WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

55
The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775 www.see-grid.eu SEE-GRID-2 WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes Progress Report – preliminary version PSC06 Meeting Gabriel Neagu WP2 Leader National Institute for R&D in Informatics – ICI, Bucharest [email protected], www.ici.ro

description

WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes. Progress Report – preliminary version PSC06 Meeting. Gabriel Neagu WP2 Leader National Institute for R&D in Informatics – ICI, Bucharest [email protected], www.ici.ro. - PowerPoint PPT Presentation

Transcript of WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

Page 1: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775

www.see-grid.eu

SEE-GRID-2

WP2 – Studies and Strategies for sustainable operational, organizational

and policy schemes

Progress Report – preliminary versionPSC06 Meeting

Gabriel NeaguWP2 Leader

National Institute for R&D in Informatics – ICI, [email protected], www.ici.ro

Page 2: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 2

NGI Sustainability indicators for the 2-nd project year

General remarks on the Progress report content: It is focused on received contribution per country on NGI indicators

Partners not being able to provide their contributions before are invited to report during the meeting

Should be considered as un updated version of the report for the PSC05 meeting

Additional information reported for September – November period is presented in Italics for both achieved results and updates to the 2nd project year plan

This cumulative document is intended as the main input for the second version of D2.3 deliverable

Statistics are presented at the end on the addressed NGI Indicators from both planning and achieved results perspectives

The Further Work section of the report includes WP2 open positions in the AP Register

Page 3: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 3

NGI Sustainability indicators for the 2-nd project year

NGI setup and recognition NGI organization and Consortium expansion NREN cooperation eInfrastructure national strategy National Policy documents eIRG plans National-level projects Other sources of funding in grid area including related projects Industrial cooperation Technical independence i.e. national-level services Expansion of national infrastructure Sites migrated to EGEE production Expansion to new applications and user communities

Page 4: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 4

Albania

Plan for the 2-nd project year NGI setup and recognition

The launch of NGI is planned for September 2007 National-level projects

Several proposals would be submitted to Ministry of Education and Science, regarding both Grid infrastructure and applications

Other sources of funding in grid area including related projects The support is expected from bilateral and regional (SEE-ERA.NET)

projects Expansion of national infrastructure

Extension of existing sites (INIMA, FIE, FNS), and inclusion of new sites (FECO and universities of Elbasani and Shkodra)

Expansion to new applications and user communities Expansion into new domains, such as meteorology and seismology

Page 5: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 5

Albania

Report on May-November 2007: NGI setup:

JRU signed between rectors of University of Tirana and Polytechnic University of Tirana

Plans to launch it in September delayed– Reorganization of INIMA– Plans for next PSC meeting in Sarajevo– Pre-election situation in universities

National projects One joint project-proposal was presented to Ministry in framework of

national programme for R&D in IT, focused on – Infrastructure improvement– Evaluation of future applications– Organization of local events

Page 6: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 6

Albania

Other sources of funding Proposal to SEE-ERA was not accepted due to unclear causes

Expansion of national infrastructure New site in implementation at Faculty of Economy (FECO) Work in progress for improvement of the site at FIE Work in progress for implementation of the site at FNS New site deployed already at INIMA, but

– Sites of INIMA shut down for undetermined period due to moving out of the building.

Expansion to new applications and user communities Contacts with FECO and institutes of Seismology and Hydrometeorology

established, all included in the national project-proposal

Page 7: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 7

Bosnia-Herzegovina

Plan for the 2-nd project year NGI setup and recognition

Improve the NGI organization and attempt the National level recognition. This could include recognition at various levels i.e. Ministries of Science / Technology / Education where applicable: state/entity/canton

NGI organization and Consortium expansion Planned inclusion of 3-5 new members

NREN cooperation NREN National recognition will be attempted

eInfrastructure national strategy If political issues allow

National-level policies If political issues allow

eIRG membership status If political issues allow

Page 8: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 8

Bosnia-Herzegovina

Plan for the 2-nd project year (cont.): National-level projects

One long-term project is in preparation Other sources of funding in grid area including related projects

By SARNET and by individual universities. Technical independence i.e. national-level services

National CA is planned RB, BDII servers (or gLite counterparts)

Expansion of national infrastructure All sites are due for upgrade, 2 new sites will be introduced

