    9.0'

    18

    .0

    '

    19.0'

    9.0'

    19

    .0

    '

    8.0'9.0'5.0'

    24

    .0

    '

    PR