WPS

14
Ju'aymah Gas Plant Expansion Project Subcontractor : Mohammad Al Mojil Group Subcontract No: 8396-ZA-M01-K BI-10-03193, Contract No.6600012800 (IK) WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION Sl.No WPS No Electrode Code PWHT Piping Class Fluid Service 1 GTAW P1-P1 All ER-70S-2 N N Y 1CS2P,3CS2P, N N N N 12LCOU Fire water, RAW & utilitywater 2 P1-P1 N N Y 1CS2P,3CS2P, N N N N 12CGOU N N 12LCOU Fire water, RAW & utilitywater 3 P1-P1 N N Y 1CS2P,3CS2P, N N N N 12LCOU Fire water, RAW & utilitywater 4 SMAW P1-P1 Y N Y 1CC9C4,3CC9C4 Caustic N Y 1CS1P3,3CS1P3 N Y 3CS2P1 Rich Amine N Y 1CS9P1,3CS9P1 Hydrocarbon 5 SMAW P1-P1 N N Y 1CS2P,3CS2P, N N N N 12LCOU Fire water, RAW & utilitywater 6 P1-P1 N Y Y 1CA2P Y N Low Temp. Hydrocarbon, NGL, LPG 7 GTAW P1-P1 All ER80SNi1 N Y N Low Temp. Hydrocarbon, NGL, LPG Técnicas Reunidas Gulf Co. Ltd Weldin g Proces s Base Materi al Thickne ss Range Diamete r Range Servic e Temp Impac t Test Hardnes s Test P01-001 Rev.M.0 0.0625" - 0.436" -20 0 F - 750 0 F ASME B31.3 Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare 1CS9P,3CS9P, 6CS9P Hydrocarbon, Boiled feed water, Steam condensate air P01-002 Rev.M.0 GTAW & SMAW 0.187" - 0.750" over 1" OD ER-70S-2 & E7018 -20 0 F - 750 0 F ASME B31.3 Wet sour gas,HydrocorbonW/H2S, condensate W/H2S,Sour Flare 1CS9P,3CS9P, 6CS9P Hydrocarbon, Boiled feed water, Steam condensate air Instrument Air, Nitrogen,Plant Air,Cooling Water P01-009 Rev.M.1 GTAW & SMAW 0.187" - 0.750" over 1" OD ER-70S-2 & E7018 -20 0 F - 750 0 F ASME B31.3 Wet sour gas,HydrocorbonW/H2S, condensate W/H2S,Sour Flare 1CS9P,3CS9P, 6CS9P Hydrocarbon, Boiled feed water, Steam condensate air P01-022 Rev.M.0 0.188" - 1.438" over 2" OD E6010 & E7018 -20 0 F - 650 0 F ASME B31.3 Hydrocarbon (Treated Propane) Lean- Amine(cool) P01-031 Rev.M.0 0.187" - 0.750" Over 2" OD E6010 & E7018 -20 0 F - 750 o F ASME B31.3 Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare 1CS9P,3CS9P, 6CS9P Hydrocarbon, Boiled feed water, Steam condensate air P01-036 Rev.M.0 GTAW & SMAW 0.422" - 0.750" over 1" OD ER80SNi1 & E8018C3 -50 0 F - 650 0 F ASME B31.3 Wet sour gas,HydrocorbonW/H2S, condensate W/H2S Low temp. 1CA9P,3CA2P, 3CA9P P01-037 0.190" - -50 0 F - ASME 1CA9P,3CA2P, 3CA9P Técnica Gulf

description

MD1 PPT

Transcript of WPS

Page 1: WPS

Page 1 of 7

Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil GroupSubcontract No: 8396-ZA-M01-K

BI-10-03193, Contract No.6600012800 (IK)