Expansion to new applications and user communities Attempt the expansion into new domains: electromagnetics, fluid

dynamics, seismology, meteorology, biomed

Page 9: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 9

Bosnia-Herzegovina

Report on May-November 2007:

Page 10: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 10

Bulgaria

Plan for the 2-nd project year: NGI organization and Consortium expansion

BGGC expects new members eInfrastructure national strategy

eInfrastructure national strategy will be recognized on governmental level eIRG plans

contribution to eIRG workshops, participation at eIRG meetings regularly National-level projects

National-level projects are expected for expansion of infrastructure Other sources of funding in grid area including related projects

New bilateral and regional projects are expected to start Technical independence i.e. national-level services

Full technical independence in the production status will be achieved Expansion of national infrastructure

A total of more than 300 CPUs is expected to be achieved

Page 11: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 11

Bulgaria

Report on May-November 2007: NGI organization and Consortium expansion

Agreement was signed with University of Ruse Interest was declared by one additional organization

National-level projects One big national project and two small projects were activated; it will

support configuration up-grades Expansion to new user communities

New members in SEE-GRID VO from computational mechanics and geographic

eIRG plans Participation in the Open Workshop on eInfrastructure, Lisbon, Portugal,

October 11-12, 2007 Participation in 12th e-IRG meeting, November 30, 2007, Lisbon, Portugal

(coming)

Page 12: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 12

Croatia

Plan for the 2-nd project year: NGI organization

Establishment of CRO GRID 2 National Grid Infrastructure (CRO NGI) and Croatian [Hrvatska] National Grid Initiative (HNGI)

More formal internal organisation and decision-making mechanisms establisheds (Steering Commitee)

eInfrastructure national strategy e-Croatia (e-Hrvatska) strategy

National-level projects CRO GRID 2

Other sources of funding in grid area including related projects EGEE-II, SEE-GRID-2, EU funded CenVis (Centre for Scientific Visualisation) DARIAH bi-lateral and multi-lateral projects

Page 13: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 13

Croatia

Plan for the 2-nd project year (cont): Industrial cooperation

Ericsson Nikola Tesla, CRO GRID related contracted relationship; IBM Hrvatska; interested industrial and other entities

Technical independence i.e. national-level services Improved Grid services at the national level Implementation of organisational mechanisms and production

infrastructure maintenance procedures Functionality and performance expansion and optimisation:

Expansion of national infrastructure The infrastructure will be expanded as the needs arise. Plans are being made to establish CRO GRID National Grid Infrastructure

in a similar way as by CARnet (no formal document, but strict rules).

Page 14: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 14

Croatia

Report on May-November 2007: NGI organization

Establishment of Steering Committee for CRO NGI The Regulation act of CRO NGI and the Budget for the Croatian

eInfrastructure was adopted on the first meeting of the official CRO NGI board

Establishment of National Committee for NGI at Croatian Academy of Sciences and Arts

Page 15: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 15

FYR of Macedonia

Plan for the 2-nd project year: NGI organization and Consortium expansion, NREN cooperation

Inclusion of new member (SEE University, Tetovo) eInfrastructure national strategy

National strategy for Electronic Communication with ICT, Ministry of Transport and Communications

Meeting with newly appointed Minister of Information Society The National Grid Strategy document will be presented to the ‘SS Cyril

and Methodius' University Council for approval. Depending of interest and inclusion of other Universities in NGI (from

Tetovo, Bitola) this document will be proposed for adoption to the Inter University Council.

National recognition of MARGI.

Page 16: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 16

FYR of Macedonia

Plan for the 2-nd project year (cont): Other sources of funding in grid area including related projects

SEE-ERA.NET call UNESCO initiative for new project: Improving Innovation Capacities in

the Universities Technical independence i.e. national-level services

CA accreditation planed to run in Jul/August 2007, CP/CPS document to be finished in March 2007; VOMS; RGMA; BDII.

