World Wide innovative process
Recycling of big tyres into
reclaim rubber powder
Using: Ultra High Pressure water jetting
B T R C
1 2
1 BTRC Belgium V432
![Page 2: World Wide innovative process - usercontent.one](https://reader031.fdocuments.us/reader031/viewer/2022020620/61e29d7e39a52900d44649f4/html5/thumbnails/2.jpg)
UHP water cutting
Side walls and tread
UHP water jetting // pulverisation
P.A.R. (Physically Active Rubber) powder and C.R.F. needles
Cutting & Crumbling Process
1 2
4 3
2 BTRC Belgium V432
![Page 3: World Wide innovative process - usercontent.one](https://reader031.fdocuments.us/reader031/viewer/2022020620/61e29d7e39a52900d44649f4/html5/thumbnails/3.jpg)
Concept Cutting
Crumbling
Re-use of PAR Tyre
PAR
Tyre Production
3 BTRC Belgium V432
![Page 4: World Wide innovative process - usercontent.one](https://reader031.fdocuments.us/reader031/viewer/2022020620/61e29d7e39a52900d44649f4/html5/thumbnails/4.jpg)
World Wide innovative process
providing reclaim in 1 step.
SEM pictures(Scanning Electronic Microscope) approx 400 µm (40mesh)
2 grades: 1 from the tread and 1 from the side walls
Enlargement 1000 X
1
2
4 BTRC Belgium V432
![Page 5: World Wide innovative process - usercontent.one](https://reader031.fdocuments.us/reader031/viewer/2022020620/61e29d7e39a52900d44649f4/html5/thumbnails/5.jpg)
Steel wire (from tread and bead)
C.R.F. needles
1
2
3
4
5 BTRC Belgium V432
![Page 6: World Wide innovative process - usercontent.one](https://reader031.fdocuments.us/reader031/viewer/2022020620/61e29d7e39a52900d44649f4/html5/thumbnails/6.jpg)
Textile Fibers
Clean fibers
Short fibers
0.5% MC
1 2
6 BTRC Belgium V432
![Page 7: World Wide innovative process - usercontent.one](https://reader031.fdocuments.us/reader031/viewer/2022020620/61e29d7e39a52900d44649f4/html5/thumbnails/7.jpg)
Plant Info
Process OTR tyres dia 1,4 to 2m
Plant dimensions:
2500 m² indoor
2500 m² outdoor (tyre storage)
Utilities:
Electricity: 2 MW installed
• 0.92 kWh / kg powder
Water: 75% water is re-cycled
• 20 m3 / day fresh water
Production 3 shifts / 5 days
Blue collar: 3 shifts = 14 men
White collar total = 3 men
Capacity 10.000 ton/y OTR
7 BTRC Belgium V432
![Page 8: World Wide innovative process - usercontent.one](https://reader031.fdocuments.us/reader031/viewer/2022020620/61e29d7e39a52900d44649f4/html5/thumbnails/8.jpg)
Super tyres dia 4m
3
Cutting and jetting tests
1
2
8 BTRC Belgium V432
![Page 9: World Wide innovative process - usercontent.one](https://reader031.fdocuments.us/reader031/viewer/2022020620/61e29d7e39a52900d44649f4/html5/thumbnails/9.jpg)
Conveyor belts with steelcord Test results
1
2
3
4
9 BTRC Belgium V432
![Page 10: World Wide innovative process - usercontent.one](https://reader031.fdocuments.us/reader031/viewer/2022020620/61e29d7e39a52900d44649f4/html5/thumbnails/10.jpg)
Rubber crawler tracks
3
Cutting and jetting tests
10
2
1
BTRC Belgium V432