www.lcra.org
Generator Test Data, Generator Capability Curve,
and NPRR 366 Terms
March 14, 2012
Mike Noth &
Bracy Nesbit
1
www.lcra.org
Common Interests
• Provide a stable and reliable system
• Comply with regulatory requirements (avoid non-compliance)
• Best value for customers
2
www.lcra.org
Review of Generator Capability
3
www.lcra.org
Area the Generator Can Safely Operate
GENERATOR CAPABILITY
4
www.lcra.org
Critical VSS Areas of Generator OperationD
ecreasing PF
Increasing PF
Increasing PF
Decreasing P
F
5
www.lcra.org
NPRR 366 Problem
• The system needs to adhere to a voltage profile to remain stable
• No single generator can prop up or sink the system voltage
6
www.lcra.org
7
Simple Nomograph of voltage from Generator Terminals to BES
www.lcra.org
The blue diamonds represent actual test points from leading and lagging reactive tests.Gen Gross are points measured at the Generator terminals.
Red square represents 0.95 to 1.05 pu Voltage and +/- 0.95 power factor.
Actual Generator Test Data – At Generator Terminals
8
www.lcra.org
Dashed green lines roughly represent +/- 2% pu of Voltage profile value and bounded by red =/- 0.95 power factor lines.
The blue diamonds represent actual test points from leading and lagging reactive tests.Net to BES are points measured at the POI.
Red square represents 0.95 to 1.05 pu Voltage and +/- 0.95 power factor.
Actual Generator Test Data – At POI
9
www.lcra.org
Existing Nodal Protocol 3.15
(3) Generation Resources required to provide VSS must be capable of producing a defined quantity of Reactive Power to maintain a Voltage Profile established by ERCOT. Generation Resources shall comply with the following Reactive Power Requirements: an over-excited (lagging) power factor capability of 0.95 or less and an under-excited (leading) power factor capability of 0.95 or less, both determined at the generating unit's maximum net power to be supplied to the ERCOT Transmission Grid and at the transmission system Voltage Profile established by ERCOT, and both measured at the POI. The Reactive Power requirements shall be available at all MW output levels and may be met through a combination of the Generation Resource’s Unit Reactive Limit (URL), which is the generating unit’s dynamic leading and lagging operating capability, and/or dynamic VAr capable devices. This Reactive Power profile is depicted graphically as a rectangle. …continued…
10
www.lcra.org
Existing Nodal Protocol 3.15
(3) Generation Resources required to provide VSS must be capable of producing a defined quantity of Reactive Power to maintain a Voltage Profile established by ERCOT. Generation Resources shall comply with the following Reactive Power Requirements: an over-excited (lagging) power factor capability of 0.95 or less and an under-excited (leading) power factor capability of 0.95 or less, both determined at the generating unit's maximum net power to be supplied to the ERCOT Transmission Grid and at the transmission system Voltage Profile established by ERCOT, and both measured at the POI. The Reactive Power requirements shall be available at all MW output levels and may be met through a combination of the Generation Resource’s Unit Reactive Limit (URL), which is the generating unit’s dynamic leading and lagging operating capability, and/or dynamic VAr capable devices. This Reactive Power profile is depicted graphically as a rectangle. …continued…
11
www.lcra.org
Decreasing P
FIncreasing P
FIncreasing P
FD
ecreasing PF
PF=0.95 or Less
Capacitive VAr devices have to be added
Reactive VAr devices have to be added
PF=0.95 or Less
Present Protocol Requirement to meet the Voltage Profile
There are no boundaries for the Generation Resource to supply reactive power in order to meet the Voltage Profile
12
www.lcra.org
Back to the NPRR 366 Problem
• The system needs to adhere to a voltage profile to remain stable
The Generation Resource must operate to the operating point determined by the Transmission Operator
• No single generator can prop up or sink the system voltage
The Generation Resource will operate up to the generator capability
13
www.lcra.org
Generating Resource Operating Modes Required to Meet the Voltage Profile – Generator Operating Point determined by Transmission Operator
VAR-002-1.1b
R2. Unless exempted by the Transmission Operator, each Generator Operator shall maintain thegenerator voltage or Reactive Power output (within applicable Facility Ratings1) as directed by the Transmission Operator.
14
www.lcra.org
Nodal Protocol 3.15 Option A Revision
15