Expansion of national infrastructure Inclusion of new site (Tetovo)

Expansion to new applications and user communities Large Scale Computations in Molecular Chemical Physics of Interacting

Systems Grid Enabled System for Mining, Gathering, Clustering and Retrieval

Images from the Web Mass Processing of Digital and Analog Seismological signals

Page 17: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 17

FYR of Macedonia

Report on May-August 2007: NGI national-level recognition – In progress

Briefings with Minister of Information society of R. Macedonia, result UKIM/MARNet is recognized as the main coordinator of the Grid Initiative in Macedonia

JRU documents prepared as continuation of the previously signed MoA (2004-2006)

eInfrastructure national strategy On the request of the Minister of ICT

– Proposition of the MARNet budget 2008 year– Talks for possibilities of expansion of the backbone to all public

universities (Bitola, Tetovo, new univ. Shtip) NGI expansion. other sources of funding in grid area including

related project Preparation and dissemination activities (Linux installations) for the

preparation of the new grid site at South East Europe University

Page 18: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 18

FYR of Macedonia

Report on May-November 2007 (cont): Industrial cooperation

Briefings with MB of MASIT Chamber of Commerce (result -presence of its president on Industrial day in Thessaloniki

Disemination event for policy makers at 5th SEEITA Conference and 4th MASIT Open Days under the track: Attracting FDI in Macedonia and SEE Region. Present were high Government officials, Minister for foreign investment, Minister for Information Society, Director of Agency for Foreign Investments, representatives of companies, USAID, GTZ

Expansion of national infrastructure Expansion of the MK1 cluster by 20 CPU-a Virtual machines, 1CPU on

3GHz and 512 MB RAM Expansion to new applications and user communities

Grid enabled system for mining, gathering, clustering and retrieval images from the web

Grid-based medical platform - analysis and enhancement of the algorithms for filtering of mammograms and segmentation).

Page 19: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 19

FYR of Macedonia

Report on May-November 2007(cont): Technical independence i.e. national-level services

Preparing Linux machine and installation of CA software Participation in EUGRIDPMA meeting CPS finalized, site prepared, CA software, hardware and site installed

and configured Started the accreditation procedure scheduled for January 2008

Amsterdam meeting of EUGRID PMA. Participation in EUGRIDPMA meeting

---------- Doctorial virtual Studies

preparatory meeting and 1 month common work of Anastas Mishev with IPP BAS

1 month common work of Azir Aliu from SEE University with IPP BAS

Page 20: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 20

FYR of Macedonia

Up-dated plan for the remaining period: NGI national-level recognition –

Adoption of the MARGI - Use Policy documents by MARNet Management Board. Preparing document for submission to the Inter University Council

National-level projects Preparation s for national Call

Other sources of funding in grid area including related projects Contributions to current FP7 projects preparations (SEE-GRID-SCI)

Technical independence i.e. national-level services Activate the national CA Improve the current level of deployment of national-level services

Expansion of national infrastructure Up-grade current sites, activate SEEU site

Page 21: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 21

Greece

Plan for the 2-nd project year: National-level projects

Expansion of the HellasGrid infrastructure Other sources of funding in grid area including related projects

Participation in various Grid Related project proposals Industrial cooperation

Increase contacts with industrial partners Expansion of national infrastructure

Yes, via national project Expansion to new applications and user communities

On going effort via dissemination and participation to related projects

Page 22: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 22

Greece

Report on May-November 2007:

Page 23: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 23

Hungary

Plan for the 2-nd project year: Other sources of funding in grid area including related

projects Participation in various Grid Related project proposals

Industrial cooperation Increase contacts with industrial partners

Expansion of national infrastructure Further increase of HunGrid resources

Expansion to new applications and user communities Expand to new user communities in areas of data mining, drug

discovery, bioinformatics, climate modeling, B2B, geophysics, network modeling, etc

Page 24: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 24

Hungary

Report on May-November 2007: NGI organization and Consortium expansion

Additional JRU established with 3 members in total: DEPARTMENT OF METEOROLOGY at ELU and SEISMOLOGICAL OBSERVATORY of GGRI

– The current JRU has been formed by two smaller application developer/user teams and one team that deals with grid development, operation, support, and training. This 'satellite' JRU will exploit the nationwide Grid resources (operated by the another HGCC JRU) together with other international resources for a specific purpose, namely for applications in the field of seismology and meteorology.

the Hungarian Grid Competence Center (HGCC), involving the key and most experienced Grid players from Hungary, has launched the National Grid Initiative and intends to become the national reference point.

– HGCC establish another JRU. SZTAKI is member in both JRUs

– The management of two separated JRUs with different objectives (instead of one heterogeneous JRU) and with different leaders seems to be more feasible.

