www.pace2020.com | See the possibilities…
Scheduler Overview
Fusion 08John Berenguer
www.pace2020.com | See the possibilities…
10,000 Foot View
• Integrated systems– ePace – Browser-based– Scheduler – Windows based
• Server application on Windows Server as service.• Workstation client on Windows PC.• Database on ePace appliance.
www.pace2020.com | See the possibilities…
10,000 Foot View
• Moving parts– Estimate converted to Job
• Creates Job Planning records.– EDI moves ePace Job Plan info to Scheduler inbox
(export)• Schedulable jobs
– Designer plans schedule and adopts the board– EDI updates ePace Job Planning record
• Information from published Scheduler board (import)– Data Collection updates published Scheduler board
• Real-time via TCP/IP packet
www.pace2020.com | See the possibilities…
ePace Procedures
• Activity code Setup– Planning integration
• Set to schedulable.
– Rollup• If needed to group functions on same piece of equipment.
– As if complete• D/C interface automatically removes entry from board.
www.pace2020.com | See the possibilities…
ePace Procedures
• Creating job planning recs– Estimate Convert
• Automatic if system is configured to do so
www.pace2020.com | See the possibilities…
ePace Procedures
• Scheduler/EDI– Launch from menu - Production/JobPlanning/Run
Scheduler EDI• Data Collection
– Status update (ready/running/interrupted/complete)
www.pace2020.com | See the possibilities…
Scheduler Procedures
• Tray vs. Board– Tray is the inbox where you choose what goes on board.– Board is where you see your availability/load.
• Design vs. Monitor– Design is your sandbox – hypothetical– Monitor is the published active board - official
• Resource vs. Activity Code– Resource is something you are scheduling in Scheduler.– Activity code is a process in ePace.
www.pace2020.com | See the possibilities…
Scheduler Procedures
• Display options– Workstation specific– Background color/bar color/tags
• Down bars– Also called proforma – your plant holiday/shift
schedule• Scale
– User-defined, workstation specific– Short run shop use small scale, long run shops large
scale
www.pace2020.com | See the possibilities…
Scheduler Procedures
• Moving jobs– drag/drop/fix left/reassign
• Resource view– See all jobs for a selected resource
www.pace2020.com | See the possibilities…
Scheduler Procedures
• Job view– Displays job summary info.– Displays job part info.
• Production list– Displays each scheduled activity in grid format.
• Summary at bottom of board– Displays key information for selected process.
www.pace2020.com | See the possibilities…
Reports
• Reports– Capacity
www.pace2020.com | See the possibilities…
Questions and Answers