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION

Sl.NoWPS No Electrode Code PWHT Piping Class Fluid ServiceSTATUS

1 GTAW P1-P1 All ER-70S-2 N

N Y 1CS2P,3CS2P,

19-Jun-2006N N

N N 12LCOU Fire water, RAW & utilitywater

2 P1-P1 N

N Y 1CS2P,3CS2P,

19-Jun-2006N N

N N 12CGOU

N N 12LCOU Fire water, RAW & utilitywater

3 P1-P1 N

N Y 1CS2P,3CS2P,

19-Jun-2006N N

N N 12LCOU Fire water, RAW & utilitywater

4 SMAW P1-P1 Y

N Y 1CC9C4,3CC9C4 Caustic

19-Jun-2006N Y 1CS1P3,3CS1P3

N Y 3CS2P1 Rich Amine

N Y 1CS9P1,3CS9P1 Hydrocarbon

5 SMAW P1-P1 N

N Y 1CS2P,3CS2P,

19-Jun-2006N N

N N 12LCOU Fire water, RAW & utilitywater

6 P1-P1 NY Y 1CA2P

15-Jun-2006Y N Low Temp. Hydrocarbon, NGL, LPG

7 GTAW P1-P1 All ER80SNi1 NY N Low Temp. Hydrocarbon, NGL, LPG

15-Jun-2006

Técnicas Reunidas Gulf Co. Ltd

Welding

Process

Base Materi

al

Thickness

Range

Diameter

Range

Servic

e Temp

Impact Test

Hardness Test Date

ApprovedReport No

P01-001 Rev.M.0

0.0625" -

0.436"

-200F - 7500F

ASME B31.3

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

P01-002 Rev.M.0

GTAW &

SMAW

0.187" - 0.750"

over 1" OD

ER-70S-2 &

E7018

-200F - 7500F

ASME B31.3

Wet sour gas,HydrocorbonW/H2S, condensate W/H2S,Sour Flare

Rev.1 on

9/10/06

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Instrument Air, Nitrogen,Plant Air,Cooling Water

P01-009 Rev.M.1

GTAW &

SMAW

0.187" - 0.750"

over 1" OD

ER-70S-2 &

E7018

-200F - 7500F

ASME B31.3

Wet sour gas,HydrocorbonW/H2S, condensate W/H2S,Sour Flare

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

P01-022 Rev.M.0

0.188" - 1.438"

over 2" OD

E6010 & E7018

-200F -

6500F

ASME B31.3

Hydrocarbon (Treated Propane) Lean-Amine(cool)

P01-031 Rev.M.0

0.187" - 0.750"

Over 2" OD

E6010 & E7018

-200F - 750oF

ASME B31.3

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

P01-036 Rev.M.0

GTAW &

SMAW

0.422" - 0.750"

over 1" OD

ER80SNi1 &

E8018C3

-500F - 6500F

ASME B31.3

Wet sour gas,HydrocorbonW/H2S, condensate W/H2S Low temp.

1CA9P,3CA2P, 3CA9P

P01-037 Rev.M0

0.190" - 0.436"

-500F - 6500F

ASME B31.3

1CA9P,3CA2P, 3CA9P

Técnicas Reunidas Gulf

Page 2: WPS

Page 2 of 7

Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil GroupSubcontract No: 8396-ZA-M01-K

BI-10-03193, Contract No.6600012800 (IK)

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION

Sl.NoWPS No Electrode Code PWHT Piping Class Fluid ServiceSTATUS

Técnicas Reunidas Gulf Co. Ltd

Welding

Process

Base Materi

al

Thickness

Range

Diameter

Range

Servic

e Temp

Impact Test

Hardness Test Date

ApprovedReport No

Técnicas Reunidas Gulf

7 GTAW P1-P1 All ER80SNi1 NY Y 1CA2P

15-Jun-2006

8 P1-P1 N

N Y 1CS2P,3CS2P,

15-Jun-2006N N

N N 12LCOU Fire water, RAW & utilitywater

9 P1-P1 Y

N Y 1CC9C4,3CC9C4 Caustic

15-Jun-2006

N Y 1CS1P3,3CS1P3

N Y 1CS2P1 Sour Hydrocarbon

N Y 3CS2P1,1CS2P2 Rich Amine

N Y 1CS4P,3CS2P2 NACE

N Y 1CS9P1,3CS9P1 Hydrocarbon

N Y 6CS9P

10 P1-P1 N

N N

15-Jun-2006N Y 1CS2P,3CS2P,

N N 12LCOU Fire water, RAW & utilitywater

11 P1-P1 N

N N

15-Jun-2006N Y 1CS2P,3CS2P,

N N 12LCOU Fire water, RAW & utilitywater

12 P1-P1 N

N N

15-Jun-2006

P01-037 Rev.M0

0.190" - 0.436"

-500F - 6500F

ASME B31.3 Wet sour gas,HydrocorbonW/H2S,

condensate W/H2S Low temp.