Page 25: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 25

Hungary eIRG plans

Already eIRG member National-level projects

Same number of projects as before, working on the projects. Software and Services - National Technology Platform project initiated

and submitted (19. 11. 2007):– Hungarian Grid community (HGCC) supports and participate in the Grid related part of

the project (tight connection to NESSI - Networked European Software and Services Initiative)

Other sources of funding in Grid area including related projects SEE-GRID-SCI

Industrial cooperation Industrial collaboration was initiated with Oracle Hungary, first

negotiation was done beginning of May as an outcome of the HU-Hungarian Grid Induction and Application Development Training

Second negotiation was done at EGEE’07 in Budapest with Oracle EMEA

Page 26: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 26

Hungary

Up-dated plan for the remaining period: NGI organization and Consortium expansion

HGCC and HunGrid will be expanded with the participation of new members.

National-level projects expected expansion of infrastructure with the new submitted projects. + Software and Services National Technology Platform project (SSNTP) + Biotech National Technology Platform project (BNTP)

Other sources of funding in Grid area including related projects Contributions to current FP7 projects preparations (EGEE III, SEE-GRID-

SCI, National Technology Platform project). Industrial cooperation

Meetings will be organized to strengthen the industrial and governmental collaboration of HunGrid.

Page 27: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 27

Hungary

Up-dated plan for the remaining period (cont): Expansion of national infrastructure

more storage + CPU Expansion to new applications and user communities

Supporting different research fields such as: Biotech/Bioinformatics and looking for multidisciplinary applications in the frame of Biotech National Technology Platform project.

Page 28: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 28

Moldova

Plan for the 2-nd project year: NGI setup and recognition

MD Grid NGI establishment in May 2007 NGI organization and Consortium expansion, NREN cooperation

Inclusion of State University of Moldova, Institute of Ecology and Geography, Faculty of Economical Cybernetics of AESM and the Institute of Applied Physics of the ASM.

eInfrastructure national strategy New strategy to be accepted in collaboration with MD Grid NGI

eIRG plans Application for Moldova membership to be prepared and sent.

National-level projects Adopting by Moldovan government of the Concept of National

Information System for Science and Innovation will include grid-related topics.

Page 29: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 29

Moldova

Plan for the 2-nd project year (cont): Other sources of funding in grid area including related projects

NATO Proposal for upgrading of NGI regional and global connectivity Industrial cooperation

Negotiations for new grid nodes and users involvement from MoldHidroMeteo State Enterprise and the Institute of Economics and Statistics of Moldova.

Technical independence i.e. national-level services Necessary resources for CA, VOMS, RB/WMS to be determined and

established. Expansion of national infrastructure

Inclusion of new sites Expansion to new applications and user communities

Creation of MD-Grid user communities, applications selection and gridification.

Page 30: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 30

Moldova

Report on May-November 2007: NGI setup and recognition

MD-Grid Kick-off meeting MD-Grid NGI Consortium Agreement signed by 6 NGI participants (May

10 2007):– Research and Educational Networking Association of Moldova – coordinator– Institute of Mathematics and Computer Science of the Academy of Sciences

of Moldova– Faulty of Radioelectronics and Telecommunications of the Technical

University of Moldova– Institute of Geology and Seismology of the Academy of Sciences of Moldova– State Hydrometeorological Service– School of Public Health, State University of Medicine and Pharmacy

“N.Testemitanu” NGI Recognized by: MID – Ministry of Information Development and

ASM

Page 31: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 31

Moldova

Report on May-November 2007 (cont.): NGI organization and Consortium expansion, NREN cooperation

Negotiations of MoUs on joining MD-Grid NGI with potential partners from the State University of Moldova and the Academy of Economic Studies of Moldova have started

eIRG plans Letter of application sent. Answer gotten: Moldova cannot be member of

eIRG , observer only, but there is no policy at the moment Industrial cooperation

Negotiation of cooperation prospects with two domestic Companies that plan to be involved in GRID applications development

Technical independence i.e. national-level services CA building documents preparation continued Negotiation of the ability and possible procedure of National grid CA

creation with National PKI bodies was organized

Page 32: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 32

Moldova

Report on May-November 2007 (cont.): Expansion of national infrastructure

Organization of the tender for purchasing of the equipment according to the MoUs with institutions

In September 2007 new equipment for two clusters deployment in RENAM node (MD-01-REN node cluster) and in RENAM - IMI node (MD-02-IMI node cluster) was purchased.

