WÄRTSILÄ Hybrid Centre The first ever real scale test installation Alessandro Mercante Hybrid Application Engineer, marine engineering, Sales & Business Intelligence

Transcript of WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first...

Page 1: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

WÄRTSILÄ Hybrid CentreThe first ever real scale test installation

Alessandro MercanteHybrid Application Engineer, marine engineering, Sales & Business Intelligence

Page 2: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

© Wärtsilä

HYBRID CENTRE

• First ever full scale Hybrid Centre

• Developments and demonstration of Wärtsilä HY technologies and operating principles

Visitors counter

Page 3: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

© Wärtsilä

WÄRTSILÄ HYA new era of products

Engines

BatteriesPowerDrives

Fuel Cells

Energy ManagementSystem

Page 4: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

© Wärtsilä

What’s inside the module?Diesel-mechanical version Diesel-electric version

DC Power Electronics

El. Generator

EngineConstant Speed

Energy Storage System (ESS)

Main Engine (ME)

Shaft Generator-Motor (SG-M)Through PTO/PTI or inlineIncluding clutches

DC Power Electronics

Variable Speed

Energy Storage System (ESS)

Page 5: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

© Wärtsilä

Page 6: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

SETUP

Engine2040kW

PTO/PTI750kW

Batteries500kWh 3C

PropulsorSimulator

Generator2700kW

EMS

PowerDrives

Page 7: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

© Wärtsilä

SAILING PHASESDemonstration based on real operations

6/28/20197

Green Mode

Electric Start

HybridMode

Load Taking

Boost Mode

Peak Shaving

Page 8: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

GREEN MODE

Battery powered Zero emissionsSmokelessSilent

Page 9: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

ELECTRIC START

ELECTRIC STARTAlways availableNo compressed airSmokeless

HYBRID MODEOptimized consumptionSpinning reserveInherently redundantExtended maintenance intervals

Engine electric start

Hybrid mode

From green mode to hybrid mode

Green mode

Page 10: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

LOAD TAKING

Instant powerNo back up generatorOptimized consumption

Page 11: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

BOOST MODE

Additional powerEngine downsizingInstantly available boost

Boost mode

Max engine power

Only Engine(s)

Page 12: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

PEAK SHAVING

Stable engine loadReduced emissionsNo additional generators

Page 13: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

© Wärtsilä

FACTORY INTEGRATIONSustainable energy for local production

Page 14: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

© Wärtsilä 6/28/2019 A. Mercante/ Lafonia Fishing Vessel

HYBRID CENTER DESIGNVESSEL DESIGN

From vessel design... ...to vessel optimizationThanks to the real-scale hybrid center

14

Hybrid Centre

Page 15: WÄRTSILÄ Hybrid Centre › docs › default-source › ... · WÄRTSILÄ Hybrid Centre. The first ever real scale test installation . Alessandro Mercante. Hybrid Application Engineer,

DIGITALIZATION INTO REALITY.FAST FORWARD!