WSF MEDIUM VOLTAGE SHORE POWER FEASIBILITY ......2020/09/15 · Cavotec extends its leadership in...
Transcript of WSF MEDIUM VOLTAGE SHORE POWER FEASIBILITY ......2020/09/15 · Cavotec extends its leadership in...
-
PREPARED FOR
1201 WESTERN AVENUE, SUITE 200SEATTLE, WASHINGTON 98101-2953T 206.624.7850 GLOSTEN.COM
INNOVATIVE MARINE SOLUTIONS
PREPARED CHECKED APPROVED
WSF MEDIUM VOLTAGE SHORE POWER
FEASIBILITY STUDY
SEATTLE, WASHINGTON WASHINGTON STATE FERRIES
8 February 2018FILE NO. 17122.01
REV. –
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
SAMANTHA J. GRISWOLD SEAN A. CAUGHLAN, PE DAVID W. LARSEN, PEPROJECT ENGINEER PROJECT MANAGER PRINCIPAL-IN-CHARGE
Digitally Signed 09-Feb-2018
-
Shore Power Technology Assessment at U.S. Ports
Parainen-Nauvo,
Electrifying Finnish ferry service ,
Automatic Plug-in System (APS) System Flyer,
Cavotec is changing the ferry industry!,
FerryCHARGER Charging World’s Seaside, asiflex.no, Faiveley Stemmann-Technik a Wabtec Company,
ABB to power world’s largest emission-free electric ferries and deliver first automated shore-side charging station,
HH Ferries – Zero Emission operation,
Water-Cooled Batteries Ensure Fast Charging of Electric Ferries Across Øresund,
Another world’s first for Wärtsilä – wireless charging for hybrid coastal ferry successfully tested,
Hybrid technology for new emerging markets – inductive charging,
The evolution of wireless charging,
Making the transition to shore power,
-
Automatic Plug-in System by Cavotec SA,
Cavotec extends its leadership in automated mooring and charging for E-Ferries,
First Polish built hybrid ferry delivered,
Nå lader batterifergen mer enn hun trenger,
World’s First All-Electric Battery-Powered Ferry,
Denne fergen er revolusjonerende. Men passasjerene merker det knapt,
The world’s first ferry with inductive charging,
Time-lapse: Constructing the Maritime Industry’s First Robotic Charging Arm,
WSF Terminal Design Manual,
Advanced Clean Transit Battery Cost for Heavy-Duty Electric Vehicles,
Lifecycle Cost Estimating Manual for the Federal Energy Management Program,
Energy Price Indices and Discount Factors for Life-Cycle Cost Analysis -2017,
Jumbo Mark II Class Hybrid System Integration Study
OPS “Onshore Power Supply”
-
Elektra Ampere Folgefonn
Elektra
-
PuyallupTacoma Wenatchee
-
(1) Includes predicted sea level rise
-
TacomaPuyallup
-
and
and
15 minutes
-
or
-
Ampere Elektra.
-
Aurora Tycho Brahe
-
Folgefonn
-
M/V Ampere,
-
Cavotec
Cavotec
ABB
Wärtsilä
Stemmann-Technik
-
(USD$/kWh) (USD$/kW) (USD$/month) (USD$/month) --
-
are
-
PREPARED FOR
1201 WESTERN AVENUE, SUITE 200SEATTLE, WASHINGTON 98101-2953T 206.624.7850 GLOSTEN.COM
INNOVATIVE MARINE SOLUTIONS
PREPARED CHECKED APPROVED
WSF MEDIUM VOLTAGE SHORE POWER
FEASIBILITY STUDY
SEATTLE, WASHINGTON WASHINGTON STATE FERRIES
8 February 2018FILE NO. 17122.01
REV. –
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
SAMANTHA J. GRISWOLD SEAN A. CAUGHLAN, PE DAVID W. LARSEN, PEPROJECT ENGINEER PROJECT MANAGER PRINCIPAL-IN-CHARGE
Digitally Signed 09-Feb-2018
-
PREPARED FOR
1201 WESTERN AVENUE, SUITE 200SEATTLE, WASHINGTON 98101-2953T 206.624.7850 GLOSTEN.COM
INNOVATIVE MARINE SOLUTIONS
PREPARED CHECKED APPROVED
WSF MEDIUM VOLTAGE SHORE POWER
FEASIBILITY STUDY
SEATTLE, WASHINGTON WASHINGTON STATE FERRIES
8 February 2018FILE NO. 17122.01
REV. –
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
SAMANTHA J. GRISWOLD SEAN A. CAUGHLAN, PE DAVID W. LARSEN, PEPROJECT ENGINEER PROJECT MANAGER PRINCIPAL-IN-CHARGE
Digitally Signed 09-Feb-2018
-
PREPARED FOR
1201 WESTERN AVENUE, SUITE 200SEATTLE, WASHINGTON 98101-2953T 206.624.7850 GLOSTEN.COM
INNOVATIVE MARINE SOLUTIONS
PREPARED CHECKED APPROVED
WSF MEDIUM VOLTAGE SHORE POWER
FEASIBILITY STUDY
SEATTLE, WASHINGTON WASHINGTON STATE FERRIES
8 February 2018FILE NO. 17122.01
REV. –
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
SAMANTHA J. GRISWOLD SEAN A. CAUGHLAN, PE DAVID W. LARSEN, PEPROJECT ENGINEER PROJECT MANAGER PRINCIPAL-IN-CHARGE
Digitally Signed 09-Feb-2018
-
WSF Medium Voltage Shore PowerFeasibility Study
F- 9 February 2018Job 17122.01, Rev. -
-
WSF Medium Voltage Shore PowerFeasibility Study
F-3 9 February 2018Job 17122.01, Rev. -