Expansion to new applications and user communities 1 application, nominated and gridification started

Page 33: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 33

Moldova

Up-dated plan for the remaining period: NGI organization and Consortium expansion

State University of Moldova, the Academy of Economical Studies of Moldova

eInfrastructure national strategy new MD-Grid NG eInfrastructure to be determined

eIRG plans application for Moldova observer Membership to be prepared and sent

National-level projects Adopting by Moldovan government of the Concept of National

Information System for Science and Innovation will include grid-related topics.

Page 34: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 34

Moldova

Up-dated plan for the remaining period (cont): Other sources of funding in grid area including related projects

FP7, SEEGRID-SCI Industrial cooperation

negotiations for new grid nodes and users involvement from the Academy of Economical Studies of Moldova.

Technical independence i.e. national-level services necessary resources for CA, VOMS, RB/WMS to be determined and

established. Expansion of national infrastructure

negotiations for new grid nodes creation Expansion to new applications and user communities

creation of MD-Grid users communities, PRNNS application gridification and deployment.

Page 35: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 35

Montenegro

Plan for the 2-nd project year: NGI organization and Consortium expansion, NREN cooperation

Increase number of MGI members eInfrastructure national strategy

First draft of the national Grid strategy will be written and presented in for approval by the Ministry of Education and Science.

Promote the national Grid strategy and work on its implementation Other sources of funding in grid area including related projects

Search for additional sources of funding, especially from industry. Industrial cooperation

Dissemination of information about Grid technology among IT and other industry in Montenegro.

Page 36: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 36

Montenegro

Plan for the 2-nd project year (cont): Technical independence i.e. national-level services

Establish the National Grid CA (CP/CPS to be finished until May 2007 and completion is expected until end of 2007)

Expansion of national infrastructure Improve the Grid infrastructure by upgrading the existing site and

introducing new ones. Expansion to new applications and user communities

Increase the number of users and applications.

Page 37: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 37

Montenegro

Report on May-November 2007: NGI organization and Consortium expansion, NREN cooperation

MGI organization improved by signing of new MoU and forming of JRU Technical independence i.e. national-level services

CP/CPS documents were sent, waiting response and finish job. Expansion to new applications and user communities

Hydro-metrological institute of Montenegro signed JRU. HMI Montenegro use our cluster and adapting their application

Expansion of national infrastructure Established connection of HMI LAN with MREN

National-level projects Participation in the National Research Project Call from Ministry of

Education and Science (Project “Cluster improvement and promotion in Montenegro”, September 2007)

Page 38: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 38

Romania

Plan the 2-nd project year: NGI organization and Consortium expansion

RoGrid expansion with one more institution during 2007 NREN cooperation

Cooperation with RoEduNet for NREGI development National-level projects

The new R&D Call for proposals at the National level Plan is scheduled for June-July 2007.

Other sources of funding in grid area including related projects Via international cooperation. Utilization of Structural Funds will be

attempted. Industrial cooperation

Activate cooperation with IT private high-tech companies

Page 39: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 39

Romania

Plan for the 2-nd project year (cont): Technical independence i.e. national-level services

Activate the national CA Expansion of national infrastructure

It is planned to include 1-2 new sites Expansion to new applications and user communities

The expansion to the ESR, BioMed, and Simulation and Optimization fields will be attempted.

Page 40: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 40

Romania

Report on May-November 2007: NGI organization and Consortium expansion

Two new institutions have been included in the consortium: West University of Timisoara - Computer Science Department, and Technical University of Cluj-Napoca – Computer Science Department

National-level projects Participation in the National Research Programme Call 1 (June 2007) A proposal for NREGI development was submitted to the National

Committee for Research Infrastructures Three projects on Grid area were accepted for financing after the Call1

Other sources of funding in Grid area including related projects EGEE III, SEE-GRID-SCI, Structural funds.

Industrial cooperation IT private high-tech companies included in proposal consortia for the

NRP Call1

Page 41: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 41

Romania

Report on May-November 2007 (cont): Technical independence i.e. national-level services

National CA accredited in July 2007 Romanian CA operational from October 2007 Current level of provided services improved as compared with previous

period Expansion of national infrastructure

Site of the new RoGrid comers Expansion to new applications and user communities

Modelling, simulation and optimization (MOSI) applications on Grid are under development (ICI, NCIT, WUT, TUCN, INCAS)

EQUSIM application was defined by NIPNE in cooperation with National Institute for Earth Science Bucharest