P01-044 Rev.M0

GTAW & SAW

0.187" - 0.750"

over 1" OD

ER70S-2 &

EM12K

-200F - 750oF

ASME B31.3

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

P01-045 Rev.M0

GTAW &

SMAW

0.188" - 2.212"

over 1" OD

ER70S-2 & E7018

-200F -

6500F

ASME B31.3

Rev.1 on

9/5/06

Hydrocarbon (Treated Propane) Lean-Amine(cool)

Hydrocarbon, Boiled feed water, Steam condensate air

P01-046 Rev.M0

SMAW & SAW

0.187" - 0.750"

Over 2" OD

E6010 & EM12K

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-048 Rev.M0

GMAW &

SAW

0.187" - 0.750"

Over 2" OD

ER70S-3 &

EM12K

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-061 Rev.M0

GTAW & FCAW

0.187" - 0.750"

over 1" OD

ER70S-2 & E71T-1

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Page 3: WPS

Page 3 of 7

Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil GroupSubcontract No: 8396-ZA-M01-K

BI-10-03193, Contract No.6600012800 (IK)

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION

Sl.NoWPS No Electrode Code PWHT Piping Class Fluid ServiceSTATUS

Técnicas Reunidas Gulf Co. Ltd

Welding

Process

Base Materi

al

Thickness

Range

Diameter

Range

Servic

e Temp

Impact Test

Hardness Test Date

ApprovedReport No

Técnicas Reunidas Gulf

12 P1-P1 N N Y 1CS2P,3CS2P, 15-Jun-2006

N N 12LCOU Fire water, RAW & utilitywater

13 P1-P1 Y

N Y 1CC9C4,3CC9C4 Caustic

15-Jun-2006

N Y 1CS1P3,3CS1P3

N Y 1CS2P1 Sour Hydrocarbon

N Y 3CS2P1 Rich Amine

N Y 1CS2P2 Amina, Rich&Hot Lean

N Y 3CS4P Rich DUA

N Y 1CS9P1,3CS9P1 Hydrocarbons

14 P1-P1 N

N N

15-Jun-2006N Y 1CS2P,3CS2P,

N N 12LCOU Fire water, RAW & utilitywater

15 P1-P1 N

N N

15-Jun-2006N Y 1CS2P,3CS2P,

N N 12LCOU Fire water, RAW & utilitywater

16 GTAW P1-P1 All ER70S-2 Y

N 1CS9P1,3CS9P1 Hydrocarbon

15-Jun-2006

N Y 1CC9C4,3CC9C4 Caustic

N Y 1CS1P3,3CS1P3

N Y 1CS2P1 Sour Hydrocarbon

N Y 3CS2P1 Rich Amine

P01-061 Rev.M0

GTAW & FCAW

0.187" - 0.750"

over 1" OD

ER70S-2 & E71T-1

-200F - 750oF

ASME B31.3

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-065 Rev.M0

GTAW & SMAW & SAW

0.187" -

1.876"

over 1" OD

ER70S-2 & E7018 & EM12K

-200F -

6500F

ASME B31.3

Hydrocarbon (Treated Propane) Lean-Amine(cool)

P01-066 Rev.M0

SMAW & FCAW

0.187" - 0.750"

Over 2" OD

E6010 & E71T-1

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-067 Rev.M0

SMAW & FCAW

0.187" - 0.750"

Over 2" OD

E6010 &

E71T-11

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-069 Rev.M0

0.0625" -

0.436"

-200F -

6500F

ASME B31.3

Rev.1 on

9/10/06

Hydrocarbon (Treated Propane) Lean-Amine(cool)

Page 4: WPS

Page 4 of 7

Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil GroupSubcontract No: 8396-ZA-M01-K

BI-10-03193, Contract No.6600012800 (IK)

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION

Sl.NoWPS No Electrode Code PWHT Piping Class Fluid ServiceSTATUS

Técnicas Reunidas Gulf Co. Ltd

Welding

Process

Base Materi

al

Thickness

Range

Diameter

Range

Servic

e Temp

Impact Test

Hardness Test Date

ApprovedReport No

Técnicas Reunidas Gulf

16 GTAW P1-P1 All ER70S-2 Y

N Y 1CS4P NACE

15-Jun-2006

17 GTAW P1-P1 All ER80S-Ni1 YY Y 1CA2P1,3CA2P1 Sour water

19-Jun-2006Y Y 1CA9C4,3CA9C4 Low Temp. caustic

18 P1-P1 YY Y 1CA2P1,3CA2P1 Sour water

19-Jun-2006Y Y 1CA9C4,3CA9C4 Low Temp. caustic

19 P1-P1 N

N N

15-Jun-2006N Y 1CS2P,3CS2P,

N N 12LCOU Fire water, RAW & utilitywater

20 P1-P1 N

N N

19-Jun-2006N Y 1CS2P,3CS2P,

N N 12LCOU Fire water, RAW & utilitywater

21 P1-P1 N

N N

15-Jun-2006N Y 1CS2P,3CS2P,

N N 12LCOU Fire water, RAW & utilitywater

22 P1-P1 N

N N

15-Jun-2006N Y 1CS2P,3CS2P,

N N 12LCOU Fire water, RAW & utilitywater

23 P1-P1 N

N N

15-Jun-2006N Y 1CS2P,3CS2P,

P01-069 Rev.M0

0.0625" -

0.436"

