Worst-case Exceedance of NML 50 0 50 100 150 m

30
2 LiNCOLN STREET LANE COVE NSW 2066 AUSTRALIA T: +61 2 9427 8100 F: +61 2 0801 www.slrconsulting.com 1:5,000 Sydney Metro Chatswood to Sydenham Construction Noise Predictions Worst-case NML Exceedance Earthworks - Daytime Jacobs Group (Australia) Pty Limited The content contained within this document may be based on third party data. SLR Consulting Australia Pty Ltd does not guarantee the accuracy of such information. Project No.: Date: 610.14718 Drawn by: 08/12/2015 @A4 Scale: Sheet Size: MR GDA 1994 MGA Zone 56 Projection: 50 0 50 100 150 m 0 dB - 10 dB 10 dB - 20 dB > 20 dB Worst-case Exceedance of NML Receiver Area Construction Area Acquired Building

Transcript of Worst-case Exceedance of NML 50 0 50 100 150 m

2 LiNCOLN STREETLANE COVENSW 2066

AUSTRALIAT: +61 2 9427 8100

F: +61 2 0801www.slrconsulting.com 1:5,000

Sydney Metro Chatswood to Sydenham

Construction Noise PredictionsWorst-case NML Exceedance

Earthworks - Daytime

Jacobs Group (Australia) Pty Limited

The content contained within this document may be basedon third party data.SLR Consulting Australia Pty Ltd does not guarantee theaccuracy of such information.

Project No.:

Date:

610.14718

Drawn by:

08/12/2015

@A4

Scale:

Sheet Size:

MR

GDA 1994 MGA Zone 56Projection:

50 0 50 100 150 m 0 dB - 10 dB 10 dB - 20 dB > 20 dB

Worst-case Exceedance of NML

Receiver Area Construction Area Acquired Building

Report 610.14718

Construction Noise Predictions

Construction of Acoustic Sheds

(610.14718) SLR Consulting Australia Pty Ltd

Report 610.14718 Construction Noise Predictions

Tunnelling/Excavation

(610.14718) SLR Consulting Australia Pty Ltd