Aerospace research

Page 42: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 42

Romania

Up-dated plan for the remaining period: National-level projects

Starting winning projects from NRP Call 1 Other sources of funding in grid area including related projects

Contributions to current FP7 projects preparations (EGEE III, SEE-GRID-SCI)

Technical independence i.e. national-level services Activate the national CA Improve the current level of deployment of national-level services

Expansion of national infrastructure Up-grade current sites

Expansion to new applications and user communities MOSI applications deployment and support

Page 43: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 43

Serbia

Plan for the 2-nd project year: NGI organization and Consortium expansion, NREN cooperation

Improve AEGIS organization with signing of new MoU and forming JRU Maintain excellent relation with NREN

eInfrastructure national strategy Work towards eInfrastructure national strategy

eIRG plans Establish eIRG membership (in progress)

National-level projects Seek national funding from newly introduced Ministry of

Telecommunications and Information Society Other sources of funding in grid area including related projects

Obtain equipment grants from SNIP and IPA (in progress) Get further funding in grid area through participation in FP7 and

regional calls (e.g. see-era.net)

Page 44: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 44

Serbia

Plan for the 2-nd project year (cont): Industrial cooperation

Expand industrial cooperation, by interacting with hi-tech SMEs (e.g. IRVAS, SEWA)

Technical independence i.e. national-level services Achieve full technical independence of national-level services, after

accreditation of CA Expansion of national infrastructure

Further expand AEGIS infrastructure by introducing new sites, and by upgrading existing ones

Expansion to new applications and user communities Expand to new applications and user communities such as Meteorology

and Archeology

Page 45: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 45

Serbia

Report on May-November 2007: NGI organization and Consortium expansion, NREN cooperation

Annual AEGIS Assembly held on September 8 AEGIS organization improved by signing of new MoU and forming of JRU Excellent relation with NREN maintained – it is one of the founding

members of AEGIS Industrial cooperation

Industrial cooperation improved, two hi-tech SMEs (e.g. IRVAS, SEWA) are members of AEGIS

Technical independence i.e. national-level services Full technical independence of national-level services is achieved; AEGIS

CA accredited Expansion of national infrastructure

Upgrade of AEGIS01-PHY-SCL in progress, new sites will be added in 2007

Page 46: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 46

Turkey

Plan for the 2-nd project year: NGI organization and Consortium expansion, NREN cooperation

TR-Grid will be expanded with the participation of new members from governmental departments and industry: Prime Ministry State Planning Organization, National Meteorology Service, Turkish Atomic Energy Authority, Kandilli Observatory and Earthquake Research Center , AGMLAB

JRU will be formed as a mechanism for NGI eInfrastructure national strategy

TR-Grid strategy and policy will be finalized. eIRG plans

TUBITAK expects to become a member of eIRG. Other sources of funding in grid area including related projects

All of the TR-Grid members are trying to participate in different projects from national and international level.

Page 47: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 47

Turkey

Plan for the 2-nd project year (cont): Industrial cooperation

Meetings will be organized to strengthen the industrial and governmental collaboration of TR-Grid.

Technical independence i.e. national-level services Full technical independence will be achieved.

Expansion of national infrastructure Increase in the number of CPUs to over 1000 cores is expected.

Expansion to new applications and user communities TR-Grid will support new grid applications from different research fields

and looking at multidisciplinary applications.

Page 48: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 48

Turkey

Report on May-November 2007: NGI organization and Consortium expansion

1 new member – Turkish Atomic Energy Authority (TAEA) TR-Grid JRU was formed in August 2007 with 9 members of NGI

eInfrastructure national strategy + policy documents TR-Grid Strategy, Site and User Policy documents were finalized and

announced to grid community in Turkey. As the decision policy maker TR-Grid NGI, “TR-Grid Advisory Board” was

initiated by Management Board of TUBITAK ULAKBIM. eIRG plans

The membership of TUBITAK to eIRG was approved. National-level projects

TR-Grid e-Infrastructure Project has been extended until the end of June 2007 and total project budget was increased to 800K Euro

Page 49: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 49

Turkey

Report on May-November 2007 (cont): Other sources of funding in grid area including related projects

EUMEDGRID, EGEE-2 Industrial cooperation

The industrial collaboration was initiated with AGMLAB (SME) in the semantic and search engine areas. ULAKBIM and AGMLAB developed an academic research engine which will use TR-Grid infrastructure and grid services.