-200F -

6500F

ASME B31.3

Rev.1 on

9/10/06

P01-078 Rev.M0

0.109" -

0.436"

-500F - 6500F

ASME B31.3

P01-080 Rev.M0

GTAW &

SMAW

0.280" -

0.560"

over 1" OD

ER80SNi1 &

E8018C3

-500F -

6500F

ASME B31.3

P01-081 Rev.M0

GTAW & FCAW

0.187" - 0.750"

Over 1" OD

ER70S-2 & E71T-11

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-088 Rev.M0

GMAW (STT) &

SMAW

0.187" - 0.864"

Over 1" OD

ER70S-6 & E7018

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-089 Rev.M0

STT &

FCAW

0.187" - 0.750"

Over 1" OD

ER70S-6 & E71T-1

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-091 Rev.M0

GMAW (STT) &

SAW

0.187" - 0.750"

Over 2" OD

ER70S-6 & EM12K

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-092 Rev.M0

GTAW & SAW

0.187" - 0.750"

Over 1" OD

ER70S-2 & EM12K

-200F - 750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

Page 5: WPS

Page 5 of 7

Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil GroupSubcontract No: 8396-ZA-M01-K

BI-10-03193, Contract No.6600012800 (IK)

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION

Sl.NoWPS No Electrode Code PWHT Piping Class Fluid ServiceSTATUS

Técnicas Reunidas Gulf Co. Ltd

Welding

Process

Base Materi

al

Thickness

Range

Diameter

Range

Servic

e Temp

Impact Test

Hardness Test Date

ApprovedReport No

Técnicas Reunidas Gulf

23 P1-P1 N

N N 12LCOU Fire water, RAW & utilitywater

15-Jun-2006

24 P1-P1 NN N

15-Jun-2006

N N 12LCOU Fire water, RAW & utilitywater

25 P1-P1 Y

N Y 1CC9C4,3CC9C4 Caustic

15-Jun-2006N Y 1CS9P1,3CS9P1 Hydrocarbon

N Y 6CS9P

26 P1-P1 N

N N

15-Jun-2006

N Y 1CS2P,3CS2P,

27 P1-P1 Y N Y1CS9P1,3CS9P1 Hydrocarbon

27-Jul-06

6CS9P

28 P1-P1 Y

Y Y 3CA2P,3CA9P Low Temp.Hydrocarbon, NGL, LPG

27-Jul-06Y Y 3CA2P1 Sour water

Y Y 3CA9C4 Low Temp.Caustic

29 GTAW P8-P8 All N N Y 1SDOP 12-Jul-06

30 P8-P8 N N Y 1SDOP 12-Jul-06

P01-092 Rev.M0

GTAW & SAW

0.187" - 0.750"

Over 1" OD

ER70S-2 & EM12K

-200F - 750oF

ASME B31.3

P01-093 Rev.M0

GTAW & FCAW

0.187" - 0.750"

Over 1" OD

ER70S-2 & E71T-1

-00F -

750oF

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

P01-095 Rev.M0

GMAW (STT) &

SAW

0.187" - 2.000"

Over 2" OD

ER70S-6 & EM12K

-200F -

6500F

ASME B31.3

Rev.1 on

9/5/06Hydrocarbon, Boiled feed water, Steam condensate air

P01-103 Rev.M3

GMAW (STT) &

SAW

0.187" - 0.729"

Over 2" OD

ER70S-6 & EM12K

-200F -

7500F

ASME B31.3

1CS9P,3CS9P, 6CS9P

Hydrocarbon, Boiled feed water, Steam condensate air

Wet sour gas,HydrocorbonW/ H2S, Condensate W/H2S,Sour Flare

P01-116 Rev.2

GMAW (STT)

& SMAW

0.187" -

1.78"

Over 3" OD

ER70S-6 & E7018

-00F - 6500F

ASME B31.3

Rev.1 on

9/5/06Hydrocarbon, Boiled feed water, Steam condensate air

P01-121 Rev.0

GTAW &

SMAW

0.187" -

2.06"

Over 1" OD

ER80SNi1 &

E8018C3

-500F -

6500F

ASME B31.3

P08-001 Rev.M0

0.0625" - 0.500"