AGMLAB (SME specialized in the semantic and search engine areas) developer of “Academic Research Engine Application for Grid”

EDA Engineering and Analysis (SME specialized in Computational Fluid Dynamics)

ROKETSAN Missiles Industries Inc. (leading the national rocket and missile research and production programs)

Page 50: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 50

Turkey

Report on May-November 2007 (cont): Expansion of national infrastructure

8 sites are operational. Minimum site configuration is 64 core and 1 Tbyte storage area. As total 1000 cores and 40 Tbyte storage.

The new HPC inifiniband 240 cores cluster with 12 Tbyte raw storage is also operational.

Sites migrated to EGEE production All of the 8 sites are part of EGEE infrastructure

Page 51: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 51

Turkey

Up-dated plan for the remaining period: NGI organization and Consortium expansion, NRN cooperation

TR-Grid will be expanded with the participation of new members from governmental departments and industry:

– Prime Ministry State Planning Organization, National Meteorology Service, Kandilli Observatory and Earthquake Research Center

eIRG plans membership of eIRG

National-level projects expected expansion of infrastructure with the new submitted projects National funded grid project will be ended at the end of 2007.

Other sources of funding in grid area including related projects TR-Grid is involved in new Grid projects: EGEE-III, EUMEDGRID2, SEE-

GRID-SCI. Industrial cooperation

Meetings will be organized to strengthen the industrial and governmental collaboration of TR-Grid.

Page 52: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 52

Turkey

Up-dated plan for the remaining period (cont): Expansion of national infrastructure

more storage Expansion to new applications and user communities

TR-Grid supports new grid applications from different research fields and looking for multidisciplinary applications.

Page 53: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 53

Addressed NGI Indicators: Planning NGI setup and recognition: AL, BA, MD / MK NGI organization and Consortium expansion: BA, BG, HR, MK, ME, RO, RS,

TR / MD, TR / HU NREN cooperation: RO, RS eInfrastructure national strategy: BG, HR, MK, MD, ME, RS, TR / MD National Policy documents: MD eIRG plans: BG, MD, RS, TR/ MD, TR National-level projects: AL, BA, BG, HR, GR, MD, RO, / MK, MD, RO, TR / HU Other sources of funding in grid area including related projects: AL, BA, BG,

HR, GR, MK, HU, MD, ME, RO, RS, TR/ MD, RO, TR / HU Industrial cooperation: HR, GR, HU, MD, ME, RO, RS, TR/ MD, TR / HU Technical independence i.e. national-level services: BA, BG, HR, MK, MD,

ME, RO, RS, TR/ MK, MD, RO Expansion of national infrastructure: AL, BA, BG, MK, GR, HU, MD, ME, RO,

RS, TR/ MK, MD, RO, RS, TR / HU Sites migrated to EGEE production: RO Expansion to new applications and user communities: AL, BA, MK, GR, HU,

MD, ME, RO, RS, TR/ MD, RO, TR / HU

Page 54: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 54

Addressed NGI Indicators: Results NGI setup and recognition: MK,MD / AL NGI organization and Consortium expansion: BG,HR,MK,HU,MD,RO,RS,TR/

ME,RS NREN cooperation: RS eInfrastructure national strategy: MK,MD,TR / TR National Policy documents: TR / TR eIRG plans: HU,MD,TR / BG,TR National-level projects: BG,MK,HU,MD,RO,TR/ AL,HU,ME ,RO Other sources of funding in grid area including related projects: RO,TR Industrial cooperation: MK,HU,MD,RO,RS,TR / HU,MK,TR Technical independence i.e. national-level services: MK,MD,RO,RS /

ME,MK,RO Expansion of national infrastructure: MK,MD,RO,RS,TR / AL,ME,MK,TR Sites migrated to EGEE production: TR Expansion to new applications and user communities: BG,MK,MD,RO/

AL,BG,ME,MK,RO

Page 55: WP2 – Studies and Strategies for sustainable operational, organizational and policy schemes

SEEGRID PSC 06 Meeting – Sarajevo, 22.11.2007 55

Further work

Priority on Open Action lines: WP2 dissemination / open Produce a Guideline document based on D2.2 / open Detail WP2 metrics / open

We have a list of indicators for sustainability and a list of metrics in our 3M report

Finalize Policy documents / 30.11.2007 All partners to send me the policy documents implemented so far

Strength NGI in Albania and Bosnia-Herzegovina / 31.12.2007