ER308L OR

ER316L

-200F -

7500F

ASME B31.3

General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil

P08-020 Rev.M0

GTAW &

SMAW

0.118" -

1.000"

Over 1" OD

ER308L&E308L OR

ER316L&E316L

-200F -

7500F

ASME B31.3

General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil

Page 6: WPS

Page 6 of 7

Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil GroupSubcontract No: 8396-ZA-M01-K

BI-10-03193, Contract No.6600012800 (IK)

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION

Sl.NoWPS No Electrode Code PWHT Piping Class Fluid ServiceSTATUS

Técnicas Reunidas Gulf Co. Ltd

Welding

Process

Base Materi

al

Thickness

Range

Diameter

Range

Servic

e Temp

Impact Test

Hardness Test Date

ApprovedReport No

Técnicas Reunidas Gulf

31 GTAW P8-P8 All ERNiCrMo-3 N N N 1SVOP 12-Jul-06

32 P8-P8 N N N 1SVOP 13-Jul-06

33 P8-P8 N N N 1SDOP 13-Jul-06

34 GTAW P34-P34 ≤ 3" OD ERCuNi N N Y 12LCOU 16-Jul-06

P08-030 Rev.M0

0.062" - 0.308"

-200F -

3000F

ASME B31.3

Waste Air,sea water, Misc.piping&drain,caustic, disulfide oil.

P08-031 Rev.M0

GTAW &

SMAW

0.062" - 0.362"

Over 1" OD

ERNiCr -Mo-3 & ENiCr-

Mo-3

-200F -

3000F

ASME B31.3

Waste Air,sea water, Misc.piping&drain,caustic, disulfide oil.

P08-032 Rev.M0

GMAW (STT)

0.0625" - 0.500"

Over 1" OD

ER308L OR

ER316L

-200F -

7500F

ASME B31.3

General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil

P34-002 Rev.M1

0.0625" - 0.500"

330F -

1800F

ASME B31.3

Fire water, Storm Drain, Raw Water, OWS, utilitywater 4"Φbelow

Page 7: WPS

Page 7 of 7

Ju'aymah Gas Plant Expansion Project

Subcontractor : Mohammad Al Mojil GroupSubcontract No: 8396-ZA-M01-K

BI-10-03193, Contract No.6600012800 (IK)

WELDING PROCEDURE SPECIFICATION (WPS) REGISTRATION

Sl.NoWPS No Electrode Code PWHT Piping Class Fluid ServiceSTATUS

1 GTAW P8-P8 All N N Y 1SDOP 12-Jul-06 SS

2 P8-P8 N N Y 1SDOP 12-Jul-06 SS

3 GTAW P8-P8 All ERNiCrMo-3 N N N 1SVOP 12-Jul-06 SS

4 P8-P8 N N N 1SVOP 13-Jul-06 SS

5 P8-P8 N N N 1SDOP 13-Jul-06 SS

1 GTAW P34-P34 ≤ 3" OD ERCuNi N N Y 12LCOU 16-Jul-06 CuNi

Técnicas Reunidas Gulf Co. Ltd

Welding

Process

Base Materi

al

Thickness

Range

Diameter

Range

Servic

e Temp

Impact Test

Hardness Test Date

ApprovedReport No

P08-001 Rev.M0

0.0625" - 0.500"

ER308L OR

ER316L

-200F -

7500F

ASME B31.3

General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil

P08-020 Rev.M0

GTAW &

SMAW

0.118" -

1.000"

Over 1" OD

ER308L&E308L OR

ER316L&E316L

-200F -

7500F

ASME B31.3

General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil

P08-030 Rev.M0

0.062" - 0.308"

-200F -

3000F

ASME B31.3

Waste Air,sea water, Misc.piping&drain,caustic, disulfide oil.

P08-031 Rev.M0

GTAW &

SMAW

0.062" - 0.362"

Over 1" OD

ERNiCr -Mo-3 & ENiCr-

Mo-3

-200F -

3000F

ASME B31.3

Waste Air,sea water, Misc.piping&drain,caustic, disulfide oil.

P08-032 Rev.M0

GMAW (STT)

0.0625" - 0.500"

Over 1" OD

ER308L OR

ER316L

-200F -

7500F

ASME B31.3

General process,Corrosive processs, Rich DUA, D.M water, Lube oil, Seal oil

P34-002 Rev.M1

0.0625" - 0.500"

330F -

1800F

ASME B31.3

Fire water, Storm Drain, Raw Water, OWS, utilitywater 4"Φbelow

Técnicas Reunidas Gulf